CN-370000-GC868-A3.pdf

PDF 4 MB Posted

Attached to
Master Agreement FL|GC868|e6d58d6dd71f3148d6b7c364b46e35ec
Contract number
GC868
Issued by
Florida

About this file

Summary

This document is Amendment No. 3 to DEP Agency Term Contract No. GC868, a petroleum restoration program contract executed between the Florida Department of Environmental Protection (FDEP) and HLM Environmental Remediation, Inc. The amendment was signed on April 27, 2017 (with an effective data processing date of May 26, 2017) and modifies the rate schedule for petroleum contamination site response action services in Florida's South Region.

The amendment authorizes a rate increase of up to 5 percent on specified pay items in Attachment D (V2.1), the Rate Schedule. The increases apply exclusively to new work assignments offered on or after the Rate Change Date of May 26, 2017, while all pre-Rate Change Date work assignments continue to apply the contractor's prior rate schedule. The revised rates affect over 200 pay items encompassing office activities, field activities, mobilization, drilling and boring, well installation, well abandonment, sample collection and field testing, laboratory analysis for soil/sediment and water samples, product and air analysis, soil source removal, petroleum storage tank removal, debris and waste disposal, resurfacing, remedial action construction, pilot test packages, short-term system operation packages, monthly system operation and maintenance packages, equipment use, reports, and personnel services including professional engineering and geology services. The rate changes do not modify any pay item descriptions contained in the contract, and the contractor's detailed justification for the increases was reviewed and approved by FDEP as compliant with the maximum 5 percent threshold allowed under contract provision 11.B.

View the file

Other files

File Type Posted
CN-370000-GC868-A10.pdf PDF
CN-370000-GC868-A7.pdf PDF
CN-370000-GC868-CMC.pdf PDF
CN-370000-GC868-CMC4.pdf PDF
CN-370000-GC868-CMC5.pdf PDF
CN-370000-GC868-CO1.pdf PDF
CN-370000-GC868-A2.pdf PDF
CN-370000-GC868-A6.pdf PDF
CN-370000-GC868-A9.pdf PDF
CN-370000-GC868-A15E1.pdf PDF
CN-370000-GC868-A17E2.pdf PDF
CN-370000-GC868-A5.pdf PDF
CN-370000-GC868-AR1.pdf PDF
CN-370000-GC868-CMC2.pdf PDF
CN-370000-GC868-CMC3.pdf PDF
PC-370000-GC868.pdf PDF
CN-370000-GC868-A11.pdf PDF
CN-370000-GC868-A12.pdf PDF
CN-370000-GC868-A13.pdf PDF
CN-370000-GC868-A14.pdf PDF
CN-370000-GC868-A16.pdf PDF
CN-370000-GC868-A4.pdf PDF
CN-370000-GC868-A8.pdf PDF
CN-370000-GC868-CMC1.pdf PDF
CN-370000-GC868.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAY

ITEM UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

1.

1-1. Per Review $ 510.00 $ 510.00 $ 535.50 1-2. Per Site $ 305.00 $ 305.00 $ 320.25

1-2.a. Per Site Not Applicable $ - $ - 1-3. Per Package $ 265.00 $ 265.00 $ 278.25 1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-5. Per Agreement $ 475.00 $ 475.00 $ 475.00

1-5.a. Per Agreement Not Applicable $ - $ - 1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00 1-7. % Surcharge Not Applicable $ 0.06 $ 0.06 2.

2-1. Per Visit $ 595.00 $ 595.00 $ 624.75 2-2. Per Survey $ 559.04 $ 559.04 $ 586.99 2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 2-4. Per Day $ 750.00 $ 750.00 $ 787.50 3.

3-1. Per Round Trip $ 500.00 $ 500.00 $ 525.00 3-2. Per Round Trip $ 700.00 $ 700.00 $ 735.00 3-3. Per Round Trip $ 460.00 $ 460.00 $ 483.00 3-4. Per Round Trip $ 920.00 $ 920.00 $ 966.00 3-5. Per Round Trip $ 230.00 $ 230.00 $ 230.00 3-6. Per Round Trip $ 400.00 $ 400.00 $ 400.00

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - 100 miles each way Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way Work Trailer - 100 miles each way Work Trailer - > 100 miles each way

Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items Off-Site Property Access Agreement Site Property Access Agreement for Source Property at no cost to FDEP Project Specific Financial Guarantee Bond (if required by DEP) 6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

DESCRIPTION

OFFICE ACTIVITIES

File Review Site Health & Safety Plan Site Health & Safety Plan for Continued Work at no cost to FDEP Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit Receptor Survey and Exposure Pathway Identification (Excludes report) Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

3-7. Per Round Trip $ 520.00 Not Applicable Not Applicable 3-7.a. Per Round Trip Not Applicable $ 600.00 $ 600.00 3-8. Per Round Trip $ 780.00 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 1,300.00 $ 1,300.00 3-9. Per Round Trip $ 575.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 900.00 $ 900.00 3-10. Per Round Trip $ 830.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,950.00 $ 1,950.00 3-11. Per Round Trip $ 230.00 $ 230.00 $ 241.50 3-12. Per Round Trip $ 230.00 $ 230.00 $ 241.50 3-13. Per Round Trip $ 5,750.00 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 6,500.00 $ 6,500.00 3-14. Per Round Trip $ 8,050.00 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable $ 8,800.00 $ 8,800.00 3-15. Per Round Trip $ 230.00 $ 230.00 $ 241.50 3-16. Per Round Trip $ 230.00 $ 230.00 $ 241.50 3-17. Per Round Trip $ 230.00 $ 230.00 $ 241.50 3-18. Per Round Trip $ 230.00 $ 230.00 $ 241.50 3-19. Per Round Trip Not Applicable $ 350.00 $ 350.00 3-20. Per Round Trip Not Applicable $ 450.00 $ 450.00 Drum Compactor mobilization - > 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way Loader/Backhoe Mobilization - 100 miles each way Loader/Backhoe Mobilization - > 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - 100 miles each way Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way Excavator Mobilization - 100 miles each way Excavator Mobilization - > 100 miles each way LDA Rig Mobilization - 100 miles each way LDA Rig and Support Vehicles Mobilization - 100 miles each way LDA Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - 100 miles each way DPT Rig Mobilization - > 100 miles each way DPT Rig and Support Vehicles Mobilization - > 100 miles each way Drill Rig Mobilization - 100 miles each way Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - 100 miles each way Drill Rig Mobilization - > 100 miles each way

DPT Rig Mobilization - 100 miles each way

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

4.

4-1.a. Per Person, Per Day $ 80.00 $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00 5.

5-1.a. Per Spoon $ 35.00 Not Applicable Not Applicable 5-1.a.1. Per Spoon Not Applicable $ 35.00 $ 35.00 5-1.a.2. Per Spoon Not Applicable $ 40.80 $ 40.80 5-1.a.3. Per Spoon Not Applicable $ 52.70 $ 52.70 5-1.b. Per Core $ 115.00 $ 115.00 $ 120.75 5-1.c. Per Core $ 17.70 Not Applicable Not Applicable 5-2. Per Boring $ 191.00 $ 191.00 $ 200.55 5-3. Per Foot $ 18.30 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 2,150.00 $ 2,150.00 5-4. Per Foot $ 26.80 Not Applicable Not Applicable 5-5. Per Foot $ 34.80 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 3,357.50 $ 3,357.50 5-6. Per Foot $ 27.23 $ 27.23 $ 28.59

Direct Push Boring Direct Push Technology (DPT) Rig and Equipment Direct Push Boring with Cone Penetrometer Test Probe (CPT) Direct Push Boring with Membrane Interface Probe (MIP) DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate) HSA or MR Boring, 6 inch diameter, < 50 foot total depth

Split Spoon Sampling � 2 foot (during boring) < 50 feet Split Spoon Sampling � 2 foot (during boring) 50 to 100 feet Split Spoon Sampling � 2 foot (during boring) > 100 feet Sonic Core Sampling - 5 or 10 foot (during boring) DPT Core Sampling - 4 or 5 foot (during boring) Hand Auger Boring 10 foot total depth

MEALS AND LODGING

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

5-7. Per Foot $ 29.50 $ 29.50 $ 30.97 5-8. Per Foot $ 35.00 $ 35.00 $ 36.75 5-9. Per Foot $ 30.00 $ 30.00 $ 31.50 5-10. Per Foot $ 33.00 $ 33.00 $ 34.65 5-11. Per Foot $ 38.50 $ 38.50 $ 40.42 5-12. Per Foot $ 53.00 $ 53.00 $ 55.65 5-13. Per Foot $ 44.00 $ 44.00 $ 46.20 5-14. Per Foot $ 48.45 $ 48.45 $ 50.87 5-15. Per Foot $ 33.95 $ 33.95 $ 35.64 5-16. Per Foot $ 36.50 $ 36.50 $ 38.32 5-17. Per Foot $ 41.85 $ 41.85 $ 43.94 5-18. Per Foot $ 50.70 $ 50.70 $ 53.23 5-19. Per Foot $ 55.30 $ 55.30 $ 58.06 5-20. Per Foot $ 64.50 $ 64.50 $ 67.72 5-21. Per Foot $ 76.00 $ 76.00 $ 79.80 5-22. Per Foot $ 74.00 $ 74.00 $ 77.70 5-23. Per Foot $ 93.50 $ 93.50 $ 98.17

6.

6-1. Per Foot $ 29.50 $ 29.50 $ 30.97 6-2. Per Foot $ 32.00 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 33.15 $ 33.15 6-2.b. Per Foot Not Applicable $ 50.00 $ 50.00

Well Installation - 1 inch diameter Well Installation - 2 inch diameter Well Installation - 2 inch diameter (Vertical) Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth Sonic Boring, 6 inch diameter, < 50 foot total depth Sonic Boring, 6 inch diameter, 50 to 100 foot total depth Sonic Boring, 6 inch diameter, > 100 foot total depth Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, 6 inch diameter, 50 to 100 foot total depth HSA or MR Boring, 6 inch diameter, > 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

6-3. Per Foot $ 40.00 Not Applicable Not Applicable 6-3.a. Per Foot Not Applicable $ 40.80 $ 40.80 6-3.b. Per Foot Not Applicable $ 55.00 $ 55.00 6-4. Per Foot $ 51.75 $ 51.75 $ 54.34 6-5. Per Foot $ 37.00 $ 37.00 $ 38.85 6-6. Per Foot $ 45.00 $ 45.00 $ 47.25 6-7. Per Foot $ 57.00 $ 57.00 $ 59.85 6-8. Per Foot $ 65.00 $ 65.00 $ 68.25

6-9.a. Per Foot $ 7.00 $ 7.00 $ 7.35 6-9.b. Per Foot $ 9.40 $ 9.40 $ 9.87 6-9.c. Per Foot $ 15.00 $ 15.00 $ 15.75 6-9.d. Per Foot $ 19.00 $ 19.00 $ 19.95 6-10. Per Well $ 325.00 $ 325.00 $ 341.25 6-11. Per Vault $ 695.00 $ 695.00 $ 729.75 6-12. Per Vault $ 1,475.00 $ 1,475.00 $ 1,548.75 6-13. Per Well Not Applicable $ 150.00 $ 150.00 6-14. Per Well Not Applicable $ 250.00 $ 250.00

6-15. Per Well Not Applicable $ 275.00 $ 275.00

Installation of Well Vault - 4 x 4 x 2 foot Well Redevelopment Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Additional Well Screen > 20 feet - 1 inch diameter Additional Well Screen > 20 feet - 2 inch diameter Additional Well Screen > 20 feet - 4 inch diameter Additional Well Screen > 20 feet - 6 inch diameter Above Grade Well Completion Installation of Well Vault - 2 x 2 x 2 foot

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling) Well Installation - 6 inch diameter Surface Casing - 6 inch diameter Surface Casing - 8 inch diameter Surface Casing - 10 inch diameter Surface Casing - 12 inch diameter

Well Installation - 4 inch diameter Well Installation - 4 inch diameter (Vertical)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

7.

7-1. Per Foot $ 17.00 $ 17.00 $ 17.85 7-2. Per Foot $ 20.13 $ 20.13 $ 21.13 7-3. Per Foot $ 25.00 $ 25.00 $ 26.25 7-4. Per Foot $ 29.25 $ 29.25 $ 30.71 7-5. Per Vault $ 495.00 $ 495.00 $ 519.75 7-6. Per Vault $ 700.00 $ 700.00 $ 735.00 7-7 Per Well Not Applicable $ 125.00 $ 125.00 8.

8-1. Per Well $ 218.62 $ 218.62 $ 218.62 8-2. Per Well $ 255.00 $ 255.00 $ 267.75 8-3. Per Well $ 139.34 $ 139.34 $ 139.34 8-4. Per Sample $ 139.34 $ 139.34 $ 139.34 8-5. Per Sample $ 90.00 $ 90.00 $ 94.50 8-6. Per Sample $ 60.00 $ 60.00 $ 63.00 8-7. Per Well $ 20.29 $ 20.29 $ 21.30 8-8. Per Well $ 20.29 $ 20.29 $ 21.30 8-9. Per Sample $ 50.00 $ 50.00 $ 52.50 8-10. Per Sample $ 139.76 $ 139.76 $ 139.76 8-11. Per Sampling Event Not Applicable $ 50.00 $ 50.00 8-12. Per Well Not Applicable $ 25.00 $ 25.00 Survey Latitude/Longitude of Existing Monitor Wells

Soil/Sediment Sample Collection Water Level or Free Product Gauging Free Product Gauging & Bailing Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent) Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, 100 foot depth Monitoring Well Sampling with Water Level, > 100 foot depth Domestic Water Well Sampling Other Water Sampling Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter Grout and Abandon Well, > 4 to 6 inch diameter Grout and Abandon Well, > 6 inch diameter Removal of Well Vault - 2 x 2 x 2 foot Removal of Well Vault - 4 x 4 x 2 foot Removal of Well Pad and Manhole

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

8-13. Per Well Not Applicable $ 25.00 $ 25.00

8-14 Per Sample Not Applicable $ 20.00 $ 20.00

9.

9.A.

9-1. Per Sample $ 391.00 $ 391.00 $ 410.55 9-2. Per Sample $ 34.50 $ 34.50 $ 36.22 9-3. Per Sample $ 63.25 $ 63.25 $ 63.25 9-4. Per Sample $ 72.45 $ 72.45 $ 76.07 9-5. Per Sample $ 80.50 $ 80.50 $ 84.52 9-6. Per Sample $ 74.75 $ 74.75 $ 78.49 9-7. Per Sample $ 270.25 $ 270.25 $ 283.76 9-8. Per Sample $ 46.00 $ 46.00 $ 48.30

9-8.a. Per Sample Not Applicable $ 200.00 $ 200.00 9-9. Per Sample $ 46.00 $ 46.00 $ 48.30 9-10. Per Sample $ 69.00 $ 69.00 $ 72.45 9-11. Per Sample $ 11.50 $ 11.50 $ 12.07

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method) Soil, PCBs [or Aroclors] (EPA 8082) Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury]) Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260) Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260) Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260) Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310) Soil, Priority Pollutant Volatile Organics (EPA 8260) Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Survey Latitude/Longitude of New Monitor Wells Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

LABORATORY ANALYSIS

SOIL/SEDIMENT ANALYSIS

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

9-12. Per Sample $ 11.50 $ 11.50 $ 12.07 9-13. Per Sample $ 11.50 $ 11.50 $ 12.07 9-14. Per Sample $ 11.50 $ 11.50 $ 12.07 9-15. Per Sample $ 28.75 $ 28.75 $ 30.18 9-16. Per Sample $ 28.75 $ 28.75 $ 30.18 9-17. Per Sample $ 46.00 $ 46.00 $ 48.30 9-18. Per Sample $ 74.75 $ 74.75 $ 74.75 9-19. Per Sample $ 5.75 $ 5.75 $ 6.03 9-20. Per Sample $ 75.00 $ 75.00 $ 75.00 9-21. Per Sample $ 368.00 $ 368.00 $ 368.00 9-22. Per Sample $ 400.00 $ 400.00 $ 420.00 9-23. Per Sample $ 57.50 $ 57.50 $ 60.37 9-24. Per Sample $ 241.50 $ 241.50 $ 253.58 9.B.

9-25. Per Sample $ 227.70 $ 227.70 $ 239.09

9-26. Per Sample $ 414.00 $ 414.00 $ 434.70

WATER ANALYSIS

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods) Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

Soil, Moisture Content (ASTM D2216-10) Soil, Texture, (See Gee 7 Bauder [1966]) Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS) Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Chromium (EPA 6010 or EPA 6020) Soil, Lead (EPA 6010 or EPA 6020) Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311) Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312) Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black) Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, - 96e1 or ASTM D2937-10)

Soil, Cadmium (EPA 6010 or EPA 6020)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

9-27. Per Sample $ 34.50 $ 34.50 $ 36.22 9-28. Per Sample $ 63.25 $ 63.25 $ 63.25 9-29. Per Sample $ 63.25 $ 63.25 $ 66.41 9-30. Per Sample $ 80.50 $ 80.50 $ 84.52 9-31. Per Sample $ 40.25 $ 40.25 $ 42.26

9-31.a. Per Sample Not Applicable $ 50.00 $ 50.00 9-32. Per Sample $ 69.00 $ 69.00 $ 72.45 9-33. Per Sample $ 74.75 $ 74.75 $ 78.49 9-34. Per Sample $ 143.75 $ 143.75 $ 150.94 9-35. Per Sample $ 270.25 $ 270.25 $ 283.76 9-36. Per Sample $ 46.00 $ 46.00 $ 48.30 9-37. Per Sample $ 46.00 $ 46.00 $ 48.30 9-38. Per Sample $ 9.20 $ 9.20 $ 9.66 9-39. Per Sample $ 9.20 $ 9.20 $ 9.66 9-40. Per Sample $ 9.20 $ 9.20 $ 9.66 9-41. Per Sample $ 9.20 $ 9.20 $ 9.66

9-41.a. Per Sample Not Applicable $ 35.00 $ 35.00 9-42. Per Sample $ 18.40 $ 18.40 $ 18.40

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380) Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270) Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO) Water, PCBs [or Aroclors] (EPA 608 or EPA 8082) Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011) Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM) Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624) Water, Priority Pollutant Volatile Organics (EPA 8260) Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260) Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260) Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

9-43. Per Sample $ 9.20 $ 9.20 $ 9.66 9-44. Per Sample $ 9.20 $ 9.20 $ 9.66

9-44.a. Per Sample Not Applicable $ 35.00 $ 35.00 9-45. Per Sample $ 9.20 $ 9.20 $ 9.66 9-46. Per Sample $ 9.20 $ 9.20 $ 9.66 9-47. Per Sample $ 9.20 $ 9.20 $ 9.66 9-48. Per Sample $ 9.20 $ 9.20 $ 9.66 9-49. Per Sample $ 13.80 $ 13.80 $ 13.80 9-50. Per Sample $ 17.00 $ 17.00 $ 17.85 9-51. Per Sample $ 13.80 $ 13.80 $ 14.49 9-52. Per Sample $ 11.50 $ 11.50 $ 12.07 9-53. Per Sample $ 13.80 $ 13.80 $ 14.49 9-54. Per Sample $ 13.80 $ 13.80 $ 14.49 9-55. Per Sample $ 13.80 $ 13.80 $ 14.49 9-56. Per Sample $ 20.70 $ 20.70 $ 21.73 9-57. Per Sample $ 17.00 $ 17.00 $ 17.00 9-58. Per Sample $ 12.65 $ 12.65 $ 13.28

Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF) Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E) Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C) Water, Nitrate [as N] (EPA 300.0 or EPA 353.2) Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or

SM 4500-NO3 F)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F) Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020) Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B) Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020) Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

9-59. Per Sample $ 12.65 $ 12.65 $ 13.28 9-60. Per Sample $ 13.80 $ 13.80 $ 14.49 9-61. Per Sample $ 50.00 $ 50.00 $ 52.50 9-62. Per Sample $ 945.00 $ 945.00 $ 992.25

9-63. Per Sample $ 1,035.00 $ 1,035.00 $ 1,035.00

9-64. Per Sample $ 369.15 $ 369.15 $ 387.61 9-65. Per Sample $ 390.00 $ 390.00 $ 409.50 9-66. Per Sample $ 51.75 $ 51.75 $ 54.34 9-67. Per Sample $ 241.50 $ 241.50 $ 253.58 9-78. Per Sample Not Applicable $ 55.00 $ 55.00 9-79. Per Sample Not Applicable $ 55.00 $ 55.00 9-80. Per Sample Not Applicable $ 55.00 $ 55.00

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260) Water, Methane (EPA SOP RSK-175)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS) Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS) Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS) Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS) Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D) Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C) Water, Heterotrophic Plate Count (SM 9215 B) Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:

Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

9.C.

9-68. Per Sample $ 80.50 $ 80.50 $ 84.52 9-69. Per Sample $ 166.75 $ 166.75 $ 175.09 9-70. Per Sample $ 161.00 $ 161.00 $ 169.05 9-71. Per Sample $ 276.00 $ 276.00 $ 276.00 9.D.

9-72. Per Sample $ 241.50 $ 241.50 $ 253.58

9-73. Per Sample $ 485.00 $ 485.00 $ 509.25 9.E.

9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable 9-75. Percent

Surcharge $ - $ - $ - 9-76. Percent

Surcharge $ 0.51 $ 0.51 $ 0.51 9-77. Percent

Surcharge $ 1.02 $ 1.02 $ 1.02 10.

10-1. Per Sq. Foot/Day $ 41.00 Not Applicable Not Applicable 10-1.a Per Sq. Foot Not Applicable $ 30.00 $ 30.00

Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.

SOIL SOURCE REMOVAL RELATED

Sheet Piling for 20 feet deep excavation (per square foot) Sheet Piling Installation for 20 feet deep Excavation

Air, Volatile Organic Compounds (EPA Method TO-17)

PRODUCT ANALYSIS

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID) Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)

OTHER ANALYSIS

Other Analysis, Not Otherwise Specified

AIR ANALYSIS

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3) Air, Volatile Organic Aromatics (EPA Method TO-15) Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

10.1.b Per Sq. Foot/Day Not Applicable $ 2.00 $ 2.00 10.1.c Per Sq. Foot/Week Not Applicable $ 4.00 $ 4.00 10.1.d Per Sq. Foot/Month Not Applicable $ 20.80 $ 20.80 10-2. Per Sq. Foot/Week $ 42.00 Not Applicable Not Applicable 10-2.a Per Sq. Foot Not Applicable $ 42.00 $ 42.00 10.2.b Per Sq. Foot/Day Not Applicable $ 2.00 $ 2.00 10.2.c Per Sq. Foot/Week Not Applicable $ 4.00 $ 4.00 10.2.d Per Sq. Foot/Month Not Applicable $ 28.00 $ 28.00 10-3. Per Sq. Foot/Month $ 46.00 Not Applicable Not Applicable 10-4. Per Sq. Foot/Day $ 47.00 Not Applicable Not Applicable 10-5. Per Sq. Foot/Week $ 50.00 Not Applicable Not Applicable 10-6. Per Sq. Foot/Month $ 60.00 Not Applicable Not Applicable 10-7. Per Cubic Yard $ 50.00 $ 50.00 $ 50.00 10-8. Per Cubic Yard $ 38.00 $ 38.00 $ 38.00 10-9. Per Cubic Yard $ 130.00 $ 130.00 $ 130.00 10-10. Per Cubic Yard $ 115.00 $ 115.00 $ 115.00

10-11.a. Per Cubic Yard $ 150.00 $ 150.00 $ 150.00 10-11.b. Per Cubic Yard $ 322.50 $ 322.50 $ 322.50 10-12.a. Per Cubic Yard $ 145.25 $ 145.25 $ 145.25 10-12.b. Per Cubic Yard $ 288.00 $ 288.00 $ 288.00 10-13. Per Cubic Yard $ 116.00 $ 116.00 $ 116.00 10-14. Per Cubic Yard $ 38.00 $ 38.00 $ 39.90

LDA Excavation and Loading With Surface Casing > 300 cubic yards LDA Excavation and Loading With Driven Casing > 300 cubic yards Flowable Fill Concrete and Installation Clean Backfill Material, Compaction and Testing (includes transport) 300 cubic yards

Conventional Soil Excavation and Loading 300 cubic yards Conventional Soil Excavation and Loading > 300 cubic yards LDA Excavation and Loading Without Casing 300 cubic yards LDA Excavation and Loading Without Casing > 300 cubic yards LDA Excavation and Loading With Surface Casing 300 cubic yards LDA Excavation and Loading With Driven Casing < 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation Sheet Piling for 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per square foot) Sheet Piling for > 20 feet deep excavation (per sqyuare foot) Sheet Piling for > 20 feet deep excavation (per square foot)

Sheet Piling Rental for 20 feet deep Excavation Sheet Piling Rental for 20 feet deep Excavation Sheet Piling Rental for 20 feet deep Excavation Sheet Piling for 20 feet deep excavation (per square foot) Sheet Piling Installation for > 20 feet deep Excavation Sheet Piling Rental for > 20 feet deep Excavation

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

10-15. Per Cubic Yard $ 36.00 $ 36.00 $ 37.80 10-15.a. Per Cubic Yard Not Applicable $ 15.00 $ 15.00 10-15.b. Per Cubic Yard Not Applicable $ 15.00 $ 15.00 10-16. Per Ton $ 60.00 $ 60.00 $ 63.00 10-17. Per Ton $ 55.00 $ 55.00 $ 57.75 10-18. Per Day $ 2,875.00 $ 2,875.00 $ 3,018.75 10-19. Per Day $ 115.00 $ 115.00 $ 120.75 10-20. Per Week $ 8,625.00 $ 8,625.00 $ 9,056.25 10-21. Per Week $ 143.75 $ 143.75 $ 150.94 10-22. Per Month $ 16,000.00 $ 16,000.00 $ 16,800.00 10-23. Per Month $ 287.50 $ 287.50 $ 301.88

11.

11-1. Per Tank $ 5,500.00 $ 5,500.00 $ 5,500.00 11-2. Per Tank $ 6,000.00 $ 6,000.00 $ 6,000.00 11-3. Per Tank $ 7,500.00 $ 7,500.00 $ 7,500.00 11-4. Per Tank $ 9,500.00 $ 9,500.00 $ 9,500.00 12.

12-1. Per Square Foot $ 4.00 $ 4.00 $ 4.20 12-2. Per Square Foot $ 3.30 $ 3.30 $ 3.46 12-3. Per Ton $ 50.60 $ 50.60 $ 53.13 12-4. Per Ton $ 40.00 $ 40.00 $ 42.00 12-5. Per Ton $ 53.00 $ 53.00 $ 55.65

Transport and Disposal of Clean Concrete Transport and Disposal of Mixed Debris

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness Additional Removal/Loading Cost for Concrete - > 4 inch thickness Loading, Transport and Disposal/Recycle Clean Overburden

Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation)

PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL

Remove and Dispose Petroleum Storage Tank - 1,000 gal. capacity Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards Pea Gravel #57 Stone Dewatering System, up to 12 well points (includes installation) Additional Dewatering System Well Points (2) (includes installation) Dewatering System, up to 12 well points (includes installation)

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards Clean Overburden Used As Backfill, Compaction and Testing 300 cubic yards

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

12-6. Per Drum $ 162.25 $ 162.25 $ 170.36 12-7. Per Ton $ 28.50 $ 28.50 $ 28.50 12-8. Per Ton $ 49.00 $ 49.00 $ 49.00 12-9. Per Ton $ 35.00 $ 35.00 $ 36.75 12-10. Per Ton $ 34.50 $ 34.50 $ 36.22 12-11. Per Ton $ 37.00 $ 37.00 $ 37.00 12-12. Per Ton $ 35.00 $ 35.00 $ 35.00 12-13. Per Drum $ 162.25 $ 162.25 $ 170.36 12-14. Per Gallon $ 1.25 $ 1.25 $ 1.31 12-15. Per Drum $ 162.25 $ 162.25 $ 170.36 12-16. Per Gallon $ 0.84 $ 0.84 $ 0.88 12-17. Per Week Not Applicable $ 400.00 $ 400.00 12-18. Per Week Not Applicable $ 400.00 $ 400.00

13.

13-1. Per Square Foot $ 8.00 $ 8.00 $ 8.40 13-2. Per Square Foot $ 2.30 $ 2.30 $ 2.41 13-3. Per Square Foot $ 8.50 $ 8.50 $ 8.92 13-4. Per Square Foot $ 2.25 $ 2.25 $ 2.36 13-5. Per Square Foot $ 2.70 $ 2.70 $ 2.83 13-6. Per Square Foot $ 1.50 $ 1.50 $ 1.57 13-7. Per Square Foot $ 0.65 $ 0.65 $ 0.68

Concrete Paving - 4 inch thickness (includes sub-base) Concrete Paving - additional 1 inch thickness Crushed Lime Rock Cover - 2 inch thickness Grass - Sod Grass - Seed and Mulch

Transport and Disposal of Petroleum Product (bulk) Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container Additional Rental of 20 Cubic Yard Roll-Off Container

RESURFACING

Asphalt Paving - 2 inch thickness (includes sub-base) Asphalt Paving - additional 1 inch thickness

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) 450 tons Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons Transport and Disposal of Petroleum Contact Water (includes drum) Transport and Disposal of Petroleum Contact Water (bulk) Transport and Disposal of Petroleum Product (includes drum)

Transport and Disposal of Petroleum Impacted Soil (includes drum) Transport Petroleum Impacted Soil (bulk) 100 miles Transport Petroleum Impacted Soil (bulk) > 100 miles Disposal of Petroleum Impacted Soil at a Landfill (bulk) 450 tons

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

14.

14-1. Per Foot $ 30.00 $ 30.00 $ 31.50 14-2. Per Injection Point $ 306.00 $ 306.00 $ 321.30 14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 14-4. Per Week Not Applicable $ 4,500.00 $ 4,500.00 14-5. Per Month Not Applicable $ 13,500.00 $ 13,500.00 15.

15.A.

15-1. Per Linear Foot $ 95.00 Not Applicable Not Applicable

15-1.a. Per Linear Foot of Trench Not Applicable $ 90.00 $ 90.00

15-1.b. Per Linear Foot of Trench Not Applicable $ 90.00 $ 90.00

15-1.c. Per Linear Foot of Trench Not Applicable $ 105.00 $ 105.00

15-1.d. Per Linear Foot of Trench Not Applicable $ 70.00 $ 70.00

15-2. Per Linear Foot $ 14.00 Not Applicable Not Applicable 15-2.a. Per Foot Not Applicable $ 15.00 $ 15.00

Trenching and Installation - Additional 2 plumbing lines Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.

Electrical lines are not counted in determination of costs.

TRENCHING

Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench Trenching and Installation of 11 - 20 Lines Trenching and Installation of 21 - 30 Lines Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Direct Push Boring with In-Situ Injection In-Situ Injection Into Existing Well/Treatment Point Materials to be Injected Groundwater Injection System (not by direct push) Groundwater Injection System (not by direct push)

REMEDIAL ACTION CONSTRUCTION

IN-SITU INJECTION

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00 15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00 15.B.

15-4. Per Integration /

Startup $ 14,500.00 Not Applicable Not Applicable 15-4.a Per Startup Not Applicable $ 16,000.00 $ 16,000.00

15-4.b Per Startup Not Applicable $ 22,000.00 $ 22,000.00

15-4.c Per Startup Not Applicable $ 29,000.00 $ 29,000.00

15-4.d Per Startup Not Applicable $ 6,500.00 $ 6,500.00

15-5. Per Additional Tech Component $ 2,500.00 $ 2,500.00 $ 2,625.00

15-6. Per 2 Recovery / Treatment Points $ 650.00 Not Applicable Not Applicable

15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00

System Installation/Integration/Startup � Addition of 2 recovery/treatment points Compound Construction/fencing (materials) Utility Drop

System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 21-30 recovery/treatment points System Installation/Integration/Startup - 1 technology component - 1-10 additional recovery/treatment points greater than 30. This item is used in conjunction with 15.4.c when needed.

System Installation/Integration/Startup � Addition of 1 technology component

Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order) Traffic Bearing Trench Plates (materials) Infiltration Gallery Installation

REMEDIATION SYSTEM INTEGRATION AND STARTUP

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

15-9. Reimbursable* Not Applicable $ 1.00 $ 1.00 15-10. Reimbursable* Not Applicable $ 1.00 $ 1.00

16.

16.A.

16-1. Per Test $ 3,500.00 $ 3,500.00 $ 3,675.00 16-2. Per 2 Hrs $ 425.00 $ 425.00 $ 446.25 16-3. Per Test $ 3,500.00 $ 3,500.00 $ 3,675.00 16-4. Per 2 Hrs $ 425.00 $ 425.00 $ 446.25 16-5. Per Test $ 3,500.00 $ 3,500.00 $ 3,675.00 16-6. Per 2 Hrs $ 425.00 $ 425.00 $ 446.25 16-7. Per Test $ 3,500.00 $ 3,500.00 $ 3,675.00 16-8. Per 2 Hrs $ 425.00 $ 425.00 $ 446.25 16-9. Per Test $ 3,500.00 $ 3,500.00 $ 3,675.00 16-10. Per 2 Hrs $ 425.00 $ 425.00 $ 446.25 16-11. Per Test $ 3,500.00 $ 3,500.00 $ 3,675.00 16-12. Per 2 Hrs $ 425.00 $ 425.00 $ 446.25 16-13. Per Test Not Applicable $ 4,900.00 $ 4,900.00 16-14. Per 2 Hours Not Applicable $ 595.00 $ 595.00 16.B.

16-17. Per Day $ 3,500.00 $ 3,500.00 $ 3,675.00

Multi-Phase Extraction Pilot Test - Additional Time Air Sparging/Multiphase Extraction Pilot Test - 8 hours Air Sparging/Multiphase Extraction Pilot Test - Additional Time SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES (Including Remediation System Equipment) Groundwater Treatment System Package - Medium

Vapor Extraction Pilot Test - Additional Time Vapor Extraction/Aquifer Pumping Test - 8 hours Vapor Extraction/Aquifer Pumping Test - Additional Time Air Sparging/Vapor Extraction Pilot Test - 8 hours Air Sparging/Vapor Extraction Pilot Test - Additional Time Multi-Phase Extraction Pilot Test - 8 hours

PILOT TEST PACKAGES (Including Remediation System Equipment) Groundwater Recovery System Pilot Test - 8 hours Groundwater Recovery System Pilot Test - Additional Time Air Sparging or Biosparging Pilot Test - 8 hours Air Sparging or Biosparging Pilot Test - Additional Time Vapor Extraction Pilot Test - 8 hours

Utility Connection Utility Disconnect REMEDIAL ACTION - PACKAGED WORK SCOPES (Including Remediation System Equipment)

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

16-18. Per Week $ 5,800.00 $ 5,800.00 $ 6,090.00 16-19. Per Day $ 3,500.00 $ 3,500.00 $ 3,500.00 16-20. Per Week $ 5,800.00 $ 5,800.00 $ 6,090.00 16-21. Per Day $ 3,500.00 $ 3,500.00 $ 3,675.00 16-22. Per Week $ 5,800.00 $ 5,800.00 $ 6,090.00 16-23. Per Day $ 3,500.00 $ 3,500.00 $ 3,675.00 16-24. Per Week $ 5,800.00 $ 5,800.00 $ 6,090.00 16-25. Per Day Not Applicable $ 4,900.00 $ 4,900.00 16-26. Per Week Not Applicable $ 8,120.00 $ 8,120.00 16-27. Per Day Not Applicable $ 2,000.00 $ 2,000.00 16-28. Per Week Not Applicable $ 8,000.00 $ 8,000.00

17.

17-1. Per Month $ 1,500.00 $ 1,500.00 $ 1,575.00 17-2. Per Month $ 1,700.00 $ 1,700.00 $ 1,785.00 17-3. Per Month $ 1,900.00 $ 1,900.00 $ 1,995.00 17-4. Per Month $ 2,100.00 $ 2,100.00 $ 2,205.00 17-5. Per Month $ 250.00 $ 250.00 $ 262.50 18.

18-1. Per Month $ 424.00 $ 424.00 $ 445.20 18-2. Per Month $ 311.00 $ 311.00 $ 326.55 18-3. Per Month $ 1,060.00 $ 1,060.00 $ 1,113.00

Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term 6 mos.

System O&M Package - Medium System O&M Package - Large System O&M Package - Extra Large Supplemental System O&M Package - Add Thermox or Catox Treatment REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M) Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term 6 mos.

AS/MPE System Package - Medium AS/MPE System Package - Medium SVE System Package - Medium SVE System Package - Medium MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES (Excluding Remediation System Equipment) System O&M Package - Small

Air Sparge System Package - Medium Air Sparge System Package - Medium AS/SVE System Package - Medium AS/SVE System Package - Medium MPE System Package - Medium MPE System Package - Medium

Groundwater Treatment System Package - Medium

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

18-4. Per Month $ 800.00 $ 800.00 $ 840.00 18-5. Per Month $ 6,500.00 $ 6,500.00 $ 6,825.00 18-6. Per Month $ 4,200.00 $ 4,200.00 $ 4,410.00 18-7. Per Month $ 10,000.00 $ 10,000.00 $ 10,000.00 18-8. Per Month $ 6,300.00 $ 6,300.00 $ 6,615.00 18-9. Per Month $ 14,000.00 $ 14,000.00 $ 14,700.00 18-10. Per Month $ 9,000.00 $ 9,000.00 $ 9,450.00 18-11. Per Month $ 3,000.00 $ 3,000.00 $ 3,150.00 18-12. Per Month $ 2,000.00 $ 2,000.00 $ 2,100.00 18-13. Per Month $ 3,300.00 $ 3,300.00 $ 3,465.00 18-14. Per Month $ 2,300.00 $ 2,300.00 $ 2,415.00 18-15. Per Month $ 4,900.00 $ 4,900.00 $ 5,145.00 18-16. Per Month $ 3,150.00 $ 3,150.00 $ 3,307.50 18-17. Per Month $ 5,650.00 $ 5,650.00 $ 5,932.50 18-18. Per Month $ 3,700.00 $ 3,700.00 $ 3,885.00 18-19. Per Month $ 6,000.00 $ 6,000.00 $ 6,300.00 18-20. Per Month $ 4,050.00 $ 4,050.00 $ 4,252.50 18-21. Per Month $ 6,900.00 $ 6,900.00 $ 7,245.00 18-22. Per Month $ 5,250.00 $ 5,250.00 $ 5,512.50 18-23. Per Month $ 4,330.00 $ 4,330.00 $ 4,546.50 18-24. Per Month $ 3,000.00 $ 3,000.00 $ 3,150.00 18-25. Per Month $ 6,000.00 $ 6,000.00 $ 6,300.00

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Large - Short Term 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

MPE System - Small - Short Term 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Medium - Short Term 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

Air Sparge System - Large - Short Term 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

AS/SVE System - Small - Short Term 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

AS/SVE System - Medium - Short Term 6 mos.

Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Large - Short Term 6 mos.

Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.

Air Sparge System - Small - Short Term 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Medium - Short Term 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Small - Short Term 6 mos.

Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Medium - Short Term 6 mos.

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

18-26. Per Month $ 4,100.00 $ 4,100.00 $ 4,305.00 18-27. Per Month $ 7,400.00 $ 7,400.00 $ 7,770.00 18-28. Per Month $ 5,300.00 $ 5,300.00 $ 5,565.00 18-29. Per Month $ 5,000.00 $ 5,000.00 $ 5,250.00 18-30. Per Month $ 4,000.00 $ 4,000.00 $ 4,200.00 18-31. Per Month $ 7,350.00 $ 7,350.00 $ 7,717.50 18-32. Per Month $ 3,950.00 $ 3,950.00 $ 4,147.50 18-33. Per Month $ 5,350.00 $ 5,350.00 $ 5,617.50 18-34. Per Month $ 7,000.00 $ 7,000.00 $ 7,350.00 18-35. Per Month $ 650.00 $ 650.00 $ 650.00 18-36. Per Month $ 650.00 $ 650.00 $ 682.50 18-37. Per Month $ 1,052.25 $ 1,052.25 $ 1,052.25 18-38. Per Month $ 300.00 $ 300.00 $ 315.00 18-39. Per Month $ 325.00 $ 325.00 $ 341.25 18-40. Per Month $ 500.00 $ 500.00 $ 525.00 18-41. Per Month $ 3,400.00 $ 3,400.00 $ 3,570.00 18-42. Per Month $ 4,000.00 $ 4,000.00 $ 4,200.00 18-43. Per Month $ 6,796.50 $ 6,796.50 $ 6,796.50 18-44. Per Month $ 3,100.00 $ 3,100.00 $ 3,255.00 18-45. Per Month $ 3,900.00 $ 3,900.00 $ 4,095.00 18-46. Per Month $ 6,238.75 $ 6,238.75 $ 6,238.75 18-47. Per Month Not Applicable $ 4,500.00 $ 4,500.00

Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.

Soil Vapor Extraction (SVE) System - Small - Short Term 6 Months

Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small - Short Term 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Large - Short Term 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small - Short Term 6 mos.

Carbon Off Gas Treatment - Add On - Medium - Short Term 6 mos.

Carbon Off Gas Treatment - Add On - Large - Short Term 6 mos.

MPE System - Medium - Long Term > 6 mos.

MPE System - Large - Short Term 6 mos.

MPE System - Large - Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Short Term 6 mos.

Groundwater Treatment - Add On - Medium - Short Term 6 mos.

Groundwater Treatment - Add On - Large - Short Term 6 mos.

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

18.48. Per Month Not Applicable $ 3,500.00 $ 3,500.00

18-49. Per Month Not Applicable $ 5,000.00 $ 5,000.00 18-50. Per Month Not Applicable $ 4,000.00 $ 4,000.00 18-51. Per Month Not Applicable $ 6,000.00 $ 6,000.00 18-52. Per Month Not Applicable $ 4,500.00 $ 4,500.00 18-53. Per Month Not Applicable $ 8,204.00 $ 8,204.00 18-54. Per Month Not Applicable $ 5,481.00 $ 5,481.00 18-55. Per Month Not Applicable $ 9,100.00 $ 9,100.00 18-56. Per Month Not Applicable $ 5,985.00 $ 5,985.00 18-57. Per Month Not Applicable $ 11,148.00 $ 11,148.00 18-58. Per Month Not Applicable $ 7,553.00 $ 7,553.00

19.

19-1. Per Report $ 1,644.55 $ 1,644.55 $ 1,726.78 19-2. Per Report $ 1,644.55 Not Applicable Not Applicable 19-3. Per Report $ 2,500.00 $ 2,500.00 $ 2,625.00 19-4. Per Report $ 1,750.00 $ 1,750.00 $ 1,837.50 19-5. Per Report $ 1,050.00 $ 1,050.00 $ 1,102.50 19-6. Per Plan $ 998.03 $ 998.03 $ 1,047.93 19-7. Per Report $ 486.52 $ 486.52 $ 510.85 19-8. Per Report $ 1,218.03 $ 1,218.03 $ 1,278.93 19-9. Per Plan $ 624.55 $ 624.55 $ 655.78 Pilot Test Plan

General Site Assessment Report Supplemental Site Assessment Report Receptor and Exposure Pathway Report Level 2 Natural Attenuation Monitoring Plan Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual Natural Attenuation or Post RA Monitoring Report, Annual

Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Large - Short Term 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Large - Long Term > 6 Months REPORTS (Excluding Professional Engineering and Professional Geology Services) Soil Source Removal Report Site Characterization Screening Report

Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months Soil Vapor Extraction (SVE) System - Large - Short Term 6 Months Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Small - Short Term 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Small - Long Term > 6 Months Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Short Term 6 Months

Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months Soil Vapor Extraction (SVE) System - Medium - Short Term 6 Months

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

19-10. Per Report $ 1,092.58 $ 1,092.58 $ 1,147.21 19-11. Per Plan $ 10,698.06 $ 10,698.06 $ 11,232.96 19-12. Per Plan $ 14,249.73 $ 14,249.73 $ 14,962.22 19-13. Per Plan $ 1,274.55 $ 1,274.55 $ 1,338.28 19-14. Per Plan $ 2,506.06 $ 2,506.06 $ 2,631.36 19-15. Per Plan $ 4,346.67 $ 4,346.67 $ 4,564.00 19-16. Per Plan $ 7,124.87 $ 7,124.87 $ 7,481.11 19-17. Per Report $ 3,574.55 $ 3,574.55 $ 3,574.55 19-18. Per Drawings $ 626.52 $ 626.52 $ 657.85 19-19. Per Report $ 2,271.06 $ 2,271.06 $ 2,384.61 19-20. Per Report $ 191.52 $ 191.52 $ 201.10 19-21. Per Report $ 1,494.55 $ 1,494.55 $ 1,569.28 19-22. Per Report $ 2,709.71 $ 2,709.71 $ 2,845.20 19-23. Per Report $ 998.03 $ 998.03 $ 1,047.93 19-24. Per Report $ 486.52 $ 486.52 $ 510.85 19-25. Per Report $ 500.00 $ 500.00 $ 525.00 19-26. Per Report $ 220.00 $ 220.00 $ 231.00 19-27 Per Report Not Applicable $ 1,000.00 $ 1,000.00

20.

20-1. Per Hour $ 106.52 $ 106.52 $ 111.85 20-2. Per Hour $ 85.00 $ 85.00 $ 89.25 20-3. Per Hour $ 85.00 $ 85.00 $ 89.25

Interim Assessment Report PERSONNEL (Excluding Professional Engineer and Professional Geologist) Program Manager (Key) Project Manager (Key) Engineer (Key)

Operation & Maintenance Report, Quarterly or Non-Annual Operation & Maintenance Annual Report Remedial Action General Report Remedial Action Interim Report Free Product Recovery Report Well Abandonment/Site Restoration Report

Level 3 Limited Scope Remedial Action Plan or RAP Modification Plan Level 4 Limited Scope Remedial Action Plan or RAP Modification Plan Construction Drawings and Specs Report As-Built Drawings (P.E. Sealed red lined modifications) Remedial Action Startup Report Letter/NPDES Report

Pilot Test Report Level 1 Remedial Action Plan Level 2 Remedial Action Plan Level 1 Limited Scope Remedial Action Plan or RAP Modification Plan Level 2 Limited Scope Remedial Action Plan or RAP Modification Plan

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.0)

REVISED

CONTRACTED

ITEM PRICE (V2.1)

Region:

Contractor:

Contract #:

South

HLM ENVIRONMENTAL REMEDIATION, INC.

GC868

DESCRIPTION

20-4. Per Hour $ 85.00 $ 85.00 $ 89.25 20-5. Per Hour $ 85.00 $ 85.00 $ 89.25 20-6. Per Hour $ 75.00 $ 75.00 $ 78.75 20-7. Per Hour $ 65.00 $ 65.00 $ 68.25 20-8. Per Hour $ 55.00 $ 55.00 $ 57.75 20-9. Per Hour $ 65.00 $ 65.00 $ 68.25 20-10. Per Hour $ 50.00 $ 50.00 $ 52.50 20-11. Per Hour $ 45.00 $ 45.00 $ 47.25

21.

21-1. Per Hour $ 105.00 $ 105.00 $ 110.25 21-2. Per Hour $ 105.00 $ 105.00 $ 110.25 21-3. Per Hour $ 105.00 $ 105.00 $ 110.25 21-4. Per Hour $ 105.00 $ 105.00 $ 110.25 21-5. Per Test $ 1,050.00 $ 1,050.00 $ 1,050.00

21-6.a. Per System $ 840.00 $ 840.00 $ 882.00 21-6.b. Per System $ 1,680.00 $ 1,680.00 $ 1,680.00 21-6.c. Per System $ 2,310.00 $ 2,310.00 $ 2,310.00 21-6.d.

This is the start of the file's text. The full file is on GovTribe.