This document is Amendment No. 5 to DEP Agency Term Contract No. GC832, an indefinite delivery contract between the Florida Department of Environmental Protection (FDEP) and WES Environmental, LLC for petroleum contamination site response action services in the North Region of Florida. The amendment was executed on May 12, 2018, with an effective Rate Change Date of May 22, 2018, following data processing by FDEP.
The contract provides comprehensive environmental remediation services including site characterization, drilling and boring, well installation and abandonment, sample collection and laboratory analysis, soil source removal and excavation, petroleum storage tank removal, remedial system construction and operation, professional engineering and geology oversight, and reporting services. Amendment No. 5 implements rate adjustments to Attachment D (Rate Schedule V2.2), with the majority of pay items increasing by approximately 4.99 to 5.00 percent for new work assignments. Notable exceptions include certain mobilization items (ranging from -30% to -37% reductions), groundwater treatment system packages (-17% to -25% reductions), and air sparge system packages (-26% to -38% reductions). The rate increases do not exceed the maximum 5 percent threshold permitted under contract provision 11.B.ii. All pre-Rate Change Date work assignments continue to apply the previous rate schedule, while rates in the revised schedule apply exclusively to new work assignments issued on or after May 22, 2018.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC832-A10.pdf | ||
| CN-370000-GC832-A19.pdf | ||
| CN-370000-GC832-A6.pdf | ||
| CN-370000-GC832-CMC1.pdf | ||
| CN-370000-GC832-A14.pdf | ||
| CN-370000-GC832-A3.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC832-A7.pdf | ||
| CN-370000-GC832-A9.pdf | ||
| CN-370000-GC832.pdf | ||
| CN-370000-GC832-A11.pdf | ||
| CN-370000-GC832-A13.pdf | ||
| CN-370000-GC832-A15E1.pdf | ||
| CN-370000-GC832-A17E2.pdf | ||
| CN-370000-GC832-A18.pdf | ||
| CN-370000-GC832-A2.pdf | ||
| CN-370000-GC832-A8.pdf | ||
| CN-370000-GC832-CMC.pdf | ||
| CN-370000-GC832-A12.pdf | ||
| CN-370000-GC832-A16.pdf | ||
| CN-370000-GC832-A3.pdf | ||
| CN-370000-GC832-A4.pdf | ||
| CN-370000-GC832-AR1.pdf | ||
| CN-370000-GC832-CMC2.pdf | ||
| CN-370000-GC874-GC874.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAY
ITEM
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
1.
1-1. Per Review $ 500.00 $ 525.00 $ 551.25
1-2. Per Site $ 300.00 $ 315.00 $ 330.75
1-2.a. Per Site Not Applicable $ - $ -
1-3. Per Package $ 225.00 $ 236.25 $ 248.06
1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00
1-5. Per Agreement $ 125.00 $ 131.25 $ 137.81
1-5.a. Per Agreement Not Applicable $ - $ -
1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00
1-7. % Surcharge Not Applicable $ 0.06 $ 0.06
2.
2-1. Per Visit $ 400.00 $ 420.00 $ 441.00
2-2. Per Survey $ 400.00 $ 420.00 $ 441.00
2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
2-4. Per Day $ 600.00 $ 630.00 $ 661.50
3.
3-1. Per Round Trip $ 400.00 $ 420.00 $ 441.00
3-2. Per Round Trip $ 600.00 $ 630.00 $ 661.50
3-3. Per Round Trip $ 475.00 $ 498.75 $ 523.68
3-4. Per Round Trip $ 825.00 $ 866.25 $ 909.56
3-5. Per Round Trip $ 110.00 $ 115.50 $ 121.27
3-6. Per Round Trip $ 225.00 $ 236.25 $ 248.06
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Work Trailer - ≤ 100 miles each way
Work Trailer - > 100 miles each way
Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items
Off-Site Property Access Agreement
Site Property Access Agreement for Source Property at no cost to FDEP
Project Specific Financial Guarantee Bond (if required by DEP)
6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
DESCRIPTION
OFFICE ACTIVITIES
File Review
Site Health & Safety Plan
Site Health & Safety Plan for Continued Work at no cost to FDEP
Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit
Receptor Survey and Exposure Pathway Identification (Excludes report)
Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable
3-7.a. Per Round Trip Not Applicable $ 577.50 $ 606.37
3-8. Per Round Trip $ 632.50 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 892.50 $ 937.12
3-9. Per Round Trip $ 660.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 997.50 $ 997.50
3-10. Per Round Trip $ 750.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,732.50 $ 1,732.50
3-11. Per Round Trip $ 600.00 $ 630.00 $ 661.50
3-12. Per Round Trip $ 900.00 $ 945.00 $ 661.50
3-13. Per Round Trip $ 8,250.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 8,662.50 $ 9,095.62
3-14. Per Round Trip $ 11,000.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable
3-15. Per Round Trip $ 330.00 $ 346.50 $ 363.82
3-16. Per Round Trip $ 550.00 $ 577.50 $ 363.82
3-17. Per Round Trip $ 275.00 $ 288.75 $ 303.18
3-18. Per Round Trip $ 385.00 $ 404.25 $ 424.46
3-19. Per Round Trip Not Applicable $ 288.75 $ 303.18
3-20. Per Round Trip Not Applicable $ 472.50 $ 307.13 Drum Compactor mobilization - > 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Loader/Backhoe Mobilization - ≤ 100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - ≤ 100 miles each way
Mini Excavator/Loader (BobcatTM) Mobilization - > 100 miles each way Drum Compactor mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
Excavator Mobilization - ≤ 100 miles each way
Excavator Mobilization - > 100 miles each way
LDA Rig Mobilization - ≤ 100 miles each way
LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way
LDA Rig Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
DPT Rig Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way
Drill Rig Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
Drill Rig Mobilization - > 100 miles each way
DPT Rig Mobilization - ≤ 100 miles each way
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
4.
4-1.a.
Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 33.00 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 32.55 $ 34.17
5-1.a.2. Per Spoon Not Applicable $ 34.65 $ 36.38
5-1.a.3. Per Spoon Not Applicable $ 39.90 $ 41.89
5-1.b. Per Core $ 99.00 $ 103.95 $ 109.14
5-1.c. Per Core $ 16.50 Not Applicable Not Applicable
5-2. Per Boring $ 148.00 $ 155.40 $ 163.17
5-3. Per Foot $ 11.00 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 2,572.50 $ 2,701.12
5-4. Per Foot $ 14.30 Not Applicable Not Applicable
5-5. Per Foot $ 24.20 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 2,572.50 $ 2,701.12
5-6. Per Foot $ 20.35 $ 21.36 $ 22.42
Direct Push Boring
Direct Push Technology (DPT) Rig and Equipment
Direct Push Boring with Cone Penetrometer Test Probe (CPT)
Direct Push Boring with Membrane Interface Probe (MIP)
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT Base Rate)
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet
Split Spoon Sampling – 2 foot (during boring) > 100 feet
Sonic Core Sampling - 5 or 10 foot (during boring)
DPT Core Sampling - 4 or 5 foot (during boring)
Hand Auger Boring ≤ 10 foot total depth
MEALS AND LODGING
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
5-7. Per Foot $ 27.50 $ 28.87 $ 30.31
5-8. Per Foot $ 33.00 $ 34.65 $ 36.38
5-9. Per Foot $ 27.50 $ 28.87 $ 30.31
5-10. Per Foot $ 33.00 $ 34.65 $ 36.38
5-11. Per Foot $ 38.50 $ 40.42 $ 42.44
5-12. Per Foot $ 33.00 $ 34.65 $ 36.38
5-13. Per Foot $ 40.00 $ 42.00 $ 44.10
5-14. Per Foot $ 44.00 $ 46.20 $ 48.51
5-15. Per Foot $ 27.50 $ 28.87 $ 30.31
5-16. Per Foot $ 30.80 $ 32.34 $ 33.95
5-17. Per Foot $ 38.50 $ 40.42 $ 42.44
5-18. Per Foot $ 33.00 $ 34.65 $ 36.38
5-19. Per Foot $ 38.50 $ 40.42 $ 42.44
5-20. Per Foot $ 49.50 $ 51.97 $ 54.56
5-21. Per Foot $ 60.50 $ 63.52 $ 66.69
5-22. Per Foot $ 70.00 $ 73.50 $ 77.17
5-23. Per Foot $ 87.00 $ 91.35 $ 95.91
6.
6-1. Per Foot $ 22.00 $ 23.10 $ 24.25
6-2. Per Foot $ 22.00 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 31.50 $ 33.07
6-2.b. Per Foot Not Applicable $ 152.25 $ 159.86
Well Installation - 1 inch diameter
Well Installation - 2 inch diameter
Well Installation - 2 inch diameter (Vertical)
Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
6-3. Per Foot $ 27.50 Not Applicable Not Applicable
6-3.a. Per Foot Not Applicable $ 38.32 $ 40.23
6-3.b. Per Foot Not Applicable $ 183.75 $ 192.93
6-4. Per Foot $ 44.00 $ 46.20 $ 48.51
6-5. Per Foot $ 33.00 $ 34.65 $ 36.38
6-6. Per Foot $ 44.00 $ 46.20 $ 48.51
6-7. Per Foot $ 55.00 $ 57.75 $ 60.63
6-8. Per Foot $ 66.00 $ 69.30 $ 72.76
6-9.a. Per Foot $ 6.60 $ 6.93 $ 7.27
6-9.b. Per Foot $ 8.80 $ 9.24 $ 9.70
6-9.c. Per Foot $ 14.00 $ 14.70 $ 15.43
6-9.d. Per Foot $ 17.80 $ 18.69 $ 19.62
6-10. Per Well $ 350.00 $ 367.50 $ 385.87
6-11. Per Vault $ 700.00
6-12. Per Vault $ 1,400.00
6-13. Per Well Not Applicable $ 157.50 $ 165.37
6-14. Per Well Not Applicable $ 288.75 $ 303.18
6-15. Per Well Not Applicable $ 341.25 $ 358.31
Installation of Well Vault - 4 x 4 x 2 foot
Well Redevelopment
Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Additional Well Screen > 20 feet - 1 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 6 inch diameter
Above Grade Well Completion
Installation of Well Vault - 2 x 2 x 2 foot
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)
Well Installation - 6 inch diameter
Surface Casing - 6 inch diameter
Surface Casing - 8 inch diameter
Surface Casing - 10 inch diameter
Surface Casing - 12 inch diameter
Well Installation - 4 inch diameter
Well Installation - 4 inch diameter (Vertical)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
7.
7-1. Per Foot $ 15.00 $ 15.75 $ 16.53
7-2. Per Foot $ 17.75 $ 18.63 $ 19.56
7-3. Per Foot $ 22.00 $ 23.10 $ 24.25
7-4. Per Foot $ 25.00 $ 26.25 $ 27.56
7-5. Per Vault $ 275.00 $ 288.75 $ 303.18
7-6. Per Vault $ 495.00 $ 519.75 $ 545.73
7-7 Per Well Not Applicable $ 131.25 $ 137.81
8.
8-1. Per Well $ 185.00 $ 194.25 $ 203.96
8-2. Per Well $ 225.00 $ 236.25 $ 248.06
8-3. Per Well $ 100.00 $ 105.00 $ 110.25
8-4. Per Sample $ 100.00 $ 105.00 $ 110.25
8-5. Per Sample $ 100.00 $ 105.00 $ 105.00
8-6. Per Sample $ 75.00 $ 78.75 $ 78.75
8-7. Per Well $ 20.00 $ 21.00 $ 22.05
8-8. Per Well $ 100.00 $ 105.00 $ 110.25
8-9. Per Sample $ 50.00 $ 52.50 $ 55.12
8-10. Per Sample $ 55.00 $ 57.75 $ 60.63
8-11. Per Sampling Event Not Applicable $ 105.00 $ 110.25
8-12. Per Well Not Applicable $ 31.50 $ 33.07 Survey Latitude/Longitude of Existing Monitor Wells
Soil/Sediment Sample Collection
Water Level or Free Product Gauging
Free Product Gauging & Bailing
Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)
Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent) Electronic Data Deliverables (EDD)
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, ≤ 100 foot depth
Monitoring Well Sampling with Water Level, > 100 foot depth
Domestic Water Well Sampling
Other Water Sampling
Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 6 inch diameter
Removal of Well Vault - 2 x 2 x 2 foot
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Pad and Manhole
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
8-13. Per Well Not Applicable $ 31.50 $ 33.07
8-14 Per Sample Not Applicable $ 15.75 $ 16.53
9.
9.A.
9-1. Per Sample $ 300.00 $ 315.00 $ 330.75
9-2. Per Sample $ 38.50 $ 40.42 $ 42.44
9-3. Per Sample $ 55.00 $ 57.75 $ 60.63
9-4. Per Sample $ 55.00 $ 57.75 $ 60.63
9-5. Per Sample $ 54.00 $ 56.70 $ 59.53
9-6. Per Sample $ 55.00 $ 57.75 $ 60.63
9-7. Per Sample $ 110.00 $ 115.50 $ 121.27
9-8. Per Sample $ 38.50 $ 40.42 $ 42.44
9-8.a. Per Sample Not Applicable $ 275.00 $ 275.00
9-9. Per Sample $ 55.00 $ 57.75 $ 60.63
9-10. Per Sample $ 55.00 $ 57.75 $ 60.63
9-11. Per Sample $ 7.00 $ 7.35 $ 7.71
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, PCBs [or Aroclors] (EPA 8082)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])
Survey Latitude/Longitude of New Monitor Wells
Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
9-12. Per Sample $ 7.00 $ 7.35 $ 7.71
9-13. Per Sample $ 7.00 $ 7.35 $ 7.71
9-14. Per Sample $ 7.00 $ 7.35 $ 7.71
9-15. Per Sample $ 55.00 $ 57.75 $ 57.75
9-16. Per Sample $ 71.50 $ 71.50 $ 71.50
9-17. Per Sample $ 25.00 $ 26.25 $ 27.56
9-18. Per Sample $ 32.00 $ 33.60 $ 35.28
9-19. Per Sample $ 12.50 $ 13.12 $ 13.77
9-20. Per Sample $ 30.00 $ 31.50 $ 33.07
9-21. Per Sample $ 360.00 $ 378.00 $ 378.00
9-22. Per Sample $ 550.00 $ 550.00 $ 550.00
9-23. Per Sample $ 38.50 $ 40.42 $ 42.44
9-24. Per Sample $ 290.00 $ 304.50 $ 304.50
9.B.
9-25. Per Sample $ 180.00 $ 189.00 $ 198.45
9-26. Per Sample $ 291.00 $ 305.55 $ 320.82
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non- Priority Pollutant Organics (Multiple Methods)
Soil, Moisture Content (ASTM D2216-10)
Soil, Texture, (See Gee 7 Bauder [1966])
Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)
Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)
Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, - 96e1 or ASTM D2937-10)
Soil, Cadmium (EPA 6010 or EPA 6020)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
9-27. Per Sample $ 27.50 $ 28.87 $ 30.31
9-28. Per Sample $ 55.00 $ 57.75 $ 60.63
9-29. Per Sample $ 45.00 $ 47.25 $ 49.61
9-30. Per Sample $ 65.00 $ 68.25 $ 71.66
9-31. Per Sample $ 27.50 $ 28.87 $ 30.31
9-31.a. Per Sample Not Applicable $ 31.50 $ 33.07
9-32. Per Sample $ 45.00 $ 47.25 $ 49.61
9-33. Per Sample $ 65.00 $ 68.25 $ 71.66
9-34. Per Sample $ 110.00 $ 115.50 $ 121.27
9-35. Per Sample $ 110.00 $ 115.50 $ 121.27
9-36. Per Sample $ 40.00 $ 42.00 $ 44.10
9-37. Per Sample $ 50.00 $ 52.50 $ 55.12
9-38. Per Sample $ 7.00 $ 7.35 $ 7.71
9-39. Per Sample $ 7.00 $ 7.35 $ 7.71
9-40. Per Sample $ 7.00 $ 7.35 $ 7.71
9-41. Per Sample $ 7.00 $ 7.35 $ 7.71
9-41.a. Per Sample Not Applicable $ 21.00 $ 22.05
9-42. Per Sample $ 16.00 $ 16.80 $ 17.64
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, Priority Pollutant Volatile Organics (EPA 8260)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
9-43. Per Sample $ 7.00 $ 7.35 $ 7.71
9-44. Per Sample $ 7.00 $ 7.35 $ 7.71
9-44.a. Per Sample Not Applicable $ 21.00 $ 22.05
9-45. Per Sample $ 7.00 $ 7.35 $ 7.71
9-46. Per Sample $ 7.00 $ 7.35 $ 7.71
9-47. Per Sample $ 7.00 $ 7.35 $ 7.71
9-48. Per Sample $ 7.00 $ 7.35 $ 7.71
9-49. Per Sample $ 13.00 $ 13.65 $ 14.33
9-50. Per Sample $ 13.00 $ 13.65 $ 14.33
9-51. Per Sample $ 7.00 $ 7.35 $ 7.71
9-52. Per Sample $ 7.00 $ 7.35 $ 7.71
9-53. Per Sample $ 7.00 $ 7.35 $ 7.71
9-54. Per Sample $ 7.00 $ 7.35 $ 7.71
9-55. Per Sample $ 7.00 $ 7.35 $ 7.71
9-56. Per Sample $ 13.00 $ 13.65 $ 14.33
9-57. Per Sample $ 9.00 $ 9.45 $ 9.92
9-58. Per Sample $ 8.00 $ 8.40 $ 8.82
Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF)
Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E)
Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or
SM 4500-NO3 F)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)
Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
9-59. Per Sample $ 8.00 $ 8.40 $ 8.82
9-60. Per Sample $ 7.00 $ 7.35 $ 7.71
9-61. Per Sample $ 41.00 $ 43.05 $ 45.20
9-62. Per Sample $ 650.00
9-63. Per Sample $ 870.00
9-64. Per Sample $ 368.00 $ 386.40 $ 386.40
9-65. Per Sample $ 550.00 $ 550.00 $ 550.00
9-66. Per Sample $ 38.50 $ 40.42 $ 42.44
9-67. Per Sample $ 281.00 $ 295.05 $ 309.80
9-78. Per Sample Not Applicable $ 57.75 $ 60.63
9-79. Per Sample Not Applicable $ 55.00 $ 55.00
9-80. Per Sample Not Applicable $ 84.00 $ 88.20
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, Methane (EPA SOP RSK-175)
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:
Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]
(EPA 2006.0/2007.0)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)
Water, Heterotrophic Plate Count (SM 9215 B)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:
Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
9.C.
9-68. Per Sample $ 75.00 $ 78.75 $ 82.68
9-69. Per Sample $ 150.00 $ 157.50 $ 165.37
9-70. Per Sample $ 150.00 $ 157.50 $ 165.37
9-71. Per Sample $ 150.00 $ 157.50 $ 165.37
9.D.
9-72. Per Sample $ 336.00 $ 352.80 $ 352.80
9-73. Per Sample $ 715.00 $ 715.00 $ 715.00
9.E.
9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable
9-75.
Percent
Surcharge
9-76.
Percent
Surcharge $ 0.50 $ 0.50 $ 0.52
9-77.
Percent
Surcharge $ 1.00 $ 1.00 $ 1.05
10.
10-1. Per Sq. Foot/Day $ 66.00 Not Applicable Not Applicable
10-1.a Per Sq. Foot Not Applicable $ 28.87 $ 30.31
Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.
SOIL SOURCE REMOVAL RELATED
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling Installation for ≤ 20 feet deep Excavation
Air, Volatile Organic Compounds (EPA Method TO-17)
PRODUCT ANALYSIS
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)
OTHER ANALYSIS
Other Analysis, Not Otherwise Specified
AIR ANALYSIS
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Air, Volatile Organic Aromatics (EPA Method TO-15)
Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
10.1.b Per Sq. Foot/Day Not Applicable $ 1.15 $ 1.20
10.1.c Per Sq. Foot/Week Not Applicable $ 3.46 $ 3.63
10.1.d Per Sq. Foot/Month Not Applicable $ 10.39 $ 10.90
10-2. Per Sq. Foot/Week $ 66.00 Not Applicable Not Applicable
10-2.a Per Sq. Foot Not Applicable $ 34.65 $ 36.38
10.2.b Per Sq. Foot/Day Not Applicable $ 1.15 $ 1.20
10.2.c Per Sq. Foot/Week Not Applicable $ 3.46 $ 3.63
10.2.d Per Sq. Foot/Month Not Applicable $ 10.39 $ 10.90
10-3. Per Sq. Foot/Month $ 66.00 Not Applicable Not Applicable
10-4. Per Sq. Foot/Day $ 55.00 Not Applicable Not Applicable
10-5. Per Sq. Foot/Week $ 58.00 Not Applicable Not Applicable
10-6. Per Sq. Foot/Month $ 99.00 Not Applicable Not Applicable
10-7. Per Cubic Yard $ 33.00 $ 34.65 $ 36.38
10-8. Per Cubic Yard $ 27.50 $ 28.87 $ 30.31
10-9. Per Cubic Yard $ 120.00 $ 126.00 $ 132.30
10-10. Per Cubic Yard $ 105.00 $ 110.25 $ 115.76
10-11.a. Per Cubic Yard $ 143.00 $ 150.15 $ 157.65
10-11.b. Per Cubic Yard $ 268.00 $ 281.40 $ 295.47
10-12.a. Per Cubic Yard $ 137.50 $ 144.38 $ 151.59
10-12.b. Per Cubic Yard $ 220.00 $ 231.00 $ 242.55
10-13. Per Cubic Yard $ 99.00 $ 103.95 $ 109.14
10-14. Per Cubic Yard $ 27.50 $ 28.87 $ 30.31
LDA Excavation and Loading With Surface Casing > 300 cubic yards
LDA Excavation and Loading With Driven Casing > 300 cubic yards
Flowable Fill Concrete and Installation
Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards
LDA Excavation and Loading With Driven Casing < 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling for > 20 feet deep excavation (per square foot)
Sheet Piling for > 20 feet deep excavation (per sqyuare foot)
Sheet Piling for > 20 feet deep excavation (per square foot)
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling Installation for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
10-15. Per Cubic Yard $ 24.20 $ 25.41 $ 26.68
10-15.a. Per Cubic Yard Not Applicable $ 11.55 $ 12.12
10-15.b. Per Cubic Yard Not Applicable $ 11.55 $ 12.12
10-16. Per Ton $ 60.00 $ 63.00 $ 66.15
10-17. Per Ton $ 44.00 $ 46.20 $ 48.51
10-18. Per Day $ 3,250.00 $ 3,412.50 $ 3,583.12
10-19. Per Day $ 275.00 $ 288.75 $ 303.18
10-20. Per Week $ 7,500.00 $ 7,875.00 $ 8,268.75
10-21. Per Week $ 400.00 $ 420.00 $ 420.00
10-22. Per Month $ 15,000.00 $ 15,750.00 $ 16,537.50
10-23. Per Month $ 500.00 $ 525.00 $ 551.25
11.
11-1. Per Tank $ 3,850.00 $ 4,042.50 $ 4,244.62
11-2. Per Tank $ 6,000.00 $ 6,300.00 $ 6,615.00
11-3. Per Tank $ 8,500.00 $ 8,925.00 $ 9,371.25
11-4. Per Tank $ 11,000.00 $ 11,550.00 $ 12,127.50
12.
12-1. Per Square Foot $ 2.00 $ 2.10 $ 2.20
12-2. Per Square Foot $ 1.00 $ 1.05 $ 1.10
12-3. Per Ton $ 45.00 $ 47.25 $ 49.61
12-4. Per Ton $ 35.00 $ 36.75 $ 38.58
12-5. Per Ton $ 45.00 $ 47.25 $ 49.61
Transport and Disposal of Clean Concrete
Transport and Disposal of Mixed Debris
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Loading, Transport and Disposal/Recycle Clean Overburden
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL
Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Pea Gravel
#57 Stone
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
12-6. Per Drum $ 165.00 $ 173.25 $ 181.91
12-7. Per Ton $ 25.25 $ 26.51 $ 27.83
12-8. Per Ton $ 35.00 $ 36.75 $ 38.58
12-9. Per Ton $ 27.50 $ 28.87 $ 30.31
12-10. Per Ton $ 27.50 $ 28.87 $ 30.31
12-11. Per Ton $ 33.50 $ 35.17 $ 35.17
12-12. Per Ton $ 32.50 $ 34.12 $ 34.12
12-13. Per Drum $ 175.00 $ 183.75 $ 192.93
12-14. Per Gallon $ 1.25 $ 1.31 $ 1.37
12-15. Per Drum $ 137.50 $ 144.38 $ 151.59
12-16. Per Gallon $ 1.25 $ 1.31 $ 1.37
12-17. Per Week Not Applicable $ 525.00 $ 551.25
12-18. Per Week Not Applicable $ 500.00 $ 500.00
13.
13-1. Per Square Foot $ 6.00 $ 6.30 $ 6.61
13-2. Per Square Foot $ 2.40 $ 2.52 $ 2.64
13-3. Per Square Foot $ 7.75 $ 8.13 $ 8.53
13-4. Per Square Foot $ 1.50 $ 1.57 $ 1.64
13-5. Per Square Foot $ 2.50 $ 2.62 $ 2.75
13-6. Per Square Foot $ 1.00 $ 1.05 $ 1.10
13-7. Per Square Foot $ 0.50 $ 0.52 $ 0.54
Concrete Paving - 4 inch thickness (includes sub-base)
Concrete Paving - additional 1 inch thickness
Crushed Lime Rock Cover - 2 inch thickness
Grass - Sod
Grass - Seed and Mulch
Transport and Disposal of Petroleum Product (bulk)
Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container
Additional Rental of 20 Cubic Yard Roll-Off Container
RESURFACING
Asphalt Paving - 2 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Transport and Disposal of Petroleum Contact Water (includes drum)
Transport and Disposal of Petroleum Contact Water (bulk)
Transport and Disposal of Petroleum Product (includes drum)
Transport and Disposal of Petroleum Impacted Soil (includes drum)
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport Petroleum Impacted Soil (bulk) > 100 miles
Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
14.
14-1. Per Foot $ 28.25 $ 29.66 $ 31.14
14-2. Per Injection Point $ 35.00 $ 36.75 $ 38.58
14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
14-4. Per Week Not Applicable $ 4,200.00 $ 4,410.00
14-5. Per Month Not Applicable $ 7,350.00 $ 7,717.50
15.
15.A.
15-1. Per Linear Foot $ 76.00 Not Applicable Not Applicable
15-1.a.
Per Linear Foot of
Trench Not Applicable $ 63.00 $ 66.15
15-1.b.
Per Linear Foot of
Trench Not Applicable $ 63.00 $ 66.15
15-1.c.
Per Linear Foot of
Trench Not Applicable $ 63.00 $ 66.15
15-1.d.
Per Linear Foot of
Trench Not Applicable $ 63.00 $ 66.15
15-2. Per Linear Foot $ 9.00 Not Applicable Not Applicable
15-2.a. Per Foot Not Applicable $ 17.32 $ 18.18
Trenching and Installation - Additional 2 plumbing lines
Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
TRENCHING
Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Trenching and Installation of 11 - 20 Lines
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines
Direct Push Boring with In-Situ Injection
In-Situ Injection Into Existing Well/Treatment Point
Materials to be Injected
Groundwater Injection System (not by direct push)
Groundwater Injection System (not by direct push)
REMEDIAL ACTION CONSTRUCTION
IN-SITU INJECTION
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00
15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00
15.B.
15-4.
Per Integration /
Startup $ 6,380.00 Not Applicable Not Applicable
15-4.a Per Startup Not Applicable $ 6,825.00 $ 7,166.25
15-4.b Per Startup Not Applicable $ 8,925.00 $ 9,371.25
15-4.c Per Startup Not Applicable $ 11,025.00 $ 11,576.25
15-4.d Per Startup Not Applicable $ 2,310.00 $ 2,425.50
15-5.
Per Additional Tech
Component $ 2,250.00 $ 2,362.50 $ 2,480.62
15-6.
Per 2 Recovery / Treatment Points
$ 440.00 Not Applicable Not Applicable
15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00
15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00
System Installation/Integration/Startup – Addition of 2 recovery/treatment points
Compound Construction/fencing (materials)
Utility Drop
System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 21-30 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 1-10 additional recovery/treatment points greater than 30. This item is used in conjunction with 15.4.c when needed.
System Installation/Integration/Startup – Addition of 1 technology component
Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order)
Traffic Bearing Trench Plates (materials)
Infiltration Gallery Installation
REMEDIATION SYSTEM INTEGRATION AND STARTUP
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
15-9. Reimbursable* Not Applicable $ 1.00 $ 1.00
15-10. Reimbursable* Not Applicable $ 1.00 $ 1.00
16.
16.A.
16-1. Per Test $ 4,250.00 $ 4,462.50 $ 4,685.62
16-2. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60
16-3. Per Test $ 2,000.00 $ 2,100.00 $ 2,205.00
16-4. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60
16-5. Per Test $ 3,080.00 $ 3,234.00 $ 3,395.70
16-6. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60
16-7. Per Test $ 4,250.00 $ 4,462.50 $ 4,685.62
16-8. Per 2 Hrs $ 175.00 $ 183.75 $ 192.93
16-9. Per Test $ 2,915.00 $ 3,060.75 $ 3,213.78
16-10. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60
16-11. Per Test $ 4,250.00 $ 4,462.50 $ 4,685.62
16-12. Per 2 Hrs $ 240.00 $ 252.00 $ 264.60
16-13. Per Test Not Applicable $ 3,622.50 $ 3,803.62
16-14. Per 2 Hours Not Applicable $ 603.75 $ 633.93
16.B.
16-17. Per Day $ 3,750.00 $ 3,937.50 $ 4,134.37
Multi-Phase Extraction Pilot Test - Additional Time
Air Sparging/Multiphase Extraction Pilot Test - 8 hours
Air Sparging/Multiphase Extraction Pilot Test - Additional Time
SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES (Including Remediation System Equipment)
Groundwater Treatment System Package - Medium
Vapor Extraction Pilot Test - Additional Time
Vapor Extraction/Aquifer Pumping Test - 8 hours
Vapor Extraction/Aquifer Pumping Test - Additional Time
Air Sparging/Vapor Extraction Pilot Test - 8 hours
Air Sparging/Vapor Extraction Pilot Test - Additional Time
Multi-Phase Extraction Pilot Test - 8 hours
PILOT TEST PACKAGES (Including Remediation System Equipment)
Groundwater Recovery System Pilot Test - 8 hours
Groundwater Recovery System Pilot Test - Additional Time
Air Sparging or Biosparging Pilot Test - 8 hours
Air Sparging or Biosparging Pilot Test - Additional Time
Vapor Extraction Pilot Test - 8 hours
Utility Connection
Utility Disconnect
REMEDIAL ACTION - PACKAGED WORK SCOPES (Including Remediation System Equipment)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
16-18. Per Week $ 10,000.00 $ 10,500.00 $ 7,875.00
16-19. Per Day $ 2,250.00 $ 2,362.50 $ 2,480.62
16-20. Per Week $ 6,250.00 $ 6,562.50 $ 4,856.25
16-21. Per Day $ 3,000.00 $ 3,150.00 $ 3,307.50
16-22. Per Week $ 7,500.00 $ 7,875.00 $ 6,300.00
16-23. Per Day $ 3,250.00 $ 3,412.50 $ 3,583.12
16-24. Per Week $ 7,850.00 $ 8,242.50 $ 6,841.28
16-25. Per Day Not Applicable $ 2,100.00 $ 2,205.00
16-26. Per Week Not Applicable $ 8,190.00 $ 5,077.80
16-27. Per Day Not Applicable $ 1,890.00 $ 1,984.50
16-28. Per Week Not Applicable $ 7,612.50 $ 4,186.88
17.
17-1. Per Month $ 2,400.00 $ 2,520.00 $ 2,646.00
17-2. Per Month $ 2,750.00 $ 2,887.50 $ 3,031.87
17-3. Per Month $ 3,300.00 $ 3,465.00 $ 3,638.25
17-4. Per Month $ 3,775.00 $ 3,963.75 $ 4,161.93
17-5. Per Month $ 435.00 $ 456.75 $ 479.58
18.
18-1. Per Month $ 385.00 $ 404.25 $ 424.46
18-2. Per Month $ 308.00 $ 323.40 $ 339.57
18-3. Per Month $ 997.00 $ 1,046.85 $ 1,099.19
Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term ≤ 6 mos.
System O&M Package - Medium
System O&M Package - Large
System O&M Package - Extra Large
Supplemental System O&M Package - Add Thermox or Catox Treatment
REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M)
Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term ≤ 6 mos.
AS/MPE System Package - Medium
AS/MPE System Package - Medium
SVE System Package - Medium
SVE System Package - Medium
MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES (Excluding Remediation System Equipment)
System O&M Package - Small
Air Sparge System Package - Medium
Air Sparge System Package - Medium
AS/SVE System Package - Medium
AS/SVE System Package - Medium
MPE System Package - Medium
MPE System Package - Medium
Groundwater Treatment System Package - Medium
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
18-4. Per Month $ 662.00 $ 695.10 $ 729.85
18-5. Per Month $ 5,000.00 $ 5,250.00 $ 5,512.50
18-6. Per Month $ 4,131.00 $ 4,337.55 $ 4,554.42
18-7. Per Month $ 9,000.00 $ 9,450.00 $ 7,843.50
18-8. Per Month $ 6,330.00 $ 6,646.50 $ 6,646.50
18-9. Per Month $ 9,500.00 $ 9,975.00 $ 8,478.75
18-10. Per Month $ 8,500.00 $ 8,925.00 $ 7,586.25
18-11. Per Month $ 2,640.00 $ 2,772.00 $ 2,910.60
18-12. Per Month $ 2,000.00 $ 2,100.00 $ 2,205.00
18-13. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70
18-14. Per Month $ 2,250.00 $ 2,362.50 $ 2,480.62
18-15. Per Month $ 3,500.00 $ 3,675.00 $ 3,858.75
18-16. Per Month $ 3,144.00 $ 3,301.20 $ 3,466.26
18-17. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70
18-18. Per Month $ 2,860.00 $ 3,003.00 $ 3,153.15
18-19. Per Month $ 3,300.00 $ 3,465.00 $ 3,638.25
18-20. Per Month $ 3,135.00 $ 3,291.75 $ 3,456.33
18-21. Per Month $ 4,400.00 $ 4,620.00 $ 4,851.00
18-22. Per Month $ 4,180.00 $ 4,389.00 $ 4,608.45
18-23. Per Month $ 3,500.00 $ 3,675.00 $ 3,858.75
18-24. Per Month $ 2,967.00 $ 3,115.35 $ 3,271.11
18-25. Per Month $ 4,500.00 $ 4,725.00 $ 4,961.25
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Large - Short Term ≤ 6 mos.
AS/SVE System - Large - Long Term > 6 mos.
MPE System - Small - Short Term ≤ 6 mos.
MPE System - Small - Long Term > 6 mos.
MPE System - Medium - Short Term ≤ 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
Air Sparge System - Large - Short Term ≤ 6 mos.
Air Sparge System - Large - Long Term > 6 mos.
AS/SVE System - Small - Short Term ≤ 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
AS/SVE System - Medium - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.
Air Sparge System - Small - Short Term ≤ 6 mos.
Air Sparge System - Small - Long Term > 6 mos.
Air Sparge System - Medium - Short Term ≤ 6 mos.
Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.
Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.
Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
18-26. Per Month $ 4,064.00 $ 4,267.20 $ 4,480.56
18-27. Per Month $ 6,490.00 $ 6,814.50 $ 7,155.22
18-28. Per Month $ 5,299.00 $ 5,563.95 $ 5,563.95
18-29. Per Month $ 590.00 $ 619.50 $ 650.47
18-30. Per Month $ 960.00 $ 1,008.00 $ 1,058.40
18-31. Per Month $ 1,925.00 $ 2,021.25 $ 2,122.31
18-32. Per Month $ 450.00 $ 472.50 $ 496.12
18-33. Per Month $ 590.00 $ 619.50 $ 650.47
18-34. Per Month $ 1,500.00 $ 1,575.00 $ 1,653.75
18-35. Per Month $ 500.00 $ 525.00 $ 551.25
18-36. Per Month $ 616.00 $ 646.80 $ 679.14
18-37. Per Month $ 946.00 $ 993.30 $ 1,042.96
18-38. Per Month $ 260.00 $ 273.00 $ 286.65
18-39. Per Month $ 330.00 $ 346.50 $ 363.82
18-40. Per Month $ 560.00 $ 588.00 $ 617.40
18-41. Per Month $ 2,860.00 $ 3,003.00 $ 3,153.15
18-42. Per Month $ 3,080.00 $ 3,234.00 $ 3,395.70
18-43. Per Month $ 4,400.00 $ 4,620.00 $ 4,851.00
18-44. Per Month $ 2,750.00 $ 2,887.50 $ 3,031.87
18-45. Per Month $ 2,970.00 $ 3,118.50 $ 3,274.42
18-46. Per Month $ 4,290.00 $ 4,504.50 $ 4,729.72
18-47. Per Month Not Applicable $ 3,150.00 $ 3,307.50
Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Soil Vapor Extraction (SVE) System - Small - Short Term ≤ 6 Months
Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.
Thermox/Catox Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Small - Long Term > 6 mos.
Groundwater Treatment - Add On - Medium - Long Term > 6 mos.
Groundwater Treatment - Add On - Large - Long Term > 6 mos.
Carbon Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.
Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.
MPE System - Medium - Long Term > 6 mos.
MPE System - Large - Short Term ≤ 6 mos.
MPE System - Large - Long Term > 6 mos.
Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.
Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos.
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
18.48. Per Month Not Applicable $ 2,887.50 $ 3,031.87
18-49. Per Month Not Applicable $ 3,675.00 $ 3,858.75
18-50. Per Month Not Applicable $ 3,150.00 $ 3,307.50
18-51. Per Month Not Applicable $ 4,620.00 $ 4,851.00
18-52. Per Month Not Applicable $ 3,832.50 $ 4,024.12
18-53. Per Month Not Applicable $ 4,882.50 $ 5,126.62
18-54. Per Month Not Applicable $ 4,515.00 $ 4,740.75
18-55. Per Month Not Applicable $ 5,092.50 $ 5,347.12
18-56. Per Month Not Applicable $ 4,830.00 $ 5,071.50
18-57. Per Month Not Applicable $ 6,195.00 $ 6,504.75
18-58. Per Month Not Applicable $ 5,932.50 $ 6,229.12
19.
19-1. Per Report $ 1,500.00 $ 1,575.00 $ 1,653.75
19-2. Per Report $ 1,250.00 Not Applicable Not Applicable
19-3. Per Report $ 2,000.00 $ 2,100.00 $ 2,205.00
19-4. Per Report $ 1,900.00 $ 1,995.00 $ 2,094.75
19-5. Per Report $ 500.00 $ 525.00 $ 551.25
19-6. Per Plan $ 1,000.00 $ 1,050.00 $ 1,102.50
19-7. Per Report $ 615.00 $ 645.75 $ 678.03
19-8. Per Report $ 1,000.00 $ 1,050.00 $ 1,102.50
19-9. Per Plan $ 850.00 $ 892.50 $ 937.12 Pilot Test Plan
General Site Assessment Report
Supplemental Site Assessment Report
Receptor and Exposure Pathway Report
Level 2 Natural Attenuation Monitoring Plan
Natural Attenuation or Post RA Monitoring Report, Quarterly or Non-Annual
Natural Attenuation or Post RA Monitoring Report, Annual
Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Long Term > 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Large - Short Term ≤ 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Large - Long Term > 6 Months
REPORTS (Excluding Professional Engineering and Professional Geology Services)
Soil Source Removal Report
Site Characterization Screening Report
Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Large - Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Large - Long Term > 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Small - Short Term ≤ 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Small - Long Term > 6 Months
Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Short Term ≤ 6 Months
Soil Vapor Extraction (SVE) System - Small - Long Term > 6 Months
Soil Vapor Extraction (SVE) System - Medium - Short Term ≤ 6 Months
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V2.1)
REVISED
CONTRACTED
ITEM PRICE (V2.2)
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832 Amendment No. 5
Attachment D (V2.2) - Rate Schedule
DESCRIPTION
19-10. Per Report $ 1,325.00 $ 1,391.25 $ 1,460.81
19-11. Per Plan $ 10,000.00 $ 10,500.00 $ 11,025.00
19-12. Per Plan $ 15,000.00 $ 15,750.00 $ 16,537.50
19-13. Per Plan $ 1,200.00 $ 1,260.00 $ 1,323.00
19-14. Per Plan $ 2,500.00 $ 2,625.00 $ 2,756.25
19-15. Per Plan $ 4,500.00 $ 4,725.00 $ 4,961.25
19-16. Per Plan $ 6,500.00 $ 6,825.00 $ 7,166.25
19-17. Per Report $ 3,200.00 $ 3,360.00 $ 3,528.00
19-18. Per Drawings $ 650.00 $ 682.50 $ 716.62
19-19. Per Report $ 1,375.00 $ 1,443.75 $ 1,515.93
19-20. Per Report $ 240.00 $ 252.00 $ 264.60
19-21. Per Report $ 1,500.00 $ 1,575.00 $ 1,653.75
19-22. Per Report $ 2,950.00 $ 3,097.50 $ 3,252.37
19-23. Per Report $ 1,000.00 $ 1,050.00 $ 1,102.50
19-24. Per Report $ 600.00 $ 630.00 $ 661.50
19-25. Per Report $ 450.00 $ 472.50 $ 496.12
19-26. Per Report $ 285.00 $ 299.25 $ 314.21
19-27 Per Report Not Applicable $ 252.00 $ 264.60
20.
20-1. Per Hour $ 90.00 $ 94.50 $ 99.22
20-2. Per Hour $ 70.00 $ 73.50 $ 77.17
20-3. Per Hour $ 90.00 $ 94.50 $ 99.22
Interim Assessment Report
PERSONNEL (Excluding Professional Engineer and Professional Geologist)
Program Manager (Key)
Project Manager (Key)
Engineer (Key)
Operation & Maintenance Report, Quarterly or Non-Annual
Operation & Maintenance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .