Task Assignment Notification for Main Street Cleaners Supplemental Site Assessment

This Task Assignment (DC023P) is issued under Florida Department of Environmental Protection (FDEP) Contract No. HW552 by the Bureau of Waste Cleanup Services. The contractor is Professional Service Industries, Inc. (PSI), with Nana Westmark serving as the contractor representative and Walsta Jean-Baptiste as the FDEP contract manager. The work is being performed at Main Street Cleaners Inc., located at 1679 Main Street, Sarasota, Sarasota County, Florida (DEP Site #ERIC_5423). The task assignment was executed on December 2, 2021, and authorizes PSI to conduct supplemental site assessment activities in accordance with the contractor's submitted scope of work, bid documentation, cost estimate, and schedule received on November 23, 2021.

The deliverable under this task assignment is a Supplemental Site Assessment Report including investigation derived waste manifests and project management, with a final deliverable due date of May 31, 2022, and a period of performance execution through August 30, 2022. The task assignment is structured as a fixed price contract with a total not-to-exceed amount of $19,340.76 and 130 hours of effort. The work encompasses five subtasks: (1) Project Management ($1,419.49); (2) Site Access and Monitoring Well Installation ($7,883.14); (3) Soil Sampling ($3,011.45); (4) Groundwater Sampling ($4,058.55); and (5) Data Evaluation and Report ($2,968.13). Drilling services were subcontracted to ATI, St. Petersburg at $2,985.00 as the low bid among three responsive bidders. The invoicing requirement specifies payment upon FDEP approval of the Supplemental Site Assessment Report including investigation derived waste manifests and project management for the total contract value of $19,340.76 with zero retainage.

View the file

Other files

File Type Posted
CN-370000-HW552-A2.pdf PDF
CN-370000-HW552-CO1.pdf PDF
CN-370000-HW552-CO3.pdf PDF
CN-370000-HW552-CO4.pdf PDF
CN-370000-HW552-DC004N.pdf PDF
CN-370000-HW552-DC009M.pdf PDF
CN-370000-HW552-DC009O.pdf PDF
CN-370000-HW552-DC010I.pdf PDF
CN-370000-HW552-DC013I.pdf PDF
CN-370000-HW552-DC014H.pdf PDF
CN-370000-HW552-DC014I.pdf PDF
CN-370000-HW552-DC014J.pdf PDF
CN-370000-HW552-DC018V.pdf PDF
CN-370000-HW552-DC019G.pdf PDF
CN-370000-HW552-DC01A.pdf PDF
CN-370000-HW552-DC01ACO5.pdf PDF
CN-370000-HW552-DC01ACO6.pdf PDF
CN-370000-HW552-DC01ACO7.pdf PDF
CN-370000-HW552-DC01C.pdf PDF
CN-370000-HW552-DC01E.pdf PDF
CN-370000-HW552-DC01F.pdf PDF
CN-370000-HW552-DC01I.pdf PDF
CN-370000-HW552-DC020E.pdf PDF
CN-370000-HW552-DC020i.pdf PDF
CN-370000-HW552-DC023F.pdf PDF
CN-370000-HW552-DC023L.pdf PDF
CN-370000-HW552-DC028D.pdf PDF
CN-370000-HW552-DC02E.pdf PDF
CN-370000-HW552-DC02F.pdf PDF
CN-370000-HW552-DC031A.pdf PDF
CN-370000-HW552-DC031BCO.pdf PDF
CN-370000-HW552-DC032B.pdf PDF
CN-370000-HW552-DC037E.pdf PDF
CN-370000-HW552-DC03DCO3.pdf PDF
CN-370000-HW552-DC03DCO4.pdf PDF
CN-370000-HW552-DC03F.pdf PDF
CN-370000-HW552-DC03G.pdf PDF
CN-370000-HW552-DC03I.pdf PDF
CN-370000-HW552-DC04C.pdf PDF
CN-370000-HW552-DC04E.pdf PDF
CN-370000-HW552-DC04F.pdf PDF
CN-370000-HW552-DC04J.pdf PDF
CN-370000-HW552-DC04JCO1.pdf PDF
CN-370000-HW552-DC04KCO1.pdf PDF
CN-370000-HW552-DC04L.pdf PDF
CN-370000-HW552-DC04R.pdf PDF
CN-370000-HW552-DC04RCO2.pdf PDF
CN-370000-HW552-DC04S.pdf PDF
CN-370000-HW552-DC05ACO1.pdf PDF
CN-370000-HW552-DC05C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW552

D000 NADC023P

Professional Service Industries (PSI)

Nana Westmark

850-245-8705Walsta Jean-Baptiste

ERIC_5423

Main Street Cleaners Inc

1679 Main Street, Sarasota, Sarasota County

Assessment

This Task Assignment authorizes PSI to conduct supplemental site assessment in accordance with the PSI scope of work, bid documentation, cost estimate form, and schedule received on November 23, 2021.

Supplemental Site Assessment Report

05/31/2022

08/30/2022

$ 19,340.76 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.12.02 13:31:02 -05'00'

Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.12.02 13:31:11 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.12.02 14:41:05 -05'00'

Nana G Westmark Digitally signed by Nana G Westmark Date: 2021.12.02 15:08:06 -05'00'

$ 19,340.76

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1-5: Supplemental Site Assessment Report including investigation derived waste manifests and project management 05/31/2022

Subtasks 1-5: FDEP approval of the Supplemental Site Assessment Report including investigation derived waste manifests and project management $ 19,340.76

$ 19,340.76

HW552

DC023P

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton

Secretary

Memorandum

TO: HW552 Contract File

FROM: Walsta Jean-Baptiste, Contract Manager

SUBJECT: Supplemental Site Assessment

Main Street Cleaners, Inc - DC023P

DATE: December 2, 2021

This Task Assignment authorizes PSI to conduct supplemental site assessment in accordance with the PSI scope of work, bid documentation, cost estimate form, and schedule received on November 23, 2021.

There were no changes to the proposed costs. PSI received three responsive bids for subcontracted services.

The cost related to this Task Assignment is $19,340.76 with 130 hours.

PSI Project Number: 05521366 PSI Proposal Number: 0552-360100

November 23, 2021

Professional Service Industries, Inc.

5801 Benjamin Center Drive, Suite 112, Tampa, FL 33634

Phone: (813) 886-1075 Fax: (813) 249-4916 www.intertek.com/building

Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400

Attention: Ms. Walsta Jean-Baptiste, PG Contract Manager Telephone: (850) 245-8705, (850) 245-8973 direct Email: walsta.jeanbaptiste@FloridaDEP.gov

Re: Proposal for Limited Site Assessment Addendum

Main Street (Current Courtesy Cleaners on Main) 1679 Main Street Sarasota, Sarasota County, Florida

FDEP Facility ID No. 58 9500336 / ERIC_5423

Dear Ms. Jean-Baptiste:

Professional Service Industries, Inc. (PSI) is pleased to provide a proposal to perform monitoring well installation, soil confirmation sampling services and groundwater sampling services at the former Main Street Cleaners located at 1679 Main Street, Sarasota, Florida. Included with this proposal is a brief discussion of project history to date, proposed scope of work, cost estimate and a proposed schedule for completion.

PROJECT BACKGROUND

The former Main Street Cleaners (now known as Courtesy Cleaners on Main) is a pickup/drop-off drycleaning business in Sarasota, Florida. The former Main Street Cleaners was accepted in the State of Florida Drycleaning Solvent Cleanup Program in May 1997 and received a priority list scoring of 112.

The subject site is located at 1679 Main Street, on the north side of Main Street, approximately 700 feet east of the intersection of Main and Orange Avenue and within the downtown area of Sarasota. The subject site houses a standalone building that abuts a building immediately adjacent to the east.

mailto:walsta.jeanbaptiste@FloridaDEP.gov

FDEP – Main Street Cleaners Limited Site Assessment Addendum

The subject property was a former gasoline service station from 1930s until 1976. The building is remodeled, but the canopy, pump island, and former service bays are still visible.

The former Main Street Cleaners property is owned by the First Baptist Church of Sarasota, who also owns the property to the west across King Court, where the main sanctuary building is located. A pre-kindergarten school is located at the church property directly north of the drycleaner building.

The Limited Site Assessment / Interim Source Removal Plan conducted under the Drycleaning Solvent Cleanup Program identified drycleaning solvents in vadose zone soils and shallow groundwater on-site. Off-site assessment of groundwater was not completed at that time. A remedial strategy for the unsaturated zone soil consisting of an SVE system was designed and implemented. The SVE system start-up occurred in August 2015. Since that time, the SVE system has been operational.

PSI collected soil confirmation samples at seven locations in 2017. The analytical results are compared to the original samples results and are summarized below:

Location Date of Sample PCE concentration Depth of Sample

BLS

MAG002 4/17/2014

6/15/2017

0.11 mg/kg

0.0033 U mg/kg

3 ft.

MAG003 4/17/2014

6/15/2017

0.215 mg/kg

0.0028 U mg/kg

1 ft.

MAG005 4/17/2014

6/15/2017

0.241 mg/kg

0.0025 U mg/kg

MAG006 4/18/2014

6/15/2017

0.115 mg/kg

0.0030 U mg/kg

1 ft.

DP007

7/9/2014 6/15/2017

0.130 mg/kg

0.0028 U mg/kg

SB005

7/8/2014

0.280 mg/kg

0.0033 U mg/kg

SB006

7/8/2014

0.290 mg/kg

0.0030 U mg/kg

FDEP – Main Street Cleaners Limited Site Assessment Addendum

PSI has been performing annual groundwater monitoring since 2016. The most recent groundwater sampling event occurred in March 2021. Groundwater analytical results, indicated that Natural Attenuation Default Concentration (NADC) exceedances of TCE and cis-DCE were detected in monitoring well MW005S. A Groundwater Cleanup Target Level (GCTL) exceedance of PCE was detected in monitoring well MW005S, and a GCTL exceedance of cis-DCE was detected in monitoring well MW009S. Monitoring well MW005S is located on-site near the abandoned UST farm on the south side of the building. Monitoring well MW009S is located across the street behind the church office, beyond which is a post office. No GCTL exceedances were detected in any of the other wells that were sampled.

Based on recent comments by the FDEP, additional monitoring wells are recommended. A downgradient compliance point, consisting of a shallow monitoring well, is recommended for installation at the rear parking area of a United States Postal Service (USPS) facility located at 1661 Ringling Blvd. Two additional shallow monitoring wells are recommended on and to the east of Main Street Cleaners property for additional VOH groundwater plume definition. Two of these proposed wells will require Site Access from the different property owners.

Additionally, four additional confirmation soil samples are recommended at locations near the source area on Main Street Cleaners property.

A proposal to install one on-site permanent monitoring well, two permanent off-site monitoring wells, conduct soil sampling and perform annual groundwater monitoring is contained herein.

PROPOSED SCOPE OF WORK

1. Project Management

This scope is provided for in the template worksheets.

2. Off-Site Property Access / Monitoring Well Installation

Off-Site Property Access

Site access will consist of obtaining permission from the First Baptist Church of Sarasota (also owner of the Main Street Cleaners) to install a well at 1693 Main Street. Additionally, permission will be obtained from the United States Postal Service (USPS) to install a shallow well in the parking lot at the rear of their facility at 1661 Ringling Boulevard. The USPS has indicated that a short workplan and a signed access form will be necessary to receive permission for well installation at their facility.

FDEP – Main Street Cleaners Limited Site Assessment Addendum

Monitoring Well Installation

PSI will provide oversight for new monitoring well installation. The proposed new monitoring wells will monitor the cross gradient (east) and downgradient (south) portions of the groundwater contaminant plume. Three new monitoring wells will be installed at locations presented on the attached map. The downgradient well planned for the post office will be installed with a direct push drill rig, and the remaining two shallow wells will be installed by hand.

The proposed wells will be constructed of one-inch diameter PVC riser and prepack well screen.

The annular space between the outer screen and the borehole will be packed with 20/30 silica-sand to 1-foot above the well screen, followed by 1-foot of 30/65 fine sand or bentonite seal. The remaining annular space will be sealed with a mixture of bentonite and Portland Type 1 cement.

Each well will be set inside an 8-inch manhole with steel cover and a locking, watertight cap. The manhole will be placed inside a 2-foot square concrete pad.

All downhole tools will be decontaminated prior to and between each location. Standard decontamination procedures (steam wash) apply for all drilling equipment and downhole tools (e.g., tremie pipe, hoses). Decontamination fluids and solids will be containerized.

The well locations are presented on the attached map. Specific construction details are described as follows:

Location A monitoring well – shallow screened from 2-7 ft. bls

Location B monitoring well – shallow screened from 2-7 ft. bls

Location C monitoring well – shallow screened from 5-15 ft. bls

Please note that ATI, St. Petersburg was selected as the low bid drilling contractor.

FDEP – Main Street Cleaners Limited Site Assessment Addendum

3. Soil Sampling and Analysis

Soil samples will be collected with a decontaminated stainless-steel hand auger. A coring machine will be utilized to penetrate concrete and asphalt surface cover. Locations selected for soil samples are illustrated on the attached site sketch and are as follows:

The soil confirmation samples will be collected at the locations presented on table above and will be as close as physically possible to the previously collected samples which exhibited elevated PCE concentrations.

4. Groundwater Sampling and Analysis

Groundwater samples will be collected from the newly installed wells and the existing wells using standard FDEP SOP procedures. The annual groundwater monitoring event has occurred in previous years in the first quarter of the year; therefore, we are including appropriate existing monitoring wells for annual sampling in addition to the proposed new wells. The groundwater monitoring will consist of the following activities:

a. Mobilization to the site.

b. Collect groundwater elevation measurements from the eleven previously existing and three newly installed monitoring wells.

c. Collect groundwater samples from the following fourteen monitoring wells:

i. MW003S;

ii. MW005S, MW005I;

iii. MW006S, MW006I;

iv. MW008S, MW008D;

v. MW009S, MW009D;

vi. MW010S, MW010D;

Date of Sample PCE concentration Depth of Sample

BLS

DP002 7/7/2014

0.058 mg/kg 3 ft.

SB008 7/10/2014 0.053 mg/kg 3 ft.

SB009

7/10/2014

0.040 mg/kg

SB013

7/14/2014

0.0575 mg/kg

FDEP – Main Street Cleaners Limited Site Assessment Addendum

vii. three proposed new wells;

viii. Duplicate.

d. Submit groundwater samples to a NELAC approved laboratory for analysis of

VOHs via EPA Method 8260.

e. Development of ADaPT / GIS package deliverable.

The investigative derived waste (IDW) that will be generated during well development/ groundwater monitoring is limited to purge water from the monitoring wells which will be put into the existing polytank and stored on-site.

5. Data Evaluation and Report Deliverable

A Limited Site Assessment Report Addendum will be prepared which will include updated soil and groundwater summary tables, revised maps, soil boring logs, well construction logs and analytical reports. The laboratory analytical data will be validated using the FDEP’s Automated Data Processing Tool (ADaPT) to ensure quality control targets were met. Geographic Information System (GIS) tables will also be developed for this study.

Conclusions and recommendations will be made, which will include any modifications to the proposed annual groundwater sampling event. The report will incorporate specific recommendations and provide opinions based on professional experience in order to achieve the most efficient endpoints.

FDEP – Main Street Cleaners Limited Site Assessment Addendum

A Cost Estimate and Level of Effort are attached.

COST ESTIMATE AND SCHEDULE

The estimated cost to conduct the above described work, including site access, monitor well installation, soil confirmation sampling, groundwater sampling and data evaluation / reporting is shown on the attached Cost Estimate and Level of Effort sheets. All PSI services will be conducted in accordance with the terms and conditions contained within DEP Contract No. HW552, Bureau of Waste Cleanup Services, dated December 10, 2010. We anticipate the Monitoring Well Installation and Groundwater Monitoring to be conducted in February 2022 and be completed within 7 to 9 weeks after FDEP approval, depending on the time to obtain permission to work off-site and availability of the drilling subcontractor.

PSI appreciates the opportunity to be of service to the FDEP. We look forward to working with you on this important project. If you have any questions, please feel free to contact us at (813) 886-1075.

Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC.

Christopher L. Cummins, PG Nana Westmark, PG, CHMM Senior Geologist Principal Consultant / Contract Manager

Enclosure: Cost Estimate Level of Effort Proposed Soil Boring Location Map Proposed Well Location Map Drilling Bids

Z:\552-Env\FDEP BWC\05521366 Main Street Cleaners, Sarasota\Proposal\2021 - 11 Add'l Wells LSARA\Main St 0552- 360100.docx

DJG

PROJ. NO.

DRAWN BY

DATE CREATED

SCALE: 1" = 10'

5801 Benjamin Center Drive, Suite 112

Tampa, Florida 33634

(813) 886-1075

(813) 249-0301 fax

FIGURE No.

SOIL ANALYTICAL RESULTS

MAIN STREET CLEANERS

1679 MAIN STREET

SARASOTA, SARASOTA COUNTY, FLORIDA

FDEP ID No. 58 9500336

05521366

8/8/14

Depth PCE 1 ft. 0.0030 U 3 ft. 0.058

Depth PCE 1 ft. 0.0029 U 3 ft. 0.0040

Depth PCE 1 ft. 0.0035 U 3 ft. 0.0025 U

Depth PCE 1 ft. 0.0033 U 3 ft. 0.130

Depth PCE 1 ft. 0.033 3 ft. 0.065

Depth PCE 1 ft. 0.006 3 ft. 0.130

Depth PCE 1 ft. 0.008 3 ft. 0.009

Depth PCE 1 ft. 0.0039 U 3 ft. 0.003

Depth PCE 1 ft. 0.0024 U 3 ft. 0.0023 U

Depth PCE cis-1,2-DCE 1 ft. 0.0070 U 0.007 U 3 ft. 0.025 U 0.036

Depth PCE 1 ft. 0.0035 U 3 ft. 0.018

Depth PCE 1 ft. 0.012 3 ft. 0.019

Depth PCE 1 ft. 0.0025 U 3 ft. 0.0025 U

Depth PCE 1 ft. 0.040 3 ft. 0.280

Depth PCE 1 ft. 0.057 3 ft. 0.290

Depth PCE 1 ft. 0.007 3 ft. 0.015

Depth PCE 1 ft. 0.022 3 ft. 0.053

Depth PCE 1 ft. 0.013 3 ft. 0.040

Depth PCE 1 ft. 0.0033 U 3 ft. 0.007

Depth PCE 1 ft. 0.0034 U 3 ft. 0.0027 U

Depth PCE 3 ft. 0.0019 U

Depth PCE 3 ft. 0.0575

Depth PCE 1 ft. 0.007 3 ft. 0.009

Depth PCE 3 ft. 0.0034 I

Depth PCE 3 ft. 0.11

Depth PCE 1 ft. 0.215

Depth PCE 1 ft. 0.0296

Depth PCE 3 ft. 0.241

Depth PCE 1 ft. 0.115Depth PCE cis-1,2-DCE

5 ft. 2.98 U* 2.98 U*

9.5 ft. 0.0030 U 0.859

Depth PCE 1 ft. 0.060 3 ft. 0.021

Depth PCE cis-1,2-DCE 1 ft. 0.0033 U 0.0033 U 3 ft. 0.0024 U 0.051

PROPOSED CONFIRMATION SOIL BORINGS

DATE 1/26/16 4/21/17 7/18/18 11/1/19 7/23/20

PCE 0.50 U 0.50 U 0.50 U 0.50 U 0.38 U

TCE 0.50 U 0.50 U 0.61 U 0.61 U 0.36 U

cDCE 0.59 I 0.50 U 0.32 U 0.32 U 0.27 U tDCE 0.50 U 0.50 U 0.39 U 0.39 U 0.23 U

VC 0.50 U 0.50 U 0.26 U 0.26 U 0.39 U

E NA NA 0.27 U 0.27 U NA

MW001S

(2-7')

DATE 1/26/16 4/21/17 7/18/18 11/1/19 11/21/19 7/24/20 3/23/21

PCE 0.50 U 12.5 U 0.50 U 0.50 U 0.50 U 0.38 U 0.38 U

TCE 0.50 U 170 13 2.7 4.8 0.36 U 1.2

cDCE 817 2520 96 1.1 2.2 10.9 3.5 tDCE 34.5 80.5 2.1 0.39 U 0.39 U 0.23 U 0.23 U

VC 0.56 I 12.5 U 0.26 U 0.26 U 0.26 U 0.39 U 0.39 U

E NA NA 4.0 2.9 NA NA NA

MW003S

(2-7')

DATE 8/8/14 1/26/16 4/21/17 7/18/18 11/1/19 7/23/20

PCE 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.38 U

TCE 0.50 U 0.50 U 0.50 U 0.61 U 0.61 U 0.36 U

cDCE 0.50 U 0.50 U 0.50 U 0.32 U 0.32 U 0.27 U tDCE 0.50 U 0.50 U 0.50 U 0.39 U 0.39 U 0.23 U

VC 0.50 U 0.50 U 0.50 U 0.26 U 0.26 U 0.39 U

E 0.50 U NA NA 0.27 U 0.27 U NA

MW004S

(2-7')

DATE 7/17/18 10/31/19 7/24/20 3/22/21

PCE 0.50 U 0.50 U 0.38 U 0.38 U

TCE 0.61 U 0.61 U 0.36 U 0.36 U

cDCE 5.2 0.91 I 0.44 I 11.6 tDCE 0.39 U 0.39 U 0.23 U 0.23 U

VC 0.26 U 0.26 U 0.39 U 0.39 U

E 0.27 U 0.27 U NA NA

(5-15')

MW010S

DATE 7/17/18 11/3/19 7/24/20 3/24/21

PCE 100 27 589 43.5

TCE 420 750 1350 433

cDCE 520 630 488 767 tDCE 35 62 57.0 74.2

VC 0.51 U 1.3 U 0.39 U 0.59 I

E 260 110 NA NA

MW005S

(2-7')

DATE 7/11/14 1/26/16 4/21/17 7/18/18 11/1/19 7/23/20 3/24/21

PCE 45 0.50 U 0.50 U 0.50 U 0.50 U 0.38 U 0.38 U

TCE 1 U 0.50 U 0.50 U 0.61 U 1.6 I 0.36 U 0.36 U

cDCE 1 U 0.50 U 0.50 U 1.3 15 0.27 U 0.27 U tDCE 1 U 0.50 U 0.50 U 0.39 U 1.1 I 0.23 U 0.23 U

VC 1 U 0.50 U 0.50 U 0.26 U 0.42 I 0.39 U 0.39 U

E 1 U NA NA 0.27 U 0.27 U NA NA

MW002S

(2.5-7.5')

DATE 7/17/18 10/31/19 11/21/19 7/24/20 3/22/21

PCE 0.50 U 0.50 U 0.50 U 0.38 U 0.38 U

TCE 1.8 I 3.0 3.4 3.0 2.0

cDCE 8.5 97 130 163 164 tDCE 1.4 I 6.9 8.6 7.0 6.8

VC 0.26 U 0.87 I 1.2 0.77 I 0.85 I

E 0.27 U 0.27 U NA NA NA

(5-15')

MW009S

DATE 7/18/18 11/3/19 7/23/20

PCE 1.4 I 0.50 U 0.38 U

TCE 0.61 U 0.61 U 0.36 U

cDCE 0.32 U 0.32 U 0.27 U tDCE 0.39 U 0.39 U 0.23 U

VC 0.26 U 0.26 U 0.39 U

E 0.27 U 0.27 U NA

(2-7')

MW007S

DATE 7/18/18 11/1/19 7/24/20 3/24/21

PCE 0.50 U 0.70 I 0.58 I 0.63 I

TCE 67 1.1 I 0.36 U 0.36 U

cDCE 5.8 0.68 I 0.36 I 9.1 tDCE 0.39 U 0.39 U 0.23 U 0.67 I

VC 0.26 U 0.26 U 0.39 U 0.39 U

E 5.9 0.27 U NA NA

(2-7')

MW006S

DATE 7/17/18 10/31/19 7/24/20 3/23/21

PCE 0.50 U 0.50 U 0.38 U 0.38 U

TCE 0.61 U 0.61 U 0.43 I 0.36 U

cDCE 0.32 U 0.32 U 0.39 I 0.93 I tDCE 0.39 U 0.39 U 0.23 U 0.23 U

VC 0.26 U 0.26 U 0.39 U 0.39 U

E 0.27 U 0.27 U NA NA

(5-15')

MW008S

u

RED

BOLD

BLUE

DATE GCTL NADC

PCE 3 300

TCE 3 300

cDCE 70 700 tDCE 100 1000

VC 1 100

E 30 300

SAMPLE ID

SCREEN INTERVAL

Screened 2-7 ft

Screened 5-15 ft

PROPOSED NEW WELLS

A B

C

FDEP COST ESTI MATE

Contractor: Professional Service Industries, Inc.

Date: 11/23/2021

Task #: DC023P SUBTASK 1: Project Management SUBTASK 6:

Site: SUBTASK 2: Site Access/MW Install SUBTASK 7:

Activity/Phase: SUBTASK 3: Soil Sampling SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: GW Sampling SUBTASK 9:

SUBTASK 5: Data Evaluation / Report SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 10 9.7 $62.50 Principal Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $52.89 Senior Engineer, 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $48.08 Senior Geologist, NW 17 7.0 2.0 2.0 6.0 0.0 0.0 0.0 0.0 0 $45.20 Senior Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $34.62 Certified Industrial Hygientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Certified Hazardous Materials Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $50.00 Florida Licensed Asbestos Consultant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $48.08 Project Manager 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $31.73 Project Engineer, MM 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $32.94 Project Geologist, CC 49 31.0 0.0 0.0 18.0 0.0 0.0 0.0 0.0 0 $29.81 Project Scientist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $29.81 QA Officer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $32.21 Remediation Coordinator 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$0.00 Professional Land Surveyor 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $0.00 Chemist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$24.50 GIS Specialist, DG 4 0.0 0.0 0.0 4.0 0.0 0.0 0.0 0.0 0 $25.00 Staff Engineer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Staff Geologist 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $24.76 Staff Scientist, RH 39 0.0 10.5 28.0 0.0 0.0 0.0 0.0 0.0 0 $24.04 Staff Scientist, RF 11 0.0 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $20.57 Staff Scientist, AH 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.30 Environmental Technician 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $18.75 Administrative Assistant 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $15.50 Secretary 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 $15.00 Senior Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0

$12.00 Laborer 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 Total Hours 130 10 38.0 23.5 30.0 28.0 0.0 0.0 0.0 0.0 0

Professional Service Industries, Inc.

Direct Labor $4,215.51 $468.39 $1,357.70 $620.58 $789.44 $979.40 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $7,206.83 $800.76 $2,321.12 $1,060.94 $1,349.63 $1,674.38 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (PSI) $11,422.34 $1,269.15 $3,678.82 $1,681.52 $2,139.07 $2,653.78 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $11,422.34 $1,269.15 $3,678.82 $1,681.52 $2,139.07 $2,653.78 $0.00 $0.00 $0.00 $0.00 $0.00

LSAA

Main Street ERIC_5423

REV: 02/03 CEF_PSI.XLS Page 1

FDEP COST ESTI MATE

Contractor: Professional Service Industries, Inc.

Date: 11/23/2021

Task #: DC023P SUBTASK 1: Project Management SUBTASK 6:

Site: SUBTASK 2: Site Access/MW Install SUBTASK 7:

Activity/Phase: SUBTASK 3: Soil Sampling SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: GW Sampling SUBTASK 9:

SUBTASK 5: Data Evaluation / Report SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10

LSAA

Main Street ERIC_5423

Other Direct Costs $210.78 $23.42 $67.89 $31.03 $39.47 $48.97 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

Vehicle Rental $582.00 $194.00 $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $582.00 $194.00 $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling, Conventional $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling, Non-Conventional $2,985.00 $2,985.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $150.00 $0.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities / GPR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sewer Line $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Permits $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $3,135.00 $2,985.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $313.50 $298.50 $15.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $3,448.50 $3,283.50 $165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,414.00 $0.00 $424.00 $990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,414.00 $0.00 $424.00 $990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $162.50 $65.00 $32.50 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $958.40 $226.05 $315.25 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,120.90 $291.05 $347.75 $482.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $18,198.52 $1,292.57 $7,515.26 $2,843.30 $3,844.64 $2,702.75 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,142.24 $126.92 $367.88 $168.15 $213.91 $265.38 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $19,340.76 $1,419.49 $7,883.14 $3,011.45 $4,058.55 $2,968.13 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF_PSI.XLS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Main Street ERIC_5423 SUBTASK 2: Site Access/MW Install

DATE: 11/23/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Geologist, N Westmark Develop level of effort and cost estimate 3 Develop bids 4

Site Access 7 Project Geologist, C Cummins Technical review 2

Site Access (Develop USPS workplan, notification with property owners) 8 Travel (roundtrip) 3 Meeting on site with tenants, owners 2

Well Installation Oversight Project Geologist, C Cummins Load / Unload 1

Travel (1 roundtrip) 3 Oversight of well installation 10 Survey top of casings 2

31.0

TOTAL LABOR 38

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Monitor well installation kit $184.30 day 1 $184.30 Survey Station $41.75 day 1 $41.75

$226.05 Expendables $32.50 day 2 $65.00

TOTAL EQUIPMENT $291.05

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (Well Install) $97.00 day 2 $194.00

On-site meeting Well Oversight

TOTAL VEHICLE $194.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

ATI Drilling 1 $2,985.00 $2,985.00

TOTAL $2,985.00

well installation

Page 3 Main St 0552-360100.xlsx

SUBTASK 3: Soil Sampling

DATE: 11/23/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Senior Geologist, N Westmark Technical Oversight 2

Staff Scientist, R Fetter Project Prep 1

Travel (1 days @ 3 hours roundtrip) 3 Set-up space for coring (plastic sheeting, tape) 1 Concrete Coring 2 Install hand augers for soil sampling

2 soil borings 2 Resurface boreholes 2

Staff Scientist, R Hanson Load, unload 2

Travel (1 days @ 3 hours roundtrip) 3 Concrete Coring 2 Install hand augers for soil sampling

2 soil borings 2 Pick-up, drop off samples 1 Stage IDW 0.5

10.5

TOTAL LABOR 23.5

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Soil Sampling Kit, (through concrete) $208.55 day 1 $208.55 PID / FID $106.70 day 1 $106.70

$315.25 Expendables $32.50 day 1 $32.50

TOTAL EQUIPMENT $347.75

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (Soil Sampling) $97.00 day 1 $97.00 Staff Scientist Equipment Van / Truck (Soil Sampling) $97.00 day 1 $97.00 Staff Scientist

TOTAL VEHICLE $194.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH by EPA Method 8260 $66.00 4 $264.00 SPLP Extraction soil $40.00 4 $160.00 Encore soil $8.75 4 $35.00

TOTAL LAB $424.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

PetroTech SouthEast Waste management 1 $150.00 $150.00

TOTAL $150.00

Page 4 Main St 0552-360100.xlsx

SUBTASK 4: GW Sampling

DATE: 11/23/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Senior Geologist, N Westmark Technical Oversight 2

Staff Scientist, R Hanson Technical Preparation 1

Load / Unload 1 Travel (2 days /3 hrs roundtrip) 6 Collect groundwater elevations (14 wells) (10 minutes per well ) 2 Collect groundwater samples (14 wells) (1 hour per well) 14 Documentation of groundwater sampling & measurements 2 Pickup / drop off samples 2

TOTAL LABO 30

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Shallow groundwater sampling kit $208.55 day 2 $417.10 Expendables $32.50 day 2 $65.00

TOTAL EQUIPME $482.10

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck (GW Sampling) $97.00 day 2 $194.00

TOTAL VEHICL $194.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIE $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

VOH by EPA Method 8260 $66.00 14 1 $990.00

TOTAL LAB $990.00

Page 5 Main St 0552-360100.xlsx

SUBTASK 5: Data Evaluation / Report

DATE: 11/23/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities Data Evaluation / Develop Report

Senior Geologist, N Westmark Review report text, tables, figures 3 Prepare recommendations 2 Sign and seal documents 1

Project Geologist, C Cummins Review Data 3 Develop contour maps, figures from data results 5 Develop GIS Tables 1 Evaluate ADaPT data 1 Develop LSAA Report 8

GIS/CADD Specialist, D Grove Develop maps, figures 4

TOTAL LABOR 28

Page 6 Main St 0552-360100.xlsx

Professional Service Industries, Inc. (PSI) Request for Quotation

Facility Name Main Street Cleaners Facility Location Sarasota, Sarasota County, FL Facility ID ERIC_5423 FDEP Drycleaning Solvent Cleanup Program

Units Unit Rate Extended Price

1 575.00$ 575.00$

1 1,450.00$ 1,450.00$

1 170.00$ 170.00$

2 100.00$ 200.00$

3 100.00$ 300.00$

1 65.00$ 65.00$

3 75.00$ 225.00$

Total: 2,985.00$

Geoprobe 7720 DT or larger required as standard rig.

One well is in concrete. The other two are in asphalt

Signed PSI Purchase Order is required before working.

All equipment to be decontaminated prior to boring / well installation by steam cleaning.

OSHA HazWOPER trained crew required.

Include per diem in cost, if necessary.

Estimated start date: January 2022 Company Name: Ambient Technologies inc Address: 4610 Central Ave, St Petersburg, FL Phone: 727 328-0268 Email: marcelo@ambienttech.com Contact: Marcelo Reis, Msc.

Proposal: 22111018

11/12/2021

Name, Title.

Permtis

Monitoring well installation.

Mobilization (lump sum)

Drums (each)

Standard DPT Rig Daily Charge (per day)

Hand Installed Shallow Well (5 ft of prepack screen, 2-7 ft TD) (each) (Materials Only)

Rig Installed Shallow Well (10 ft of prepack screen, 15 ft TD) (each) (Materials Only)

Pad Construction and Development (each)

Professional Service Industries, Inc. (PSI) Request for Quotation

Facility Name Main Street Cleaners Facility Location 1679 Main St, Sarasota, FL Facility ID ERIC_5423 FDEP Drycleaning Solvent Cleanup Program

Units Unit Rate Extended Price

1 575.00$ 575.00$

1 1,575.00$ 1,575.00$

1 280.00$ 280.00$

2 125.00$ 250.00$

3 110.00$ 330.00$

1 55.00$ 55.00$

1 275.00$ 275.00$

Total: 3,340.00$

Geoprobe 7720 DT or larger required as standard rig.

One well is in concrete. The other two are in asphalt

Signed PSI Purchase Order is required before working.

All equipment to be decontaminated prior to boring / well installation by steam cleaning.

OSHA HazWOPER trained crew required.

Include per diem in cost, if necessary.

Estimated start date: January 2022 Company Name: Preferred Drilling Solutions Address: 8820 66th St N, Pinellas Park, FL Phone: (727) 561-7477 Email: Kevin@pdsflorida.com Contact: Kevin Bonacum

Name, Title.

Permtis

Monitoring well installation.

Mobilization (lump sum)

Drums (each)

Standard DPT Rig Daily Charge (per day)

Hand Installed Shallow Well (5 ft of prepack screen, 2-7 ft TD) (each) (Materials Only)

Rig Installed Shallow Well (10 ft of prepack screen, 15 ft TD) (each) (Materials Only)

Pad Construction and Development (each)

PSI - Intertek Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort Myers, Naples) Panhandle water $90.00 $90.00 $100.00 $100.00 $110.00 soil $110.00 $110.00 $120.00 $120.00 $130.00 low volume fee if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$50 if< 6 drums +$200 Pick-up fee NA NA NA NA NA Total Per One Drum Water $140.00 $140.00 $150.00 $150.00 310.00$ Total Per One Drum Soil $160.00 $160.00 $170.00 $170.00 330.00$

Plus $150 per day / per diem water $115.00 $115.00 Non service area Non service area Non service area soil $150.00 $150.00 Non service area Non service area Non service area water $92.00 $92.00 $92.00 $92.00 $92.00 soil $67.00 $67.00 $67.00 $67.00 $67.00 low volume fee if 3 drums or less add $35 if 3 drums or less add $45 if 3 drums or less add $55 if 3 drums or less add $55 if 10 drums or less add $450

Pick-up Fee 30 40 50 50 95.00$ Total Per One Drum Water $157.00 $177.00 $197.00 $197.00 637.00$ Total Per One Drum Soil $132.00 $152.00 $172.00 $172.00 612.00$

Plus $150 per day / per diem

* = DOT shippable drums on hard concrete or asphalt surface easily accessible with tractor trailer with no dirt, grass or curbs to get drums to tailgate of truck ** = Need TCLPs for VOHS for soils, Totals only for VOHSs for water 100% liquids.

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

Petrotech Southeast, Inc.

Clark Environmental, Inc. * and **

NRC / US Ecology(formerly SWS)

Page 1 of 1 PSI IDW Bids 1-31-2020

PSI - Intertek Request for Annual Investigative Derived Waste (IDW) IDW Pick-up, transport, Disposal and Treatment

PROJECT BID TABULATIONS IDW

Facility Name Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida Facility Location Various Facility ID Various

Description of Service

Tampa Area Orlando - Central

Florida Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples) Panhandle water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. ) Please include all costs for pick-up, transport, fuel costs, stoppage fee, disposal, based on per drum cost.

2.) PSI is neither the generator nor transporter for hazardous or non-hazardous waste

5. ) Waste is considered not hazardous.

6. ) Analytical results of waste will be provided by a NELAP -approved laboratory.

7.) A PSI Purchase Order referencing Terms & Conditions (attached) will be issued and must be signed prior to pick-up.

Description 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

State of Florida

3. Waste generated is from assessment / remediation of drycleaner sites under the State of Florida Drycleaning Solvent Cleanup Program with funding provided by the FDEP.

The Generator is the Florida Department of Environmental Protection, 2600 Blair Stone Road, Tallahassee, FL 32399, MS 4512 or 4505.

4. ) PSI is under contract with FDEP for the assessment and remediation of drycleaner projects, and hence signs profiles and manifests on behalf of FDEP, Bureau of Waste Cleanup,Hazardous Waste Cleanup Section.

$115.00 $150.00

$115.00 $150.00

Petrotech Southeast, Inc.

Phone: 407 - 656-8114 Fax: 407 - 358-5030 Natacha Mitchell-Jackson

Quote # TP02077

US Ecology Waste (IDW) IDW Pick-up, Transport & Disposal Services

Various Drycleaning Sites under FDEP Drycleaning Solvent Cleanup Program in Florida

Description of Service

State of Florida

Description

Tampa Area

Orlando - Central

Florida

Jacksonville Area, North Florida

South Florida (Miami, Fort

Myers, Naples)

Panhandle 55-Gallon Drum Pick-up, Transport, Disposal at an approved facility.

water soil low volume fee Pick-up fee

$0.00 $0.00 $0.00 $0.00 $0.00

1. Drums must be in DOT Shippable containers before being transported.

2. Pricing does not include over-packing Non-DOT shippable containers (drums).

3. Disposal pricing offered is based on the non-hazardous waste being containerized in 55/Gal drums. 15/Gal, 30/Gal, 85/Gal & 95/Gal containers are not included.

4. All waste must be profiled and acknowledged by Intertek PSI as well as providing signed waste manifests for each site.

5. Pricing for waste is upon disposal facility acceptance. Off-spec charges and/or surcharges will be priced accordingly.

6. All waste pickups will be scheduled during normal business hours, Monday - Friday. Nights, weekends and holidays are not included

7. The Panhandle pricing will apply to drum pickups in the Florida Keys.

Intertek PSI Representative

$92.00 $67.00 $67.00

$92.00 $67.00 $92.00 $92.00

$67.00 $67.00 $92.00

$95.00 $450 / 10 Drums or Less35 / 3 Drums or Less

$30.00 $40.00 $45 / 3 Drums or Less

$50.00 $55/ 3 Drums or Less

$50.00 $55/ 3 Drums or Less

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
Main St 0552-360100.pdf
Main St 0552-360100 cost.pdf
Cost Estimate
Formula Sheet
2 Site Access_MW Install
3 Soil Sampling
4 GW Sampling
5 Evaluation Report
Preferred Main Street Cleaners 1679 Main St Sarasota.pdf
Drilling
PSI IDW Package Bids.pdf
IDW
PetroTech Southeast PSI IDW Quotes Request 1-24-2020.pdf
IDW
(2) PSI IDW Bids 1-31-2020.pdf
IDW
PSI IDW Bids 1-31-2020.pdf
IDW
Main St 0552-360100_CEF.pdf
Cost Estimate
2 Site Access_MW Install
3 Soil Sampling
4 GW Sampling
5 Evaluation Report