CN-370000-GC832-A14.pdf

PDF 1 MB Posted

Attached to
Master Agreement FL|GC832|a2fed0e15e70fe39dbea4e2d21af08f1
Contract number
GC832
Issued by
Florida

About this file

Amendment No. 14 to DEP Agency Term Contract No. GC832 is a language amendment with rate increase and decrease modifications executed between the Florida Department of Environmental Protection (Department) and WES Environmental, LLC (Contractor). The original contract was executed on February 25, 2014, to provide petroleum contamination site response action services in the North Region. This amendment modifies only the rates within Attachment D (Rate Schedule V3.5) and does not add, delete, or otherwise modify any line items contained in the contract.

The rate changes are effective for new work assignments offered on or after June 1, 2023 (the Rate Change Date), while all pre-Rate Change Date work assignments continue to apply the prior Rate Schedule. The amendment encompasses rate adjustments across 159 pay items covering drilling, boring, sampling, well installation, laboratory analysis, remediation systems, and professional services. Rate increases range from approximately 7.25 percent to 8.00 percent for the majority of items, with select items experiencing rate reductions, including Level 1 Remedial Action Plan (reduced 9.09 percent from $11,000.00 to $10,000.00), Level 2 Remedial Action Plan (reduced 15.00 percent from $14,250.00 to $12,112.50), and P.E. Review, Evaluation and Certification of a Level 2 Remedial Action Plan (reduced 8.20 percent from $3,050.00 to $2,800.00). The amendment also includes a technical specification update requiring photo documentation of the inside of drums to ensure compliance with the industry-wide standard of 75 percent capacity and establishes that no new Purchase Orders or Task Assignments shall be issued after the renewal term, with completion work continuing for up to twelve months post-renewal expiration.

View the file

Other files

File Type Posted
CN-370000-GC832-A3.pdf.crdownload CRDOWNLOAD file
CN-370000-GC832-A7.pdf PDF
CN-370000-GC832-A9.pdf PDF
CN-370000-GC832.pdf PDF
CN-370000-GC832-A10.pdf PDF
CN-370000-GC832-A19.pdf PDF
CN-370000-GC832-A5.pdf PDF
CN-370000-GC832-A6.pdf PDF
CN-370000-GC832-CMC1.pdf PDF
CN-370000-GC832-A11.pdf PDF
CN-370000-GC832-A13.pdf PDF
CN-370000-GC832-A15E1.pdf PDF
CN-370000-GC832-A17E2.pdf PDF
CN-370000-GC832-A18.pdf PDF
CN-370000-GC832-A2.pdf PDF
CN-370000-GC832-A8.pdf PDF
CN-370000-GC832-CMC.pdf PDF
CN-370000-GC832-A12.pdf PDF
CN-370000-GC832-A16.pdf PDF
CN-370000-GC832-A3.pdf PDF
CN-370000-GC832-A4.pdf PDF
CN-370000-GC832-AR1.pdf PDF
CN-370000-GC832-CMC2.pdf PDF
CN-370000-GC874-GC874.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

2.

3.

NOW THEREFORE, the parties agree as follows:

WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).

WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.4) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.4) entitled "Rate Schedule" in accordance with provision 11.C of the Contract; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, The Agency Term Contract No. GC832 (hereinafter "Contract") between the FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and WES

ENVIRONMENTAL, LLC (hereinafter "Contractor") executed on February 25, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.

PETROLEUM RESTORATION PROGRAM

AGENCY TERM CONTRACT NO. GC832

LANGUAGE AMENDMENT WITH

RATE INCREASE AND DECREASE

AMENDMENT NO. 14

Amendment No. 14

DEP Agency Term Contract No. GC832

This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.

All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.

Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.

Amendment No. 14

DEP Agency Term Contract No. GC832

4.

5.

6.

C.

7.

8.

The following provision is hereby added to paragraph 4, Term of Contract:

This amendment shall include an update to ATTACHMENT A (V2.0), SCOPE OF SERVICES, V.

Technical Specification, B. Schedule of Pay Items, Section 12. DEBRIS, WASTE AND

PRODUCT REMOVAL AND DISPOSAL, as follows:

No new Purchase Orders or Task Assignments shall be issued or executed after renewal term. However, the Restated Contract shall continue in effect up to twelve months after expiration of the renewal term for completion of any Purchase Order or Task Assignment issued/executed during the renewal term. Purchase Orders or Task Assignments, completion of which that extends beyond the renewal term shall continue to be subject to change, as appropriate.

Photo documentation of the inside of the drums is required to ensure drums meet the industry wide standard of being 75% full.

Attachment D, Rate Schedule (V3.5) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.5) shall apply.

The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s

Data Processing Information. Prior to the Rate Change Date, the Department shall provide

Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change

Date, within five (5) business days from the data entry date.

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this

Amendment shall control.

Pre-existing

Rate

Agreed

New Rate(1)

850.00$ $ 918.00

1,075.00$ $ 1,161.00

325.00$ $ 351.00

12,733.00$ $ 13,751.64

42.00$ $ 45.36

48.00$ $ 51.84

138.00$ $ 149.04

180.00$ $ 194.40

41.72$ $ 45.05

34.90$ $ 37.69

44.00$ $ 47.52

46.75$ $ 50.49

42.00$ $ 45.36

56.00$ $ 60.48

60.14$ $ 64.95

96.60$ $ 104.32

31.00$ $ 33.48

53.00$ $ 57.24

202.56$ $ 218.76

174.25$ $ 188.19

225.00$ $ 243.00

95.00$ $ 102.60

Est %

Rate

Change(2)

+8.00%

+8.00%

+8.00%

8-6.

3-2.

3-4.

Hand Auger Boring ≤ 10 foot total depth

Sonic Core Sampling - 5 or 10 foot (during boring)

Monitoring Well Sampling with Water Level, ≤

100 foot depth

Well Redevelopment

Description

Table 1. Listed Schedule of Pay Items with Rate Changes

6-13.

8-1.

Work Trailer - > 100 miles each way

Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way

Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way

Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth

Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth

Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth

Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth

HSA or MR Boring, > 10 to 14 inch diameter, <

50 foot total depth

Well Installation - 1 inch diameter

Split Spoon Sampling – 2 foot (during boring)

50 to 100 feet

Split Spoon Sampling – 2 foot (during boring) <

50 feet

LDA Rig and Support Vehicles Mobilization - >

100 miles each way

Sonic Boring, > 10 to 14 inch diameter, 50 to

100 foot total depth

Soil/Sediment Sample Collection

Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)

Well Installation - 4 inch diameter (vertical)6-3.a.

6-3.b.

Pay Item No.

3-14.a.

3-6.

5-1.a.1.

5-1.a.2.

5-1.b.

5-2.

5-17.

5-18.

5-19.

5-20.

5-22.

6-1.

5-12.

5-15.

5-16.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.98%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

110.25$ $ 119.07

380.00$ $ 410.40

64.00$ $ 69.12

78.25$ $ 84.51

64.00$ $ 69.12

122.00$ $ 131.76

56.25$ $ 60.75

73.00$ $ 78.84

8.40$ $ 9.07

8.40$ $ 9.07

8.40$ $ 9.07

8.40$ $ 9.07

42.44$ $ 45.83

368.00$ $ 397.44

59.80$ $ 64.58

90.00$ $ 97.20

35.65$ $ 38.50

33.00$ $ 35.64

50.00$ $ 54.00

72.00$ $ 77.76

+7.99%

+8.00%

+7.99%

+8.00%

+7.99%

+8.00%

+7.98%

+7.98%

+7.98%

+7.98%

9-1.

9-4.

9-5.

9-6.

8-8.

9-7.

9-8.

9-10.

9-11.

9-12.

9-13.

9-14.

Soil, Total Recoverable Petroleum

Hydrocarbons (FL-PRO)

Soil, Priority Pollutant Extractable Organics-

Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])

Free Product Gauging & Bailing

Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority

Pollutant Organics (multiple methods)

Water, Priority Pollutant Volatile Organics [for

NPDES purposes only] (EPA 624)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)

Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)

Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)

Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)

Water, Priority Pollutant Volatile Organics (EPA

8260)

Soil, Priority Pollutant Volatile Organics (EPA

8260)

Soil, Polycyclic Aromatic Hydrocarbons (EPA

8270 or EPA 8310)

Soil, BTEX + MTBE + VOHs (EPA 8021 or

EPA 8260)

Water, Used Oil/Unknown Product Group-Table

D of Ch. 62-780, F.A.C., except for non-Priority

Pollutant Organics (multiple methods)

Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High

Resolution GC/MS)

Soil, Lead (EPA 6010 or EPA 6020)

Soil, Chromium (EPA 6010 or EPA 6020)

Soil, Cadmium (EPA 6010 or EPA 6020)

Soil, Arsenic (EPA 6010 or EPA 6020)

Soil, 8 RCRA Metals (EPA 6010 or EPA 6020

[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471

[Mercury])

9-32.

9-26.

9-29.

9-30.

9-31.

9-31.a.

9-23.

9-33.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

140.30$ $ 151.52

140.30$ $ 151.52

57.50$ $ 62.10

8.40$ $ 9.07

8.40$ $ 9.07

8.40$ $ 9.07

8.40$ $ 9.07

23.00$ $ 24.84

8.00$ $ 8.64

8.00$ $ 8.64

23.15$ $ 25.00

8.00$ $ 8.64

8.00$ $ 8.64

8.00$ $ 8.64

8.00$ $ 8.64

7.71$ $ 8.32

7.71$ $ 8.32

7.71$ $ 8.32

9-51.

9-52.

9-53.

Water, Total Recoverable Petroleum

Hydrocarbons (FL-PRO)

Water, Priority Pollutant Extractable Organics-

Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA

608 + EPA 8270)

Water, Priority Pollutant Extractable Organics-

Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 +

EPA 625])

Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)

Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)

Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)

Water, Chloride (EPA 300.0, EPA 9056, EPA

9251, EPA 9053, SM 4500CI B, SM 4500CI C

or SM 4500CI E)

Water, Sodium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Manganese, Total (EPA 200.7, EPA

200.8, EPA 6010 or EPA 6020)

Water, Magnesium, Total (EPA 200.7, EPA

6010 or EPA 6020)

Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Iron, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Calcium, Total (EPA 200.7, EPA 6010 or

EPA 6020)

Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)

Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)

Water, Chromium, Total (EPA 200.7, EPA

200.8, EPA 6010 or EPA 6020)

9-48.

9-41.

9-41.a.

9-43.

9-44.

9-44.a.

9-45.

9-46.

9-47.

9-39.

9-40.

9-34.

9-35.

9-36.

9-38.

+8.00%

+8.00%

+8.00%

+7.98%

+7.98%

+7.98%

+7.98%

+8.00%

+8.00%

+8.00%

+7.99%

+8.00%

+8.00%

+8.00%

+8.00%

+7.91%

+7.91%

+7.91%

7.71$ $ 8.32

7.71$ $ 8.32

10.00$ $ 10.80

7.71$ $ 8.32

1.32$ $ 1.42

3.99$ $ 4.30

12.00$ $ 12.96

1.32$ $ 1.42

3.99$ $ 4.30

12.00$ $ 12.96

42.00$ $ 45.36

34.90$ $ 37.69

34.90$ $ 37.69

34.50$ $ 37.26

69.25$ $ 74.79

60.00$ $ 64.80

16,000.00$ $ 17,280.00

578.80$ $ 625.10

2.77$ $ 2.99

1.38$ $ 1.49

44.62$ $ 48.18

54.50$ $ 58.86

+8.00%

+8.00%

+7.99%

+7.99%

+8.00%

+8.00%

+7.58%

+7.77%

+8.00%

+7.58%

+7.77%

12-4.

12-5.

10-2.c.

10-2.d.

10-7.

10-8.

9-57.

9-60.

10-1.b.

10-1.c.

10-1.d.

9-54.

9-55.

10-2.b.

Water, Orthophosphate [as P] (EPA 300.0, EPA

300.1, EPA 365.1, EPA 365.3, EPA 9056, SM

4500-PE or SM 4500-PF)

Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)

Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA

353.2, SM 4500-NO3 E or SM 4500-NO3 F)

Water, Sulfate (ASTM D516-02, ASTM D516-

90, EPA 300.0, EPA 300.1, EPA 375.2, EPA

9038, EPA 9056 or SM 4500-SO4 C)

#57 Stone

Pea Gravel

Clean Backfill Material, Compaction and

Testing (includes transport) > 300 cubic yards

Clean Backfill Material, Compaction and

Testing (includes transport) ≤ 300 cubic yards

Dewatering System, up to 12 well points

(includes installation)

Sheet Piling Rental for ≤ 20 feet deep

Excavation

Sheet Piling Rental for ≤ 20 feet deep

Excavation

Sheet Piling Rental for ≤ 20 feet deep

Excavation

Conventional Soil Excavation and Loading >

300 cubic yards

Conventional Soil Excavation and Loading ≤

300 cubic yards

Sheet Piling Rental for > 20 feet deep

Excavation

Sheet Piling Rental for > 20 feet deep

Excavation

Sheet Piling Rental for > 20 feet deep

Excavation

Additional Dewatering System Well Points (2)

(includes installation)

Transport and Disposal of Mixed Debris

Transport and Disposal of Clean Concrete

Additional Removal/Loading Cost for Concrete -

> 4 inch thickness

Removal and Loading of Asphalt and/or

Concrete - up to 4 inch thickness

10-22.

10-23.

10-17.

10-14.

10-15.

10-16.

12-1.

12-2.

+7.91%

+7.91%

+8.00%

+7.91%

+8.00%

+8.00%

+8.00%

+7.94%

+7.97%

+7.98%

33.60$ $ 36.28

48.87$ $ 52.77

38.23$ $ 41.28

38.23$ $ 41.28

36.92$ $ 39.87

35.82$ $ 38.68

1.50$ $ 1.62

166.75$ $ 180.09

732.95$ $ 791.58

8.78$ $ 9.48

3.17$ $ 3.42

10.79$ $ 11.65

2.17$ $ 2.34

2.88$ $ 3.11

1.44$ $ 1.55

0.69$ $ 0.74

5,250.00$ $ 5,670.00

4,000.00$ $ 4,320.00

4,861.50$ $ 5,250.42

85.00$ $ 91.80

85.00$ $ 91.80

8,295.00$ $ 8,958.60

10,846.50$ $ 11,714.22

13,398.00$ $ 14,469.84

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

14-4.

15-1.b.

15-1.c.

12-7.

In-Situ Injection Into Existing Well/Treatment

Point

Direct Push Boring with In-Situ Injection

Grass - Seed and Mulch

Grass - Sod

Crushed Lime Rock Cover - 2 inch thickness

Disposal of Petroleum Impacted Soil at a

Landfill (bulk) ≤ 450 tons

Transport Petroleum Impacted Soil (bulk) > 100 miles

Asphalt Paving - 2 inch thickness (includes sub-base)

Delivery, Pick Up and Rental of 20 Cubic Yard

Roll-Off Container

Transport and Disposal of Petroleum Product

(includes drum)

Transport and Disposal of Petroleum Contact

Water (bulk)

Disposal of Petroleum Impacted Soil at a

Thermal Treatment Facility (bulk) > 450 tons

Disposal of Petroleum Impacted Soil at a

Thermal Treatment Facility (bulk) ≤ 450 tons

Disposal of Petroleum Impacted Soil at a

Landfill (bulk) > 450 tons

Transport Petroleum Impacted Soil (bulk) ≤ 100 miles

Concrete Paving - additional 1 inch thickness

Concrete Paving - 4 inch thickness (includes sub-base)

Asphalt Paving - additional 1 inch thickness

Trenching and Installation of 21 - 30 Lines

Trenching and Installation of 11 - 20 Lines

System Installation/Integration/Startup - 1

Technology Component - 21-30

Recovery/Treatment Points

System Installation/Integration/Startup - 1

Technology Component - 11-20

Recovery/Treatment Points

System Installation/Integration/Startup - 1

Technology Component - 1-10

Recovery/Treatment Points

Groundwater Injection System (not by direct push)

14-1.a.

12-17.

13-1.

13-2.

13-3.

13-4.

13-5.

13-6.

13-7.

12-8.

15-4.a.

15-4.b.

15-4.c.

12-9.

12-10.

12-11.

12-12.

12-14.

12-15.

14-2.a.

+7.98%

+7.98%

+7.98%

+7.98%

+8.00%

+7.99%

+7.98%

+8.00%

+8.00%

+8.00%

+7.97%

+7.89%

+7.97%

+7.83%

+7.99%

+7.64%

+7.25%

+8.00%

2,803.50$ $ 3,027.78

2,604.00$ $ 2,812.32

2,315.25$ $ 2,500.47

264.00$ $ 285.12

3,374.46$ $ 3,644.41

264.60$ $ 285.76

3,803.62$ $ 4,107.90

634.00$ $ 684.72

7,875.00$ $ 8,505.00

4,856.25$ $ 5,244.75

6,300.00$ $ 6,804.00

6,841.28$ $ 7,388.58

5,077.80$ $ 5,484.02

4,186.88$ $ 4,521.83

2,778.30$ $ 3,000.56

3,183.46$ $ 3,438.13

3,820.16$ $ 4,125.77

4,370.02$ $ 4,719.62

2,315.25$ $ 2,500.47

2,700.00$ $ 2,916.00

4,000.00$ $ 4,320.00

4,600.00$ $ 4,968.00

5,750.00$ $ 6,210.00

546.00$ $ 589.68

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

16-24.

18-22.

16-26.

16-28.

17-1.

17-2.

17-3.

17-4.

18-20.

18-12.

18-14.

18-18.

16-18.

16-9.

16-10.

16-13.

16-14.

16-20.

16-22.

16-3.

16-4.

Air Sparging or Biosparging Pilot Test -

Additional Time

Air Sparging or Biosparging Pilot Test - 8 hours

System Installation/Integration/Startup –

Addition of 1 Technology Component

System Installation/Integration/Startup - 1

Technology Component - 1-10 Additional

Recovery/Treatment Points greater Than 30

(This item is used in conjunction with 15.4.c when needed)

Air Sparging/Vapor Extraction Pilot Test -

Additional Time

Air Sparging/Vapor Extraction Pilot Test - 8 hours

System O&M Package - Extra Large

System O&M Package - Large

System O&M Package - Medium

System O&M Package - Small

SVE System Package - Medium

AS/MPE System Package - Medium

MPE System Package - Medium

AS/SVE System Package - Medium

Air Sparge System Package - Medium

Groundwater Treatment System Package -

Medium

Air Sparging/Multiphase Extraction Pilot Test -

Additional Time

Air Sparging/Multiphase Extraction Pilot Test -

8 hours

Groundwater Treatment - Add On - Small - Long

Term > 6 mos.

Air Sparge System - Small - Long Term > 6 mos.

AS/SVE System - Large - Long Term > 6 mos.

AS/SVE System - Medium - Long Term > 6 mos.

AS/SVE System - Small - Long Term > 6 mos.

Air Sparge System - Medium - Long Term > 6 mos.

15-4.d.

15-5.

18-32.

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

714.00$ $ 771.12

1,821.75$ $ 1,967.49

5,750.00$ $ 6,210.00

6,000.00$ $ 6,480.00

6,540.00$ $ 7,063.20

11,000.00$ $ 10,000.00

14,250.00$ $ 12,112.50

100.00$ $ 108.00

70.00$ $ 75.60

63.25$ $ 68.31

100.00$ $ 108.00

228.00$ $ 246.24

328.00$ $ 354.24

437.50$ $ 472.50

794.00$ $ 857.52

500.00$ $ 540.00

218.00$ $ 235.44

2,200.00$ $ 2,000.00

3,050.00$ $ 2,800.00

416.74$ $ 400.00

+8.00%

+8.00%

-9.09%

-8.20%

-4.02%

+8.00%

+8.00%

+8.00%

19-11.

19-12.

20-8.

20-3.

20-6.

18-58.

18-56.

18-54.

P.E. Review, Evaluation and Certification of a

Level 1 Remedial Action Plan

P.E. Review, Evaluation and Certification of a

Pilot Test Plan

Field Technician (Key)

P.E. Project Oversight for Remediation System

Operation and Maintenance

P.E. Project Oversight for Remediation System

Integration and Startup - Extra Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Large System

P.E. Project Oversight for Remediation System

Integration and Startup - Medium System

P.E. Project Oversight for Remediation System

Integration and Startup - Small System

P.E. Project Oversight for Remediation

Technology Pilot Testing

Notes:

Groundwater Treatment - Add On - Large - Long

Term > 6 mos.

Groundwater Treatment - Add On - Medium -

Long Term > 6 mos.

Level 1 Remedial Action Plan

Air Sparge/Multiphase Extraction (AS/MPE)

System - Large - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE)

System - Medium - Long Term > 6 Months

Air Sparge/Multiphase Extraction (AS/MPE)

System - Small - Long Term > 6 Months

Level 2 Remedial Action Plan

Scientist/Technical Specialist (Key)

Engineer (Key)

P.E. Review, Evaluation and Certification of As-

Built Drawings (P.E. sealed red lined modifications)

P.E. Review, Evaluation and Certification of a

Level 2 Remedial Action Plan

18-33.

18-34.

21-29.

21-6.a.

21-6.b.

21-6.c.

21-6.d.

21-8.

21-5.

21-21.

21-23.

21-24.

+8.00%

+8.00%

+8.00%

-9.09%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

+8.00%

-15.00%

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK

(1)

The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.

(2)

The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.

6/1/2023

Justin Wolfe Digitally signed by Justin Wolfe Date: 2023.05.30 15:55:31 -04'00'

Jamie Lopez Digitally signed by Jamie Lopez Date: 2023.06.02 10:16:57 -04'00'

File details come from the government source that posted it. Updated .