Task Assignment Notification and Supporting Documentation Summary

This document comprises a Task Assignment Notification Form and supporting cost estimates for work performed under Florida Department of Environmental Protection (FDEP) Contract No. HW552, issued to Professional Service Industries, Inc. (PSI), an Intertek company. The task assignment (DC004S) authorizes PSI to conduct environmental remediation activities at the Tempo Dry Cleaners facility located at 233 Oxford Road, Fern Park, Seminole County, Florida (FDEP Facility ID ERIC_5476). The contract was executed on June 1, 2020, with performance extending through January 29, 2021.

The scope of work consists of five subtasks: project management; utility location and right-of-way permitting; installation of eight injection wells and four intermediate monitoring wells using sonic drilling techniques; top-of-casing survey and groundwater sampling from both newly installed and existing wells; and preparation of a Revised Remedial Action Plan Modification (RAP-Mod). The total fixed-price task assignment value is $77,068.43, comprising $71,084.82 for field activities (Subtasks 2-4) and $5,983.61 for RAP-Mod revision (Subtasks 1 and 5). Invoicing is contingent upon FDEP receipt and approval of deliverables. The cost estimate includes direct labor of $20,506.47 based on 229 labor hours; subcontractor costs of $45,903.00 for drilling services (Huss Drilling selected at $38,410.00 from three competitive bids); laboratory analysis of $1,677.50; and field expenses totaling $3,078.40. Supporting quotes were obtained from vendors including Petrotech Southeast for investigative derived waste handling and GPRS for underground utility location services at $800.00.

View the file

Other files

File Type Posted
CN-370000-HW552-A2.pdf PDF
CN-370000-HW552-CO1.pdf PDF
CN-370000-HW552-CO3.pdf PDF
CN-370000-HW552-CO4.pdf PDF
CN-370000-HW552-DC004N.pdf PDF
CN-370000-HW552-DC009M.pdf PDF
CN-370000-HW552-DC009O.pdf PDF
CN-370000-HW552-DC010I.pdf PDF
CN-370000-HW552-DC013I.pdf PDF
CN-370000-HW552-DC014H.pdf PDF
CN-370000-HW552-DC014I.pdf PDF
CN-370000-HW552-DC014J.pdf PDF
CN-370000-HW552-DC018V.pdf PDF
CN-370000-HW552-DC019G.pdf PDF
CN-370000-HW552-DC01A.pdf PDF
CN-370000-HW552-DC01ACO5.pdf PDF
CN-370000-HW552-DC01ACO6.pdf PDF
CN-370000-HW552-DC01ACO7.pdf PDF
CN-370000-HW552-DC01C.pdf PDF
CN-370000-HW552-DC01E.pdf PDF
CN-370000-HW552-DC01F.pdf PDF
CN-370000-HW552-DC01I.pdf PDF
CN-370000-HW552-DC020E.pdf PDF
CN-370000-HW552-DC020i.pdf PDF
CN-370000-HW552-DC023F.pdf PDF
CN-370000-HW552-DC023L.pdf PDF
CN-370000-HW552-DC023P.pdf PDF
CN-370000-HW552-DC028D.pdf PDF
CN-370000-HW552-DC02E.pdf PDF
CN-370000-HW552-DC02F.pdf PDF
CN-370000-HW552-DC031A.pdf PDF
CN-370000-HW552-DC031BCO.pdf PDF
CN-370000-HW552-DC032B.pdf PDF
CN-370000-HW552-DC037E.pdf PDF
CN-370000-HW552-DC03DCO3.pdf PDF
CN-370000-HW552-DC03DCO4.pdf PDF
CN-370000-HW552-DC03F.pdf PDF
CN-370000-HW552-DC03G.pdf PDF
CN-370000-HW552-DC03I.pdf PDF
CN-370000-HW552-DC04C.pdf PDF
CN-370000-HW552-DC04E.pdf PDF
CN-370000-HW552-DC04F.pdf PDF
CN-370000-HW552-DC04J.pdf PDF
CN-370000-HW552-DC04JCO1.pdf PDF
CN-370000-HW552-DC04KCO1.pdf PDF
CN-370000-HW552-DC04L.pdf PDF
CN-370000-HW552-DC04R.pdf PDF
CN-370000-HW552-DC04RCO2.pdf PDF
CN-370000-HW552-DC05ACO1.pdf PDF
CN-370000-HW552-DC05C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW552

D000 N/ADC004S

Professional Service Industries, Inc. (PSI)

Nana Westmark

850-245-8928Killian Talley

ERIC_5476

Tempo Cleaners

233 Oxford Road, Fern Park, Seminole County

Design

This Task Assignment authorizes PSI to oversee installation of wells for design and assessment of site remedy selection along with sampling of the monitoring well network in accordance with the May 13, 2020 scope of work, cost estimate, and bid documentation.

Revised Remedial Action Plan Modification

10/09/2020

01/29/2021

$ 77,068.43 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Killian Talley Digitally signed by Killian Talley Date: 2020.06.01 11:34:39 -04'00'

Killian Talley Digitally signed by Killian Talley Date: 2020.06.01 11:34:51 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.06.01 13:12:55 -04'00'

Nana G Westmark Digitally signed by Nana G Westmark Date: 2020.06.01 15:33:01 -04'00'

$ 77,068.43

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 2-4: Submittal of documentation of field activities including boring logs and groundwater sampling field notes 08/14/2020

Subtasks 1&5: Submittal of Revised Remedial Action Plan Modification 10/09/2020

Subtasks 2-4: FDEP receipt and approval of documentation of field activities including boring logs and groundwater sampling field notes $ 71,084.82

Subtasks 1&5: FDEP receipt and approval of Revised Remedial Action Plan Modification $ 5,983.61

$ 77,068.43

HW552

DC004S

Florida Department of Memorandum Environmental Protection

To: HW552 Contract Negotiation File

Tempo Cleaners Fern Park, Seminole County

ERIC_5476

From: Killian Talley, Project Manager Date: June 1, 2020 Subject: Negotiation Summary

HW552 DC004S

Task Assignment HW550 DC004S authorizes PSI to install additional wells for design and assessment of site remedy to submit a revised Remedial Action Plan Modification (RAP-Mod).

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Utility Locate, Notification & ROW Permitting Subtask authorizes labor and related costs for necessary activities prior to subsurface investigation including identify and location of underground utilities and obtaining right of way permits.

Subtask 3: Well Installation (Injection & Additional Plume Definition) Subtask includes costs and related labor for installation of additional monitoring and injection wells at Department request. Monitoring wells will be installed to further refine the extent of groundwater contamination and obtain a temporary point of compliance well while injection wells will be installed for future remediation activities under a separate assignment.

Subtask 4: Top-of-Casing Survey & Groundwater Sampling Subtask includes costs and related labor for sampling of the monitoring well network and survey of newly installed wells. Annual groundwater sampling and analysis will be conducted to update the RAP-Mod with new data along with collection of underground injection control parameters from select wells as explained in the accompanying PSI scope of work.

Subtask 5: Revised RAP-Mod This subtask includes labor for preparation of Remedial Action Plan Modification.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $77,068.43 with 229 labor hours.

PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATE

Contractor: Professional Service Industries, Inc.

Date: 5/27/2020

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Tempo Dry Cleaners SUBTASK 2: Utility, ROW Permits, Notification SUBTASK 7:

Activity/Phase: SUBTASK 3: Monitoring Well Installation SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: TOC Survey/ Groundwater Sampling SUBTASK 9:

SUBTASK 5: RAPMod Revisions SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 18 17.5 $62.50 Principal Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $52.89 Senior Engineer, 5 0.0 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0 $48.08 Senior Geologist 18 7.0 7.0 2.0 2.0 0.0 0.0 0.0 0.0 0 $45.20 Senior Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Florida Licensed Asbestos Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $48.08 Project Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $31.73 Project Engineer, MM 17 0.0 0.0 0.0 17.0 0.0 0.0 0.0 0.0 0 $32.94 Project Geologist, CC 105 15.0 90.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.81 Project Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.81 QA Officer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $32.21 Remediation Coordinator 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$0.00 Professional Land Surveyor 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $0.00 Chemist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$24.50 GIS Specialist, DG 8 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0 $25.00 Staff Engineer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Staff Geologist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.76 Staff Scientist, RH 27 0.0 0.0 27.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Staff Scientist, RF 29 0.0 0.0 29.0 0.0 0.0 0.0 0.0 0.0 0 $20.57 Staff Scientist, AH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.30 Environmental Technician 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.75 Administrative Assistant 2 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $12.00 Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

Total Hours 229 18 22.0 97.0 58.0 34.0 0.0 0.0 0.0 0.0 0

Professional Service Industries, Inc.

Direct Labor $7,568.08 $840.90 $830.66 $3,301.16 $1,461.84 $1,133.52 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $12,938.39 $1,437.60 $1,420.10 $5,643.66 $2,499.16 $1,937.87 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $20,506.47 $2,278.50 $2,250.76 $8,944.82 $3,961.00 $3,071.39 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $20,506.47 $2,278.50 $2,250.76 $8,944.82 $3,961.00 $3,071.39 $0.00 $0.00 $0.00 $0.00 $0.00

Well Installation

REV: 02/03 CEF_PSI.XLS Page 1

FDEP COST ESTIMATE

Contractor: Professional Service Industries, Inc.

Date: 5/27/2020

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Tempo Dry Cleaners SUBTASK 2: Utility, ROW Permits, Notification SUBTASK 7:

Activity/Phase: SUBTASK 3: Monitoring Well Installation SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: TOC Survey/ Groundwater Sampling SUBTASK 9:

SUBTASK 5: RAPMod Revisions SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

Well Installation

Other Direct Costs $378.41 $42.05 $41.53 $165.06 $73.09 $56.68 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $1,584.00 $97.00 $711.00 $776.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,890.00 $0.00 $1,080.00 $810.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,474.00 $97.00 $1,791.00 $1,586.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling, Conventional $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling, Non-Conventional $38,410.00 $0.00 $38,410.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $2,300.00 $0.00 $0.00 $2,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Permitting $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

GPR $800.00 $800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $41,730.00 $1,020.00 $38,410.00 $2,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $4,173.00 $102.00 $3,841.00 $230.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $45,903.00 $1,122.00 $42,251.00 $2,530.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,677.50 $0.00 $0.00 $1,677.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,677.50 $0.00 $0.00 $1,677.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $422.50 $32.50 $260.00 $130.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,290.10 $0.00 $1,290.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,324.05 $0.00 $0.00 $1,324.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $41.75 $0.00 $0.00 $41.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,078.40 $32.50 $1,550.10 $1,495.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $75,017.78 $2,320.55 $3,543.79 $54,701.98 $11,323.39 $3,128.07 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,050.65 $227.85 $225.08 $894.48 $396.10 $307.14 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $77,068.43 $2,548.40 $3,768.87 $55,596.46 $11,719.49 $3,435.21 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_PSI.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Tempo Dry Cleaners SUBTASK 2: Utility, ROW Permits, Notification

DATE: 5/27/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist, N Westmark Develop cost estimate, level of effort 6 Technical oversight 1

Project Geologist, C Cummins Travel (6 hours roundtrip) 6

Site Reconaissance, Overssee GPR and utility locate 3 Permit appllication Staff Scientist 6

22.0

EQUIPMENT ITEM RATE UNIT USAGE TOTALS

Expendables $32.50 day 1 $32.50

$32.50

VEHICLE TYPE RATE UNIT USAGE

Equipment Van / Truck Project Geologist $97.00 day 1 $97.00

$97.00

PER DIEM STAFF RATE UNIT USAGE

$0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

TOTAL $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Cost UNIT No.

110.00$ 2 $220.00

GPRS GPR Survey $800.00 1 $800.00

TOTAL $1,020.00

TOTAL LABOR

TOTAL EQUIPMENT

TOTAL VEHICLE

TOTAL PER DIEM

ROW Permit, Seminole City

Page 4 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898

SUBTASK 3: Monitoring Well Installation

DATE: 5/27/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist, N Westmark Technical oversight during installation 5 Provide updates to FDEP 2

Project Geologist, C Cummins Load, unload 1

Travel (6 hours round trip) 6 Project preparation 3 Well Installation 80

97.0

EQUIPMENT ITEM RATE UNIT USAGE TOTALS

Monitor well installation kit $737.20 week 1 $737.20 Monitor well installation kit $184.30 day 3 $552.90

$1,290.10 Expendables $32.50 day 8 $260.00

$1,550.10

VEHICLE TYPE RATE UNIT USAGE

Equipment Van / Truck Project Geologist $420.00 week 1 $420.00 Equipment Van / Truck Project Geologist $97.00 day 3 $291.00

$711.00

PER DIEM STAFF RATE UNIT USAGE

Project Geologist Lodging Groundwater Sampling $99.00 8 $792.00 Meals Groundwater Sampling $36.00 8 $288.00

$1,080.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

Halocarbons, EPA Method 8260 $66.00 0 0 0 $0.00

IDW

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate No. UNIT

Huss Drilling 38,410.00$ per quote 1 $38,410.00

TOTAL $38,410.00

TOTAL LABOR

TOTAL EQUIPMENT

injection & monitoring well installation

TOTAL PER DIEM

TOTAL VEHICLE RENTAL

Page 5 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898

SUBTASK 4: TOC Survey/ Groundwater Sampling

DATE: 5/27/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Senior Geologist, Westmark Oversight 2

Staff Scientist, R Fetter Project preparation 1 Travel (6 hours round trip) 6 Sample 3 shallow wells (1 hr per well) 3 Sample 1 irrigation well (1 hr per well) 1 Sample 8 intermediate wells (1.5 hr per well) 12 Survey top of casing 4 Sample pick-up / drop-off 2

Staff Scientist, R Hanson Load / Unload 2 Collect groundwater elevations (17 wells) (10 minutes per well) 3 Travel (6 hours round trip) 6 Sample 3 intermediate well (1.5 hr per well) 5 Sample 2 deep wells (2 hr per well) 4 Additional sampling for additional parameters 2 Assist with Survey top of casing 4 Stage drum 1

58.0

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Shallow Groundwater Sampling Kit $208.55 day 3 $625.65 Deep Groundwater Sampling Kit $349.20 day 2 $698.40

$1,324.05 Total Survey Station $41.75 day 1 $41.75 Expendables $32.50 day 4 $130.00

$1,495.80

VEHICLE TYPE RATE UNIT USAGE

Equipment Van / Truck Staff Scientist $97.00 day 4 $388.00 Equipment Van / Truck Staff Scientist $97.00 day 4 $388.00

$776.00

PER DIEM STAFF RATE UNIT USAGE

Staff Scientist Lodging Groundwater Sampling $99.00 3 $297.00 Meals Groundwater Sampling $36.00 3 $108.00

Staff Scientist Lodging Groundwater Sampling $99.00 3 $297.00 Meals Groundwater Sampling $36.00 3 $108.00

$810.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

Halocarbons, EPA Method 8260 $66.00 17 1 1 $1,254.00 TOC by EPA Method 9060 $26.00 7 $182.00 Iron by EPA Method 6010 $11.50 7 $80.50 Sodium by EPA Method 6010 $11.50 7 $80.50 TDS by EPA Method 2450C $11.50 7 $80.50

TOTAL LAB $1,677.50

SUBCONTRACTOR COSTS

NAME PURPOSE Rate No. UNIT Petrotech Southeast IDW T&D 115.00$ per water drum 20 $2,300.00

TOTAL $2,300.00

TOTAL LABOR

TOTAL EQUIPMENT

TOTAL VEHICLE

TOTAL PER DIEM

Page 6 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898

SUBTASK 5: RAPMod Revisions

DATE: 5/27/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Technical oversight 1 Review final document 1

Senior Engineer, MR FDEP teleconference to discuss full scale design/cost 1.0 Review calculations 1.0 Review Text 1.0 Review Tables 0.5 Review Figures 0.5 Sign and seal documents 0.5

Project Engineer, MM Prepare remediation calculations with updated data 3 FDEP teleconference to discuss full scale design/cost 1 Prepare RAP text 3 UIC permit 0 Develop Tables 3 Develop Figures (gw data, NADC contour, lithological cross sections, MIP cross sections, 6 injection well locations, injection process flow diagram, equipment components) Prepare RAP Checklist 1

GIS/CADD Specialist, CG RAP Mod - Create and prepare final figures 8

Administrative Assistance compilation of report, pdf 2

TOTAL LABO 33.5

EQUIPMENT ITEM RATE UNIT USAGE TOTALS

TOTAL EQUIPME $0.00

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICL $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIE $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE RATE COST

TOTAL $0.00

Page 7 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898

PSI Project Number: 0552-593 PSI Proposal Number: 0552-309898-Rev 2

May 27, 2020 www.intertek.com/building

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634 Phone: (813) 886-1075

Fax: (813) 249-4916

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400

Attention: Mr. Killian Talley, Environmental Specialist III Contract Manager

(850) 245-8705 Email: Killian.Talley@FloridaDEP.gov

Re: Revision 2 Proposal – Well Installation, Groundwater Sampling and RAPMod Revision

Tempo Dry Cleaners 233 Oxford Road Fern Park, Seminole County, Florida, 32730

FDEP Facility ID# 59 9501358 / ERIC_5476

Dear Mr. Talley:

Professional Service Industries, Inc. (PSI), an Intertek Company, is pleased to provide the revised proposal contained herein to install injection and monitoring wells followed by groundwater sampling and testing.

The proposed activities will address impacted groundwater for the Tempo Dry Cleaners at 233 Oxford Road, Fern Park, Florida. Included with this proposal is the project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.

PROJECT BACKGROUND

Drycleaning operations at the Tempo Dry Cleaners began in January 1978 and utilized perchloroethene (PCE). In November 1994, a 150-gallon aboveground storage tank (AST) containing PCE was reportedly tipped over. On or prior to November 30, an area approximately 4 feet by 4 feet was excavated, in an attempt to remove the contaminated soil associated with the AST discharge. The excavated soil was later used as backfill. A soil sample collected from the former excavation area had a PCE concentration of 49,000,000 milligrams per kilogram (mg/kg).

In May 1995, the PCE drycleaning operations ceased at Tempo, and the business was sold and converted to a dry drop-off as documented by a FDEP inspection in March 1997. The drycleaner was accepted into the Drycleaning Solvent Cleanup Program in June 1998, and assessment activities conducted by WRS commenced in October 2002.

In February 2007, an air sparge curtain system, consisting of six (6) air sparge wells was implemented at the site. An Interim Source Removal was conducted at Tempo Cleaners in April 2008.

mailto:Killian.Talley@FloridaDEP.gov

Tempo Dry Cleaners, Well Installation/Groundwater Monitoring

PSI was tasked with providing remediation system start-up in January 2011. Monthly O&M activities commenced in February 2011 and were discontinued in August 2011. A Membrane Interface Probe study was conducted in November 2011 which revealed more specific data to interpret the contamination plume which is widespread and is migrating vertically. The air sparge system appears to have been successful in decreasing contaminant levels in the shallow zone. However, historic efforts to remediate the intermediate zone have had little impact.

Annual groundwater monitoring data from 2013 to 2018 indicate the continued presence of contaminant concentrations above applicable regulatory Cleanup Target Levels. A groundwater PCE concentration as high as 32,000 μg/L has been reported for samples collected from monitoring well EMW012, which was located in the same location as the former PCE AST where the reported discharge occurred (ECS, 2000).

Over the last 15 years or so, groundwater PCE concentrations have generally decreased in the AST spill area and increased in some of the downgradient wells. Contaminant reduction in the AST spill area appears to be attributable to a combination of source removal activities (ISR and SVE), contaminant migration, and natural attenuation.

In April 2015, PSI representatives met with the owner due to planned construction to remodel the former drycleaner space and expand the convenience store. PSI modified the interior SVE trenching system to underground and performed Soil Oxidant Demand (SOD) testing activities on soil samples to evaluate future remedial strategies. Approximately 12 tons of contaminated soil was removed and transported for off-site treatment and disposal. Two vapor points were abandoned, and one shallow well was installed inside the building.

During discussions with the Department in March 2016, various injection point locations were evaluated for PeroxyChem’s EHC® product. EHC® is composed of zero valent iron (ZVI), controlled release carbon and nutrients, which stimulate the chemical reduction and abiotic degradation of the contaminants. A buffer will also be introduced to ensure the pH is maintained above 6 SU. The selected target zone is the interval 40 to 55 feet bls.

A RAPMOD, dated November 2018, revised September 26, 2019 has been submitted to the FDEP. The RAPMOD proposes in situ chemical reduction, which combines abiotic chemical reduction (zero valent iron) and anaerobic bioremediation. The target treatment areas include the original release area and the on-site portion of the groundwater plume that exceeds NADC levels.

Groundwater testing performed in August 2019 revealed a concentration of PCE in temporary point of compliance (TPOC) well BMW034 exceeding the GCTL. The FDEP has therefore requested a new TPOC well to be located downgradient of BMW034. Additionally, FDEP has requested the installation of intermediate depth wells along the western edge of the groundwater VOH plume for horizontal delineation.

PROPOSED SCOPE OF WORK

Specifically, the proposed scope of work consists of the following subtasks:

Tempo Dry Cleaners, Well Installation/Groundwater Monitoring

1. Project Management

This scope is provided for in the template worksheets.

2. Utility Locate, Notification, and ROW permitting

A utility locate subcontractor will be utilized to identify and locate underground obstructions at the property prior to site subsurface activities. Site access will be coordinated with the site owner. Right of way permits will be obtained from Seminole County for proposed well locations along Fern Park Boulevard and Lochmond Drive.

3. Well Installation (Injection and Additional Plume Definition)

As per the RAPMOD, eight injection wells will be installed at Tempo Dry Cleaners in a grid like fashion.

The injections wells will be installed using sonic drilling technique. The injection wells will be constructed of 2-inch diameter schedule 40 PVC and screened from 40 to 55 ft. below land surface (bls). 0.02 slot screen and a 6/20 filter sand pack will be used to minimize the possibility of injectate clogging the well screen. The injection wells will be developed until purge water is relatively clear and will be completed with 18-inch diameter vaults and cam locks.

Monitoring wells will be installed to further refine the extent groundwater contamination. Sonic drilling technique will be used for the well installation based on depth of wells. All wells will be constructed of schedule 40 PVC and be two inches in diameter. Four intermediate wells will be screened from 50-55 ft.

bls. The monitoring wells will be constructed with 0.01 slot screen and a 20/30 filter sand pack. The monitoring wells will be developed until purge water is relatively clear and will be completed with 2 ft. by 2 ft. flush mounted concrete pads. One well will be installed in the residential neighborhood south of Tempo Dry Cleaners for down gradient plume definition. An additional three intermediate wells will be installed on the western portion of Tempo Dry Cleaner also for plume definition.

All downhole tools will be decontaminated prior to and between each location. Standard decontamination procedures (steam wash) apply for all drilling equipment and downhole tools (e.g., tremie pipe, hoses). Decontamination fluids and solids will be containerized.

Soil cuttings will be place into properly labeled DOT certified drums for proper transportation and disposal by a licensed waste handler. Purge water will be stored in the onsite remediation system holding tank.

Price quotations for the drilling activities were solicited from three firms, and the lowest price bidder was selected, Huss Drilling. A copy of the associated three bids are attached.

4. Top of Casing Survey and Groundwater Sampling and Analysis

Subsequent to well installation, well top of casings will be surveyed using a standard survey gun and tripod.

PSI proposes to conduct annual groundwater sampling and analysis and to update the RAPMod with the new data to ensure the most recent information will be used for the groundwater remediation strategy.

Tempo Dry Cleaners, Well Installation/Groundwater Monitoring

The data will be used to confirm current groundwater quality conditions before revising the RAPMod, if necessary.

Subsequent to well installation, groundwater samples will be collected from the newly installed wells and existing wells. The groundwater sampling program will include the following field and laboratory activities. Field sampling and decontamination procedures will be conducted by PSI in general accordance with FDEP Standard Operating Procedures (DEP SOP 001/01).

a. Mobilization to the site.

b. Collect groundwater elevation measurements of 17 wells.

c. Collect annual groundwater samples from the following thirteen previously existing wells:

AMW017, AMW040, AMW042, BMW020, BMW022, BMW023, BMW030, BMW034,

BMW041, BMW043, DMW026, DMW028 and the irrigation well (IW002) located at 310 Lochmond Drive. Collect groundwater samples from the four newly installed intermediate monitoring wells.

d. Submit samples to a National Environmental Laboratory Accredited Conference (NELAC) approved laboratory for Total Volatile Halogens by EPA Method 8260.

e. Collect groundwater samples from the following seven monitor wells: BMW020, BMW021, BMW022, BMW023, BMW030, BMW041, BMW043. Submit samples for analysis for TOC by EPA Method 9060, Iron, Sodium by EPA Method 6010, Sulfate by EPA Method 300.0, and TDS by EPA Method 2450C.

f. Containerize the investigation derived waste (IDW) purge water in the on-site polytank.

5. Revised RAPMod

Upon receipt of the laboratory analytical results, the data will be evaluated and compared to state standards within Chapter 62-777, Florida Administrative Code (FAC). The newly obtained data will be used to recalculate our design for the RAPMod for groundwater, if necessary. The report will also incorporate information from the various comments by the FDEP to provide a comprehensive document.

Conclusions and recommendations will be made, which will include any modifications to the proposed annual groundwater sampling event and remedial design. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient endpoints.

Tempo Dry Cleaners, Well Installation/Groundwater Monitoring

COST ESTIMATE AND SCHEDULE

The estimated cost to perform the Well Installation, Groundwater Testing and RAPMod Revision is presented on the attached Cost Estimate and Level of Effort. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW552, Bureau of Waste Cleanup Services, dated December 10, 2010. We anticipate performing the well installation on an expedited schedule in July 2020 but will depend on ROW permit approval and drillers availability. Once the well installation and sampling results are received, the RAPMod will be revised within 6 weeks.

PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Christopher L. Cummins, PG Nana Westmark, PG, CHMM Senior Geologist Principal Consultant / Contract Manager

Enclosure: Cost Estimate Level of Effort Drilling Bids and Site Sketch of Proposed Wells

\\tampa-fs1\PROJECTS\552-Env\FDEP BWC\0552593 Tempo Cleaners\Proposal\2020 04 MW Injection Well Install\5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898.docx

FIGURE

0552593

DJG

PROJ. NO.

DRAWN BY

DATE CREATED

SCALE: 1" = 60'

TEMPO DRY CLEANERS

223 OXFORD ROAD

FERN PARK, SEMINOLE COUNTY, FLORIDA

FDEP ID No. 59 9501358/ERIC_5476

INTERMEDIATE GROUNDWATER VOH CONTAMINANT CONCENTRATION MAP (ZONE B)

9/24/19

Suite 112

Tampa, Florida 33634

(813) 886-1075

(813) 249-4916 fax

5801 Benjamin Center Drive, CLEANUP TARGET LEVELS

GCTL

(μg/L)

NADC

(μg/L)

PCE 3 300

TCE 3 300

cDCE 70 700

BMW033R

(38.6’ – 43.6’)

6/2/11

PCE 5

TCE 19

cDCE 10

BMW037

(39.75'-44.75')

3/5/13

PCE 0.2 I

TCE 0.2 U

cDCE 0.2 U

IW001

(unknown)

4/26/17

PCE 0.50 U

TCE 0.61 U

cDCE 0.65 U

BMW033R

(38.6’ – 43.6’)

1/27/10 7/21/10 6/2/11

PCE 0.2 U 0.2 U 5

TCE 0.4 I 0.2 U 19

cDCE 2.5 0.44 I 10

DMW028

(72.2 - 77.2)

4/26/17 6/7/18 8/7/19

PCE 0.50 U 0.50 U 0.50 U

TCE 0.61 U 0.61 U 0.61 U

cDCE 0.65 U 0.32 U 0.32 U

DMW025

(70.5’ – 75.5’)

7/20/10 6/3/11 3/6/13 3/22/16 4/26/17 6/7/18

PCE 0.69 I 0.25 U 0.3 I 0.50 U 0.50 U 0.50 U

TCE 0.2 U 0.2 U 0.2 U 0.61 U 0.61 U 0.61 U

cDCE 0.2 U 0.2 U 0.2 U 0.65 U 0.65 U 0.32 U

BMW023

(39.1’ – 44.1’)

6/2/11 3/6/13 3/22/16 4/26/17 6/6/18 8/7/19

PCE 1800 750 D20 8 3.2 1.2 I 2.6

TCE 2.2 22 0.61 U 0.88 I 0.61 U 0.61 U

cDCE 0.2 U 0.7 I 0.65 U 0.65 U 0.32 U 0.32 U

BMW020

(40.0’ – 45.0’)

6/2/11 3/5/13 6/6/18 8/7/19

PCE 460 470 D10 130 130

TCE 16 14 23 31

cDCE 8.2 16 1.1 0.70 I

DMW027

DMW027

1/27/10 7/21/10 6/3/11 6/14/12 8/8/19

PCE 0.2 U 0.2 U 0.25 U 0.2 I 0.50 U

TCE 0.2 U 0.2 U 0.2 U 0.2 U 4.2

cDCE 0.2 U 0.2 U 0.2 U 0.2 U 0.72 I

BMW030

(37.6’ – 42.6’)

6/2/11 3/5/13 3/23/16 4/26/17 6/6/18 8/8/19

PCE 990 89 4.3 5.9 2 1.0 U

TCE 200 1400 D50 920 590 560 420

cDCE 2.9 20 71 130 120 150

BMW034

(37.3’ – 42.3’)

6/2/11 3/5/13 3/23/16 4/26/17 6/7/18 8/8/19

PCE 0.25 U 0.2 U 0.50 U 0.50 U 0.50 U 18

TCE 0.2 U 0.2 U 0.61 U 0.61 U 0.61 U 1.2 I

cDCE 0.2 U 0.2 U 0.65 U 0.65 U 0.32 U 0.32 U

BMW022

(39.2’ – 44.2’)

6/2/11 3/5/13 3/22/16 4/26/17 6/6/18 8/8/19

PCE 120 91 37 48 39 32

TCE 43 76 24 18 30 27

cDCE 2.1 7.9 12 6.4 30 2.2

BMW043

(50.00'-55.00')

4/26/17 6/6/18 8/8/19

PCE 3,400 4500 5800

TCE 360 610 710 I

cDCE 8.4 I 11 I 160 U

BMW041

(50.00'-55.00')

4/26/17 6/6/18 8/7/19

PCE 0.79 I 0.50 U 0.50 U

TCE 5.7 0.61 U 0.61 U

cDCE 49 5.8 1.5

X

X X

X

AutoCAD SHX Text

APPROXIMATE SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

OXFORD ROAD

AutoCAD SHX Text

FERN PARK BOULEVARD

AutoCAD SHX Text

AREA

AutoCAD SHX Text

UST

AutoCAD SHX Text

DISPENSERS

AutoCAD SHX Text

FARMS

AutoCAD SHX Text

CUMBERLAND

AutoCAD SHX Text

POND

AutoCAD SHX Text

IW001

AutoCAD SHX Text

DMW029

AutoCAD SHX Text

AMW035

AutoCAD SHX Text

IW002

AutoCAD SHX Text

AMWO31

AutoCAD SHX Text

AMW017

AutoCAD SHX Text

BMW022

AutoCAD SHX Text

EMW005

AutoCAD SHX Text

DMW028

AutoCAD SHX Text

AMW016

AutoCAD SHX Text

BMW020

AutoCAD SHX Text

EMW015

AutoCAD SHX Text

EMW010

AutoCAD SHX Text

EMW014

AutoCAD SHX Text

EMW001

AutoCAD SHX Text

EMW002

AutoCAD SHX Text

EMW009D

AutoCAD SHX Text

EMW004R

AutoCAD SHX Text

EMW007

AutoCAD SHX Text

BMW023

AutoCAD SHX Text

DMW025

AutoCAD SHX Text

EMW012R

AutoCAD SHX Text

AMW018

AutoCAD SHX Text

DMW024

AutoCAD SHX Text

CONCRETE WALL

AutoCAD SHX Text

PROPERTY BOUNDARY

AutoCAD SHX Text

ESTIMATED NORTHERN

AutoCAD SHX Text

AutoCAD SHX Text Lochmond

AutoCAD SHX Text Drive

AutoCAD SHX Text Drive

AutoCAD SHX Text Lochmond

AutoCAD SHX Text

AutoCAD SHX Text

LOCHMOND DRIVE

AutoCAD SHX Text

PRIVACY FENCE

AutoCAD SHX Text

DRIVE

AutoCAD SHX Text

LOCHINVAR

AutoCAD SHX Text Drive

AutoCAD SHX Text Lochinvar

AutoCAD SHX Text

AutoCAD SHX Text

AMW032R

AutoCAD SHX Text

BMW033R

AutoCAD SHX Text

BMW019

AutoCAD SHX Text

BMW034

AutoCAD SHX Text

ASW005

AutoCAD SHX Text

ASW004

AutoCAD SHX Text

ASW002

AutoCAD SHX Text

ASW001

AutoCAD SHX Text

BMW037

AutoCAD SHX Text

AMW036

AutoCAD SHX Text

EMW015R

AutoCAD SHX Text

EMW013R

AutoCAD SHX Text

APPROXIMATE POND

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

VE-4

AutoCAD SHX Text

VE-3

AutoCAD SHX Text

VE-2

AutoCAD SHX Text

VE-1

AutoCAD SHX Text

SW011

AutoCAD SHX Text

SW010

AutoCAD SHX Text

SW009

AutoCAD SHX Text

SD0011

AutoCAD SHX Text

SD0010

AutoCAD SHX Text

SD009

AutoCAD SHX Text

AMW038

AutoCAD SHX Text

BMW039

AutoCAD SHX Text

SW013

AutoCAD SHX Text

TEMPO

AutoCAD SHX Text

VMP-1

AutoCAD SHX Text

VMP-2

AutoCAD SHX Text

BMW041

AutoCAD SHX Text

AMW040

AutoCAD SHX Text

AMW042

AutoCAD SHX Text

SW018

AutoCAD SHX Text

SW014

AutoCAD SHX Text

SW015

AutoCAD SHX Text

SW016

AutoCAD SHX Text

SW017

AutoCAD SHX Text

SW042

AutoCAD SHX Text P:\552-Env\FDEP BWC\0552593 Tempo Cleaners\CAD\2019-09

AutoCAD SHX Text

DMW026

AutoCAD SHX Text

BMW021

AutoCAD SHX Text

ASW006

AutoCAD SHX Text

BMW043

AutoCAD SHX Text

EMW011

AutoCAD SHX Text

ANALYTE NOT DETECTED ABOVE

AutoCAD SHX Text

LABORATORY METHOD DETECTION LIMIT

AutoCAD SHX Text

ANALYTE DETECTED BETWEEN THE

AutoCAD SHX Text

LABORATORY METHOD DETECTION LIMIT

AutoCAD SHX Text

AND THE PRACTICAL QUANTITATION LIMIT

AutoCAD SHX Text

MOST RECENT SAMPLE DATE

AutoCAD SHX Text

AutoCAD SHX Text

YELLOW

AutoCAD SHX Text I =

AutoCAD SHX Text U =

AutoCAD SHX Text

ANALYTE EXCEEDS GCTL

AutoCAD SHX Text

AutoCAD SHX Text

RED

AutoCAD SHX Text

SURFACE WATER SAMPLE LOCATION

AutoCAD SHX Text

VAPOR MONITORING POINT (VMP)

AutoCAD SHX Text

MONITOR WELL LOCATION (MW)

AutoCAD SHX Text

DESTROYED OR ABANDONED MONITOR

AutoCAD SHX Text

%%ULEGEND

AutoCAD SHX Text

WELL LOCATION (MW)

AutoCAD SHX Text

AIR SPARGE WELL (ASW)

AutoCAD SHX Text

VAPOR RECOVERY WELL

AutoCAD SHX Text

VOH GCTL CONTOUR, DASHED WHERE

AutoCAD SHX Text

AutoCAD SHX Text

ANALYTE EXCEEDS NADC

AutoCAD SHX Text

AutoCAD SHX Text

BLUE

AutoCAD SHX Text

INFERRED

AutoCAD SHX Text

VOH NADC CONTOUR, DASHED WHERE

AutoCAD SHX Text

AutoCAD SHX Text

INFERRED

AutoCAD SHX Text

MICROGRAMS PER LITER

AutoCAD SHX Text μg/L =

AutoCAD SHX Text

WELL ID

AutoCAD SHX Text

SCREEN INTERVAL (FEET BLS)

AutoCAD SHX Text

SAMPLE DATE

AutoCAD SHX Text TETRACHLOROETHENE (μg/L)

AutoCAD SHX Text TRICHLOROETHENE (μg/L)

AutoCAD SHX Text cis-1,2-DICHLOROETHENE (μg/L)

AutoCAD SHX Text

SITE PLAN PROVIDED BY WRS COMPASS.

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

AMW031R

AutoCAD SHX Text

BMW030

AutoCAD SHX Text

ASW003

AutoCAD SHX Text

SW041

AutoCAD SHX Text

DMW027

PROJECT BID TABULATIONS Sonic Drilling

Facility Name Tempo Dry Cleaners Facility Location Fern Park, Seminole County, Florida Facilty ID 59/9501358 / ERIC_5476

Contractor → Drillpro Huss Cascade

Well Installation, lump sum 41,800.00$ 38,410.00$ 52,180.00$

Total: 41,800.00$ 38,410.00$ 52,180.00$

Selected Vendor: Huss @ $38,410.00 Basis:

Description

Price and Experience

Professional Service Industries, Inc. (PSI) Request for Quotation

Facility Name Tempo Dry Cleaners Facility Location Fern Park, Seminole County, FL Facility ID ERIC_5476 FDEP Drycleaning Solvent Cleanup Program

Units Unit Rate Extended Price

1 3,500.00$ 3,500.00$

8 5,000.00$ 40,000.00$

8 440.00$ 3,520.00$

4 440.00$ 1,760.00$

8 150.00$ 1,200.00$

4 175.00$ 700.00$

55-gallon DOT approved drums (each) 20 75.00$ 1,500.00$

Total: 52,180.00$

Active business, limited room for equipment.

Asphalt surface Signed PSI Purchase Order is required before working.

All equipment to be decontaminated prior to boring / well installation.

OSHA HazWOPER trained crew required.

Include per diem in cost, if necessary.

Estimated start date: June 2020 Company Name:

Address:

Phone:

Email:

Contact:

Proposal #

Pad Construction and Development- Monitoring Wells (each)

Sonic Drilling Technique. Eighteen injection wells screened from 40 to 55 ft. Four intermediate depth screened from 38-48 ft. Three additional intermediate depth screened from 50-55 ft. Five deep wells screened from 70-75 ft. Injection wells to be constructed with 0.02 slot screen, 6/20 sand and 2-inch diameter riser. Monitoring wells to be constructed with 0.01 slot screen and 2-inch diameter PVC riser. Injection wells to be completed with 8-inch vaults and camlocks. Flush mounted 2x2 concrete pads for the monitoring wells.

Mobilization (lump sum)

Intermediate Monitoring Wells (each) (Materials Only)

Injection Wells (each) (Materials Only)

Sonic Rig Daily Charge (per day)

Vault Construction and Development- Injection Wells (each)

PN200420-88960

Cascade Drilling LP 5785 SW 6th Place, Ocala FL 34474 352-237-1995-office, 352-266-9232-mobile mrice@cascade-env.com Michael C. Rice, Southeast Region Estimator mailto:mrice@cascade-env.com mailto:mrice@cascade-env.com mailto:mrice@cascade-env.com mailto:mrice@cascade-env.com

Professional Service Industries, Inc. (PSI) Request for Quotation

Facility Name Facility Location Facility ID FDEP Drycleaning Solvent Cleanup Program

Tempo Dry Cleaners Fern Park, Seminole County, FL

ERIC_5476

GP#420054-2

Sonic Drilling Technique. Eight injection wells screened from 40 to 55 ft. Four intermediate depth screened from 50-55 ft. Injection wells to be constructed with 0.02 slot screen, 6120 sand and z-tncn diameter riser. Monitoring wells to be constructed with 0.01 slot screen and 2·lnch diameter PVC riser. Injection wells to be completed with 18-inch W x ts-tncn D boltdown manholes and 2'x'2' pads. Flush mounted 2x2 concrete pads and 8-inch boltdown manholes for the monitoring wells.

Units Unit Rate Extended Price

Mobilization (lump sum) 1 $ 1,500.00 $ 1,500.00

Sonic Rig Daily Charge (per day) 8 $ 3,750.00 $ 30,000.00

Injection Wells (each) (Materials Only) 8 $ 550.00 $ 4,400.00

Intermediate Monitoring Wells (each) (Materials Only) 4 $ 550.00 $ 2,200.00

Vault Construction and Development- Injection Wells (each) 8 $ 325.00 $ 2,600.00

Pad Construction and Development- MonitOring Wells (each) 4 $ 175.00 $ 700.00

55-gallon DOT approved drums (each) 20 $ 20.00 $ 400.00

Total: $ 41,800.00

Active business, limited room for equipment.

Asphalt surface

Signed PSI Purchase Order is required before working.

All equipment to be decontaminated prior to boring 1 well installation.

OSHA HazWOPER trained crew required.

Include per diem in cost, if necessary.

Estimated start date: June 2020 Company Name:

Address:

Phone:

Email:

Contact:

Drillpro, LLC dba Groundwater Protection 2300 Silver Star Rd., Orlando, FL 32804 407-426-7885

David Boggs, Project Manager 5/8/2020

PSI - Intertek Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort Myers, Naples) Panhandle water $90.00 $90.00 $100.00 $100.00 $110.00 soil $110.00 $110.00 $120.00 $120.00 $130.00 low volume fee if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$200 Pick-up fee NA NA NA NA NA Total Per One Drum Water $140.00 $140.00 $150.00 $150.00 310.00$ Total Per One Drum Soil $160.00 $160.00 $170.00 $170.00 330.00$

Plus $150 per day / per diem water $115.00 $115.00 Non service area Non service area Non service area soil $150.00 $150.00 Non service area Non service area Non service area water $92.00 $92.00 $92.00 $92.00 $92.00 soil $67.00 $67.00 $67.00 $67.00 $67.00 low volume fee if 3 drums or less add $35 if 3 drums or less add $45 if 3 drums or less add $55 if 3 drums or less add $55 if 10 drums or less add $450

Pick-up Fee 30 40 50 50 95.00$ Total Per One Drum Water $157.00 $177.00 $197.00 $197.00 637.00$ Total Per One Drum Soil $132.00 $152.00 $172.00 $172.00 612.00$

Plus $150 per day / per diem

* = DOT shippable drums on hard concrete or asphalt surface easily accessible with tractor trailer with no dirt, grass or curbs to get drums to tailgate of truck ** = Need TCLPs for VOHS for soils, Totals only for VOHSs for water 100% liquids.

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

Petrotech Southeast, Inc.

Clark Environmental, Inc. * and **

NRC / US Ecology(formerly SWS)

Page 1 of 1 PSI IDW Bids 1-31-2020

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Panhandle water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

$115.00 $150.00

$115.00 $150.00

Petrotech Southeast, Inc.

Phone: 407 - 656-8114 Fax: 407 - 358-5030 Natacha Mitchell-Jackson

Quote # TP02077

US Ecology Waste (IDW) IDW Pick-up, Transport & Disposal Services

Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida

Description of Service

State of Florida

Description

Tampa Area

Orlando - Central

Florida

Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples)

Panhandle 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. Drums must be in DOT Shippable containers before being transported.

2. Pricing does not include over-packing Non-DOT shippable containers (drums).

3. Disposal pricing offered is based on the non-hazardous waste being containerized in 55/Gal drums. 15/Gal, 30/Gal, 85/Gal & 95/Gal containers are not included.

4. All waste must be profiled and acknowledged by Intertek PSI as well as providing signed waste manifests for each site.

5. Pricing for waste is upon disposal facility acceptance. Off-spec charges and/or surcharges will be priced accordingly.

6. All waste pickups will be scheduled during normal business hours, Monday - Friday. Nights, weekends and holidays are not included

7. The Panhandle pricing will apply to drum pickups in the Florida Keys.

Intertek PSI Representative

$92.00 $67.00 $67.00

$92.00 $67.00 $92.00 $92.00

$67.00 $67.00 $92.00

$95.00 $450 / 10 Drums or Less35 / 3 Drums or Less

$30.00 $40.00 $45 / 3 Drums or Less

$50.00 $55/ 3 Drums or Less

$50.00 $55/ 3 Drums or Less

Micah Slankard | Project Coordinator | Southeast | (407) 335-6588 |micah.slankard@gprsinc.com www.gprsinc.com | Corporate Headquarters: 5217 Monroe St, Toledo, OH 43623 | EIN #: 31-1803412

April 17, 2020

Intertek-PSI

Attn: Christopher L. Cummins

Project: 223 Oxford Rd, Fern Park FL

GPRS appreciates the opportunity to provide this proposal. I encourage you to visit our website

(www.gprsinc.com) and contact any of the numerous references listed. Our insurance certificate and W-9 can also be downloaded here. Please feel free to contact me if you have any questions, or if you need additional information.

SCOPE OF WORK

GPRS understands the scope to be searching for underground utilities in the vicinity of the proposed injection well locations and new well locations as shown in the images provided by the client on page 2. We will attempt to locate any utilities within a radius of approximately 10’ from each proposed location. GPRS will attempt to trace any utilities for which there are structures visible from the work area. The client will be responsible to provide drawings or notify GPRS of any utilities known to be entering the work area for which there are no apparent surface features or structures that are visible from the work area. Interior locations will be scanned with both GPR antennas listed below. The areas should be laid out, marked, and cleared of obstructions prior to our arrival in order to avoid additional charges. Please notify GPRS in advance should additional reporting or records be required beyond field markings and our standard job summary. Please visit www.simspec.org for an overview of our industry-leading best practices that will be applied to this project.

EQUIPMENT

• 400/350 MHz GPR Antenna. The antenna is mounted in a stroller frame which rolls over the surface. The surface needs to be reasonably smooth and unobstructed in order to obtain readable scans. Obstructions such as curbs, landscaping, and vegetation will limit the feasibility of GPR. The data is displayed on a screen and marked in the field in real time. GPR works by sending pulses of energy into a material and recording the strength and the time required for the return of the reflected signal. Reflections are produced when the energy pulses enter into a material with different electrical properties from the material it left. The strength of the reflection is determined by the contrast in signal speed between the two materials. The total depth achieved can be as much as 8’ or more with this antenna but can vary widely depending on the conductivity of the materials. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit:

o 400 MHz GPR Antenna: Link o 350 MHz GPR Antenna: Link

• Electromagnetic Pipe Locator. The EM locator can passively detect the electromagnetic fields from live AC power or radio signals travelling along some conductive utilities. It can also be used in conjunction with a transmitter to connect directly to accessible, metallic pipes, risers, or tracer wires. A current is sent through the pipe or tracer wire at a specific frequency and the resulting EM field can then be detected by the receiver. A utility’s ability to be located depends on a variety of factors including access to the utility, conductivity, grounding, interference from other fields, and many others. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link

• Traceable Rodder. The rodder has a copper wire encased in 5/16” of fiberglass. The line is pushed through accessible pipes before placing a current on the wire which is then traced from the surface. The maximum traceable depth is 10’ depending on the soil conditions and the maximum distance is 300’. The line can be pushed through a pipe with direct access such as a sewer line at a cleanout or a storm drain catch basin. It may not be able to be pushed through deeper pipes within manholes and conduits will not be accessed by GPRS. The signal cannot be located through metallic pipes. For more information, please visit: Link

OPTIONAL EQUIPMENT

• GPS. This handheld GPS unit offers accuracy down to 4 inches, however, the accuracy will depend on the satellite environment and obstructions and should not be considered to be survey-grade. Features can be collected as points, lines, or areas and then exported into Google Earth or overlaid on a CAD drawing. For more information, please visit: Link mailto:micah.slankard@gprsinc.com http://www.gprsinc.com/ http://www.gprsinc.com/ https://www.gp-radar.com/downloadable-forms-and-certificate-of-insurance http://www.simspec.org/ https://www.gp-radar.com/GSSI-Antennas-Brochure.html https://www.gp-radar.com/GSSI-350HS-Antenna-Brochure.html https://www.gp-radar.com/RD-8100-Brochure.html https://www.gp-radar.com/Duct-Hunter-Traceable-Rodders.html https://www.gp-radar.com/GPS-Data-Sheets.html

MAP OF SCAN AREA

mailto:micah.slankard@gprsinc.com http://www.gprsinc.com/

PROJECT COSTS

SERVICE SCOPE PRICE

SCANNING/FIELD MARKINGS See previous pages $800

MOBILIZATION Included at no charge $0

ADDITIONAL FEES Changes in this scope of work or delays incurred on site will be billed by the hour

$200/hour

TOTAL *$800

OPTIONAL SERVICES (INITIAL IF DESIRED)

GPS MAP Our findings collected with GPS and overlaid in Google Earth. Results are not survey-grade accuracy.

Initial ____ $400

WRITTEN REPORT Basic report of findings with photos and example data. Initial ____ $400

CAD DRAWING Findings will be drafted in AutoCAD with an aerial image background. A linework version will also be provided if the client provides an existing drawing. Results are not survey-grade accuracy.

Initial ____ $950