CN-370000-HW552-DC032B.pdf
PDF 3 MB Posted
- Contract number
- HW552
- Issued by
- Florida
About this file
Contract Summary
This document package consists of a Task Assignment Notification Form and related correspondence for Contract HW552, an indefinite delivery vehicle (IDV) awarded to Professional Service Industries, Inc. (PSI) by the Florida Department of Environmental Protection (FDEP). The assignment (DC032B) authorizes PSI to conduct a site assessment at the Westwood Cleaners facility located at 4513 Gunn Highway, Tampa, Hillsborough County, Florida. The work is performed under the FDEP Drycleaning Solvent Cleanup Program and includes comprehensive environmental site investigation activities, utility locating, groundwater monitoring, and analytical testing. Multiple subcontractors are engaged for specialized services including drilling (Ambient Technologies Inc., Huss Drilling, ATI Drilling, National Environmental Technology Inc.), surveying (SurvTech Solutions), mobile laboratory analysis (Pace Analytical Services, Columbia Technologies, NEW AGE Laboratories), sewer inspection (Olin Plumbing Inc., Blue Works), utility designation (SurvTech Solutions, GPRS Subsurface Scanning Solutions, National Ground Penetrating Radar Service Inc.), and IDW management (Horizon Environmental Services).
The total task assignment value is $96,118.79 with a fixed-price structure and no additional fees. The work consists of six subtasks: Project Management (12.5% of direct labor costs), Initial Activities including utility location and sewer inspection, Lithologic Profiling and soil/groundwater screening with monitoring well installation, Groundwater Sampling and Aquifer Characterization, Modified Active Gas Survey (MAGS) testing, and Data Evaluation/Report Development. Field work documentation and the Site Assessment Report are due by August 31, 2018, with final execution through October 31, 2018. Deliverables include electronic site assessment reports, ADAacPT/GIS submittals, and Final Investigative Derived Waste Manifests. Payment is structured on two invoicing milestones: $80,887.74 upon FDEP receipt and approval of field work documentation and $15,231.05 upon receipt and approval of the final assessment report and analytical data submittals.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .