Task Assignment Notification and Supporting Documentation Summary
This document comprises a Task Assignment Notification Form and supporting cost estimates for work performed under Florida Department of Environmental Protection (FDEP) Contract No. HW552, issued to Professional Service Industries, Inc. (PSI), an Intertek company. The task assignment (DC004S) authorizes PSI to conduct environmental remediation activities at the Tempo Dry Cleaners facility located at 233 Oxford Road, Fern Park, Seminole County, Florida (FDEP Facility ID ERIC_5476). The contract was executed on June 1, 2020, with performance extending through January 29, 2021.
The scope of work consists of five subtasks: project management; utility location and right-of-way permitting; installation of eight injection wells and four intermediate monitoring wells using sonic drilling techniques; top-of-casing survey and groundwater sampling from both newly installed and existing wells; and preparation of a Revised Remedial Action Plan Modification (RAP-Mod). The total fixed-price task assignment value is $77,068.43, comprising $71,084.82 for field activities (Subtasks 2-4) and $5,983.61 for RAP-Mod revision (Subtasks 1 and 5). Invoicing is contingent upon FDEP receipt and approval of deliverables. The cost estimate includes direct labor of $20,506.47 based on 229 labor hours; subcontractor costs of $45,903.00 for drilling services (Huss Drilling selected at $38,410.00 from three competitive bids); laboratory analysis of $1,677.50; and field expenses totaling $3,078.40. Supporting quotes were obtained from vendors including Petrotech Southeast for investigative derived waste handling and GPRS for underground utility location services at $800.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW552
D000 N/ADC004S
Professional Service Industries, Inc. (PSI)
Nana Westmark
850-245-8928Killian Talley
ERIC_5476
Tempo Cleaners
233 Oxford Road, Fern Park, Seminole County
Design
This Task Assignment authorizes PSI to oversee installation of wells for design and assessment of site remedy selection along with sampling of the monitoring well network in accordance with the May 13, 2020 scope of work, cost estimate, and bid documentation.
Revised Remedial Action Plan Modification
10/09/2020
01/29/2021
$ 77,068.43 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Killian Talley Digitally signed by Killian Talley Date: 2020.06.01 11:34:39 -04'00'
Killian Talley Digitally signed by Killian Talley Date: 2020.06.01 11:34:51 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.06.01 13:12:55 -04'00'
Nana G Westmark Digitally signed by Nana G Westmark Date: 2020.06.01 15:33:01 -04'00'
$ 77,068.43
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 2-4: Submittal of documentation of field activities including boring logs and groundwater sampling field notes 08/14/2020
Subtasks 1&5: Submittal of Revised Remedial Action Plan Modification 10/09/2020
Subtasks 2-4: FDEP receipt and approval of documentation of field activities including boring logs and groundwater sampling field notes $ 71,084.82
Subtasks 1&5: FDEP receipt and approval of Revised Remedial Action Plan Modification $ 5,983.61
$ 77,068.43
HW552
DC004S
Florida Department of Memorandum Environmental Protection
To: HW552 Contract Negotiation File
Tempo Cleaners Fern Park, Seminole County
ERIC_5476
From: Killian Talley, Project Manager Date: June 1, 2020 Subject: Negotiation Summary
HW552 DC004S
Task Assignment HW550 DC004S authorizes PSI to install additional wells for design and assessment of site remedy to submit a revised Remedial Action Plan Modification (RAP-Mod).
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Utility Locate, Notification & ROW Permitting Subtask authorizes labor and related costs for necessary activities prior to subsurface investigation including identify and location of underground utilities and obtaining right of way permits.
Subtask 3: Well Installation (Injection & Additional Plume Definition) Subtask includes costs and related labor for installation of additional monitoring and injection wells at Department request. Monitoring wells will be installed to further refine the extent of groundwater contamination and obtain a temporary point of compliance well while injection wells will be installed for future remediation activities under a separate assignment.
Subtask 4: Top-of-Casing Survey & Groundwater Sampling Subtask includes costs and related labor for sampling of the monitoring well network and survey of newly installed wells. Annual groundwater sampling and analysis will be conducted to update the RAP-Mod with new data along with collection of underground injection control parameters from select wells as explained in the accompanying PSI scope of work.
Subtask 5: Revised RAP-Mod This subtask includes labor for preparation of Remedial Action Plan Modification.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment Change Order. The final cost for this Task Assignment Change Order is $77,068.43 with 229 labor hours.
PSI may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATE
Contractor: Professional Service Industries, Inc.
Date: 5/27/2020
Task #: SUBTASK 1: Project Management SUBTASK 6:
Site: Tempo Dry Cleaners SUBTASK 2: Utility, ROW Permits, Notification SUBTASK 7:
Activity/Phase: SUBTASK 3: Monitoring Well Installation SUBTASK 8:
Project Manager: Nana Westmark SUBTASK 4: TOC Survey/ Groundwater Sampling SUBTASK 9:
SUBTASK 5: RAPMod Revisions SUBTASK 10:
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
Professional Service Industries, Inc.
$48.08 Project Manager 18 17.5 $62.50 Principal Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $52.89 Senior Engineer, 5 0.0 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0 $48.08 Senior Geologist 18 7.0 7.0 2.0 2.0 0.0 0.0 0.0 0.0 0 $45.20 Senior Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Florida Licensed Asbestos Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $48.08 Project Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $31.73 Project Engineer, MM 17 0.0 0.0 0.0 17.0 0.0 0.0 0.0 0.0 0 $32.94 Project Geologist, CC 105 15.0 90.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.81 Project Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.81 QA Officer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $32.21 Remediation Coordinator 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
$0.00 Professional Land Surveyor 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $0.00 Chemist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
$24.50 GIS Specialist, DG 8 0.0 0.0 0.0 8.0 0.0 0.0 0.0 0.0 0 $25.00 Staff Engineer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Staff Geologist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.76 Staff Scientist, RH 27 0.0 0.0 27.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Staff Scientist, RF 29 0.0 0.0 29.0 0.0 0.0 0.0 0.0 0.0 0 $20.57 Staff Scientist, AH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.30 Environmental Technician 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.75 Administrative Assistant 2 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $12.00 Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
Total Hours 229 18 22.0 97.0 58.0 34.0 0.0 0.0 0.0 0.0 0
Professional Service Industries, Inc.
Direct Labor $7,568.08 $840.90 $830.66 $3,301.16 $1,461.84 $1,133.52 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 170.96% $12,938.39 $1,437.60 $1,420.10 $5,643.66 $2,499.16 $1,937.87 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $20,506.47 $2,278.50 $2,250.76 $8,944.82 $3,961.00 $3,071.39 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $20,506.47 $2,278.50 $2,250.76 $8,944.82 $3,961.00 $3,071.39 $0.00 $0.00 $0.00 $0.00 $0.00
Well Installation
REV: 02/03 CEF_PSI.XLS Page 1
FDEP COST ESTIMATE
Contractor: Professional Service Industries, Inc.
Date: 5/27/2020
Task #: SUBTASK 1: Project Management SUBTASK 6:
Site: Tempo Dry Cleaners SUBTASK 2: Utility, ROW Permits, Notification SUBTASK 7:
Activity/Phase: SUBTASK 3: Monitoring Well Installation SUBTASK 8:
Project Manager: Nana Westmark SUBTASK 4: TOC Survey/ Groundwater Sampling SUBTASK 9:
SUBTASK 5: RAPMod Revisions SUBTASK 10:
Totals 1 2 3 4 5 6 7 8 9 10
Well Installation
Other Direct Costs $378.41 $42.05 $41.53 $165.06 $73.09 $56.68 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $1,584.00 $97.00 $711.00 $776.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,890.00 $0.00 $1,080.00 $810.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,474.00 $97.00 $1,791.00 $1,586.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling, Conventional $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling, Non-Conventional $38,410.00 $0.00 $38,410.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $2,300.00 $0.00 $0.00 $2,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Permitting $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GPR $800.00 $800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $41,730.00 $1,020.00 $38,410.00 $2,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $4,173.00 $102.00 $3,841.00 $230.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $45,903.00 $1,122.00 $42,251.00 $2,530.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,677.50 $0.00 $0.00 $1,677.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,677.50 $0.00 $0.00 $1,677.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $422.50 $32.50 $260.00 $130.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,290.10 $0.00 $1,290.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,324.05 $0.00 $0.00 $1,324.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $41.75 $0.00 $0.00 $41.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,078.40 $32.50 $1,550.10 $1,495.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $75,017.78 $2,320.55 $3,543.79 $54,701.98 $11,323.39 $3,128.07 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,050.65 $227.85 $225.08 $894.48 $396.10 $307.14 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $77,068.43 $2,548.40 $3,768.87 $55,596.46 $11,719.49 $3,435.21 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF_PSI.XLS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Tempo Dry Cleaners SUBTASK 2: Utility, ROW Permits, Notification
DATE: 5/27/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities
Senior Geologist, N Westmark Develop cost estimate, level of effort 6 Technical oversight 1
Project Geologist, C Cummins Travel (6 hours roundtrip) 6
Site Reconaissance, Overssee GPR and utility locate 3 Permit appllication Staff Scientist 6
22.0
EQUIPMENT ITEM RATE UNIT USAGE TOTALS
Expendables $32.50 day 1 $32.50
$32.50
VEHICLE TYPE RATE UNIT USAGE
Equipment Van / Truck Project Geologist $97.00 day 1 $97.00
$97.00
PER DIEM STAFF RATE UNIT USAGE
$0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
TOTAL $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE Cost UNIT No.
110.00$ 2 $220.00
GPRS GPR Survey $800.00 1 $800.00
TOTAL $1,020.00
TOTAL LABOR
TOTAL EQUIPMENT
TOTAL VEHICLE
TOTAL PER DIEM
ROW Permit, Seminole City
Page 4 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898
SUBTASK 3: Monitoring Well Installation
DATE: 5/27/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities
Senior Geologist, N Westmark Technical oversight during installation 5 Provide updates to FDEP 2
Project Geologist, C Cummins Load, unload 1
Travel (6 hours round trip) 6 Project preparation 3 Well Installation 80
97.0
EQUIPMENT ITEM RATE UNIT USAGE TOTALS
Monitor well installation kit $737.20 week 1 $737.20 Monitor well installation kit $184.30 day 3 $552.90
$1,290.10 Expendables $32.50 day 8 $260.00
$1,550.10
VEHICLE TYPE RATE UNIT USAGE
Equipment Van / Truck Project Geologist $420.00 week 1 $420.00 Equipment Van / Truck Project Geologist $97.00 day 3 $291.00
$711.00
PER DIEM STAFF RATE UNIT USAGE
Project Geologist Lodging Groundwater Sampling $99.00 8 $792.00 Meals Groundwater Sampling $36.00 8 $288.00
$1,080.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
Halocarbons, EPA Method 8260 $66.00 0 0 0 $0.00
IDW
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE Rate No. UNIT
Huss Drilling 38,410.00$ per quote 1 $38,410.00
TOTAL $38,410.00
TOTAL LABOR
TOTAL EQUIPMENT
injection & monitoring well installation
TOTAL PER DIEM
TOTAL VEHICLE RENTAL
Page 5 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898
SUBTASK 4: TOC Survey/ Groundwater Sampling
DATE: 5/27/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities Senior Geologist, Westmark Oversight 2
Staff Scientist, R Fetter Project preparation 1 Travel (6 hours round trip) 6 Sample 3 shallow wells (1 hr per well) 3 Sample 1 irrigation well (1 hr per well) 1 Sample 8 intermediate wells (1.5 hr per well) 12 Survey top of casing 4 Sample pick-up / drop-off 2
Staff Scientist, R Hanson Load / Unload 2 Collect groundwater elevations (17 wells) (10 minutes per well) 3 Travel (6 hours round trip) 6 Sample 3 intermediate well (1.5 hr per well) 5 Sample 2 deep wells (2 hr per well) 4 Additional sampling for additional parameters 2 Assist with Survey top of casing 4 Stage drum 1
58.0
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Shallow Groundwater Sampling Kit $208.55 day 3 $625.65 Deep Groundwater Sampling Kit $349.20 day 2 $698.40
$1,324.05 Total Survey Station $41.75 day 1 $41.75 Expendables $32.50 day 4 $130.00
$1,495.80
VEHICLE TYPE RATE UNIT USAGE
Equipment Van / Truck Staff Scientist $97.00 day 4 $388.00 Equipment Van / Truck Staff Scientist $97.00 day 4 $388.00
$776.00
PER DIEM STAFF RATE UNIT USAGE
Staff Scientist Lodging Groundwater Sampling $99.00 3 $297.00 Meals Groundwater Sampling $36.00 3 $108.00
Staff Scientist Lodging Groundwater Sampling $99.00 3 $297.00 Meals Groundwater Sampling $36.00 3 $108.00
$810.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC IDW
Halocarbons, EPA Method 8260 $66.00 17 1 1 $1,254.00 TOC by EPA Method 9060 $26.00 7 $182.00 Iron by EPA Method 6010 $11.50 7 $80.50 Sodium by EPA Method 6010 $11.50 7 $80.50 TDS by EPA Method 2450C $11.50 7 $80.50
TOTAL LAB $1,677.50
SUBCONTRACTOR COSTS
NAME PURPOSE Rate No. UNIT Petrotech Southeast IDW T&D 115.00$ per water drum 20 $2,300.00
TOTAL $2,300.00
TOTAL LABOR
TOTAL EQUIPMENT
TOTAL VEHICLE
TOTAL PER DIEM
Page 6 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898
SUBTASK 5: RAPMod Revisions
DATE: 5/27/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Geologist, N Westmark Technical oversight 1 Review final document 1
Senior Engineer, MR FDEP teleconference to discuss full scale design/cost 1.0 Review calculations 1.0 Review Text 1.0 Review Tables 0.5 Review Figures 0.5 Sign and seal documents 0.5
Project Engineer, MM Prepare remediation calculations with updated data 3 FDEP teleconference to discuss full scale design/cost 1 Prepare RAP text 3 UIC permit 0 Develop Tables 3 Develop Figures (gw data, NADC contour, lithological cross sections, MIP cross sections, 6 injection well locations, injection process flow diagram, equipment components) Prepare RAP Checklist 1
GIS/CADD Specialist, CG RAP Mod - Create and prepare final figures 8
Administrative Assistance compilation of report, pdf 2
TOTAL LABO 33.5
EQUIPMENT ITEM RATE UNIT USAGE TOTALS
TOTAL EQUIPME $0.00
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICL $0.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIE $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE COST
TOTAL $0.00
Page 7 5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898
PSI Project Number: 0552-593 PSI Proposal Number: 0552-309898-Rev 2
May 27, 2020 www.intertek.com/building
Professional Service Industries, Inc.
5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634 Phone: (813) 886-1075
Fax: (813) 249-4916
Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Attention: Mr. Killian Talley, Environmental Specialist III Contract Manager
(850) 245-8705 Email: Killian.Talley@FloridaDEP.gov
Re: Revision 2 Proposal – Well Installation, Groundwater Sampling and RAPMod Revision
Tempo Dry Cleaners 233 Oxford Road Fern Park, Seminole County, Florida, 32730
FDEP Facility ID# 59 9501358 / ERIC_5476
Dear Mr. Talley:
Professional Service Industries, Inc. (PSI), an Intertek Company, is pleased to provide the revised proposal contained herein to install injection and monitoring wells followed by groundwater sampling and testing.
The proposed activities will address impacted groundwater for the Tempo Dry Cleaners at 233 Oxford Road, Fern Park, Florida. Included with this proposal is the project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.
PROJECT BACKGROUND
Drycleaning operations at the Tempo Dry Cleaners began in January 1978 and utilized perchloroethene (PCE). In November 1994, a 150-gallon aboveground storage tank (AST) containing PCE was reportedly tipped over. On or prior to November 30, an area approximately 4 feet by 4 feet was excavated, in an attempt to remove the contaminated soil associated with the AST discharge. The excavated soil was later used as backfill. A soil sample collected from the former excavation area had a PCE concentration of 49,000,000 milligrams per kilogram (mg/kg).
In May 1995, the PCE drycleaning operations ceased at Tempo, and the business was sold and converted to a dry drop-off as documented by a FDEP inspection in March 1997. The drycleaner was accepted into the Drycleaning Solvent Cleanup Program in June 1998, and assessment activities conducted by WRS commenced in October 2002.
In February 2007, an air sparge curtain system, consisting of six (6) air sparge wells was implemented at the site. An Interim Source Removal was conducted at Tempo Cleaners in April 2008.
mailto:Killian.Talley@FloridaDEP.gov
Tempo Dry Cleaners, Well Installation/Groundwater Monitoring
PSI was tasked with providing remediation system start-up in January 2011. Monthly O&M activities commenced in February 2011 and were discontinued in August 2011. A Membrane Interface Probe study was conducted in November 2011 which revealed more specific data to interpret the contamination plume which is widespread and is migrating vertically. The air sparge system appears to have been successful in decreasing contaminant levels in the shallow zone. However, historic efforts to remediate the intermediate zone have had little impact.
Annual groundwater monitoring data from 2013 to 2018 indicate the continued presence of contaminant concentrations above applicable regulatory Cleanup Target Levels. A groundwater PCE concentration as high as 32,000 μg/L has been reported for samples collected from monitoring well EMW012, which was located in the same location as the former PCE AST where the reported discharge occurred (ECS, 2000).
Over the last 15 years or so, groundwater PCE concentrations have generally decreased in the AST spill area and increased in some of the downgradient wells. Contaminant reduction in the AST spill area appears to be attributable to a combination of source removal activities (ISR and SVE), contaminant migration, and natural attenuation.
In April 2015, PSI representatives met with the owner due to planned construction to remodel the former drycleaner space and expand the convenience store. PSI modified the interior SVE trenching system to underground and performed Soil Oxidant Demand (SOD) testing activities on soil samples to evaluate future remedial strategies. Approximately 12 tons of contaminated soil was removed and transported for off-site treatment and disposal. Two vapor points were abandoned, and one shallow well was installed inside the building.
During discussions with the Department in March 2016, various injection point locations were evaluated for PeroxyChem’s EHC® product. EHC® is composed of zero valent iron (ZVI), controlled release carbon and nutrients, which stimulate the chemical reduction and abiotic degradation of the contaminants. A buffer will also be introduced to ensure the pH is maintained above 6 SU. The selected target zone is the interval 40 to 55 feet bls.
A RAPMOD, dated November 2018, revised September 26, 2019 has been submitted to the FDEP. The RAPMOD proposes in situ chemical reduction, which combines abiotic chemical reduction (zero valent iron) and anaerobic bioremediation. The target treatment areas include the original release area and the on-site portion of the groundwater plume that exceeds NADC levels.
Groundwater testing performed in August 2019 revealed a concentration of PCE in temporary point of compliance (TPOC) well BMW034 exceeding the GCTL. The FDEP has therefore requested a new TPOC well to be located downgradient of BMW034. Additionally, FDEP has requested the installation of intermediate depth wells along the western edge of the groundwater VOH plume for horizontal delineation.
PROPOSED SCOPE OF WORK
Specifically, the proposed scope of work consists of the following subtasks:
Tempo Dry Cleaners, Well Installation/Groundwater Monitoring
1. Project Management
This scope is provided for in the template worksheets.
2. Utility Locate, Notification, and ROW permitting
A utility locate subcontractor will be utilized to identify and locate underground obstructions at the property prior to site subsurface activities. Site access will be coordinated with the site owner. Right of way permits will be obtained from Seminole County for proposed well locations along Fern Park Boulevard and Lochmond Drive.
3. Well Installation (Injection and Additional Plume Definition)
As per the RAPMOD, eight injection wells will be installed at Tempo Dry Cleaners in a grid like fashion.
The injections wells will be installed using sonic drilling technique. The injection wells will be constructed of 2-inch diameter schedule 40 PVC and screened from 40 to 55 ft. below land surface (bls). 0.02 slot screen and a 6/20 filter sand pack will be used to minimize the possibility of injectate clogging the well screen. The injection wells will be developed until purge water is relatively clear and will be completed with 18-inch diameter vaults and cam locks.
Monitoring wells will be installed to further refine the extent groundwater contamination. Sonic drilling technique will be used for the well installation based on depth of wells. All wells will be constructed of schedule 40 PVC and be two inches in diameter. Four intermediate wells will be screened from 50-55 ft.
bls. The monitoring wells will be constructed with 0.01 slot screen and a 20/30 filter sand pack. The monitoring wells will be developed until purge water is relatively clear and will be completed with 2 ft. by 2 ft. flush mounted concrete pads. One well will be installed in the residential neighborhood south of Tempo Dry Cleaners for down gradient plume definition. An additional three intermediate wells will be installed on the western portion of Tempo Dry Cleaner also for plume definition.
All downhole tools will be decontaminated prior to and between each location. Standard decontamination procedures (steam wash) apply for all drilling equipment and downhole tools (e.g., tremie pipe, hoses). Decontamination fluids and solids will be containerized.
Soil cuttings will be place into properly labeled DOT certified drums for proper transportation and disposal by a licensed waste handler. Purge water will be stored in the onsite remediation system holding tank.
Price quotations for the drilling activities were solicited from three firms, and the lowest price bidder was selected, Huss Drilling. A copy of the associated three bids are attached.
4. Top of Casing Survey and Groundwater Sampling and Analysis
Subsequent to well installation, well top of casings will be surveyed using a standard survey gun and tripod.
PSI proposes to conduct annual groundwater sampling and analysis and to update the RAPMod with the new data to ensure the most recent information will be used for the groundwater remediation strategy.
Tempo Dry Cleaners, Well Installation/Groundwater Monitoring
The data will be used to confirm current groundwater quality conditions before revising the RAPMod, if necessary.
Subsequent to well installation, groundwater samples will be collected from the newly installed wells and existing wells. The groundwater sampling program will include the following field and laboratory activities. Field sampling and decontamination procedures will be conducted by PSI in general accordance with FDEP Standard Operating Procedures (DEP SOP 001/01).
a. Mobilization to the site.
b. Collect groundwater elevation measurements of 17 wells.
c. Collect annual groundwater samples from the following thirteen previously existing wells:
AMW017, AMW040, AMW042, BMW020, BMW022, BMW023, BMW030, BMW034,
BMW041, BMW043, DMW026, DMW028 and the irrigation well (IW002) located at 310 Lochmond Drive. Collect groundwater samples from the four newly installed intermediate monitoring wells.
d. Submit samples to a National Environmental Laboratory Accredited Conference (NELAC) approved laboratory for Total Volatile Halogens by EPA Method 8260.
e. Collect groundwater samples from the following seven monitor wells: BMW020, BMW021, BMW022, BMW023, BMW030, BMW041, BMW043. Submit samples for analysis for TOC by EPA Method 9060, Iron, Sodium by EPA Method 6010, Sulfate by EPA Method 300.0, and TDS by EPA Method 2450C.
f. Containerize the investigation derived waste (IDW) purge water in the on-site polytank.
5. Revised RAPMod
Upon receipt of the laboratory analytical results, the data will be evaluated and compared to state standards within Chapter 62-777, Florida Administrative Code (FAC). The newly obtained data will be used to recalculate our design for the RAPMod for groundwater, if necessary. The report will also incorporate information from the various comments by the FDEP to provide a comprehensive document.
Conclusions and recommendations will be made, which will include any modifications to the proposed annual groundwater sampling event and remedial design. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient endpoints.
Tempo Dry Cleaners, Well Installation/Groundwater Monitoring
COST ESTIMATE AND SCHEDULE
The estimated cost to perform the Well Installation, Groundwater Testing and RAPMod Revision is presented on the attached Cost Estimate and Level of Effort. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW552, Bureau of Waste Cleanup Services, dated December 10, 2010. We anticipate performing the well installation on an expedited schedule in July 2020 but will depend on ROW permit approval and drillers availability. Once the well installation and sampling results are received, the RAPMod will be revised within 6 weeks.
PSI appreciates the opportunity to be of service to the FDEP. If you have any questions, please feel free to contact us at (813) 886-1075.
Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.
Christopher L. Cummins, PG Nana Westmark, PG, CHMM Senior Geologist Principal Consultant / Contract Manager
Enclosure: Cost Estimate Level of Effort Drilling Bids and Site Sketch of Proposed Wells
\\tampa-fs1\PROJECTS\552-Env\FDEP BWC\0552593 Tempo Cleaners\Proposal\2020 04 MW Injection Well Install\5-27-2020 Rev 2 Tempo ERIC_5476 0552-309898.docx
FIGURE
0552593
DJG
PROJ. NO.
DRAWN BY
DATE CREATED
SCALE: 1" = 60'
TEMPO DRY CLEANERS
223 OXFORD ROAD
FERN PARK, SEMINOLE COUNTY, FLORIDA
FDEP ID No. 59 9501358/ERIC_5476
INTERMEDIATE GROUNDWATER VOH CONTAMINANT CONCENTRATION MAP (ZONE B)
9/24/19
Suite 112
Tampa, Florida 33634
(813) 886-1075
(813) 249-4916 fax
5801 Benjamin Center Drive, CLEANUP TARGET LEVELS
GCTL
(μg/L)
NADC
(μg/L)
PCE 3 300
TCE 3 300
cDCE 70 700
BMW033R
(38.6’ – 43.6’)
6/2/11
PCE 5
TCE 19
cDCE 10
BMW037
(39.75'-44.75')
3/5/13
PCE 0.2 I
TCE 0.2 U
cDCE 0.2 U
IW001
(unknown)
4/26/17
PCE 0.50 U
TCE 0.61 U
cDCE 0.65 U
BMW033R
(38.6’ – 43.6’)
1/27/10 7/21/10 6/2/11
PCE 0.2 U 0.2 U 5
TCE 0.4 I 0.2 U 19
cDCE 2.5 0.44 I 10
DMW028
(72.2 - 77.2)
4/26/17 6/7/18 8/7/19
PCE 0.50 U 0.50 U 0.50 U
TCE 0.61 U 0.61 U 0.61 U
cDCE 0.65 U 0.32 U 0.32 U
DMW025
(70.5’ – 75.5’)
7/20/10 6/3/11 3/6/13 3/22/16 4/26/17 6/7/18
PCE 0.69 I 0.25 U 0.3 I 0.50 U 0.50 U 0.50 U
TCE 0.2 U 0.2 U 0.2 U 0.61 U 0.61 U 0.61 U
cDCE 0.2 U 0.2 U 0.2 U 0.65 U 0.65 U 0.32 U
BMW023
(39.1’ – 44.1’)
6/2/11 3/6/13 3/22/16 4/26/17 6/6/18 8/7/19
PCE 1800 750 D20 8 3.2 1.2 I 2.6
TCE 2.2 22 0.61 U 0.88 I 0.61 U 0.61 U
cDCE 0.2 U 0.7 I 0.65 U 0.65 U 0.32 U 0.32 U
BMW020
(40.0’ – 45.0’)
6/2/11 3/5/13 6/6/18 8/7/19
PCE 460 470 D10 130 130
TCE 16 14 23 31
cDCE 8.2 16 1.1 0.70 I
DMW027
DMW027
1/27/10 7/21/10 6/3/11 6/14/12 8/8/19
PCE 0.2 U 0.2 U 0.25 U 0.2 I 0.50 U
TCE 0.2 U 0.2 U 0.2 U 0.2 U 4.2
cDCE 0.2 U 0.2 U 0.2 U 0.2 U 0.72 I
BMW030
(37.6’ – 42.6’)
6/2/11 3/5/13 3/23/16 4/26/17 6/6/18 8/8/19
PCE 990 89 4.3 5.9 2 1.0 U
TCE 200 1400 D50 920 590 560 420
cDCE 2.9 20 71 130 120 150
BMW034
(37.3’ – 42.3’)
6/2/11 3/5/13 3/23/16 4/26/17 6/7/18 8/8/19
PCE 0.25 U 0.2 U 0.50 U 0.50 U 0.50 U 18
TCE 0.2 U 0.2 U 0.61 U 0.61 U 0.61 U 1.2 I
cDCE 0.2 U 0.2 U 0.65 U 0.65 U 0.32 U 0.32 U
BMW022
(39.2’ – 44.2’)
6/2/11 3/5/13 3/22/16 4/26/17 6/6/18 8/8/19
PCE 120 91 37 48 39 32
TCE 43 76 24 18 30 27
cDCE 2.1 7.9 12 6.4 30 2.2
BMW043
(50.00'-55.00')
4/26/17 6/6/18 8/8/19
PCE 3,400 4500 5800
TCE 360 610 710 I
cDCE 8.4 I 11 I 160 U
BMW041
(50.00'-55.00')
4/26/17 6/6/18 8/7/19
PCE 0.79 I 0.50 U 0.50 U
TCE 5.7 0.61 U 0.61 U
cDCE 49 5.8 1.5
X
X X
X
AutoCAD SHX Text
APPROXIMATE SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
OXFORD ROAD
AutoCAD SHX Text
FERN PARK BOULEVARD
AutoCAD SHX Text
AREA
AutoCAD SHX Text
UST
AutoCAD SHX Text
DISPENSERS
AutoCAD SHX Text
FARMS
AutoCAD SHX Text
CUMBERLAND
AutoCAD SHX Text
POND
AutoCAD SHX Text
IW001
AutoCAD SHX Text
DMW029
AutoCAD SHX Text
AMW035
AutoCAD SHX Text
IW002
AutoCAD SHX Text
AMWO31
AutoCAD SHX Text
AMW017
AutoCAD SHX Text
BMW022
AutoCAD SHX Text
EMW005
AutoCAD SHX Text
DMW028
AutoCAD SHX Text
AMW016
AutoCAD SHX Text
BMW020
AutoCAD SHX Text
EMW015
AutoCAD SHX Text
EMW010
AutoCAD SHX Text
EMW014
AutoCAD SHX Text
EMW001
AutoCAD SHX Text
EMW002
AutoCAD SHX Text
EMW009D
AutoCAD SHX Text
EMW004R
AutoCAD SHX Text
EMW007
AutoCAD SHX Text
BMW023
AutoCAD SHX Text
DMW025
AutoCAD SHX Text
EMW012R
AutoCAD SHX Text
AMW018
AutoCAD SHX Text
DMW024
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
PROPERTY BOUNDARY
AutoCAD SHX Text
ESTIMATED NORTHERN
AutoCAD SHX Text
AutoCAD SHX Text Lochmond
AutoCAD SHX Text Drive
AutoCAD SHX Text Drive
AutoCAD SHX Text Lochmond
AutoCAD SHX Text
AutoCAD SHX Text
LOCHMOND DRIVE
AutoCAD SHX Text
PRIVACY FENCE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
LOCHINVAR
AutoCAD SHX Text Drive
AutoCAD SHX Text Lochinvar
AutoCAD SHX Text
AutoCAD SHX Text
AMW032R
AutoCAD SHX Text
BMW033R
AutoCAD SHX Text
BMW019
AutoCAD SHX Text
BMW034
AutoCAD SHX Text
ASW005
AutoCAD SHX Text
ASW004
AutoCAD SHX Text
ASW002
AutoCAD SHX Text
ASW001
AutoCAD SHX Text
BMW037
AutoCAD SHX Text
AMW036
AutoCAD SHX Text
EMW015R
AutoCAD SHX Text
EMW013R
AutoCAD SHX Text
APPROXIMATE POND
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
VE-4
AutoCAD SHX Text
VE-3
AutoCAD SHX Text
VE-2
AutoCAD SHX Text
VE-1
AutoCAD SHX Text
SW011
AutoCAD SHX Text
SW010
AutoCAD SHX Text
SW009
AutoCAD SHX Text
SD0011
AutoCAD SHX Text
SD0010
AutoCAD SHX Text
SD009
AutoCAD SHX Text
AMW038
AutoCAD SHX Text
BMW039
AutoCAD SHX Text
SW013
AutoCAD SHX Text
TEMPO
AutoCAD SHX Text
VMP-1
AutoCAD SHX Text
VMP-2
AutoCAD SHX Text
BMW041
AutoCAD SHX Text
AMW040
AutoCAD SHX Text
AMW042
AutoCAD SHX Text
SW018
AutoCAD SHX Text
SW014
AutoCAD SHX Text
SW015
AutoCAD SHX Text
SW016
AutoCAD SHX Text
SW017
AutoCAD SHX Text
SW042
AutoCAD SHX Text P:\552-Env\FDEP BWC\0552593 Tempo Cleaners\CAD\2019-09
AutoCAD SHX Text
DMW026
AutoCAD SHX Text
BMW021
AutoCAD SHX Text
ASW006
AutoCAD SHX Text
BMW043
AutoCAD SHX Text
EMW011
AutoCAD SHX Text
ANALYTE NOT DETECTED ABOVE
AutoCAD SHX Text
LABORATORY METHOD DETECTION LIMIT
AutoCAD SHX Text
ANALYTE DETECTED BETWEEN THE
AutoCAD SHX Text
LABORATORY METHOD DETECTION LIMIT
AutoCAD SHX Text
AND THE PRACTICAL QUANTITATION LIMIT
AutoCAD SHX Text
MOST RECENT SAMPLE DATE
AutoCAD SHX Text
AutoCAD SHX Text
YELLOW
AutoCAD SHX Text I =
AutoCAD SHX Text U =
AutoCAD SHX Text
ANALYTE EXCEEDS GCTL
AutoCAD SHX Text
AutoCAD SHX Text
RED
AutoCAD SHX Text
SURFACE WATER SAMPLE LOCATION
AutoCAD SHX Text
VAPOR MONITORING POINT (VMP)
AutoCAD SHX Text
MONITOR WELL LOCATION (MW)
AutoCAD SHX Text
DESTROYED OR ABANDONED MONITOR
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
WELL LOCATION (MW)
AutoCAD SHX Text
AIR SPARGE WELL (ASW)
AutoCAD SHX Text
VAPOR RECOVERY WELL
AutoCAD SHX Text
VOH GCTL CONTOUR, DASHED WHERE
AutoCAD SHX Text
AutoCAD SHX Text
ANALYTE EXCEEDS NADC
AutoCAD SHX Text
AutoCAD SHX Text
BLUE
AutoCAD SHX Text
INFERRED
AutoCAD SHX Text
VOH NADC CONTOUR, DASHED WHERE
AutoCAD SHX Text
AutoCAD SHX Text
INFERRED
AutoCAD SHX Text
MICROGRAMS PER LITER
AutoCAD SHX Text μg/L =
AutoCAD SHX Text
WELL ID
AutoCAD SHX Text
SCREEN INTERVAL (FEET BLS)
AutoCAD SHX Text
SAMPLE DATE
AutoCAD SHX Text TETRACHLOROETHENE (μg/L)
AutoCAD SHX Text TRICHLOROETHENE (μg/L)
AutoCAD SHX Text cis-1,2-DICHLOROETHENE (μg/L)
AutoCAD SHX Text
SITE PLAN PROVIDED BY WRS COMPASS.
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
AMW031R
AutoCAD SHX Text
BMW030
AutoCAD SHX Text
ASW003
AutoCAD SHX Text
SW041
AutoCAD SHX Text
DMW027
PROJECT BID TABULATIONS Sonic Drilling
Facility Name Tempo Dry Cleaners Facility Location Fern Park, Seminole County, Florida Facilty ID 59/9501358 / ERIC_5476
Contractor → Drillpro Huss Cascade
Well Installation, lump sum 41,800.00$ 38,410.00$ 52,180.00$
Total: 41,800.00$ 38,410.00$ 52,180.00$
Selected Vendor: Huss @ $38,410.00 Basis:
Description
Price and Experience
Professional Service Industries, Inc. (PSI) Request for Quotation
Facility Name Tempo Dry Cleaners Facility Location Fern Park, Seminole County, FL Facility ID ERIC_5476 FDEP Drycleaning Solvent Cleanup Program
Units Unit Rate Extended Price
1 3,500.00$ 3,500.00$
8 5,000.00$ 40,000.00$
8 440.00$ 3,520.00$
4 440.00$ 1,760.00$
8 150.00$ 1,200.00$
4 175.00$ 700.00$
55-gallon DOT approved drums (each) 20 75.00$ 1,500.00$
Total: 52,180.00$
Active business, limited room for equipment.
Asphalt surface Signed PSI Purchase Order is required before working.
All equipment to be decontaminated prior to boring / well installation.
OSHA HazWOPER trained crew required.
Include per diem in cost, if necessary.
Estimated start date: June 2020 Company Name:
Address:
Phone:
Email:
Contact:
Proposal #
Pad Construction and Development- Monitoring Wells (each)
Sonic Drilling Technique. Eighteen injection wells screened from 40 to 55 ft. Four intermediate depth screened from 38-48 ft. Three additional intermediate depth screened from 50-55 ft. Five deep wells screened from 70-75 ft. Injection wells to be constructed with 0.02 slot screen, 6/20 sand and 2-inch diameter riser. Monitoring wells to be constructed with 0.01 slot screen and 2-inch diameter PVC riser. Injection wells to be completed with 8-inch vaults and camlocks. Flush mounted 2x2 concrete pads for the monitoring wells.
Mobilization (lump sum)
Intermediate Monitoring Wells (each) (Materials Only)
Injection Wells (each) (Materials Only)
Sonic Rig Daily Charge (per day)
Vault Construction and Development- Injection Wells (each)
PN200420-88960
Cascade Drilling LP 5785 SW 6th Place, Ocala FL 34474 352-237-1995-office, 352-266-9232-mobile mrice@cascade-env.com Michael C. Rice, Southeast Region Estimator mailto:mrice@cascade-env.com mailto:mrice@cascade-env.com mailto:mrice@cascade-env.com mailto:mrice@cascade-env.com
Professional Service Industries, Inc. (PSI) Request for Quotation
Facility Name Facility Location Facility ID FDEP Drycleaning Solvent Cleanup Program
Tempo Dry Cleaners Fern Park, Seminole County, FL
ERIC_5476
GP#420054-2
Sonic Drilling Technique. Eight injection wells screened from 40 to 55 ft. Four intermediate depth screened from 50-55 ft. Injection wells to be constructed with 0.02 slot screen, 6120 sand and z-tncn diameter riser. Monitoring wells to be constructed with 0.01 slot screen and 2·lnch diameter PVC riser. Injection wells to be completed with 18-inch W x ts-tncn D boltdown manholes and 2'x'2' pads. Flush mounted 2x2 concrete pads and 8-inch boltdown manholes for the monitoring wells.
Units Unit Rate Extended Price
Mobilization (lump sum) 1 $ 1,500.00 $ 1,500.00
Sonic Rig Daily Charge (per day) 8 $ 3,750.00 $ 30,000.00
Injection Wells (each) (Materials Only) 8 $ 550.00 $ 4,400.00
Intermediate Monitoring Wells (each) (Materials Only) 4 $ 550.00 $ 2,200.00
Vault Construction and Development- Injection Wells (each) 8 $ 325.00 $ 2,600.00
Pad Construction and Development- MonitOring Wells (each) 4 $ 175.00 $ 700.00
55-gallon DOT approved drums (each) 20 $ 20.00 $ 400.00
Total: $ 41,800.00
Active business, limited room for equipment.
Asphalt surface
Signed PSI Purchase Order is required before working.
All equipment to be decontaminated prior to boring 1 well installation.
OSHA HazWOPER trained crew required.
Include per diem in cost, if necessary.
Estimated start date: June 2020 Company Name:
Address:
Phone:
Email:
Contact:
Drillpro, LLC dba Groundwater Protection 2300 Silver Star Rd., Orlando, FL 32804 407-426-7885
David Boggs, Project Manager 5/8/2020
PSI - Intertek Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment
PROJECT BID TABULATIONS IDW
Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various
Description of Service
Tampa Area Orlando - Central
Florida Jacksonville Area, North Florida
South Florida (Miami, Fort Myers, Naples) Panhandle water $90.00 $90.00 $100.00 $100.00 $110.00 soil $110.00 $110.00 $120.00 $120.00 $130.00 low volume fee if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$200 Pick-up fee NA NA NA NA NA Total Per One Drum Water $140.00 $140.00 $150.00 $150.00 310.00$ Total Per One Drum Soil $160.00 $160.00 $170.00 $170.00 330.00$
Plus $150 per day / per diem water $115.00 $115.00 Non service area Non service area Non service area soil $150.00 $150.00 Non service area Non service area Non service area water $92.00 $92.00 $92.00 $92.00 $92.00 soil $67.00 $67.00 $67.00 $67.00 $67.00 low volume fee if 3 drums or less add $35 if 3 drums or less add $45 if 3 drums or less add $55 if 3 drums or less add $55 if 10 drums or less add $450
Pick-up Fee 30 40 50 50 95.00$ Total Per One Drum Water $157.00 $177.00 $197.00 $197.00 637.00$ Total Per One Drum Soil $132.00 $152.00 $172.00 $172.00 612.00$
Plus $150 per day / per diem
* = DOT shippable drums on hard concrete or asphalt surface easily accessible with tractor trailer with no dirt, grass or curbs to get drums to tailgate of truck ** = Need TCLPs for VOHS for soils, Totals only for VOHSs for water 100% liquids.
1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.
2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste
5. ) Waste is considered not hazardous.
6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.
7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.
55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.
State of Florida
3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.
The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.
4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.
Petrotech Southeast, Inc.
Clark Environmental, Inc. * and **
NRC / US Ecology(formerly SWS)
Page 1 of 1 PSI IDW Bids 1-31-2020
PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment
PROJECT BID TABULATIONS IDW
Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various
Description of Service
Tampa Area Orlando - Central
Florida Jacksonville Area, North Florida
South Florida (Miami, Fort
Myers, Naples) Panhandle water soil low volume fee Pick-up fee
$0.00 $0.00 $0.00 $0.00 $0.00
1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.
2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste
5. ) Waste is considered not hazardous.
6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.
7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.
Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.
State of Florida
3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.
The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.
4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.
$115.00 $150.00
$115.00 $150.00
Petrotech Southeast, Inc.
Phone: 407 - 656-8114 Fax: 407 - 358-5030 Natacha Mitchell-Jackson
Quote # TP02077
US Ecology Waste (IDW) IDW Pick-up, Transport & Disposal Services
Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida
Description of Service
State of Florida
Description
Tampa Area
Orlando - Central
Florida
Jacksonville Area, North Florida
South Florida (Miami, Fort
Myers, Naples)
Panhandle 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.
water soil low volume fee Pick-up fee
$0.00 $0.00 $0.00 $0.00 $0.00
1. Drums must be in DOT Shippable containers before being transported.
2. Pricing does not include over-packing Non-DOT shippable containers (drums).
3. Disposal pricing offered is based on the non-hazardous waste being containerized in 55/Gal drums. 15/Gal, 30/Gal, 85/Gal & 95/Gal containers are not included.
4. All waste must be profiled and acknowledged by Intertek PSI as well as providing signed waste manifests for each site.
5. Pricing for waste is upon disposal facility acceptance. Off-spec charges and/or surcharges will be priced accordingly.
6. All waste pickups will be scheduled during normal business hours, Monday - Friday. Nights, weekends and holidays are not included
7. The Panhandle pricing will apply to drum pickups in the Florida Keys.
Intertek PSI Representative
$92.00 $67.00 $67.00
$92.00 $67.00 $92.00 $92.00
$67.00 $67.00 $92.00
$95.00 $450 / 10 Drums or Less35 / 3 Drums or Less
$30.00 $40.00 $45 / 3 Drums or Less
$50.00 $55/ 3 Drums or Less
$50.00 $55/ 3 Drums or Less
Micah Slankard | Project Coordinator | Southeast | (407) 335-6588 |micah.slankard@gprsinc.com www.gprsinc.com | Corporate Headquarters: 5217 Monroe St, Toledo, OH 43623 | EIN #: 31-1803412
April 17, 2020
Intertek-PSI
Attn: Christopher L. Cummins
Project: 223 Oxford Rd, Fern Park FL
GPRS appreciates the opportunity to provide this proposal. I encourage you to visit our website
(www.gprsinc.com) and contact any of the numerous references listed. Our insurance certificate and W-9 can also be downloaded here. Please feel free to contact me if you have any questions, or if you need additional information.
SCOPE OF WORK
GPRS understands the scope to be searching for underground utilities in the vicinity of the proposed injection well locations and new well locations as shown in the images provided by the client on page 2. We will attempt to locate any utilities within a radius of approximately 10’ from each proposed location. GPRS will attempt to trace any utilities for which there are structures visible from the work area. The client will be responsible to provide drawings or notify GPRS of any utilities known to be entering the work area for which there are no apparent surface features or structures that are visible from the work area. Interior locations will be scanned with both GPR antennas listed below. The areas should be laid out, marked, and cleared of obstructions prior to our arrival in order to avoid additional charges. Please notify GPRS in advance should additional reporting or records be required beyond field markings and our standard job summary. Please visit www.simspec.org for an overview of our industry-leading best practices that will be applied to this project.
EQUIPMENT
• 400/350 MHz GPR Antenna. The antenna is mounted in a stroller frame which rolls over the surface. The surface needs to be reasonably smooth and unobstructed in order to obtain readable scans. Obstructions such as curbs, landscaping, and vegetation will limit the feasibility of GPR. The data is displayed on a screen and marked in the field in real time. GPR works by sending pulses of energy into a material and recording the strength and the time required for the return of the reflected signal. Reflections are produced when the energy pulses enter into a material with different electrical properties from the material it left. The strength of the reflection is determined by the contrast in signal speed between the two materials. The total depth achieved can be as much as 8’ or more with this antenna but can vary widely depending on the conductivity of the materials. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit:
o 400 MHz GPR Antenna: Link o 350 MHz GPR Antenna: Link
• Electromagnetic Pipe Locator. The EM locator can passively detect the electromagnetic fields from live AC power or radio signals travelling along some conductive utilities. It can also be used in conjunction with a transmitter to connect directly to accessible, metallic pipes, risers, or tracer wires. A current is sent through the pipe or tracer wire at a specific frequency and the resulting EM field can then be detected by the receiver. A utility’s ability to be located depends on a variety of factors including access to the utility, conductivity, grounding, interference from other fields, and many others. Depths provided should always be treated as estimates as their accuracy can be affected by multiple factors. For more information, please visit: Link
• Traceable Rodder. The rodder has a copper wire encased in 5/16” of fiberglass. The line is pushed through accessible pipes before placing a current on the wire which is then traced from the surface. The maximum traceable depth is 10’ depending on the soil conditions and the maximum distance is 300’. The line can be pushed through a pipe with direct access such as a sewer line at a cleanout or a storm drain catch basin. It may not be able to be pushed through deeper pipes within manholes and conduits will not be accessed by GPRS. The signal cannot be located through metallic pipes. For more information, please visit: Link
OPTIONAL EQUIPMENT
• GPS. This handheld GPS unit offers accuracy down to 4 inches, however, the accuracy will depend on the satellite environment and obstructions and should not be considered to be survey-grade. Features can be collected as points, lines, or areas and then exported into Google Earth or overlaid on a CAD drawing. For more information, please visit: Link mailto:micah.slankard@gprsinc.com http://www.gprsinc.com/ http://www.gprsinc.com/ https://www.gp-radar.com/downloadable-forms-and-certificate-of-insurance http://www.simspec.org/ https://www.gp-radar.com/GSSI-Antennas-Brochure.html https://www.gp-radar.com/GSSI-350HS-Antenna-Brochure.html https://www.gp-radar.com/RD-8100-Brochure.html https://www.gp-radar.com/Duct-Hunter-Traceable-Rodders.html https://www.gp-radar.com/GPS-Data-Sheets.html
MAP OF SCAN AREA
mailto:micah.slankard@gprsinc.com http://www.gprsinc.com/
PROJECT COSTS
SERVICE SCOPE PRICE
SCANNING/FIELD MARKINGS See previous pages $800
MOBILIZATION Included at no charge $0
ADDITIONAL FEES Changes in this scope of work or delays incurred on site will be billed by the hour
$200/hour
TOTAL *$800
OPTIONAL SERVICES (INITIAL IF DESIRED)
GPS MAP Our findings collected with GPS and overlaid in Google Earth. Results are not survey-grade accuracy.
Initial ____ $400
WRITTEN REPORT Basic report of findings with photos and example data. Initial ____ $400
CAD DRAWING Findings will be drafted in AutoCAD with an aerial image background. A linework version will also be provided if the client provides an existing drawing. Results are not survey-grade accuracy.
Initial ____ $950