CN-370000-GC832-A5.pdf

PDF 5 MB Posted

Attached to
Master Agreement FL|GC832|a2fed0e15e70fe39dbea4e2d21af08f1
Contract number
GC832
Issued by
Florida

About this file

Summary

This document is Amendment No. 5 to DEP Agency Term Contract No. GC832, an indefinite delivery contract between the Florida Department of Environmental Protection (FDEP) and WES Environmental, LLC for petroleum contamination site response action services in the North Region of Florida. The amendment was executed on May 12, 2018, with an effective Rate Change Date of May 22, 2018, following data processing by FDEP.

The contract provides comprehensive environmental remediation services including site characterization, drilling and boring, well installation and abandonment, sample collection and laboratory analysis, soil source removal and excavation, petroleum storage tank removal, remedial system construction and operation, professional engineering and geology oversight, and reporting services. Amendment No. 5 implements rate adjustments to Attachment D (Rate Schedule V2.2), with the majority of pay items increasing by approximately 4.99 to 5.00 percent for new work assignments. Notable exceptions include certain mobilization items (ranging from -30% to -37% reductions), groundwater treatment system packages (-17% to -25% reductions), and air sparge system packages (-26% to -38% reductions). The rate increases do not exceed the maximum 5 percent threshold permitted under contract provision 11.B.ii. All pre-Rate Change Date work assignments continue to apply the previous rate schedule, while rates in the revised schedule apply exclusively to new work assignments issued on or after May 22, 2018.

View the file

Other files

File Type Posted
CN-370000-GC832-A10.pdf PDF
CN-370000-GC832-A19.pdf PDF
CN-370000-GC832-A6.pdf PDF
CN-370000-GC832-CMC1.pdf PDF
CN-370000-GC832-A14.pdf PDF
CN-370000-GC832-A3.pdf.crdownload CRDOWNLOAD file
CN-370000-GC832-A7.pdf PDF
CN-370000-GC832-A9.pdf PDF
CN-370000-GC832.pdf PDF
CN-370000-GC832-A11.pdf PDF
CN-370000-GC832-A13.pdf PDF
CN-370000-GC832-A15E1.pdf PDF
CN-370000-GC832-A17E2.pdf PDF
CN-370000-GC832-A18.pdf PDF
CN-370000-GC832-A2.pdf PDF
CN-370000-GC832-A8.pdf PDF
CN-370000-GC832-CMC.pdf PDF
CN-370000-GC832-A12.pdf PDF
CN-370000-GC832-A16.pdf PDF
CN-370000-GC832-A3.pdf PDF
CN-370000-GC832-A4.pdf PDF
CN-370000-GC832-AR1.pdf PDF
CN-370000-GC832-CMC2.pdf PDF
CN-370000-GC874-GC874.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAY

ITEM

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

1.

1-1. Per Review $ 500.00 $ 525.00 $ 551.25

1-2. Per Site $ 300.00 $ 315.00 $ 330.75

1-2.a. Per Site Not Applicable $ - $ -

1-3. Per Package $ 225.00 $ 236.25 $ 248.06

1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-5. Per Agreement $ 125.00 $ 131.25 $ 137.81

1-5.a. Per Agreement Not Applicable $ - $ -

1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00

1-7. % Surcharge Not Applicable $ 0.06 $ 0.06

2.

2-1. Per Visit $ 400.00 $ 420.00 $ 441.00

2-2. Per Survey $ 400.00 $ 420.00 $ 441.00

2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

2-4. Per Day $ 600.00 $ 630.00 $ 661.50

3.

3-1. Per Round Trip $ 400.00 $ 420.00 $ 441.00

3-2. Per Round Trip $ 600.00 $ 630.00 $ 661.50

3-3. Per Round Trip $ 475.00 $ 498.75 $ 523.68

3-4. Per Round Trip $ 825.00 $ 866.25 $ 909.56

3-5. Per Round Trip $ 110.00 $ 115.50 $ 121.27

3-6. Per Round Trip $ 225.00 $ 236.25 $ 248.06

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Work Trailer - ≤ 100 miles each way

Work Trailer - > 100 miles each way

Contractor Oversight for Non-Price Schedule Activities

MOBILIZATION

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way

Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items

Off-Site Property Access Agreement

Site Property Access Agreement for Source Property at no cost to FDEP

Project Specific Financial Guarantee Bond (if required by DEP)

6% Handling Fee for Cost Reimbursable Items

FIELD ACTIVITIES - GENERAL

DESCRIPTION

OFFICE ACTIVITIES

File Review

Site Health & Safety Plan

Site Health & Safety Plan for Continued Work at no cost to FDEP

Notice of Discovery of Contamination Package (Initial or TPOC)

Site Reconnaissance/Field Measurement Visit

Receptor Survey and Exposure Pathway Identification (Excludes report)

Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable

3-7.a. Per Round Trip Not Applicable $ 577.50 $ 606.37

3-8. Per Round Trip $ 632.50 Not Applicable Not Applicable

3-8.a. Per Round Trip Not Applicable $ 892.50 $ 937.12

3-9. Per Round Trip $ 660.00 Not Applicable Not Applicable

3-9.a. Per Round Trip Not Applicable $ 997.50 $ 997.50

3-10. Per Round Trip $ 750.00 Not Applicable Not Applicable

3-10.a. Per Round Trip Not Applicable $ 1,732.50 $ 1,732.50

3-11. Per Round Trip $ 600.00 $ 630.00 $ 661.50

3-12. Per Round Trip $ 900.00 $ 945.00 $ 661.50

3-13. Per Round Trip $ 8,250.00 Not Applicable Not Applicable

3-13.a. Per Round Trip Not Applicable $ 8,662.50 $ 9,095.62

3-14. Per Round Trip $ 11,000.00 Not Applicable Not Applicable

3-14.a. Per Round Trip Not Applicable

3-15. Per Round Trip $ 330.00 $ 346.50 $ 363.82

3-16. Per Round Trip $ 550.00 $ 577.50 $ 363.82

3-17. Per Round Trip $ 275.00 $ 288.75 $ 303.18

3-18. Per Round Trip $ 385.00 $ 404.25 $ 424.46

3-19. Per Round Trip Not Applicable $ 288.75 $ 303.18

3-20. Per Round Trip Not Applicable $ 472.50 $ 307.13 Drum Compactor mobilization - > 100 miles each way

LDA Rig and Support Vehicles Mobilization - > 100 miles each way

Loader/Backhoe Mobilization - ≤ 100 miles each way

Loader/Backhoe Mobilization - > 100 miles each way

Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way

Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way

Excavator Mobilization - ≤ 100 miles each way

Excavator Mobilization - > 100 miles each way

LDA Rig Mobilization - ≤ 100 miles each way

LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way

LDA Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way

DPT Rig Mobilization - > 100 miles each way

DPT Rig and Support Vehicles Mobilization - > 100 miles each way

Drill Rig Mobilization - ≤ 100 miles each way

Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way

Drill Rig Mobilization - > 100 miles each way

DPT Rig Mobilization - ≤ 100 miles each way

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

4.

4-1.a.

Per Person, Per Day $ 80.00 $ 80.00 $ 80.00

4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00

5.

5-1.a. Per Spoon $ 33.00 Not Applicable Not Applicable

5-1.a.1. Per Spoon Not Applicable $ 32.55 $ 34.17

5-1.a.2. Per Spoon Not Applicable $ 34.65 $ 36.38

5-1.a.3. Per Spoon Not Applicable $ 39.90 $ 41.89

5-1.b. Per Core $ 99.00 $ 103.95 $ 109.14

5-1.c. Per Core $ 16.50 Not Applicable Not Applicable

5-2. Per Boring $ 148.00 $ 155.40 $ 163.17

5-3. Per Foot $ 11.00 Not Applicable Not Applicable

5-3.a. Full Day Not Applicable $ 2,572.50 $ 2,701.12

5-4. Per Foot $ 14.30 Not Applicable Not Applicable

5-5. Per Foot $ 24.20 Not Applicable Not Applicable

5-5.a. Full Day Not Applicable $ 2,572.50 $ 2,701.12

5-6. Per Foot $ 20.35 $ 21.36 $ 22.42

Direct Push Boring

Direct Push Technology (DPT) Rig and Equipment

Direct Push Boring with Cone Penetrometer Test Probe (CPT)

Direct Push Boring with Membrane Interface Probe (MIP)

DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate)

HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth

Split Spoon Sampling – 2 foot (during boring) < 50 feet

Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) > 100 feet

Sonic Core Sampling - 5 or 10 foot (during boring)

DPT Core Sampling - 4 or 5 foot (during boring)

Hand Auger Boring ≤ 10 foot total depth

MEALS AND LODGING

Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.

Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.

DRILLING AND BORING

Split Spoon Sampling - 2 foot (during boring)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

5-7. Per Foot $ 27.50 $ 28.87 $ 30.31

5-8. Per Foot $ 33.00 $ 34.65 $ 36.38

5-9. Per Foot $ 27.50 $ 28.87 $ 30.31

5-10. Per Foot $ 33.00 $ 34.65 $ 36.38

5-11. Per Foot $ 38.50 $ 40.42 $ 42.44

5-12. Per Foot $ 33.00 $ 34.65 $ 36.38

5-13. Per Foot $ 40.00 $ 42.00 $ 44.10

5-14. Per Foot $ 44.00 $ 46.20 $ 48.51

5-15. Per Foot $ 27.50 $ 28.87 $ 30.31

5-16. Per Foot $ 30.80 $ 32.34 $ 33.95

5-17. Per Foot $ 38.50 $ 40.42 $ 42.44

5-18. Per Foot $ 33.00 $ 34.65 $ 36.38

5-19. Per Foot $ 38.50 $ 40.42 $ 42.44

5-20. Per Foot $ 49.50 $ 51.97 $ 54.56

5-21. Per Foot $ 60.50 $ 63.52 $ 66.69

5-22. Per Foot $ 70.00 $ 73.50 $ 77.17

5-23. Per Foot $ 87.00 $ 91.35 $ 95.91

6.

6-1. Per Foot $ 22.00 $ 23.10 $ 24.25

6-2. Per Foot $ 22.00 Not Applicable Not Applicable

6-2.a. Per Foot Not Applicable $ 31.50 $ 33.07

6-2.b. Per Foot Not Applicable $ 152.25 $ 159.86

Well Installation - 1 inch diameter

Well Installation - 2 inch diameter

Well Installation - 2 inch diameter (Vertical)

Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth

Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth

WELL INSTALLATION

HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

6-3. Per Foot $ 27.50 Not Applicable Not Applicable

6-3.a. Per Foot Not Applicable $ 38.32 $ 40.23

6-3.b. Per Foot Not Applicable $ 183.75 $ 192.93

6-4. Per Foot $ 44.00 $ 46.20 $ 48.51

6-5. Per Foot $ 33.00 $ 34.65 $ 36.38

6-6. Per Foot $ 44.00 $ 46.20 $ 48.51

6-7. Per Foot $ 55.00 $ 57.75 $ 60.63

6-8. Per Foot $ 66.00 $ 69.30 $ 72.76

6-9.a. Per Foot $ 6.60 $ 6.93 $ 7.27

6-9.b. Per Foot $ 8.80 $ 9.24 $ 9.70

6-9.c. Per Foot $ 14.00 $ 14.70 $ 15.43

6-9.d. Per Foot $ 17.80 $ 18.69 $ 19.62

6-10. Per Well $ 350.00 $ 367.50 $ 385.87

6-11. Per Vault $ 700.00

6-12. Per Vault $ 1,400.00

6-13. Per Well Not Applicable $ 157.50 $ 165.37

6-14. Per Well Not Applicable $ 288.75 $ 303.18

6-15. Per Well Not Applicable $ 341.25 $ 358.31

Installation of Well Vault - 4 x 4 x 2 foot

Well Redevelopment

Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed

Additional Well Screen > 20 feet - 1 inch diameter

Additional Well Screen > 20 feet - 2 inch diameter

Additional Well Screen > 20 feet - 4 inch diameter

Additional Well Screen > 20 feet - 6 inch diameter

Above Grade Well Completion

Installation of Well Vault - 2 x 2 x 2 foot

Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)

Well Installation - 6 inch diameter

Surface Casing - 6 inch diameter

Surface Casing - 8 inch diameter

Surface Casing - 10 inch diameter

Surface Casing - 12 inch diameter

Well Installation - 4 inch diameter

Well Installation - 4 inch diameter (Vertical)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

7.

7-1. Per Foot $ 15.00 $ 15.75 $ 16.53

7-2. Per Foot $ 17.75 $ 18.63 $ 19.56

7-3. Per Foot $ 22.00 $ 23.10 $ 24.25

7-4. Per Foot $ 25.00 $ 26.25 $ 27.56

7-5. Per Vault $ 275.00 $ 288.75 $ 303.18

7-6. Per Vault $ 495.00 $ 519.75 $ 545.73

7-7 Per Well Not Applicable $ 131.25 $ 137.81

8.

8-1. Per Well $ 185.00 $ 194.25 $ 203.96

8-2. Per Well $ 225.00 $ 236.25 $ 248.06

8-3. Per Well $ 100.00 $ 105.00 $ 110.25

8-4. Per Sample $ 100.00 $ 105.00 $ 110.25

8-5. Per Sample $ 100.00 $ 105.00 $ 105.00

8-6. Per Sample $ 75.00 $ 78.75 $ 78.75

8-7. Per Well $ 20.00 $ 21.00 $ 22.05

8-8. Per Well $ 100.00 $ 105.00 $ 110.25

8-9. Per Sample $ 50.00 $ 52.50 $ 55.12

8-10. Per Sample $ 55.00 $ 57.75 $ 60.63

8-11. Per Sampling Event Not Applicable $ 105.00 $ 110.25

8-12. Per Well Not Applicable $ 31.50 $ 33.07 Survey Latitude/Longitude of Existing Monitor Wells

Soil/Sediment Sample Collection

Water Level or Free Product Gauging

Free Product Gauging & Bailing

Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)

Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)

SAMPLE COLLECTION AND FIELD TESTING

Monitoring Well Sampling with Water Level, ≤ 100 foot depth

Monitoring Well Sampling with Water Level, > 100 foot depth

Domestic Water Well Sampling

Other Water Sampling

Free Product Sample Collection

Grout and Abandon Well, > 2 to 4 inch diameter

Grout and Abandon Well, > 4 to 6 inch diameter

Grout and Abandon Well, > 6 inch diameter

Removal of Well Vault - 2 x 2 x 2 foot

Removal of Well Vault - 4 x 4 x 2 foot

Removal of Well Pad and Manhole

WELL ABANDONMENT

Grout and Abandon Well, 1 to 2 inch diameter

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

8-13. Per Well Not Applicable $ 31.50 $ 33.07

8-14 Per Sample Not Applicable $ 15.75 $ 16.53

9.

9.A.

9-1. Per Sample $ 300.00 $ 315.00 $ 330.75

9-2. Per Sample $ 38.50 $ 40.42 $ 42.44

9-3. Per Sample $ 55.00 $ 57.75 $ 60.63

9-4. Per Sample $ 55.00 $ 57.75 $ 60.63

9-5. Per Sample $ 54.00 $ 56.70 $ 59.53

9-6. Per Sample $ 55.00 $ 57.75 $ 60.63

9-7. Per Sample $ 110.00 $ 115.50 $ 121.27

9-8. Per Sample $ 38.50 $ 40.42 $ 42.44

9-8.a. Per Sample Not Applicable $ 275.00 $ 275.00

9-9. Per Sample $ 55.00 $ 57.75 $ 60.63

9-10. Per Sample $ 55.00 $ 57.75 $ 60.63

9-11. Per Sample $ 7.00 $ 7.35 $ 7.71

Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)

Soil, PCBs [or Aroclors] (EPA 8082)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, BTEX + MTBE (EPA 8021 or EPA 8260)

Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)

Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)

Soil, Priority Pollutant Volatile Organics (EPA 8260)

Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Survey Latitude/Longitude of New Monitor Wells

Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).

LABORATORY ANALYSIS

SOIL/SEDIMENT ANALYSIS

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

9-12. Per Sample $ 7.00 $ 7.35 $ 7.71

9-13. Per Sample $ 7.00 $ 7.35 $ 7.71

9-14. Per Sample $ 7.00 $ 7.35 $ 7.71

9-15. Per Sample $ 55.00 $ 57.75 $ 57.75

9-16. Per Sample $ 71.50 $ 71.50 $ 71.50

9-17. Per Sample $ 25.00 $ 26.25 $ 27.56

9-18. Per Sample $ 32.00 $ 33.60 $ 35.28

9-19. Per Sample $ 12.50 $ 13.12 $ 13.77

9-20. Per Sample $ 30.00 $ 31.50 $ 33.07

9-21. Per Sample $ 360.00 $ 378.00 $ 378.00

9-22. Per Sample $ 550.00 $ 550.00 $ 550.00

9-23. Per Sample $ 38.50 $ 40.42 $ 42.44

9-24. Per Sample $ 290.00 $ 304.50 $ 304.50

9.B.

9-25. Per Sample $ 180.00 $ 189.00 $ 198.45

9-26. Per Sample $ 291.00 $ 305.55 $ 320.82

WATER ANALYSIS

Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)

Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)

Soil, Moisture Content (ASTM D2216-10)

Soil, Texture, (See Gee 7 Bauder [1966])

Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)

Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)

Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)

Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)

Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, - 96e1 or ASTM D2937-10)

Soil, Cadmium (EPA 6010 or EPA 6020)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

9-27. Per Sample $ 27.50 $ 28.87 $ 30.31

9-28. Per Sample $ 55.00 $ 57.75 $ 60.63

9-29. Per Sample $ 45.00 $ 47.25 $ 49.61

9-30. Per Sample $ 65.00 $ 68.25 $ 71.66

9-31. Per Sample $ 27.50 $ 28.87 $ 30.31

9-31.a. Per Sample Not Applicable $ 31.50 $ 33.07

9-32. Per Sample $ 45.00 $ 47.25 $ 49.61

9-33. Per Sample $ 65.00 $ 68.25 $ 71.66

9-34. Per Sample $ 110.00 $ 115.50 $ 121.27

9-35. Per Sample $ 110.00 $ 115.50 $ 121.27

9-36. Per Sample $ 40.00 $ 42.00 $ 44.10

9-37. Per Sample $ 50.00 $ 52.50 $ 55.12

9-38. Per Sample $ 7.00 $ 7.35 $ 7.71

9-39. Per Sample $ 7.00 $ 7.35 $ 7.71

9-40. Per Sample $ 7.00 $ 7.35 $ 7.71

9-41. Per Sample $ 7.00 $ 7.35 $ 7.71

9-41.a. Per Sample Not Applicable $ 21.00 $ 22.05

9-42. Per Sample $ 16.00 $ 16.80 $ 17.64

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)

Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)

Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)

Water, Priority Pollutant Volatile Organics (EPA 8260)

Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])

Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)

Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

9-43. Per Sample $ 7.00 $ 7.35 $ 7.71

9-44. Per Sample $ 7.00 $ 7.35 $ 7.71

9-44.a. Per Sample Not Applicable $ 21.00 $ 22.05

9-45. Per Sample $ 7.00 $ 7.35 $ 7.71

9-46. Per Sample $ 7.00 $ 7.35 $ 7.71

9-47. Per Sample $ 7.00 $ 7.35 $ 7.71

9-48. Per Sample $ 7.00 $ 7.35 $ 7.71

9-49. Per Sample $ 13.00 $ 13.65 $ 14.33

9-50. Per Sample $ 13.00 $ 13.65 $ 14.33

9-51. Per Sample $ 7.00 $ 7.35 $ 7.71

9-52. Per Sample $ 7.00 $ 7.35 $ 7.71

9-53. Per Sample $ 7.00 $ 7.35 $ 7.71

9-54. Per Sample $ 7.00 $ 7.35 $ 7.71

9-55. Per Sample $ 7.00 $ 7.35 $ 7.71

9-56. Per Sample $ 13.00 $ 13.65 $ 14.33

9-57. Per Sample $ 9.00 $ 9.45 $ 9.92

9-58. Per Sample $ 8.00 $ 8.40 $ 8.82

Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF)

Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E)

Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or

SM 4500-NO3 F)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)

Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)

Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)

Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

9-59. Per Sample $ 8.00 $ 8.40 $ 8.82

9-60. Per Sample $ 7.00 $ 7.35 $ 7.71

9-61. Per Sample $ 41.00 $ 43.05 $ 45.20

9-62. Per Sample $ 650.00

9-63. Per Sample $ 870.00

9-64. Per Sample $ 368.00 $ 386.40 $ 386.40

9-65. Per Sample $ 550.00 $ 550.00 $ 550.00

9-66. Per Sample $ 38.50 $ 40.42 $ 42.44

9-67. Per Sample $ 281.00 $ 295.05 $ 309.80

9-78. Per Sample Not Applicable $ 57.75 $ 60.63

9-79. Per Sample Not Applicable $ 55.00 $ 55.00

9-80. Per Sample Not Applicable $ 84.00 $ 88.20

Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)

Water, Methane (EPA SOP RSK-175)

Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:

Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]

(EPA 2006.0/2007.0)

Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)

Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)

Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)

Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)

Water, BTEX/MTBE + Naphthalene (EPA 8260)

Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)

Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)

Water, Heterotrophic Plate Count (SM 9215 B)

Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:

Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

9.C.

9-68. Per Sample $ 75.00 $ 78.75 $ 82.68

9-69. Per Sample $ 150.00 $ 157.50 $ 165.37

9-70. Per Sample $ 150.00 $ 157.50 $ 165.37

9-71. Per Sample $ 150.00 $ 157.50 $ 165.37

9.D.

9-72. Per Sample $ 336.00 $ 352.80 $ 352.80

9-73. Per Sample $ 715.00 $ 715.00 $ 715.00

9.E.

9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable

9-75.

Percent

Surcharge

9-76.

Percent

Surcharge $ 0.50 $ 0.50 $ 0.52

9-77.

Percent

Surcharge $ 1.00 $ 1.00 $ 1.05

10.

10-1. Per Sq. Foot/Day $ 66.00 Not Applicable Not Applicable

10-1.a Per Sq. Foot Not Applicable $ 28.87 $ 30.31

Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.

Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.

SOIL SOURCE REMOVAL RELATED

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling Installation for ≤ 20 feet deep Excavation

Air, Volatile Organic Compounds (EPA Method TO-17)

PRODUCT ANALYSIS

Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)

Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)

OTHER ANALYSIS

Other Analysis, Not Otherwise Specified

AIR ANALYSIS

Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)

Air, Volatile Organic Aromatics (EPA Method TO-15)

Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

10.1.b Per Sq. Foot/Day Not Applicable $ 1.15 $ 1.20

10.1.c Per Sq. Foot/Week Not Applicable $ 3.46 $ 3.63

10.1.d Per Sq. Foot/Month Not Applicable $ 10.39 $ 10.90

10-2. Per Sq. Foot/Week $ 66.00 Not Applicable Not Applicable

10-2.a Per Sq. Foot Not Applicable $ 34.65 $ 36.38

10.2.b Per Sq. Foot/Day Not Applicable $ 1.15 $ 1.20

10.2.c Per Sq. Foot/Week Not Applicable $ 3.46 $ 3.63

10.2.d Per Sq. Foot/Month Not Applicable $ 10.39 $ 10.90

10-3. Per Sq. Foot/Month $ 66.00 Not Applicable Not Applicable

10-4. Per Sq. Foot/Day $ 55.00 Not Applicable Not Applicable

10-5. Per Sq. Foot/Week $ 58.00 Not Applicable Not Applicable

10-6. Per Sq. Foot/Month $ 99.00 Not Applicable Not Applicable

10-7. Per Cubic Yard $ 33.00 $ 34.65 $ 36.38

10-8. Per Cubic Yard $ 27.50 $ 28.87 $ 30.31

10-9. Per Cubic Yard $ 120.00 $ 126.00 $ 132.30

10-10. Per Cubic Yard $ 105.00 $ 110.25 $ 115.76

10-11.a. Per Cubic Yard $ 143.00 $ 150.15 $ 157.65

10-11.b. Per Cubic Yard $ 268.00 $ 281.40 $ 295.47

10-12.a. Per Cubic Yard $ 137.50 $ 144.38 $ 151.59

10-12.b. Per Cubic Yard $ 220.00 $ 231.00 $ 242.55

10-13. Per Cubic Yard $ 99.00 $ 103.95 $ 109.14

10-14. Per Cubic Yard $ 27.50 $ 28.87 $ 30.31

LDA Excavation and Loading With Surface Casing > 300 cubic yards

LDA Excavation and Loading With Driven Casing > 300 cubic yards

Flowable Fill Concrete and Installation

Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards

Conventional Soil Excavation and Loading ≤ 300 cubic yards

Conventional Soil Excavation and Loading > 300 cubic yards

LDA Excavation and Loading Without Casing ≤ 300 cubic yards

LDA Excavation and Loading Without Casing > 300 cubic yards

LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards

LDA Excavation and Loading With Driven Casing < 300 cubic yards

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling for > 20 feet deep excavation (per square foot)

Sheet Piling for > 20 feet deep excavation (per sqyuare foot)

Sheet Piling for > 20 feet deep excavation (per square foot)

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling Rental for ≤ 20 feet deep Excavation

Sheet Piling for ≤ 20 feet deep excavation (per square foot)

Sheet Piling Installation for > 20 feet deep Excavation

Sheet Piling Rental for > 20 feet deep Excavation

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

10-15. Per Cubic Yard $ 24.20 $ 25.41 $ 26.68

10-15.a. Per Cubic Yard Not Applicable $ 11.55 $ 12.12

10-15.b. Per Cubic Yard Not Applicable $ 11.55 $ 12.12

10-16. Per Ton $ 60.00 $ 63.00 $ 66.15

10-17. Per Ton $ 44.00 $ 46.20 $ 48.51

10-18. Per Day $ 3,250.00 $ 3,412.50 $ 3,583.12

10-19. Per Day $ 275.00 $ 288.75 $ 303.18

10-20. Per Week $ 7,500.00 $ 7,875.00 $ 8,268.75

10-21. Per Week $ 400.00 $ 420.00 $ 420.00

10-22. Per Month $ 15,000.00 $ 15,750.00 $ 16,537.50

10-23. Per Month $ 500.00 $ 525.00 $ 551.25

11.

11-1. Per Tank $ 3,850.00 $ 4,042.50 $ 4,244.62

11-2. Per Tank $ 6,000.00 $ 6,300.00 $ 6,615.00

11-3. Per Tank $ 8,500.00 $ 8,925.00 $ 9,371.25

11-4. Per Tank $ 11,000.00 $ 11,550.00 $ 12,127.50

12.

12-1. Per Square Foot $ 2.00 $ 2.10 $ 2.20

12-2. Per Square Foot $ 1.00 $ 1.05 $ 1.10

12-3. Per Ton $ 45.00 $ 47.25 $ 49.61

12-4. Per Ton $ 35.00 $ 36.75 $ 38.58

12-5. Per Ton $ 45.00 $ 47.25 $ 49.61

Transport and Disposal of Clean Concrete

Transport and Disposal of Mixed Debris

Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity

DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL

Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness

Additional Removal/Loading Cost for Concrete - > 4 inch thickness

Loading, Transport and Disposal/Recycle Clean Overburden

Additional Dewatering System Well Points (2) (includes installation)

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2) (includes installation)

PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL

Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity

Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity

Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards

Pea Gravel

#57 Stone

Dewatering System, up to 12 well points (includes installation)

Additional Dewatering System Well Points (2) (includes installation)

Dewatering System, up to 12 well points (includes installation)

Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards

Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

12-6. Per Drum $ 165.00 $ 173.25 $ 181.91

12-7. Per Ton $ 25.25 $ 26.51 $ 27.83

12-8. Per Ton $ 35.00 $ 36.75 $ 38.58

12-9. Per Ton $ 27.50 $ 28.87 $ 30.31

12-10. Per Ton $ 27.50 $ 28.87 $ 30.31

12-11. Per Ton $ 33.50 $ 35.17 $ 35.17

12-12. Per Ton $ 32.50 $ 34.12 $ 34.12

12-13. Per Drum $ 175.00 $ 183.75 $ 192.93

12-14. Per Gallon $ 1.25 $ 1.31 $ 1.37

12-15. Per Drum $ 137.50 $ 144.38 $ 151.59

12-16. Per Gallon $ 1.25 $ 1.31 $ 1.37

12-17. Per Week Not Applicable $ 525.00 $ 551.25

12-18. Per Week Not Applicable $ 500.00 $ 500.00

13.

13-1. Per Square Foot $ 6.00 $ 6.30 $ 6.61

13-2. Per Square Foot $ 2.40 $ 2.52 $ 2.64

13-3. Per Square Foot $ 7.75 $ 8.13 $ 8.53

13-4. Per Square Foot $ 1.50 $ 1.57 $ 1.64

13-5. Per Square Foot $ 2.50 $ 2.62 $ 2.75

13-6. Per Square Foot $ 1.00 $ 1.05 $ 1.10

13-7. Per Square Foot $ 0.50 $ 0.52 $ 0.54

Concrete Paving - 4 inch thickness (includes sub-base)

Concrete Paving - additional 1 inch thickness

Crushed Lime Rock Cover - 2 inch thickness

Grass - Sod

Grass - Seed and Mulch

Transport and Disposal of Petroleum Product (bulk)

Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container

Additional Rental of 20 Cubic Yard Roll-Off Container

RESURFACING

Asphalt Paving - 2 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons

Transport and Disposal of Petroleum Contact Water (includes drum)

Transport and Disposal of Petroleum Contact Water (bulk)

Transport and Disposal of Petroleum Product (includes drum)

Transport and Disposal of Petroleum Impacted Soil (includes drum)

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Transport Petroleum Impacted Soil (bulk) > 100 miles

Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

14.

14-1. Per Foot $ 28.25 $ 29.66 $ 31.14

14-2. Per Injection Point $ 35.00 $ 36.75 $ 38.58

14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

14-4. Per Week Not Applicable $ 4,200.00 $ 4,410.00

14-5. Per Month Not Applicable $ 7,350.00 $ 7,717.50

15.

15.A.

15-1. Per Linear Foot $ 76.00 Not Applicable Not Applicable

15-1.a.

Per Linear Foot of

Trench Not Applicable $ 63.00 $ 66.15

15-1.b.

Per Linear Foot of

Trench Not Applicable $ 63.00 $ 66.15

15-1.c.

Per Linear Foot of

Trench Not Applicable $ 63.00 $ 66.15

15-1.d.

Per Linear Foot of

Trench Not Applicable $ 63.00 $ 66.15

15-2. Per Linear Foot $ 9.00 Not Applicable Not Applicable

15-2.a. Per Foot Not Applicable $ 17.32 $ 18.18

Trenching and Installation - Additional 2 plumbing lines

Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.

Electrical lines are not counted in determination of costs.

TRENCHING

Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines

Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench

Trenching and Installation of 11 - 20 Lines

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines

Direct Push Boring with In-Situ Injection

In-Situ Injection Into Existing Well/Treatment Point

Materials to be Injected

Groundwater Injection System (not by direct push)

Groundwater Injection System (not by direct push)

REMEDIAL ACTION CONSTRUCTION

IN-SITU INJECTION

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00

15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00

15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00

15.B.

15-4.

Per Integration /

Startup $ 6,380.00 Not Applicable Not Applicable

15-4.a Per Startup Not Applicable $ 6,825.00 $ 7,166.25

15-4.b Per Startup Not Applicable $ 8,925.00 $ 9,371.25

15-4.c Per Startup Not Applicable $ 11,025.00 $ 11,576.25

15-4.d Per Startup Not Applicable $ 2,310.00 $ 2,425.50

15-5.

Per Additional Tech

Component $ 2,250.00 $ 2,362.50 $ 2,480.62

15-6.

Per 2 Recovery / Treatment Points

$ 440.00 Not Applicable Not Applicable

15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00

15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00

System Installation/Integration/Startup – Addition of 2 recovery/treatment points

Compound Construction/fencing (materials)

Utility Drop

System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 21-30 recovery/treatment points

System Installation/Integration/Startup - 1 technology component - 1-10 additional recovery/treatment points greater than 30. This item is used in conjunction with 15.4.c when needed.

System Installation/Integration/Startup – Addition of 1 technology component

Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order)

Traffic Bearing Trench Plates (materials)

Infiltration Gallery Installation

REMEDIATION SYSTEM INTEGRATION AND STARTUP

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

15-9. Reimbursable* Not Applicable $ 1.00 $ 1.00

15-10. Reimbursable* Not Applicable $ 1.00 $ 1.00

16.

16.A.

16-1. Per Test $ 4,250.00 $ 4,462.50 $ 4,685.62

16-2. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60

16-3. Per Test $ 2,000.00 $ 2,100.00 $ 2,205.00

16-4. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60

16-5. Per Test $ 3,080.00 $ 3,234.00 $ 3,395.70

16-6. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60

16-7. Per Test $ 4,250.00 $ 4,462.50 $ 4,685.62

16-8. Per 2 Hrs $ 175.00 $ 183.75 $ 192.93

16-9. Per Test $ 2,915.00 $ 3,060.75 $ 3,213.78

16-10. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60

16-11. Per Test $ 4,250.00 $ 4,462.50 $ 4,685.62

16-12. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60

16-13. Per Test Not Applicable $ 3,622.50 $ 3,803.62

16-14. Per 2 Hours Not Applicable $ 603.75 $ 633.93

16.B.

16-17. Per Day $ 3,750.00 $ 3,937.50 $ 4,134.37

Multi-Phase Extraction Pilot Test - Additional Time

Air Sparging/Multiphase Extraction Pilot Test - 8 hours

Air Sparging/Multiphase Extraction Pilot Test - Additional Time

SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES (Including Remediation System Equipment)

Groundwater Treatment System Package - Medium

Vapor Extraction Pilot Test - Additional Time

Vapor Extraction/Aquifer Pumping Test - 8 hours

Vapor Extraction/Aquifer Pumping Test - Additional Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

Air Sparging/Vapor Extraction Pilot Test - Additional Time

Multi-Phase Extraction Pilot Test - 8 hours

PILOT TEST PACKAGES (Including Remediation System Equipment)

Groundwater Recovery System Pilot Test - 8 hours

Groundwater Recovery System Pilot Test - Additional Time

Air Sparging or Biosparging Pilot Test - 8 hours

Air Sparging or Biosparging Pilot Test - Additional Time

Vapor Extraction Pilot Test - 8 hours

Utility Connection

Utility Disconnect

REMEDIAL ACTION - PACKAGED WORK SCOPES (Including Remediation System Equipment)

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

16-18. Per Week $ 10,000.00 $ 10,500.00 $ 7,875.00

16-19. Per Day $ 2,250.00 $ 2,362.50 $ 2,480.62

16-20. Per Week $ 6,250.00 $ 6,562.50 $ 4,856.25

16-21. Per Day $ 3,000.00 $ 3,150.00 $ 3,307.50

16-22. Per Week $ 7,500.00 $ 7,875.00 $ 6,300.00

16-23. Per Day $ 3,250.00 $ 3,412.50 $ 3,583.12

16-24. Per Week $ 7,850.00 $ 8,242.50 $ 6,841.28

16-25. Per Day Not Applicable $ 2,100.00 $ 2,205.00

16-26. Per Week Not Applicable $ 8,190.00 $ 5,077.80

16-27. Per Day Not Applicable $ 1,890.00 $ 1,984.50

16-28. Per Week Not Applicable $ 7,612.50 $ 4,186.88

17.

17-1. Per Month $ 2,400.00 $ 2,520.00 $ 2,646.00

17-2. Per Month $ 2,750.00 $ 2,887.50 $ 3,031.87

17-3. Per Month $ 3,300.00 $ 3,465.00 $ 3,638.25

17-4. Per Month $ 3,775.00 $ 3,963.75 $ 4,161.93

17-5. Per Month $ 435.00 $ 456.75 $ 479.58

18.

18-1. Per Month $ 385.00 $ 404.25 $ 424.46

18-2. Per Month $ 308.00 $ 323.40 $ 339.57

18-3. Per Month $ 997.00 $ 1,046.85 $ 1,099.19

Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term ≤ 6 mos.

System O&M Package - Medium

System O&M Package - Large

System O&M Package - Extra Large

Supplemental System O&M Package - Add Thermox or Catox Treatment

REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M)

Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term ≤ 6 mos.

AS/MPE System Package - Medium

AS/MPE System Package - Medium

SVE System Package - Medium

SVE System Package - Medium

MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES (Excluding Remediation System Equipment)

System O&M Package - Small

Air Sparge System Package - Medium

Air Sparge System Package - Medium

AS/SVE System Package - Medium

AS/SVE System Package - Medium

MPE System Package - Medium

MPE System Package - Medium

Groundwater Treatment System Package - Medium

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

18-4. Per Month $ 662.00 $ 695.10 $ 729.85

18-5. Per Month $ 5,000.00 $ 5,250.00 $ 5,512.50

18-6. Per Month $ 4,131.00 $ 4,337.55 $ 4,554.42

18-7. Per Month $ 9,000.00 $ 9,450.00 $ 7,843.50

18-8. Per Month $ 6,330.00 $ 6,646.50 $ 6,646.50

18-9. Per Month $ 9,500.00 $ 9,975.00 $ 8,478.75

18-10. Per Month $ 8,500.00 $ 8,925.00 $ 7,586.25

18-11. Per Month $ 2,640.00 $ 2,772.00 $ 2,910.60

18-12. Per Month $ 2,000.00 $ 2,100.00 $ 2,205.00

18-13. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70

18-14. Per Month $ 2,250.00 $ 2,362.50 $ 2,480.62

18-15. Per Month $ 3,500.00 $ 3,675.00 $ 3,858.75

18-16. Per Month $ 3,144.00 $ 3,301.20 $ 3,466.26

18-17. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70

18-18. Per Month $ 2,860.00 $ 3,003.00 $ 3,153.15

18-19. Per Month $ 3,300.00 $ 3,465.00 $ 3,638.25

18-20. Per Month $ 3,135.00 $ 3,291.75 $ 3,456.33

18-21. Per Month $ 4,400.00 $ 4,620.00 $ 4,851.00

18-22. Per Month $ 4,180.00 $ 4,389.00 $ 4,608.45

18-23. Per Month $ 3,500.00 $ 3,675.00 $ 3,858.75

18-24. Per Month $ 2,967.00 $ 3,115.35 $ 3,271.11

18-25. Per Month $ 4,500.00 $ 4,725.00 $ 4,961.25

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Large - Short Term ≤ 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

MPE System - Small - Short Term ≤ 6 mos.

MPE System - Small - Long Term > 6 mos.

MPE System - Medium - Short Term ≤ 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

Air Sparge System - Large - Short Term ≤ 6 mos.

Air Sparge System - Large - Long Term > 6 mos.

AS/SVE System - Small - Short Term ≤ 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

AS/SVE System - Medium - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.

Air Sparge System - Small - Short Term ≤ 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

Air Sparge System - Medium - Short Term ≤ 6 mos.

Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.

Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.

Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

18-26. Per Month $ 4,064.00 $ 4,267.20 $ 4,480.56

18-27. Per Month $ 6,490.00 $ 6,814.50 $ 7,155.22

18-28. Per Month $ 5,299.00 $ 5,563.95 $ 5,563.95

18-29. Per Month $ 590.00 $ 619.50 $ 650.47

18-30. Per Month $ 960.00 $ 1,008.00 $ 1,058.40

18-31. Per Month $ 1,925.00 $ 2,021.25 $ 2,122.31

18-32. Per Month $ 450.00 $ 472.50 $ 496.12

18-33. Per Month $ 590.00 $ 619.50 $ 650.47

18-34. Per Month $ 1,500.00 $ 1,575.00 $ 1,653.75

18-35. Per Month $ 500.00 $ 525.00 $ 551.25

18-36. Per Month $ 616.00 $ 646.80 $ 679.14

18-37. Per Month $ 946.00 $ 993.30 $ 1,042.96

18-38. Per Month $ 260.00 $ 273.00 $ 286.65

18-39. Per Month $ 330.00 $ 346.50 $ 363.82

18-40. Per Month $ 560.00 $ 588.00 $ 617.40

18-41. Per Month $ 2,860.00 $ 3,003.00 $ 3,153.15

18-42. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70

18-43. Per Month $ 4,400.00 $ 4,620.00 $ 4,851.00

18-44. Per Month $ 2,750.00 $ 2,887.50 $ 3,031.87

18-45. Per Month $ 2,970.00 $ 3,118.50 $ 3,274.42

18-46. Per Month $ 4,290.00 $ 4,504.50 $ 4,729.72

18-47. Per Month Not Applicable $ 3,150.00 $ 3,307.50

Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.

Soil Vapor Extraction (SVE) System - Small - Short Term ≤ 6 Months

Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.

Thermox/Catox Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Small - Long Term > 6 mos.

Groundwater Treatment - Add On - Medium - Long Term > 6 mos.

Groundwater Treatment - Add On - Large - Long Term > 6 mos.

Carbon Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.

Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.

MPE System - Medium - Long Term > 6 mos.

MPE System - Large - Short Term ≤ 6 mos.

MPE System - Large - Long Term > 6 mos.

Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.

Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos.

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

18.48. Per Month Not Applicable $ 2,887.50 $ 3,031.87

18-49. Per Month Not Applicable $ 3,675.00 $ 3,858.75

18-50. Per Month Not Applicable $ 3,150.00 $ 3,307.50

18-51. Per Month Not Applicable $ 4,620.00 $ 4,851.00

18-52. Per Month Not Applicable $ 3,832.50 $ 4,024.12

18-53. Per Month Not Applicable $ 4,882.50 $ 5,126.62

18-54. Per Month Not Applicable $ 4,515.00 $ 4,740.75

18-55. Per Month Not Applicable $ 5,092.50 $ 5,347.12

18-56. Per Month Not Applicable $ 4,830.00 $ 5,071.50

18-57. Per Month Not Applicable $ 6,195.00 $ 6,504.75

18-58. Per Month Not Applicable $ 5,932.50 $ 6,229.12

19.

19-1. Per Report $ 1,500.00 $ 1,575.00 $ 1,653.75

19-2. Per Report $ 1,250.00 Not Applicable Not Applicable

19-3. Per Report $ 2,000.00 $ 2,100.00 $ 2,205.00

19-4. Per Report $ 1,900.00 $ 1,995.00 $ 2,094.75

19-5. Per Report $ 500.00 $ 525.00 $ 551.25

19-6. Per Plan $ 1,000.00 $ 1,050.00 $ 1,102.50

19-7. Per Report $ 615.00 $ 645.75 $ 678.03

19-8. Per Report $ 1,000.00 $ 1,050.00 $ 1,102.50

19-9. Per Plan $ 850.00 $ 892.50 $ 937.12 Pilot Test Plan

General Site Assessment Report

Supplemental Site Assessment Report

Receptor and Exposure Pathway Report

Level 2 Natural Attenuation Monitoring Plan

Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual

Natural Attenuation or Post RA Monitoring Report, Annual

Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months

Air Sparge/Multphase Extraction (AS/MPE) System - Large - Short Term ≤ 6 Months

Air Sparge/Multphase Extraction (AS/MPE) System - Large - Long Term > 6 Months

REPORTS (Excluding Professional Engineering and Professional Geology Services)

Soil Source Removal Report

Site Characterization Screening Report

Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months

Soil Vapor Extraction (SVE) System - Large - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months

Air Sparge/Multphase Extraction (AS/MPE) System - Small - Short Term ≤ 6 Months

Air Sparge/Multphase Extraction (AS/MPE) System - Small - Long Term > 6 Months

Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Short Term ≤ 6 Months

Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months

Soil Vapor Extraction (SVE) System - Medium - Short Term ≤ 6 Months

UNIT OF MEASURE

ORIGINAL

CONTRACTED

ITEM PRICE 2014

PREVIOUS

CONTRACTED ITEM

PRICE (V2.1)

REVISED

CONTRACTED

ITEM PRICE (V2.2)

Region:

Contractor:

Contract #:

North

WES ENVIRONMENTAL, LLC

GC832

DEP Restated Agency Term Contract No. GC832 Amendment No. 5

Attachment D (V2.2) - Rate Schedule

DESCRIPTION

19-10. Per Report $ 1,325.00 $ 1,391.25 $ 1,460.81

19-11. Per Plan $ 10,000.00 $ 10,500.00 $ 11,025.00

19-12. Per Plan $ 15,000.00 $ 15,750.00 $ 16,537.50

19-13. Per Plan $ 1,200.00 $ 1,260.00 $ 1,323.00

19-14. Per Plan $ 2,500.00 $ 2,625.00 $ 2,756.25

19-15. Per Plan $ 4,500.00 $ 4,725.00 $ 4,961.25

19-16. Per Plan $ 6,500.00 $ 6,825.00 $ 7,166.25

19-17. Per Report $ 3,200.00 $ 3,360.00 $ 3,528.00

19-18. Per Drawings $ 650.00 $ 682.50 $ 716.62

19-19. Per Report $ 1,375.00 $ 1,443.75 $ 1,515.93

19-20. Per Report $ 240.00 $ 252.00 $ 264.60

19-21. Per Report $ 1,500.00 $ 1,575.00 $ 1,653.75

19-22. Per Report $ 2,950.00 $ 3,097.50 $ 3,252.37

19-23. Per Report $ 1,000.00 $ 1,050.00 $ 1,102.50

19-24. Per Report $ 600.00 $ 630.00 $ 661.50

19-25. Per Report $ 450.00 $ 472.50 $ 496.12

19-26. Per Report $ 285.00 $ 299.25 $ 314.21

19-27 Per Report Not Applicable $ 252.00 $ 264.60

20.

20-1. Per Hour $ 90.00 $ 94.50 $ 99.22

20-2. Per Hour $ 70.00 $ 73.50 $ 77.17

20-3. Per Hour $ 90.00 $ 94.50 $ 99.22

Interim Assessment Report

PERSONNEL (Excluding Professional Engineer and Professional Geologist)

Program Manager (Key)

Project Manager (Key)

Engineer (Key)

Operation & Maintenance Report, Quarterly or Non-Annual

Operation & Maintenance…