CN-370000-GC868-A5.pdf
PDF 622 KB Posted
- Contract number
- GC868
- Issued by
- Florida
About this file
This is Amendment No. 5 to Agency Term Contract No. GC868, a rate increase amendment executed between the Florida Department of Environmental Protection (FDEP) and HLM Environmental Remediation, Inc. The contract provides petroleum contamination site response action services in Florida's South Region. The amendment was executed on May 7, 2018, with an effective rate change date of May 22, 2018. The contractor submitted detailed justification for rate increases, which the Department reviewed and approved in accordance with Contract Provision 11.B.
The amendment increases rates for 235 pay items representing approximately 4.76% to 5.00% of the pre-existing contracted rates, with all increases not exceeding the maximum 5% allowed under Contract Provision 11.B.ii. The rate changes apply only to new work assignments offered on or after the Rate Change Date; all pre-Rate Change Date work assignments continue to apply the contractor's prior rate schedule. The revised Rate Schedule (Attachment D, Version 2.2) encompasses a comprehensive range of services including site assessments, drilling and boring, well installation, sample collection and analysis, laboratory testing, soil source removal, petroleum storage tank removal and disposal, remediation system construction and operation, and professional engineering and geological services. The rate increases affect pay items across all service categories, with individual rate adjustments ranging from approximately $0.10 to $5,250.00 depending on the specific service. All other terms and conditions of the original contract remain in effect, and the amendment does not add, delete, or otherwise modify any line items in the contract.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor�s applicable prior Rate Schedule.
Contractor�s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (�New Work� assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department�s data processing of the rate changes (hereinafter �Rate Change Date�); and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V2.1) entitled "Rate Schedule" in accordance with provision 11.B of the Contract; and, WHEREAS, the Contractor has submitted the detailed justification required under provision 11.B.ii to support the increase(s) requested; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, WHEREAS, the requested increase percentage does not exceed the maximum of 5% allowed in provision 11.B.ii; and, The Agency Term Contract No. GC868 (hereinafter "Contract") between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and HLM ENVIRONMENTAL REMEDIATION, INC. (hereinafter "Contractor") executed on February 27, 2014, to provide petroleum contamination site response action services in the South Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC868
RATE INCREASE
AMENDMENT NO. 5
Amendment No. 5 DEP Agency Term Contract No. GC868
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
NOW THEREFORE, the parties agree as follows:
Amendment No. 5 DEP Agency Term Contract No. GC868
4.
5.
6.
Attachment D, Rate Schedule (V2.2) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate schedule (V2.2) shall apply.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department�s Data Processing Information. Prior to the Rate Change Date, the Department shall provide Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change Date, within five (5) business days from the data entry date and prior to the Rate Change Date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this Amendment shall control.
Pre-existing Rate
Agreed New Rate(1)
$535.50 $562.00 $320.25 $336.20
$278.25 $292.11
$624.75 $655.86
$586.99 $616.22
$787.50 $826.72
$735.00 $771.60
$483.00 $507.05
$230.00 $241.45
$600.00 $629.88
$900.00 $944.82
$241.50 $253.53
$241.50 $253.53
$6,500.00 $6,823.70
$8,800.00 $9,238.24
$241.50 $253.00
$241.50 $253.53
$241.50 $253.53
$241.50 $253.53
$350.00 $367.43
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.76%
+4.98%
+4.98%
+4.98%
+4.98%
Pay Item No.
1-1.
1-2.
1-3.
3-14.a.
3-5.
3-7.a.
3-9.a.
3-11.
File Review Site Health & Safety Plan Notice of Discovery of Contamination Package (Initial or TPOC)
Receptor Survey and Exposure Pathway Identification (excludes report)
Site Reconnaissance/Field Measurement Visit
Drum Compactor mobilization - 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - 100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Loader/Backhoe Mobilization - 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - 100 miles each way
DPT Rig and Support Vehicles Mobilization - 100 miles each way
Work Trailer - 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Contractor Oversight for Non-Price Schedule Activities
LDA Rig and Support Vehicles Mobilization - 100 miles each way
Excavator Mobilization - > 100 miles each way
Excavator Mobilization - 100 miles each way
Description
3-12.
3-13.a.
Table 1. Listed Schedule of Pay Items with Rate Changes
2-1.
2-2.
2-4.
3-2.
3-3.
3-15.
3-16.
3-17.
3-18.
3-19.
Est % Rate
Change(2)
+4.95% +4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
$450.00 $472.41
$35.00 $36.74
$40.80 $42.83
$120.75 $126.76
$2,150.00 $2,257.07
$28.59 $30.01
$30.97 $32.51
$36.75 $38.58
$31.50 $33.07
$34.65 $36.38
$40.42 $42.43
$46.20 $48.50
$50.87 $53.40
$35.64 $37.41
$38.32 $40.23
$43.94 $46.13
$98.17 $103.06
$30.97 $32.51 $33.15 $34.80
$50.00 $52.49
$40.80 $42.83
$55.00 $57.74
$54.34 $57.05 $38.85 $40.78
+4.97%
+4.98%
+4.98%
+4.98%
+4.97% +4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.97%
+4.97%
+4.98%
+4.98%
+4.99%
+4.98%
+4.99% +4.97%
+4.98%
+4.97%
+4.98%
5-1.b.
5-3.a.
5-6.
5-7.
6-2.b.
5-17.
5-23.
6-1.
6-2.a.
5-13.
5-14.
5-15.
5-16.
5-8.
6-4.
5-1.a.1.
5-1.a.2.
6-3.a.
6-3.b.
Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)
Well Installation - 4 inch diameter (vertical)
Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
Well Installation - 2 inch diameter (vertical)
Well Installation - 6 inch diameter
Split Spoon Sampling � 2 foot (during boring) 50 to 100 feet
Split Spoon Sampling � 2 foot (during boring) < 50 feet
Drum Compactor mobilization - > 100 miles each way
Surface Casing - 6 inch diameter
Sonic Boring, 6 inch diameter, > 100 foot total depth
Sonic Boring, 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, 6 inch diameter, < 50 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, 6 inch diameter, > 100 foot total depth
Well Installation - 1 inch diameter
HSA or MR Boring, 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, 6 inch diameter, < 50 foot total depth
Direct Push Technology (DPT) Rig and Equipment
Sonic Core Sampling - 5 or 10 foot (during boring)
3-20.
5-9.
5-10.
5-11.
6-5.
+4.97%
+4.98%
+4.97%
$47.25 $49.60 $59.85 $62.83 $68.25 $71.65
$7.35 $7.70
$9.87 $10.36
$15.75 $16.53
$19.95 $20.94
$341.25 $358.24 $729.75 $766.09
$1,548.75 $1,625.88 $150.00 $157.47
$250.00 $262.45
$275.00 $288.70
$17.85 $18.74 $735.00 $771.60 $125.00 $131.23
$94.50 $99.21 $63.00 $66.14 $21.30 $22.36 $21.30 $22.36
$52.50 $55.11
$50.00 $52.49
$25.00 $26.25
$25.00 $26.25
$410.55 $431.00
$36.22 $38.02
$76.07 $79.86
+4.98%
+4.98%
+4.99%
+4.98%
+4.97%
+4.98%
+4.98% +4.98% +4.98% +4.98% +4.98% +4.98%
+4.97%
+4.98%
+4.96%
+4.95%
+4.96%
+4.98% +4.98% +4.98% +4.98%
+4.97% +4.98% +4.98%
+4.76%
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Grout and Abandon Well, 1 to 2 inch diameter
Survey Latitude/Longitude of New Monitor Wells
Survey Latitude/Longitude of Existing Monitor Wells
Electronic Data Deliverables (EDD)
Vapor/Ambient Air Sample Collection - Passive
Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)
Free Product Gauging & Bailing Water Level or Free Product Gauging Soil/Sediment Sample Collection
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Above Grade Well Completion
Additional Well Screen > 20 feet - 6 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
Surface Casing - 12 inch diameter Surface Casing - 10 inch diameter Surface Casing - 8 inch diameter
6-9.c.
6-9.d.
6-10.
6-11.
6-12.
6-13.
6-14.
6-15.
7-6.
7-7.
8-13.
6-6.
6-7.
6-8.
Well Redevelopment Installation of Well Vault - 4 x 4 x 2 foot Installation of Well Vault - 2 x 2 x 2 foot
6-9.a.
7-1.
6-9.b.
Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
Free Product Sample Collection Removal of Well Pad and Manhole Removal of Well Vault - 4 x 4 x 2 foot
Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)
9-1.
9-2.
9-4.
8-12.
8-5.
8-6.
8-7.
8-8.
8-9.
8-11.
+5.00%
+5.00%
$84.52 $88.73
$78.49 $82.40
$48.30 $50.71
$200.00 $209.96
$48.30 $50.71
$72.45 $76.00
$30.18 $31.68
$30.18 $31.68
$6.03 $6.33
$420.00 $440.92
$60.37 $63.38
$253.58 $266.21
$239.09 $251.00
$434.70 $456.35
$36.22 $38.02
$66.41 $69.72
$84.52 $88.73
+4.98%
+4.98%
+4.99%
+4.98%
+4.99%
+4.90%
9-22.
9-23.
9-24.
9-25.
9-26.
9-27.
9-29.
9-30.
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
Soil, PCBs [or Aroclors] (EPA 8082)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, Moisture Content (ASTM D2216-10)
Soil, Synthetic Precipitation Leaching Procedure- Extraction Only (EPA1312)
Soil, Toxicity Characteristic Leaching Procedure- Extraction Only (EPA 1311)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
9-5.
9-6.
9-16.
9-19.
9-15.
9-8.
9-8.a.
9-9.
9-10.
+4.98%
+4.98%
+4.99%
+4.98%
+4.98%
+4.98%
+4.97%
+4.98%
+4.98%
+4.97%
$42.26 $44.36
$50.00 $52.49
$72.45 $76.06
$78.49 $82.40
$150.94 $158.46
$283.76 $297.89
$48.30 $50.71
$48.30 $50.71
$9.66 $10.14
$9.66 $10.14
$9.66 $10.14
$9.66 $10.14
$18.40 $19.32
$9.66 $10.14
$9.66 $10.14
$9.66 $10.14
$9.66 $10.14
$9.66 $10.14
$9.66 $10.14
+4.97%
+4.97%
+4.98%
+4.98%
+4.99%
+4.99%
+4.97%
+4.97%
+4.97%
+4.97%
+5.00%
+4.98%
+4.98%
+4.97%
+4.97%
+4.97%
+4.97%
9-33.
9-34.
9-35.
9-36.
9-37.
9-38.
9-32.
9-31.
9-31.a.
9-48.
9-41.
9-42.
9-43.
9-44.
9-45.
9-46.
9-47.
9-39.
9-40.
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Sodium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Calcium, Total (EPA 200.7, EPA 6010 or
EPA 6020)
Water, Mercury, Total (EPA 245.1, EPA 6020 or
EPA 7470)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Priority Pollutant Volatile Organics (EPA 8260)
+4.97%
$17.85 $18.74
$14.49 $15.21
$12.07 $12.67
$14.49 $15.21
$14.49 $15.21
$14.49 $15.21
$21.73 $22.81
$17.00 $17.85
$14.49 $15.21
$409.50 $429.89
$54.34 $57.05
$253.58 $266.21
$55.00 $57.74
$55.00 $57.74
$84.52 $88.73
$175.09 $183.81
$169.05 $177.47
+4.99%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.97%
+4.97%
+4.97%
+4.97%
+4.97%
+4.97%
+5.00%
+4.97%
+4.98%
+4.99%
+4.98%
Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
Air, Volatile Organic Aromatics (EPA Method TO- 15)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA
9056 or SM 4500-SO4 C)
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Methane (EPA SOP RSK-175)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution
GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)
Water, Orthophosphate [as P] (EPA 300.0, EPA
300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-
PE or SM 4500-PF)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Hardness, Total [as CaCO3] (SM 2340 B or
SM 2340 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM
4500CI E)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-
NH3 H)
9-50.
9-51.
9-52.
9-53.
9-54.
9-55.
9-56.
9-67.
9-78.
9-80.
9-68.
9-69.
9-70.
9-66.
9-57.
9-60.
9-65.
$253.58 $266.21
$509.25 $534.61
$30.00 $31.49
$2.00 $2.10
$4.00 $4.20
$42.00 $44.03
$2.00 $2.10
$4.00 $4.20
$115.00 $120.73
$150.00 $157.47
$145.25 $152.48
$116.00 $121.78
$15.00 $15.75
$15.00 $15.75
$63.00 $66.14
$3,018.75 $3,169.08
$120.75 $126.76
$150.94 $158.46
$301.88 $316.91
$5,500.00 $5,773.90
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
10-15.a.
10-15.b.
10-16.
11-1.
10-11.a.
10-18.
10-19.
10-21.
10-23.
10-12.a.
10-13.
Remove and Dispose Petroleum Storage Tank - 1,000 gal. capacity
Additional Dewatering System Well Points (2) (includes installation)
Pea Gravel
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and Testing 300 cubic yards
Flowable Fill Concrete and Installation
Additional Dewatering System Well Points (2) (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Sheet Piling Rental for 20 feet deep Excavation
Sheet Piling Rental for 20 feet deep Excavation
LDA Excavation and Loading With Surface Casing > 300 cubic yards
LDA Excavation and Loading With Surface Casing 300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Installation for > 20 feet deep Excavation
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution
GC/MS)
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Sheet Piling Installation for 20 feet deep Excavation
10-2.b.
10-2.c.
10-10.
10-2.a.
9-72.
9-73.
10-1.a.
10-1.b.
10-1.c.
+4.98%
+4.98%
+4.98%
+4.98%
+5.00%
+5.00%
+4.98%
+4.98%
+4.97%
+5.00%
+5.00%
+4.83%
+5.00%
$6,000.00 $6,298.80
$7,500.00 $7,873.50
$9,500.00 $9,973.10
$3.46 $3.63
$53.13 $55.78
$42.00 $44.09
$170.36 $178.84
$170.36 $178.84
$1.31 $1.36
$170.36 $178.84
$0.88 $0.92
$400.00 $419.92
$2.41 $2.53
$8.92 $9.36
$2.36 $2.47 $2.83 $2.97 $1.57 $1.64 $0.68 $0.70
$321.30 $337.30
$4,500.00 $4,724.10
$90.00 $94.48 $105.00 $110.23
$70.00 $73.49
$15.00 $15.75
+4.98%
+4.98%
+3.82%
+4.98%
+4.55%
+4.98%
+4.98%
+4.93%
+4.66% +4.95% +4.46% +2.94%
+4.98%
+4.98%
+4.98%
+4.98%
+4.91%
+4.99%
+4.98%
+4.98%
11-3.
11-4.
12-2.
15-2.a.
15-1.d.
11-2.
12-13.
12-14.
12-15.
12-16.
14-2.
12-17.
13-2.
13-3.
13-4.
13-5.
13-6.
13-7.
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Trenching and Installation of 21 - 30 Lines Trenching and Installation of 11 - 20 Lines
Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines
Groundwater Injection System (not by direct push)
In-Situ Injection Into Existing Well/Treatment Point
Grass - Seed and Mulch Grass - Sod Crushed Lime Rock Cover - 2 inch thickness
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Delivery, Pick Up and Rental of 20 Cubic Yard Roll- Off Container
Transport and Disposal of Petroleum Product (bulk)
Transport and Disposal of Petroleum Product (includes drum)
Transport and Disposal of Petroleum Contact Water (bulk)
Transport and Disposal of Petroleum Contact Water (includes drum)
Transport and Disposal of Petroleum Impacted Soil (includes drum)
Transport and Disposal of Clean Concrete
Loading, Transport and Disposal/Recycle Clean Overburden
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
14-4.
15-1.b.
15-1.c.
12-3.
12-4.
12-6.
+4.98% +4.98%
+4.99%
$16,000.00 $16,796.80
$2,625.00 $2,755.73
$3,675.00 $3,858.02
$446.25 $468.47
$446.25 $468.47
$3,675.00 $3,858.02 $446.25 $468.47
$3,675.00 $3,858.02
$446.25 $468.47
$3,675.00 $3,858.02
$446.25 $468.47
$3,675.00 $3,858.02 $446.25 $468.47
$4,900.00 $5,144.02
$595.00 $624.63
$3,675.00 $3,858.02
$6,090.00 $6,393.28
$6,090.00 $6,393.28 $6,090.00 $6,393.28 $3,675.00 $3,858.02 $6,090.00 $6,393.28 $4,900.00 $5,144.02 $8,120.00 $8,524.38 $2,000.00 $2,099.60 $8,000.00 $8,398.40 $1,575.00 $1,653.44 $1,785.00 $1,873.89 $1,995.00 $2,094.35 $2,205.00 $2,314.81
+4.98%
+4.98%
+4.98%
+4.98% +4.98% +4.98% +4.98% +4.98% +4.98% +4.98% +4.98% +4.98% +4.98% +4.98%
15-4.a.
15-5.
Multi-Phase Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
System O&M Package - Extra Large System O&M Package - Large System O&M Package - Medium System O&M Package - Small SVE System Package - Medium SVE System Package - Medium AS/MPE System Package - Medium AS/MPE System Package - Medium MPE System Package - Medium MPE System Package - Medium AS/SVE System Package - Medium Air Sparge System Package - Medium
Groundwater Treatment System Package - Medium
Groundwater Treatment System Package - Medium
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
Multi-Phase Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional Time
Groundwater Recovery System Pilot Test - Additional Time
Groundwater Recovery System Pilot Test - 8 hours
System Installation/Integration/Startup � Addition of 1 Technology Component
System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment Points
16-1.
16-2.
16-4.
16-5.
16-18.
16-17.
16-6.
16-7.
16-8.
16-9.
16-10.
16-11.
16-12.
16-13.
16-14.
16-20.
16-22.
16-23.
16-24.
16-25.
16-26.
16-27.
16-28.
17-1.
17-2.
17-3.
17-4.
+4.98%
+4.98%
+4.98%
+4.98% +4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98% +4.98%
+4.98%
+4.98%
+4.98%
$262.50 $275.57
$1,113.00 $1,168.43
$840.00 $881.83
$10,000.00 $10,498.00
$6,615.00 $6,944.43
$2,100.00 $2,204.58
$2,415.00 $2,535.27
$3,307.50 $3,472.21
$5,932.50 $6,227.94
$3,885.00 $4,078.47
$6,300.00 $6,613.74
$4,252.50 $4,464.27
$7,245.00 $7,605.00
$5,512.50 $5,787.02
$3,150.00 $3,306.84 $4,305.00 $4,519.39 $7,770.00 $8,156.95
$5,250.00 $5,511.45
$7,717.50 $8,101.83
$4,147.50 $4,354.05
$5,617.50 $5,897.25
$7,350.00 $7,716.03
$650.00 $682.37 +4.98%
+4.98%
+4.98%
+4.98%
+4.98% +4.98% +4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
18-29.
18-31.
18-32.
18-33.
18-34.
18-35.
18-24.
18-26.
18-27.
Carbon Off Gas Treatment - Add On - Small - Short Term 6 mos.
Groundwater Treatment - Add On - Large - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long Term > 6 mos.
Groundwater Treatment - Add On - Small - Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Short Term 6 mos.
Groundwater Treatment - Add On - Small - Short Term 6 mos.
MPE System - Large - Short Term 6 mos.
MPE System - Medium - Long Term > 6 mos.
Air Sparge System - Small - Long Term > 6 mos.
MPE System - Small - Long Term > 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Large - Short Term 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Medium - Short Term 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Small - Short Term 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
Supplemental System O&M Package - Add Thermox or Catox Treatment
Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Medium - Short Term 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term 6 mos.
18-3.
18-4.
18-7.
18-8.
18-21.
18-22.
17-5.
18-20.
18-12.
18-14.
18-16.
18-17.
18-18.
18-19.
+4.98%
$682.50 $716.49
$315.00 $330.69
$341.25 $358.24
$525.00 $551.15
$3,570.00 $3,747.79
$4,200.00 $4,409.16
$4,500.00 $4,724.10
$3,500.00 $3,674.30
$5,000.00 $5,249.00
$4,000.00 $4,199.20
$6,000.00 $6,298.80
$4,500.00 $4,724.10
$5,481.00 $5,753.95
$5,985.00 $6,283.05
$7,553.00 $7,929.14
$1,726.78 $1,812.77 $2,625.00 $2,755.73 $1,837.50 $1,929.01 $1,102.50 $1,157.40 $1,047.93 $1,100.12
$510.85 $536.29
$1,278.93 $1,342.62
$655.78 $688.44 $1,147.21 $1,204.34
$11,232.96 $11,792.36 $14,962.22 $15,707.34 +4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98% +4.98% +4.98% +4.98% +4.98%
+4.98%
+4.98%
+4.98% +4.98% +4.98%
18-40.
18-41.
18-42.
18-38.
18-36.
18-39.
Level 2 Remedial Action Plan Level 1 Remedial Action Plan Pilot Test Report Pilot Test Plan
Natural Attenuation or Post RA Monitoring Report, Annual
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Level 2 Natural Attenuation Monitoring Plan Receptor and Exposure Pathway Report
Soil Vapor Extraction (SVE) System - Large - Short Term 6 Months
Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months
Supplemental Site Assessment Report General Site Assessment Report Soil Source Removal Report
Air Sparge/Multiphase Extraction (AS/MPE) System
- Large - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System
- Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System
- Small - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months
Carbon Off Gas Treatment - Add On - Medium - Short Term 6 mos.
Soil Vapor Extraction (SVE) System - Medium - Short Term 6 Months
Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Small - Short Term 6 Months
Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small
- Short Term 6 mos.
Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
18-58.
19-1.
19-3.
19-4.
19-5.
19-6.
19-7.
18-56.
18-47.
18.48.
18-49.
18-50.
18-51.
18-52.
18-54.
19-8.
19-9.
19-10.
19-11.
19-12.
$1,338.28 $1,404.93
$2,631.36 $2,762.40
$4,564.00 $4,791.29
$7,481.11 $7,853.67
$3,574.55 $3,752.56
$657.85 $690.61
$2,384.61 $2,503.36 $201.10 $211.11
$1,569.28 $1,647.43
$2,845.20 $2,986.89 $1,047.93 $1,100.12
$510.85 $536.29 $525.00 $551.15 $231.00 $242.50
$1,000.00 $1,049.80 $111.85 $117.42
$89.25 $93.69 $89.25 $93.69 $89.25 $93.69 $89.25 $93.69 $78.75 $82.67 $68.25 $71.65 $57.75 $60.63 $52.50 $55.11 $47.25 $49.60
$110.25 $115.74 $110.25 $115.74
$110.25 $115.74
$110.25 $115.74
$882.00 $925.92
$1,680.00 $1,763.66
+4.98%
+4.98%
+4.98%
+4.98%
+4.97% +4.97% +4.98% +4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
21-2.
21-3.
21-4.
21-6.a.
21-6.b.
Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan
Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan
Assistant Scientist/Technical Specialist Scientist/Technical Specialist (Key) Hydrogeologist/Modeler (Key) Geologist/Geoscientist (Key) Engineer (Key) Project Manager (Key) Program Manager (Key) Interim Assessment Report Well Abandonment/Site Restoration Report Free Product Recovery Report Remedial Action Interim Report Remedial Action General Report Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non- Annual
Letter/NPDES Report
Construction Drawings and Specs Report
P.E. Project Oversight for Remediation System Integration and Startup - Medium System
P.E. Project Oversight for Remediation System Integration and Startup - Small System
P.G. Field Oversight of Well Installation (Use hourly rate on site specific basis)
P.G. Field Oversight of Drilling and Boring and Soil- Boring Logging (Use hourly rate on site specific basis)
Remedial Action Startup Report
As-Built Drawings (P.E. Sealed red lined modifications)
Professional Geologist (Key) Professional Engineer (Key) Laborers and Security Guards Administrative Field Technician (Key)
19-18.
19-19.
19-20.
19-21.
19-22.
19-23.
19-24.
19-25.
20-10.
20-11.
21-1.
19-17.
19-13.
19-14.
19-15.
19-16.
20-8.
19-26.
19-27.
20-1.
20-2.
20-3.
20-4.
20-5.
20-6.
20-7.
+4.98%
+4.98%
+4.98% +4.98% +4.98% +4.98% +4.98% +4.98% +4.98% +4.97% +4.97% +4.97% +4.97% +4.98% +4.98% +4.99%
$2,310.00 $2,425.04
$882.00 $925.92
$661.50 $694.44
$441.00 $462.96
$441.00 $462.96
$441.00 $462.96
$577.50 $606.36
$472.50 $496.03
$441.00 $462.96
$1,102.50 $1,157.40
$882.00 $925.92
$551.25 $578.70
$441.00 $462.96
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
21-22.
21-23.
21-24.
21-27.
21-28.
21-11.
21-12.
21-13.
21-15.
21-17.
21-6.c.
21-8.
21-9.
P.G. or Qualified P.E. Review, Evaluation and Certification of a General Site Assessment Report
P.G. or P.E. Review, Evaluation and Certification of a Soil Source Removal Report That Includes a Recommendation for NFA
P.G. Review, Evaluation and Certification of Plans and Project Oversight for Installation of Engineering Controls Limited to Permanent, Impermeable Surface or Top Two Feet of Clean Fill Required for a Conditional NFA
P.E. Design and Certification of Plans and Project Oversight of Installation for Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill) required for a conditional NFA
P.E. Review, Evaluation and Certification of a Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan
P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan
P.G. or P.E. Review, Evaluation and Certification of a Receptor and Exposure Pathway Report
P.E. Review and Certification of Sufficiency of Engineering Controls (other than permanent, impermeable surface or top two feet of clean fill), with Monitoring and Maintenance Recommendations Required for a Conditional NFA
P.E. Project Oversight for Remediation System Operation and Maintenance
P.E. Project Oversight for Remediation System Integration and Startup - Large System
P.E. Review, Evaluation and Certification of a Level 1 Remedial Action Plan
P.E. Review, Evaluation and Certification of a Pilot Test Report
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+4.98%
+5.00%
$661.50 $694.44
$441.00 $462.96
$661.50 $694.44
$441.00 $462.96
$650.00 $682.37
+4.98%
+4.98%
+4.98%
21-30.
P.E. Review, Evaluation and Certification of an Annual Operation and Maintenance Report
P.E. Review, Evaluation and Certification of a Non- Annual Operation and Maintenance Report That Includes Significant Proposed Changes to the Approved RAP
P.E. Review, Evaluation and Certification of a Remedial Action Startup Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
Notes:
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1) The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2) The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
P.E. Review, Evaluation, and Certification of Construction Drawings
P.G or P.E. Review, Evaluation and Certification of an Interim Remedial Action Report That Includes a Recommendation for System Modification or Significant Change in the Course of Action
21-31.
21-32.
21-34.
21-35.
+4.98%
PAY
ITEM UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
1.
1-1. Per Review $ 510.00 $ 535.50 $ 562.00 1-2. Per Site $ 305.00 $ 320.25 $ 336.20
1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 265.00 $ 278.25 $ 292.11 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 475.00 $ 475.00 $ 475.00
1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.
2-1. Per Visit $ 595.00 $ 624.75 $ 655.86 2-2. Per Survey $ 559.04 $ 586.99 $ 616.22 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 750.00 $ 787.50 $ 826.72 3.
3-1. Per Round Trip $ 500.00 $ 525.00 $ 525.00 3-2. Per Round Trip $ 700.00 $ 735.00 $ 771.60 3-3. Per Round Trip $ 460.00 $ 483.00 $ 507.05 3-4. Per Round Trip $ 920.00 $ 966.00 $ 966.00 3-5. Per Round Trip $ 230.00 $ 230.00 $ 241.45 3-6. Per Round Trip $ 400.00 $ 400.00 $ 400.00
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - ≤ 100 miles each way Work Trailer - > 100 miles each way
Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
DESCRIPTION
OFFICE ACTIVITIES
File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
3-7. Per Round Trip $ 520.00 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 600.00 $ 629.88 3-8. Per Round Trip $ 780.00 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 1,300.00 $ 1,300.00 3-9. Per Round Trip $ 575.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 900.00 $ 944.82
3-10. Per Round Trip $ 830.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,950.00 $ 1,950.00
3-11. Per Round Trip $ 230.00 $ 241.50 $ 253.53 3-12. Per Round Trip $ 230.00 $ 241.50 $ 253.53 3-13. Per Round Trip $ 5,750.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 6,500.00 $ 6,823.70 3-14. Per Round Trip $ 8,050.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 8,800.00 $ 9,238.24 3-15. Per Round Trip $ 230.00 $ 241.50 $ 253.00 3-16. Per Round Trip $ 230.00 $ 241.50 $ 253.53 3-17. Per Round Trip $ 230.00 $ 241.50 $ 253.53 3-18. Per Round Trip $ 230.00 $ 241.50 $ 253.53 3-19. Per Round Trip Not Applicable $ 350.00 $ 367.43 3-20. Per Round Trip Not Applicable $ 450.00 $ 472.41 Drum Compactor mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - ≤ 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - ≤ 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - ≤ 100 miles each way LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way LDA Rig Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - ≤ 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way Drill Rig Mobilization - > 100 miles each way
DPT Rig Mobilization - ≤ 100 miles each way
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
4.
4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 35.00 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 35.00 $ 36.74 5-1.a.2. Per Spoon Not Applicable $ 40.80 $ 42.83 5-1.a.3. Per Spoon Not Applicable $ 52.70 $ 52.70 5-1.b. Per Core $ 115.00 $ 120.75 $ 126.76 5-1.c. Per Core $ 17.70 Not Applicable Not Applicable 5-2. Per Boring $ 191.00 $ 200.55 $ 200.55 5-3. Per Foot $ 18.30 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 2,150.00 $ 2,257.07 5-4. Per Foot $ 26.80 Not Applicable Not Applicable 5-5. Per Foot $ 34.80 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 3,357.50 $ 3,357.50
5-6. Per Foot $ 27.23 $ 28.59 $ 30.01
Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Split Spoon Sampling – 2 foot (during boring) < 50 feet Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet Split Spoon Sampling – 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring ≤ 10 foot total depth
MEALS AND LODGING
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
5-7. Per Foot $ 29.50 $ 30.97 $ 32.51 5-8. Per Foot $ 35.00 $ 36.75 $ 38.58 5-9. Per Foot $ 30.00 $ 31.50 $ 33.07
5-10. Per Foot $ 33.00 $ 34.65 $ 36.38 5-11. Per Foot $ 38.50 $ 40.42 $ 42.43 5-12. Per Foot $ 53.00 $ 55.65 $ 55.65 5-13. Per Foot $ 44.00 $ 46.20 $ 48.50 5-14. Per Foot $ 48.45 $ 50.87 $ 53.40 5-15. Per Foot $ 33.95 $ 35.64 $ 37.41 5-16. Per Foot $ 36.50 $ 38.32 $ 40.23 5-17. Per Foot $ 41.85 $ 43.94 $ 46.13 5-18. Per Foot $ 50.70 $ 53.23 $ 53.23 5-19. Per Foot $ 55.30 $ 58.06 $ 58.06 5-20. Per Foot $ 64.50 $ 67.72 $ 67.72 5-21. Per Foot $ 76.00 $ 79.80 $ 79.80 5-22. Per Foot $ 74.00 $ 77.70 $ 77.70 5-23. Per Foot $ 93.50 $ 98.17 $ 103.06
6.
6-1. Per Foot $ 29.50 $ 30.97 $ 32.51 6-2. Per Foot $ 32.00 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 33.15 $ 34.80 6-2.b. Per Foot Not Applicable $ 50.00 $ 52.49
Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
6-3. Per Foot $ 40.00 Not Applicable Not Applicable 6-3.a. Per Foot Not Applicable $ 40.80 $ 42.83 6-3.b. Per Foot Not Applicable $ 55.00 $ 57.74 6-4. Per Foot $ 51.75 $ 54.34 $ 57.05 6-5. Per Foot $ 37.00 $ 38.85 $ 40.78 6-6. Per Foot $ 45.00 $ 47.25 $ 49.60 6-7. Per Foot $ 57.00 $ 59.85 $ 62.83 6-8. Per Foot $ 65.00 $ 68.25 $ 71.65
6-9.a. Per Foot $ 7.00 $ 7.35 $ 7.70 6-9.b. Per Foot $ 9.40 $ 9.87 $ 10.36 6-9.c. Per Foot $ 15.00 $ 15.75 $ 16.53 6-9.d. Per Foot $ 19.00 $ 19.95 $ 20.94 6-10. Per Well $ 325.00 $ 341.25 $ 358.24 6-11. Per Vault $ 695.00 $ 729.75 $ 766.09 6-12. Per Vault $ 1,475.00 $ 1,548.75 $ 1,625.88 6-13. Per Well Not Applicable $ 150.00 $ 157.47
6-14. Per Well Not Applicable $ 250.00 $ 262.45
6-15. Per Well Not Applicable $ 275.00 $ 288.70
Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter
Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
7.
7-1. Per Foot $ 17.00 $ 17.85 $ 18.74 7-2. Per Foot $ 20.13 $ 21.13 $ 21.13 7-3. Per Foot $ 25.00 $ 26.25 $ 26.25 7-4. Per Foot $ 29.25 $ 30.71 $ 30.71 7-5. Per Vault $ 495.00 $ 519.75 $ 519.75 7-6. Per Vault $ 700.00 $ 735.00 $ 771.60 7-7 Per Well Not Applicable $ 125.00 $ 131.23 8.
8-1. Per Well $ 218.62 $ 218.62 $ 218.62 8-2. Per Well $ 255.00 $ 267.75 $ 267.75 8-3. Per Well $ 139.34 $ 139.34 $ 139.34 8-4. Per Sample $ 139.34 $ 139.34 $ 139.34 8-5. Per Sample $ 90.00 $ 94.50 $ 99.21 8-6. Per Sample $ 60.00 $ 63.00 $ 66.14 8-7. Per Well $ 20.29 $ 21.30 $ 22.36 8-8. Per Well $ 20.29 $ 21.30 $ 22.36
8-9. Per Sample $ 50.00 $ 52.50 $ 55.11
8-10. Per Sample $ 139.76 $ 139.76 $ 139.76 8-11. Per Sampling Event Not Applicable $ 50.00 $ 52.49 8-12. Per Well Not Applicable $ 25.00 $ 26.25 Survey Latitude/Longitude of Existing Monitor Wells
Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, ≤ 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
8-13. Per Well Not Applicable $ 25.00 $ 26.25
8-14 Per Sample Not Applicable $ 20.00 $ 20.00
9.
9.A.
9-1. Per Sample $ 391.00 $ 410.55 $ 431.00
9-2. Per Sample $ 34.50 $ 36.22 $ 38.02 9-3. Per Sample $ 63.25 $ 63.25 $ 63.25 9-4. Per Sample $ 72.45 $ 76.07 $ 79.86 9-5. Per Sample $ 80.50 $ 84.52 $ 88.73 9-6. Per Sample $ 74.75 $ 78.49 $ 82.40
9-7. Per Sample $ 270.25 $ 283.76 $ 283.76
9-8. Per Sample $ 46.00 $ 48.30 $ 50.71 9-8.a. Per Sample Not Applicable $ 200.00 $ 209.96 9-9. Per Sample $ 46.00 $ 48.30 $ 50.71
9-10. Per Sample $ 69.00 $ 72.45 $ 76.00
9-11. Per Sample $ 11.50 $ 12.07 $ 12.07
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Survey Latitude/Longitude of New Monitor Wells Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
9-12. Per Sample $ 11.50 $ 12.07 $ 12.07 9-13. Per Sample $ 11.50 $ 12.07 $ 12.07 9-14. Per Sample $ 11.50 $ 12.07 $ 12.07 9-15. Per Sample $ 28.75 $ 30.18 $ 31.68 9-16. Per Sample $ 28.75 $ 30.18 $ 31.68 9-17. Per Sample $ 46.00 $ 48.30 $ 48.30
9-18. Per Sample $ 74.75 $ 74.75 $ 74.75
9-19. Per Sample $ 5.75 $ 6.03 $ 6.33 9-20. Per Sample $ 75.00 $ 75.00 $ 75.00
9-21. Per Sample $ 368.00 $ 368.00 $ 368.00
9-22. Per Sample $ 400.00 $ 420.00 $ 440.92
9-23. Per Sample $ 57.50 $ 60.37 $ 63.38
9-24. Per Sample $ 241.50 $ 253.58 $ 266.21 9.B.
9-25. Per Sample $ 227.70 $ 239.09 $ 251.00
9-26. Per Sample $ 414.00 $ 434.70 $ 456.35
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Chromium (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)
Soil, Cadmium (EPA 6010 or EPA 6020)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
9-27. Per Sample $ 34.50 $ 36.22 $ 38.02 9-28. Per Sample $ 63.25 $ 63.25 $ 63.25 9-29. Per Sample $ 63.25 $ 66.41 $ 69.72
9-30. Per Sample $ 80.50 $ 84.52 $ 88.73
9-31. Per Sample $ 40.25 $ 42.26 $ 44.36 9-31.a. Per Sample Not Applicable $ 50.00 $ 52.49 9-32. Per Sample $ 69.00 $ 72.45 $ 76.06 9-33. Per Sample $ 74.75 $ 78.49 $ 82.40
9-34. Per Sample $ 143.75 $ 150.94 $ 158.46
9-35. Per Sample $ 270.25 $ 283.76 $ 297.89
9-36. Per Sample $ 46.00 $ 48.30 $ 50.71 9-37. Per Sample $ 46.00 $ 48.30 $ 50.71 9-38. Per Sample $ 9.20 $ 9.66 $ 10.14 9-39. Per Sample $ 9.20 $ 9.66 $ 10.14 9-40. Per Sample $ 9.20 $ 9.66 $ 10.14 9-41. Per Sample $ 9.20 $ 9.66 $ 10.14
9-41.a. Per Sample Not Applicable $ 35.00 $ 35.00
9-42. Per Sample $ 18.40 $ 18.40 $ 19.32
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED
ITEM PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
South
HLM ENVIRONMENTAL REMEDIATION, INC.
GC868
DEP Restated Agency Term Contract No. GC868 Amendment No. 5
Attachment D (V2.2) ‐ Rate Schedule
DESCRIPTION
9-43. Per Sample $ 9.20 $ 9.66 $ 10.14 9-44. Per Sample $ 9.20 $ 9.66 $ 10.14
9-44.a. Per Sample Not Applicable $ 35.00 $ 35.00
9-45. Per Sample $ 9.20 $ 9.66 $ 10.14 9-46. Per Sample $ 9.20 $ 9.66 $ 10.14 9-47. Per Sample $ 9.20 $ 9.66 $ 10.14 9-48. Per Sample $ 9.20 $ 9.66 $ 10.14 9-49. Per Sample $ 13.80 $ 13.80 $ 13.80
9-50. Per Sample $ 17.00 $ 17.85 $ 18.74
9-51. Per Sample $ 13.80 $ 14.49 $ 15.21
9-52. Per Sample $ 11.50 $…