This is Amendment No. 12 to DEP Agency Term Contract No. GC832, an indefinite delivery vehicle between the Florida Department of Environmental Protection (FDEP) and WES Environmental, LLC. The original contract was executed on February 25, 2014, to provide petroleum contamination site response action services in the North Region of Florida. The amendment, effective May 25, 2022, modifies pricing for services already under contract and does not add, delete, or otherwise modify any line items contained in the original contract.
Amendment No. 12 adjusts rates for 139 pay items across the contract's comprehensive scope of petroleum remediation services, including drilling and boring, well installation and abandonment, sample collection, laboratory analysis, soil source removal, debris removal and disposal, remedial system construction and operation, and professional engineering services. Rate changes range from increases of up to 15 percent to decreases of up to 20.21 percent, with most adjustments falling between 5 and 15 percent. The amended rates apply exclusively to new work assignments offered on or after the Rate Change Date of May 25, 2022; all pre-existing work assignments continue under the prior rate schedule. The contractor's Rate Schedule was updated to Version 3.4 (V3.4) and includes detailed pricing across 21 major service categories covering mobilization, field activities, laboratory services, remedial action construction and operation, and professional services. The rate increases were requested by the contractor in accordance with provision 11.C of the contract, and the Department approved the adjustments as justified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-GC832-A10.pdf | ||
| CN-370000-GC832-A19.pdf | ||
| CN-370000-GC832-A5.pdf | ||
| CN-370000-GC832-A6.pdf | ||
| CN-370000-GC832-CMC1.pdf | ||
| CN-370000-GC832-A16.pdf | ||
| CN-370000-GC832-A3.pdf | ||
| CN-370000-GC832-A4.pdf | ||
| CN-370000-GC832-AR1.pdf | ||
| CN-370000-GC832-CMC2.pdf | ||
| CN-370000-GC874-GC874.pdf | ||
| CN-370000-GC832-A14.pdf | ||
| CN-370000-GC832-A3.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-GC832-A7.pdf | ||
| CN-370000-GC832-A9.pdf | ||
| CN-370000-GC832.pdf | ||
| CN-370000-GC832-A11.pdf | ||
| CN-370000-GC832-A13.pdf | ||
| CN-370000-GC832-A15E1.pdf | ||
| CN-370000-GC832-A17E2.pdf | ||
| CN-370000-GC832-A18.pdf | ||
| CN-370000-GC832-A2.pdf | ||
| CN-370000-GC832-A8.pdf | ||
| CN-370000-GC832-CMC.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.
2.
3.
4.
All pre-Rate Change Date work assignments and previously offered work assignments will continue to apply Contractor’s applicable prior Rate Schedule.
Contractor’s Rate Schedule is hereby changed for the Pay Items indicated on Table 1 below, effective for New Work assignments unless and until further modified by a subsequent amendment to the Contract.
Attachment D, Rate Schedule (V3.4) is hereby added to the Contract and attached hereto and made a part hereof. For all work assignments offered on or after the Rate Change Date established in this Amendment, Attachment D, Rate Schedule (V3.4) shall apply.
WHEREAS, the rate changes authorized will be applicable only for new work assignments offered on or after the Rate Change Date (“New Work” assignments).
WHEREAS, the Department and Contractor wish to establish a date certain for the rate changes specified herein to be effective, following the execution of this Amendment and the Department’s data processing of the rate changes (hereinafter “Rate Change Date”); and, WHEREAS, the Contractor has requested that rate reductions be made to Attachment D (V3.3) entitled "Rate Schedule"; and, WHEREAS, the Contractor has requested that rate increases be made to Attachment D (V3.3) entitled "Rate Schedule" in accordance with provision 11.C of the Contract; and, WHEREAS, the Department has reviewed this justification and agrees with the requested increase(s); and, The Agency Term Contract No. GC832 (hereinafter "Contract") between the FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter "Department") and WES
ENVIRONMENTAL, LLC (hereinafter "Contractor") executed on February 25, 2014, to provide petroleum contamination site response action services in the North Region, is hereby amended.
PETROLEUM RESTORATION PROGRAM
AGENCY TERM CONTRACT NO. GC832
RATE INCREASE AND DECREASE
AMENDMENT NO. 12
Amendment No. 12
DEP Agency Term Contract No. GC832
This amendment only changes the rates as specified on Table 1, and does not add, delete or otherwise modify any of the line items contained in the Contract.
NOW THEREFORE, the parties agree as follows:
Amendment No. 12
DEP Agency Term Contract No. GC832
5.
6.
The Rate Change Date is the date shown at the bottom of this Amendment for the Department’s
Data Processing Information. Prior to the Rate Change Date, the Department shall provide
Contractor a copy of the tabulated rate changes herein and showing the effective Rate Change
Date, within five (5) business days from the data entry date.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
All other terms and conditions of the Contract remain in effect. If and to the extent that any inconsistency may appear between the Contract and this Amendment, the provisions of this
Amendment shall control.
Pre-existing
Rate
Agreed
New Rate (1)
486.00$ $ 550.00
760.00$ $ 850.00
576.00$ $ 650.00
955.00$ $ 1,075.00
133.00$ $ 150.00
286.00$ $ 325.00
665.00$ $ 750.00
1,081.50$ $ 1,200.00
1,047.00$ $ 1,175.00
1,819.00$ $ 2,000.00
550.00$ $ 500.00
376.00$ $ 300.00
425.00$ $ 485.00
325.00$ $ 300.00
37.50$ $ 42.00
42.00$ $ 48.00
46.00$ $ 52.00
120.00$ $ 138.00
171.30$ $ 180.00
+13.04%
+15.00%
+5.08%
+12.23%
+9.95%
-9.09%
-20.21%
+14.12%
-7.69%
+12.00%
+14.29%
5-1.a.3.
5-1.b.
5-2.
Pay
Item
No.
3-5.
3-6.
3-7.a.
3-8.a.
3-9.a.
3-10.a.
5-1.a.1.
5-1.a.2.
Split Spoon Sampling – 2 foot (during boring) 50 to
100 feet
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Drum Compactor mobilization - > 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - >
100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤ 100 miles each way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
Work Trailer - > 100 miles each way
Work Trailer - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Excavator Mobilization - > 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - > 100 miles each way
Description
3-12.
Table 1. Listed Schedule of Pay Items with Rate Changes
Hand Auger Boring ≤ 10 foot total depth
Sonic Core Sampling - 5 or 10 foot (during boring)
Split Spoon Sampling – 2 foot (during boring) > 100 feet
3-1.
3-2.
3-3.
3-4.
3-16.
3-18.
3-20.
Est %
Rate
Change (2)
+13.17%
+11.84%
+12.85%
+12.57%
+12.78%
+13.64%
+12.78%
+10.96%
2,836.00$ $ 3,000.00
25.70$ $ 29.00
34.90$ $ 40.00
34.65$ $ 39.00
42.00$ $ 48.00
46.75$ $ 53.75
50.40$ $ 52.95
39.10$ $ 44.00
49.00$ $ 56.00
84.00$ $ 96.60
27.56$ $ 31.00
38.06$ $ 43.00
46.46$ $ 53.00
41.45$ $ 47.00
51.45$ $ 59.00
18.90$ $ 21.70
22.55$ $ 25.90
26.25$ $ 30.15
138.00$ $ 158.00
214.15$ $ 225.00
82.68$ $ 95.00
24.15$ $ 27.50
35.50$ $ 40.00
35.50$ $ 40.00
+14.81%
+14.86%
+14.86%
+14.49%
+5.07%
+14.90%
+13.87%
+12.53%
+14.29%
+15.00%
+12.48%
+12.98%
+14.08%
+5.78%
+12.84%
+14.61%
+12.55%
+14.29%
+13.39%
+14.67%
5-3.a.
5-6.
5-7.
5-19.
5-22.
6-1.
6-2.a.
5-13.
5-16.
6-3.a. Well Installation - 4 inch diameter (vertical)
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Well Installation - 2 inch diameter (vertical)
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, 1 to 2 inch diameter
Survey Latitude/Longitude of New Monitor Wells
Survey Latitude/Longitude of Existing Monitor Wells
Water Level or Free Product Gauging
Soil/Sediment Sample Collection
Surface Casing - 8 inch diameter
Surface Casing - 6 inch diameter
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to
100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
Well Installation - 1 inch diameter
7-7.
8-1.
8-13.
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
Direct Push Technology (DPT) Rig and Equipment
6-6.
7-2.
7-3.
7-1.
Monitoring Well Sampling with Water Level, ≤ 100 foot depth
Removal of Well Pad and Manhole
5-9.
5-10.
5-11.
6-5.
8-12.
8-6.
8-7.
+14.97%
+5.06%
+12.68%
+12.68%
18.90$ $ 21.50
330.75$ $ 380.00
49.08$ $ 55.00
68.25$ $ 78.25
49.08$ $ 56.25
288.75$ $ 325.00
64.00$ $ 73.00
198.45$ $ 228.00
320.82$ $ 368.00
34.90$ $ 40.00
52.00$ $ 59.80
82.95$ $ 90.00
31.00$ $ 35.65
122.00$ $ 140.30 +15.00%
+13.76%
+14.89%
+12.06%
+14.65%
+14.61%
+12.55%
+14.06%
9-34.
9-25.
9-26.
9-27.
9-29.
9-30.
9-31.
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020
[Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471
[Mercury])
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, Polycyclic Aromatic Hydrocarbons, including
1-methylnaphthalene + 2-methylnaphthalene (EPA
610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA
624, EPA 6021 or EPA 8260)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA
8021 or EPA 8260)
Water, Priority Pollutant Extractable Organics-Base
Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority
Pollutant Organics (multiple methods)
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)
Soil, TRPH Fractionation (MADEP-EPH/VPH
Method or TPHCWG Direct Method)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-
PRO)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Used Oil/Unknown Product Group-Table D of
Ch. 62-780, F.A.C., except for non-Priority Pollutant
Organics (multiple methods)
Encore (25 gram) for SPLP Soil Sample Collection:
[Per Encore]. The cost will include the 25 gram
Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).
8-14.
9-1.
9-2.
9-5.
9-8.
9-8.a.
9-10.
+14.89%
+14.71%
+14.61%
+15.00%
+8.50%
+15.00%
122.00$ $ 140.30
50.00$ $ 57.50
95.00$ $ 100.00
30.00$ $ 34.50
13.90$ $ 15.95
13.90$ $ 15.95
53.25$ $ 60.00
2.41$ $ 2.77
1.20$ $ 1.38
200.50$ $ 220.00
29.22$ $ 33.60
42.50$ $ 48.87
33.25$ $ 38.23
33.25$ $ 38.23
202.56$ $ 220.00
1.40$ $ 1.50
1.40$ $ 1.50
637.35$ $ 732.95
7.64$ $ 8.78
2.76$ $ 3.17
9.39$ $ 10.79
1.89$ $ 2.17
+14.99%
+14.99%
+14.98%
+14.98%
+8.61%
+7.14%
+7.14%
+15.00%
+14.92%
+14.86%
+14.91%
+14.81%
+12.68%
+14.94%
+15.00%
+9.73%
+5.26%
+15.00%
+15.00%
10-15.
10-15.a.
10-15.b.
12-8.
12-1.
12-2.
12-9.
12-10.
12-13.
12-14.
12-16.
9-35.
9-36.
12-17.
13-1.
13-2.
13-3.
13-4.
10-17.
Concrete Paving - additional 1 inch thickness
Concrete Paving - 4 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) ≤ 450 tons
Transport Petroleum Impacted Soil (bulk) > 100 miles
Asphalt Paving - 2 inch thickness (includes sub-base)
Delivery, Pick Up and Rental of 20 Cubic Yard Roll-
Off Container
Transport and Disposal of Petroleum Product (bulk)
Transport and Disposal of Petroleum Contact Water
(bulk)
Transport and Disposal of Petroleum Contact Water
(includes drum)
Disposal of Petroleum Impacted Soil at a Landfill
(bulk) > 450 tons
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport and Disposal of Petroleum Impacted Soil
(includes drum)
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Removal and Loading of Asphalt and/or Concrete -up to 4 inch thickness
#57 Stone
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards
Clean Backfill Material, Compaction and Testing
(includes transport) > 300 cubic yards
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Water, Total Recoverable Petroleum Hydrocarbons
(FL-PRO)
Water, Priority Pollutant Extractable Organics-Base
Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA
8270)
9-68.
12-6.
12-7.
+15.00%
+14.75%
+14.75%
1.26$ $ 1.44
0.60$ $ 0.69
3,858.75$ $ 4,000.00
76.55$ $ 85.00
76.55$ $ 85.00
76.55$ $ 85.00
72.92$ $ 75.00
19.95$ $ 22.00
2,604.65$ $ 2,700.00
3,643.50$ $ 4,000.00
4,000.00$ $ 4,600.00
5,334.00$ $ 5,750.00
5,223.75$ $ 5,750.00
5,591.25$ $ 6,000.00
2,550.00$ $ 2,750.00
2,199.45$ $ 2,300.00
14,700.00$ $ 14,250.00
1,736.00$ $ 1,850.00
3,252.37$ $ 3,350.00
314.21$ $ 350.00
55.00$ $ 63.25
42.50$ $ 48.75
437.50$ $ 500.00
+14.71%
+14.29%
-3.06%
+10.07%
+7.84%
+4.57%
+7.80%
+3.66%
+9.78%
+11.04%
+14.29%
+15.00%
+3.66%
21-8.
15-2.a.
15-1.d.
14-2.a.
13-6.
13-7.
Level 2 Remedial Action Plan
Well Abandonment/Site Restoration Report
Operation & Maintenance Annual Report
Operation & Maintenance Report, Quarterly or Non-
Annual
Supplemental Site Assessment Report
General Site Assessment Report
Air Sparge/Multiphase Extraction (AS/MPE) System -
Medium - Long Term > 6 Months
Air Sparge/Multiphase Extraction (AS/MPE) System -
Small - Long Term > 6 Months
AS/SVE System - Large - Long Term > 6 mos.
AS/SVE System - Medium - Long Term > 6 mos.
AS/SVE System - Small - Long Term > 6 mos.
Air Sparge System - Medium - Long Term > 6 mos.
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of 11 - 20 Lines
Installation of Plumbing (and Electrical) Lines Above
Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.
Trenching and Installation of Additional 1-10 Lines
Greater Than 30 Lines
Trenching and Installation of 1-10 Plumbing (and
Electrical) Lines in Trench
In-Situ Injection Into Existing Well/Treatment Point
Grass - Seed and Mulch
Grass - Sod
P.E. Project Oversight for Remediation System
Operation and Maintenance
Notes:
Laborers and Security Guards
Field Technician (Key)
15-1.a.
15-1.b.
15-1.c.
18-22.
18-20.
18-14.
18-18.
19-3.
19-4.
18-56.
18-54.
19-21.
19-22.
20-11.
19-12.
20-8.
19-26.
+11.04%
+11.04%
+2.85%
+10.28%
+6.57%
+3.00%
+11.39%
+15.00%
+15.00%
+7.31%
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
(1)
The Agreed New Rate(s) shall be effective on and after the Rate Change Date as indicated for table labeled Department Data Processing Information below.
(2)
The column indicating estimated Percentage Rate Change is for informational purposes only and shall not supersede the actual Agreed New Rate. The Agreed New Rate is the maximum rate authorized for payment.
5/25/2022
John Truitt Digitally signed by John Truitt Date: 2022.05.18 09:53:38 -04'00'
Jamie Luten Lopez Digitally signed by Jamie Luten Lopez Date: 2022.05.25 13:54:24 -04'00'
PAY
ITEM
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
1.
1-1. Per Review $ 500.00 $ 500.00 $ 500.00
1-2. Per Site $ 300.00 $ 300.00 $ 300.00
1-2.a. Per Site Not Applicable $ - $ -
1-3. Per Package $ 225.00 $ 250.00 $ 250.00
1-4. Reimbursable* $ 1.00 $ 1.00 $ 1.00
1-5. Per Agreement $ 125.00 $ 147.00 $ 147.00
1-5.a. Per Agreement Not Applicable $ - $ -
1-6. Reimbursable* $ 1.00 $ 1.00 $ 1.00
1-7. % Surcharge Not Applicable $ 0.06 $ 0.06
2.
2-1. Per Visit $ 400.00 $ 450.00 $ 450.00
2-2. Per Survey $ 400.00 $ 450.00 $ 450.00
2-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
2-4. Per Day $ 600.00 $ 708.00 $ 708.00
3.
3-1. Per Round Trip $ 400.00 $ 486.00 $ 550.00
3-2. Per Round Trip $ 600.00 $ 760.00 $ 850.00
3-3. Per Round Trip $ 475.00 $ 576.00 $ 650.00
3-4. Per Round Trip $ 825.00 $ 955.00 $ 1,075.00
3-5. Per Round Trip $ 110.00 $ 133.00 $ 150.00
3-6. Per Round Trip $ 225.00 $ 286.00 $ 325.00
DESCRIPTION
OFFICE ACTIVITIES
File Review
Site Health & Safety Plan
Site Health & Safety Plan for Continued Work at no cost to FDEP
Notice of Discovery of Contamination Package (Initial or TPOC)
Site Reconnaissance/Field Measurement Visit
Receptor Survey and Exposure Pathway Identification (Excludes report)
Professional Land Survey (If FDEP authorizes, submit quote(s) with Change Order)
Contractor Oversight for Non-Price Schedule Activities
MOBILIZATION
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - ≤ 100 miles each way
Permit Fees - actual fee only, cost to obtain permit is included in applicable pay items
Off-Site Property Access Agreement
Site Property Access Agreement for Source Property at no cost to FDEP
Project Specific Financial Guarantee Bond (if required by DEP)
6% Handling Fee for Cost Reimbursable Items
FIELD ACTIVITIES - GENERAL
Mobilization, Light Duty Vehicle (car or 1/2 ton truck) - > 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - ≤ 100 miles each way
Heavy Duty/Stakebed Truck (3/4 ton +) - > 100 miles each way
Work Trailer - ≤ 100 miles each way
Work Trailer - > 100 miles each way
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
3-7. Per Round Trip $ 550.00 Not Applicable Not Applicable
3-7.a. Per Round Trip Not Applicable $ 665.00 $ 750.00
3-8. Per Round Trip $ 632.50 Not Applicable Not Applicable
3-8.a. Per Round Trip Not Applicable $ 1,081.50 $ 1,200.00
3-9. Per Round Trip $ 660.00 Not Applicable Not Applicable
3-9.a. Per Round Trip Not Applicable $ 1,047.00 $ 1,175.00
3-10. Per Round Trip $ 750.00 Not Applicable Not Applicable
3-10.a. Per Round Trip Not Applicable $ 1,819.00 $ 2,000.00
3-11. Per Round Trip $ 600.00 $ 652.00 $ 652.00
3-12. Per Round Trip $ 900.00 $ 550.00 $ 500.00
3-13. Per Round Trip $ 8,250.00 Not Applicable Not Applicable
3-13.a. Per Round Trip Not Applicable $ 9,072.50 $ 9,072.50
3-14. Per Round Trip $ 11,000.00 Not Applicable Not Applicable
3-14.a. Per Round Trip Not Applicable $ 12,733.00 $ 12,733.00
3-15. Per Round Trip $ 330.00 $ 376.00 $ 376.00
3-16. Per Round Trip $ 550.00 $ 376.00 $ 300.00
3-17. Per Round Trip $ 275.00 $ 300.00 $ 300.00
3-18. Per Round Trip $ 385.00 $ 425.00 $ 485.00
3-19. Per Round Trip Not Applicable $ 325.00 $ 325.00
3-20. Per Round Trip Not Applicable $ 325.00 $ 300.00
DPT Rig and Support Vehicles Mobilization - ≤ 100 miles each way
DPT Rig Mobilization - > 100 miles each way
DPT Rig and Support Vehicles Mobilization - > 100 miles each way
Drill Rig Mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - ≤
100 miles each way
Drill Rig Mobilization - > 100 miles each way
DPT Rig Mobilization - ≤ 100 miles each way
LDA Rig and Support Vehicles Mobilization - > 100 miles each way
Loader/Backhoe Mobilization - ≤ 100 miles each way
Loader/Backhoe Mobilization - > 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - ≤ 100 miles each way
Mini Excavator/Loader (Bobcat
TM
) Mobilization - > 100 miles each way
Drum Compactor mobilization - ≤ 100 miles each way
Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) - >
100 miles each way
Excavator Mobilization - ≤ 100 miles each way
Excavator Mobilization - > 100 miles each way
LDA Rig Mobilization - ≤ 100 miles each way
LDA Rig and Support Vehicles Mobilization - ≤ 100 miles each way
LDA Rig Mobilization - > 100 miles each way
Drum Compactor mobilization - > 100 miles each way
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
4.
4-1.a.
Per Person, Per Day $ 80.00 $ 80.00 $ 80.00
4-1.b. Reimbursable* $ 1.00 $ 1.00 $ 1.00
5.
5-1.a. Per Spoon $ 33.00 Not Applicable Not Applicable
5-1.a.1. Per Spoon Not Applicable $ 37.50 $ 42.00
5-1.a.2. Per Spoon Not Applicable $ 42.00 $ 48.00
5-1.a.3. Per Spoon Not Applicable $ 46.00 $ 52.00
5-1.b. Per Core $ 99.00 $ 120.00 $ 138.00
5-1.c. Per Core $ 16.50 Not Applicable Not Applicable
5-2. Per Boring $ 148.00 $ 171.30 $ 180.00
5-3. Per Foot $ 11.00 Not Applicable Not Applicable
5-3.a. Full Day Not Applicable $ 2,836.00 $ 3,000.00
5-4. Per Foot $ 14.30 Not Applicable Not Applicable
5-5. Per Foot $ 24.20 Not Applicable Not Applicable
5-5.a. Full Day Not Applicable $ 2,701.12 $ 2,701.12
5-6. Per Foot $ 20.35 $ 25.70 $ 29.00
Split Spoon Sampling – 2 foot (during boring) < 50 feet
Split Spoon Sampling – 2 foot (during boring) 50 to 100 feet
Split Spoon Sampling – 2 foot (during boring) > 100 feet
Sonic Core Sampling - 5 or 10 foot (during boring)
DPT Core Sampling - 4 or 5 foot (during boring)
Hand Auger Boring ≤ 10 foot total depth
MEALS AND LODGING
Per Diem - For Travel > 1 Consecutive day (prorated in quarter day increments)-Current
State Rate 112.061, F.S. Travel Voucher required and quoted rate should be per person per day.
Meals, Lodging and Transportation - For Contractor travel for specific meetings or legal proceedings required by Department, hotel and meals may be paid in accordance with
Section 112.061, F.S.
DRILLING AND BORING
Split Spoon Sampling - 2 foot (during boring)
Direct Push Boring
Direct Push Technology (DPT) Rig and Equipment
Direct Push Boring with Cone Penetrometer Test Probe (CPT)
Direct Push Boring with Membrane Interface Probe (MIP)
DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (Add-on Cost to DPT
Base Rate)
HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depth
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
5-7. Per Foot $ 27.50 $ 34.90 $ 40.00
5-8. Per Foot $ 33.00 $ 42.00 $ 42.00
5-9. Per Foot $ 27.50 $ 34.65 $ 39.00
5-10. Per Foot $ 33.00 $ 42.00 $ 48.00
5-11. Per Foot $ 38.50 $ 46.75 $ 53.75
5-12. Per Foot $ 33.00 $ 41.72 $ 41.72
5-13. Per Foot $ 40.00 $ 50.40 $ 52.95
5-14. Per Foot $ 44.00 $ 55.12 $ 55.12
5-15. Per Foot $ 27.50 $ 34.90 $ 34.90
5-16. Per Foot $ 30.80 $ 39.10 $ 44.00
5-17. Per Foot $ 38.50 $ 46.75 $ 46.75
5-18. Per Foot $ 33.00 $ 42.00 $ 42.00
5-19. Per Foot $ 38.50 $ 49.00 $ 56.00
5-20. Per Foot $ 49.50 $ 60.14 $ 60.14
5-21. Per Foot $ 60.50 $ 73.50 $ 73.50
5-22. Per Foot $ 70.00 $ 84.00 $ 96.60
5-23. Per Foot $ 87.00 $ 105.00 $ 105.00
6.
6-1. Per Foot $ 22.00 $ 27.56 $ 31.00
6-2. Per Foot $ 22.00 Not Applicable Not Applicable
6-2.a. Per Foot Not Applicable $ 38.06 $ 43.00
6-2.b. Per Foot Not Applicable $ 176.00 $ 176.00
HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depth
Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depth
WELL INSTALLATION
HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depth
HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, < 50 foot total depth
Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depth
Sonic Boring, ≤ 6 inch diameter, > 100 foot total depth
Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depth
Well Installation - 1 inch diameter
Well Installation - 2 inch diameter
Well Installation - 2 inch diameter (Vertical)
Well Installation - 2 inch diameter (Horizontal, by trenching, not directional drilling)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
6-3. Per Foot $ 27.50 Not Applicable Not Applicable
6-3.a. Per Foot Not Applicable $ 46.46 $ 53.00
6-3.b. Per Foot Not Applicable $ 202.56 $ 202.56
6-4. Per Foot $ 44.00 $ 52.50 $ 52.50
6-5. Per Foot $ 33.00 $ 41.45 $ 47.00
6-6. Per Foot $ 44.00 $ 51.45 $ 59.00
6-7. Per Foot $ 55.00 $ 61.00 $ 61.00
6-8. Per Foot $ 66.00 $ 73.00 $ 73.00
6-9.a. Per Foot $ 6.60 $ 7.65 $ 7.65
6-9.b. Per Foot $ 8.80 $ 10.50 $ 10.50
6-9.c. Per Foot $ 14.00 $ 15.45 $ 15.45
6-9.d. Per Foot $ 17.80 $ 19.75 $ 19.75
6-10. Per Well $ 350.00 $ 350.48 $ 350.48
6-11. Per Vault $ 700.00 $ 600.00 $ 600.00
6-12. Per Vault $ 1,400.00 $ 1,200.00 $ 1,200.00
6-13. Per Well Not Applicable $ 174.25 $ 174.25
6-14. Per Well Not Applicable $ 275.50 $ 275.50
6-15. Per Well Not Applicable $ 325.50 $ 325.50
7.
7-1. Per Foot $ 15.00 $ 18.90 $ 21.70
Well Installation - 4 inch diameter (Horizontal, by trenching, not directional drilling)
Well Installation - 6 inch diameter
Surface Casing - 6 inch diameter
Surface Casing - 8 inch diameter
Surface Casing - 10 inch diameter
Surface Casing - 12 inch diameter
Well Installation - 4 inch diameter
Well Installation - 4 inch diameter (Vertical)
Installation of Well Vault - 4 x 4 x 2 foot
Well Redevelopment
Removal and Reinstallation of 8-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
Removal and Reinstallation of 12-inch Manhole and well pad when a well pad/manhole has been damaged or destroyed
WELL ABANDONMENT
Grout and Abandon Well, 1 to 2 inch diameter
Additional Well Screen > 20 feet - 1 inch diameter
Additional Well Screen > 20 feet - 2 inch diameter
Additional Well Screen > 20 feet - 4 inch diameter
Additional Well Screen > 20 feet - 6 inch diameter
Above Grade Well Completion
Installation of Well Vault - 2 x 2 x 2 foot
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
7-2. Per Foot $ 17.75 $ 22.55 $ 25.90
7-3. Per Foot $ 22.00 $ 26.25 $ 30.15
7-4. Per Foot $ 25.00 $ 28.75 $ 28.75
7-5. Per Vault $ 275.00 $ 300.00 $ 300.00
7-6. Per Vault $ 495.00 $ 500.00 $ 500.00
7-7. Per Well Not Applicable $ 138.00 $ 158.00
8.
8-1. Per Well $ 185.00 $ 214.15 $ 225.00
8-2. Per Well $ 225.00 $ 273.25 $ 273.25
8-3. Per Well $ 100.00 $ 110.25 $ 110.25
8-4. Per Sample $ 100.00 $ 110.25 $ 110.25
8-5. Per Sample $ 100.00 $ 105.00 $ 105.00
8-6. Per Sample $ 75.00 $ 82.68 $ 95.00
8-7. Per Well $ 20.00 $ 24.15 $ 27.50
8-8. Per Well $ 100.00 $ 110.25 $ 110.25
8-9. Per Sample $ 50.00 $ 55.12 $ 55.12
8-10. Per Sample $ 55.00 $ 61.00 $ 61.00
8-11. Per Sampling Event Not Applicable $ 121.50 $ 121.50
8-12. Per Well Not Applicable $ 35.50 $ 40.00
8-13. Per Well Not Applicable $ 35.50 $ 40.00
SAMPLE COLLECTION AND FIELD TESTING
Monitoring Well Sampling with Water Level, ≤ 100 foot depth
Monitoring Well Sampling with Water Level, > 100 foot depth
Domestic Water Well Sampling
Other Water Sampling
Free Product Sample Collection
Grout and Abandon Well, > 2 to 4 inch diameter
Grout and Abandon Well, > 4 to 6 inch diameter
Grout and Abandon Well, > 6 inch diameter
Removal of Well Vault - 2 x 2 x 2 foot
Removal of Well Vault - 4 x 4 x 2 foot
Removal of Well Pad and Manhole
Survey Latitude/Longitude of Existing Monitor Wells
Survey Latitude/Longitude of New Monitor Wells
Soil/Sediment Sample Collection
Water Level or Free Product Gauging
Free Product Gauging & Bailing
Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, Tedlar
TM
Bag
(or Equivalent)
Vapor/Ambient Air Sample Collection - SUMMA
TM
Canister (or Equivalent)
Electronic Data Deliverables (EDD)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
8-14. Per Sample Not Applicable $ 18.90 $ 21.50
9.
9.A.
9-1. Per Sample $ 300.00 $ 330.75 $ 380.00
9-2. Per Sample $ 38.50 $ 49.08 $ 55.00
9-3. Per Sample $ 55.00 $ 64.00 $ 64.00
9-4. Per Sample $ 55.00 $ 64.00 $ 64.00
9-5. Per Sample $ 54.00 $ 68.25 $ 78.25
9-6. Per Sample $ 55.00 $ 64.00 $ 64.00
9-7. Per Sample $ 110.00 $ 122.00 $ 122.00
9-8. Per Sample $ 38.50 $ 49.08 $ 56.25
9-8.a. Per Sample Not Applicable $ 288.75 $ 325.00
9-9. Per Sample $ 55.00 $ 61.00 $ 61.00
9-10. Per Sample $ 55.00 $ 64.00 $ 73.00
9-11. Per Sample $ 7.00 $ 8.40 $ 8.40
9-12. Per Sample $ 7.00 $ 8.40 $ 8.40
Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing
(discarded).
LABORATORY ANALYSIS
SOIL/SEDIMENT ANALYSIS
Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-
Priority Pollutant Organics (Multiple Methods)
Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)
Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)
Soil, PCBs [or Aroclors] (EPA 8082)
Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])
Soil, Arsenic (EPA 6010 or EPA 6020)
Soil, Cadmium (EPA 6010 or EPA 6020)
Soil, BTEX + MTBE (EPA 8021 or EPA 8260)
Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)
Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)
Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)
Soil, Priority Pollutant Volatile Organics (EPA 8260)
Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA
8270 list [e.g., EPA 8081/8082 + EPA 8270])
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
9-13. Per Sample $ 7.00 $ 8.40 $ 8.40
9-14. Per Sample $ 7.00 $ 8.40 $ 8.40
9-15. Per Sample $ 55.00 $ 57.75 $ 57.75
9-16. Per Sample $ 71.50 $ 71.50 $ 71.50
9-17. Per Sample $ 25.00 $ 27.56 $ 27.56
9-18. Per Sample $ 32.00 $ 35.28 $ 35.28
9-19. Per Sample $ 12.50 $ 14.00 $ 14.00
9-20. Per Sample $ 30.00 $ 33.00 $ 33.00
9-21. Per Sample $ 360.00 $ 302.00 $ 302.00
9-22. Per Sample $ 550.00 $ 400.00 $ 400.00
9-23. Per Sample $ 38.50 $ 42.44 $ 42.44
9-24. Per Sample $ 290.00 $ 250.30 $ 250.30
9.B.
9-25. Per Sample $ 180.00 $ 198.45 $ 228.00
9-26. Per Sample $ 291.00 $ 320.82 $ 368.00
9-27. Per Sample $ 27.50 $ 34.90 $ 40.00
Soil, Moisture Content (ASTM D2216-10)
Soil, Texture, (See Gee 7 Bauder [1966])
Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)
Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High
Resolution GC/MS)
Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Soil, Chromium (EPA 6010 or EPA 6020)
Soil, Lead (EPA 6010 or EPA 6020)
Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)
Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)
Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)
Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -
96e1 or ASTM D2937-10)
WATER ANALYSIS
Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (Multiple
Methods)
Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-
Priority Pollutant Organics (Multiple Methods)
Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
9-28. Per Sample $ 55.00 $ 63.50 $ 63.50
9-29. Per Sample $ 45.00 $ 52.00 $ 59.80
9-30. Per Sample $ 65.00 $ 82.95 $ 90.00
9-31. Per Sample $ 27.50 $ 31.00 $ 35.65
9-31.a. Per Sample Not Applicable $ 33.00 $ 33.00
9-32. Per Sample $ 45.00 $ 50.00 $ 50.00
9-33. Per Sample $ 65.00 $ 72.00 $ 72.00
9-34. Per Sample $ 110.00 $ 122.00 $ 140.30
9-35. Per Sample $ 110.00 $ 122.00 $ 140.30
9-36. Per Sample $ 40.00 $ 50.00 $ 57.50
9-37. Per Sample $ 50.00 $ 55.12 $ 55.12
9-38. Per Sample $ 7.00 $ 8.40 $ 8.40
9-39. Per Sample $ 7.00 $ 8.40 $ 8.40
9-40. Per Sample $ 7.00 $ 8.40 $ 8.40
9-41. Per Sample $ 7.00 $ 8.40 $ 8.40
9-41.a. Per Sample Not Applicable $ 23.00 $ 23.00
9-42. Per Sample $ 16.00 $ 17.50 $ 17.50
9-43. Per Sample $ 7.00 $ 8.00 $ 8.00
Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)
Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)
Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)
Water, Priority Pollutant Volatile Organics (EPA 8260)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for
NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])
Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)
Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)
Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)
Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA
8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)
Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)
Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)
Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
9-44. Per Sample $ 7.00 $ 8.00 $ 8.00
9-44.a. Per Sample Not Applicable $ 23.15 $ 23.15
9-45. Per Sample $ 7.00 $ 8.00 $ 8.00
9-46. Per Sample $ 7.00 $ 8.00 $ 8.00
9-47. Per Sample $ 7.00 $ 8.00 $ 8.00
9-48. Per Sample $ 7.00 $ 8.00 $ 8.00
9-49. Per Sample $ 13.00 $ 14.50 $ 14.50
9-50. Per Sample $ 13.00 $ 14.50 $ 14.50
9-51. Per Sample $ 7.00 $ 7.71 $ 7.71
9-52. Per Sample $ 7.00 $ 7.71 $ 7.71
9-53. Per Sample $ 7.00 $ 7.71 $ 7.71
9-54. Per Sample $ 7.00 $ 7.71 $ 7.71
9-55. Per Sample $ 7.00 $ 7.71 $ 7.71
9-56. Per Sample $ 13.00 $ 14.50 $ 14.50
9-57. Per Sample $ 9.00 $ 10.00 $ 10.00
9-58. Per Sample $ 8.00 $ 9.00 $ 9.00
9-59. Per Sample $ 8.00 $ 9.00 $ 9.00
Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)
Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI
C or SM 4500CI E)
Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)
Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)
Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or
SM 4500-NO3 F)
Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)
Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)
Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)
Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)
Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)
Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)
Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA
9056, SM 4500-PE or SM 4500-PF)
Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)
Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
9-60. Per Sample $ 7.00 $ 7.71 $ 7.71
9-61. Per Sample $ 41.00 $ 45.00 $ 45.00
9-62. Per Sample $ 650.00 $ 625.00 $ 625.00
9-63. Per Sample $ 870.00 $ 800.00 $ 800.00
9-64. Per Sample $ 368.00 $ 325.00 $ 325.00
9-65. Per Sample $ 550.00 $ 325.00 $ 325.00
9-66. Per Sample $ 38.50 $ 42.44 $ 42.44
9-67. Per Sample $ 281.00 $ 250.00 $ 250.00
9-78. Per Sample Not Applicable $ 61.00 $ 61.00
9-79. Per Sample Not Applicable $ 55.00 $ 55.00
9-80. Per Sample Not Applicable $ 89.00 $ 89.00
9.C.
9-68. Per Sample $ 75.00 $ 95.00 $ 100.00
9-69. Per Sample $ 150.00 $ 165.00 $ 165.00
Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate:
Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia]
(EPA 2006.0/2007.0)
Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)
Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)
Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High
Resolution GC/MS)
Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)
Water, BTEX/MTBE + Naphthalene (EPA 8260)
Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA
9038, EPA 9056 or SM 4500-SO4 C)
Water, Heterotrophic Plate Count (SM 9215 B)
Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate:
Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA
2000.0/2002.0)
Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)
Water, Methane (EPA SOP RSK-175)
AIR ANALYSIS
Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)
Air, Volatile Organic Aromatics (EPA Method TO-15)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
9-70. Per Sample $ 150.00 $ 165.00 $ 165.00
9-71. Per Sample $ 150.00 $ 165.00 $ 165.00
9.D.
9-72. Per Sample $ 336.00 $ 265.00 $ 265.00
9-73. Per Sample $ 715.00 $ 450.00 $ 450.00
9.E.
9-74. Reimbursable* $ 1.00 Not Applicable Not Applicable
9-75.
Percent
Surcharge
9-76.
Percent
Surcharge $ 0.50 $ 0.54 $ 0.54
9-77.
Percent
Surcharge $ 1.00 $ 1.10 $ 1.10
10.
10-1. Per Sq. Foot/Day $ 66.00 Not Applicable Not Applicable
10-1.a. Per Sq. Foot Not Applicable $ 33.25 $ 33.25
10-1.b. Per Sq. Foot/Day Not Applicable $ 1.32 $ 1.32
10-1.c. Per Sq. Foot/Week Not Applicable $ 3.99 $ 3.99
10-1.d. Per Sq. Foot/Month Not Applicable $ 12.00 $ 12.00
Air, Volatile Organic Compounds (EPA Method TO-17)
PRODUCT ANALYSIS
Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High
Resolution GC/FID)
Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)
OTHER ANALYSIS
Other Analysis, Not Otherwise Specified
Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling Rental for ≤ 20 feet deep Excavation
Sheet Piling Rental for ≤ 20 feet deep Excavation
Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround.
Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround.
SOIL SOURCE REMOVAL RELATED
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling Installation for ≤ 20 feet deep Excavation
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
10-2. Per Sq. Foot/Week $ 66.00 Not Applicable Not Applicable
10-2.a. Per Sq. Foot Not Applicable $ 40.00 $ 40.00
10-2.b. Per Sq. Foot/Day Not Applicable $ 1.32 $ 1.32
10-2.c. Per Sq. Foot/Week Not Applicable $ 3.99 $ 3.99
10-2.d. Per Sq. Foot/Month Not Applicable $ 12.00 $ 12.00
10-3. Per Sq. Foot/Month $ 66.00 Not Applicable Not Applicable
10-4. Per Sq. Foot/Day $ 55.00 Not Applicable Not Applicable
10-5. Per Sq. Foot/Week $ 58.00 Not Applicable Not Applicable
10-6. Per Sq. Foot/Month $ 99.00 Not Applicable Not Applicable
10-7. Per Cubic Yard $ 33.00 $ 42.00 $ 42.00
10-8. Per Cubic Yard $ 27.50 $ 34.90 $ 34.90
10-9. Per Cubic Yard $ 120.00 $ 138.90 $ 138.90
10-10. Per Cubic Yard $ 105.00 $ 121.54 $ 121.54
10-11.a. Per Cubic Yard $ 143.00 $ 165.52 $ 165.52
10-11.b. Per Cubic Yard $ 268.00 $ 310.24 $ 310.24
10-12.a. Per Cubic Yard $ 137.50 $ 159.16 $ 159.16
10-12.b. Per Cubic Yard $ 220.00 $ 267.00 $ 267.00
10-13. Per Cubic Yard $ 99.00 $ 120.00 $ 120.00
10-14. Per Cubic Yard $ 27.50 $ 34.90 $ 34.90
10-15. Per Cubic Yard $ 24.20 $ 30.00 $ 34.50
10-15.a. Per Cubic Yard Not Applicable $ 13.90 $ 15.95
10-15.b. Per Cubic Yard Not Applicable $ 13.90 $ 15.95
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling Installation for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Conventional Soil Excavation and Loading ≤ 300 cubic yards
Conventional Soil Excavation and Loading > 300 cubic yards
LDA Excavation and Loading Without Casing ≤ 300 cubic yards
LDA Excavation and Loading Without Casing > 300 cubic yards
LDA Excavation and Loading With Surface Casing ≤ 300 cubic yards
LDA Excavation and Loading With Driven Casing < 300 cubic yards
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling Rental for > 20 feet deep Excavation
Sheet Piling for ≤ 20 feet deep excavation (per square foot)
Sheet Piling for > 20 feet deep excavation (per square foot)
Sheet Piling for > 20 feet deep excavation (per sqyuare foot)
Sheet Piling for > 20 feet deep excavation (per square foot)
Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yards
LDA Excavation and Loading With Surface Casing > 300 cubic yards
LDA Excavation and Loading With Driven Casing > 300 cubic yards
Flowable Fill Concrete and Installation
Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yards
Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yards
Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yards
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
10-16. Per Ton $ 60.00 $ 69.25 $ 69.25
10-17. Per Ton $ 44.00 $ 53.25 $ 60.00
10-18. Per Day $ 3,250.00 $ 3,760.00 $ 3,760.00
10-19. Per Day $ 275.00 $ 318.25 $ 318.25
10-20. Per Week $ 7,500.00 $ 8,000.00 $ 8,000.00
10-21. Per Week $ 400.00 $ 441.00 $ 441.00
10-22. Per Month $ 15,000.00 $ 16,000.00 $ 16,000.00
10-23. Per Month $ 500.00 $ 578.80 $ 578.80
11.
11-1. Per Tank $ 3,850.00 $ 4,244.00 $ 4,244.00
11-2. Per Tank $ 6,000.00 $ 6,086.75 $ 6,086.75
11-3. Per Tank $ 8,500.00 $ 8,010.00 $ 8,010.00
11-4. Per Tank $ 11,000.00 $ 10,350.00 $ 10,350.00
12.
12-1. Per Square Foot $ 2.00 $ 2.41 $ 2.77
12-2. Per Square Foot $ 1.00 $ 1.20 $ 1.38
12-3. Per Ton $ 45.00 $ 54.50 $ 54.50
12-4. Per Ton $ 35.00 $ 44.62 $ 44.62
12-5. Per Ton $ 45.00 $ 54.50 $ 54.50
12-6. Per Drum $ 165.00 $ 200.50 $ 220.00
12-7. Per Ton $ 25.25 $ 29.22 $ 33.60
12-8. Per Ton $ 35.00 $ 42.50 $ 48.87
Pea Gravel
#57 Stone
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacity
DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL
Removal and Loading of Asphalt and/or Concrete - up to 4 inch thickness
Additional Removal/Loading Cost for Concrete - > 4 inch thickness
Loading, Transport and Disposal/Recycle Clean Overburden
Additional Dewatering System Well Points (2) (includes installation)
Dewatering System, up to 12 well points (includes installation)
Additional Dewatering System Well Points (2) (includes installation)
PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL
Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacity
Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacity
Transport and Disposal of Clean Concrete
Transport and Disposal of Mixed Debris
Transport and Disposal of Petroleum Impacted Soil (includes drum)
Transport Petroleum Impacted Soil (bulk) ≤ 100 miles
Transport Petroleum Impacted Soil (bulk) > 100 miles
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
12-9. Per Ton $ 27.50 $ 33.25 $ 38.23
12-10. Per Ton $ 27.50 $ 33.25 $ 38.23
12-11. Per Ton $ 33.50 $ 36.92 $ 36.92
12-12. Per Ton $ 32.50 $ 35.82 $ 35.82
12-13. Per Drum $ 175.00 $ 202.56 $ 220.00
12-14. Per Gallon $ 1.25 $ 1.40 $ 1.50
12-15. Per Drum $ 137.50 $ 166.75 $ 166.75
12-16. Per Gallon $ 1.25 $ 1.40 $ 1.50
12-17. Per Week Not Applicable $ 637.35 $ 732.95
12-18. Per Week Not Applicable $ 525.00 $ 525.00
13.
13-1. Per Square Foot $ 6.00 $ 7.64 $ 8.78
13-2. Per Square Foot $ 2.40 $ 2.76 $ 3.17
13-3. Per Square Foot $ 7.75 $ 9.39 $ 10.79
13-4. Per Square Foot $ 1.50 $ 1.89 $ 2.17
13-5. Per Square Foot $ 2.50 $ 2.88 $ 2.88
13-6. Per Square Foot $ 1.00 $ 1.26 $ 1.44
13-7. Per Square Foot $ 0.50 $ 0.60 $ 0.69
14.
14-1. Per Foot $ 28.25 Not Applicable Not Applicable
14-1.a. Per Day Not Applicable $ 5,250.00 $ 5,250.00
14-2. Per Injection Point $ 35.00 Not Applicable Not Applicable
Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tons
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tons
Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tons
Transport and Disposal of Petroleum Contact Water (includes drum)
Transport and Disposal of Petroleum Contact Water (bulk)
Transport and Disposal of Petroleum Product (includes drum)
Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tons
Concrete Paving - 4 inch thickness (includes sub-base)
Concrete Paving - additional 1 inch thickness
Crushed Lime Rock Cover - 2 inch thickness
Grass - Sod
Grass - Seed and Mulch
IN-SITU INJECTION
Transport and Disposal of Petroleum Product (bulk)
Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off Container
Additional Rental of 20 Cubic Yard Roll-Off Container
RESURFACING
Asphalt Paving - 2 inch thickness (includes sub-base)
Asphalt Paving - additional 1 inch thickness
Direct Push Boring with In-Situ Injection
In-Situ Injection Into Existing Well/Treatment Point
Direct Push Boring with In-Situ Injection
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
14-2.a. Per Day Not Applicable $ 3,858.75 $ 4,000.00
14-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
14-4. Per Week Not Applicable $ 4,861.50 $ 4,861.50
14-5. Per Month Not Applicable $ 8,505.00 $ 8,505.00
15.
15.A.
15-1. Per Linear Foot $ 76.00 Not Applicable Not Applicable
15-1.a.
Per Linear Foot of
Trench Not Applicable $ 76.55 $ 85.00
15-1.b.
Per Linear Foot of
Trench Not Applicable $ 76.55 $ 85.00
15-1.c.
Per Linear Foot of
Trench Not Applicable $ 76.55 $ 85.00
15-1.d.
Per Linear Foot of
Trench Not Applicable $ 72.92 $ 75.00
15-2. Per Linear Foot $ 9.00 Not Applicable Not Applicable
15-2.a. Per Foot Not Applicable $ 19.95 $ 22.00
15-3. Reimbursable* $ 1.00 $ 1.00 $ 1.00
15-3.a. Reimbursable* Not Applicable $ 1.00 $ 1.00
TRENCHING
Trenching and Installation of Plumbing (and Electrical) Lines in Trench - up to 8 plumbing lines
Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in Trench
Trenching and Installation of 11 - 20 Lines
Trenching and Installation of 21 - 30 Lines
Trenching and Installation of Additional 1-10 Lines Greater Than 30 Lines
Materials to be Injected
Groundwater Injection System (not by direct push)
Groundwater Injection System (not by direct push)
REMEDIAL ACTION CONSTRUCTION
In-Situ Injection Into Existing Well/Treatment Point
Trenching and Installation - Additional 2 plumbing lines
Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping.
Electrical lines are not counted in determination of costs.
Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order)
Traffic Bearing Trench Plates (materials)
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
15-3.b. Reimbursable* Not Applicable $ 1.00 $ 1.00
15.B.
15-4.
Per Integration /
Startup $ 6,380.00 Not Applicable Not Applicable
15-4.a. Per Startup Not Applicable $ 8,295.00 $ 8,295.00
15-4.b. Per Startup Not Applicable $ 10,846.50 $ 10,846.50
15-4.c. Per Startup Not Applicable $ 13,398.00 $ 13,398.00
15-4.d. Per Startup Not Applicable $ 2,803.50 $ 2,803.50
15-5.
Per Additional Tech
Component $ 2,250.00 $ 2,604.00 $ 2,604.00
15-6.
Per 2 Recovery /
Treatment Points $ 440.00 Not Applicable Not Applicable
15-7. Reimbursable* Not Applicable $ 1.00 $ 1.00
15-8. Reimbursable* Not Applicable $ 1.00 $ 1.00
15-9. Reimbursable* Not Applicable $ 1.00 $ 1.00
15-10. Reimbursable* Not Applicable $ 1.00 $ 1.00
System Installation/Integration/Startup - 1 technology component - up to 8 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 1-10 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 11-20 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 21-30 recovery/treatment points
System Installation/Integration/Startup - 1 technology component - 1-10 additional recovery/treatment points greater than 30. This item is used in conjunction with 15.4.c when needed.
System Installation/Integration/Startup – Addition of 1 technology component
Infiltration Gallery Installation
REMEDIATION SYSTEM INTEGRATION AND STARTUP
System Installation/Integration/Startup – Addition of 2 recovery/treatment points
Compound Construction/fencing (materials)
Utility Drop
Utility Connection
Utility Disconnect
UNIT OF MEASURE
ORIGINAL
CONTRACTED
ITEM PRICE 2014
PREVIOUS
CONTRACTED ITEM
PRICE (V3.3)
REVISED
CONTRACTED
ITEM PRICE (V3.4)
DESCRIPTION
Region:
Contractor:
Contract #:
North
WES ENVIRONMENTAL, LLC
GC832
DEP Restated Agency Term Contract No. GC832
Amendment No. 12
Attachment D (V3.4) - Rate Schedule
16.
16.A.
16-1.