CN-370000-CN300-T1CO2.pdf

PDF 718 KB Posted

Attached to
Master Agreement FL|CN300|e850edc12e0e0c75c56d27ef9ab70ce1
Contract number
CN300
Issued by
Florida

About this file

This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for the Maclay Gardens Shop and Pole Barn Replacement project. The contract involves Bergmann Associates as the primary consultant, with Hanson Associates and EGS, Inc. providing specialized services. The change order was signed on June 29, 2017, and represents Change Order No. 02 to Task Assignment No. 01 under FDEP Contract No. CN300, Project No. 61104C.

The change order adds Task 1F, a new geotechnical services task for soil boring at the proposed shop building and pole barn locations. The net increase to the task amount is $3,058.40 in fixed fees with no additional reimbursable costs, bringing the total task amount from $89,735.85 to $92,794.25. The change extends the task end date by 120 days from October 1, 2017, to February 1, 2018. The new task involves installing 1-15 feet deep Standard Penetration Test (SPT) soil borings at both the shop building and pole barn footprints, with deliverables including an 8.5 x 11 report describing subsurface materials, groundwater measurements, soil profiles, and geotechnical recommendations for shallow foundations. Funding is allocated through Project No. 61104C, Grant No. 3750, using Fund 000286, Module U3200, Object Code 131500, with authorization code AD. Payment will be made upon FDEP approval of deliverables for each subtask as specified.

View the file

Other files

File Type Posted
CN-370000-CN300-CMC6.pdf PDF
CN-370000-CN300-T1CO1.pdf PDF
CN-370000-CN300-T2CO2.pdf PDF
CN-370000-CN300-T6.pdf PDF
CN-370000-CN300-T7.pdf PDF
CN-370000-CN300-CMC5.pdf PDF
CN-370000-CN300-T14.pdf PDF
CN-370000-CN300-T14CO1.pdf PDF
CN-370000-CN300-T2.pdf PDF
CN-370000-CN300-T2CO3.pdf PDF
CN-370000-CN300-T3.pdf PDF
CN-370000-CN300-T4.pdf PDF
CN-370000-CN300-T6CO6.pdf PDF
CN-370000-CN300-T8.pdf PDF
CN-370000-GC861-CO1.pdf PDF
CN-370000-CN300-A1.pdf PDF
CN-370000-CN300-CMC1.pdf PDF
CN-370000-CN300-CMC2.pdf PDF
CN-370000-CN300-CMC3.pdf PDF
CN-370000-CN300-T15CO1.pdf PDF
CN-370000-CN300-T15CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN300-T2CO1.pdf PDF
CN-370000-CN300-T3CO1.pdf PDF
CN-370000-CN300-T6CO1.pdf PDF
CN-370000-CN300-T6CO2.pdf PDF
CN-370000-CN300-T6CO3.pdf PDF
CN-370000-CN300-T6CO5.pdf PDF
CN-370000-CN300-T9CO1.pdf PDF
CN-370000-CN300-T1.pdf PDF
CN-370000-CN300-T10.pdf PDF
CN-370000-CN300-T13.pdf PDF
CN-370000-CN300-T15.pdf PDF
CN-370000-CN300-T6CO4.pdf PDF
CN-370000-CN300-T9.pdf PDF
CN-370000-CN300-TA3CO1.pdf PDF
CN-370000-CN300-TA5.pdf PDF
CN-370000-CN300.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT CHANGE ORDER FORM

Required Signatures: Adobe Signature

FDEP Contract No.: I Task Assignment No.: Change Order No.: I Project No.:

CN300 01 02 61104C

Project Location: Project Name:

Maclay Gardens Shop and Pole Barn Replacement Consultant Name:

Bergmann Associates Consultant Representative: Phone: Email:

Jon Braddock/ Sean O'Rourke 904-760-4501 jbraddock@,bergmannpc.com FDEP Contract Manager: Phone: Email:

Mae Roth 850-245-2781 Mae.Roth@,dep.state.fl.us Description and Justification of Change:

New task for additional geotechnical services (Task IF) described in the attached proposal dated 6/22/2017 .

ian}!e in as . Ti kA mount:

Item Rei:tnb-ursem�nt Fixed Fee Total Original Task Amount: $ 7.508.88 $ 72.277.24 $ 79.786.12 Task amount including all previous Change Orders: $7,736.88 $81,998.97 $89,735.85 Net increase/decrease in task amount for this Change Order: $0.00 $3,058.40 $ 3 058.40 Total Amounts with all Change Orders: $7,736.88 $85,057.37 $ 92.794.25

Ch ange in as 1me: . T, kT," Ori_gi_nal Task Execution Date: 9/1/2016

Original Task End Date: 6/30/2017

Present Task End Date: 10/l/2017

Net Change in Days: 120

New Task End Date: 2/l/2018

Approval Signatures:

Greg Turral Greg Turral DigitallysignedbyGregTurral Date: 2017.06.29 16:12:15 -04'00' 6-29-2017

Budget Representative, FDEP

Gretchen Miller Project Manager, FDEP

Mae Roth Contract Manager, FDEP

Sean O'Rourke Consultant

Michael W Foster, Jr, P.E.

Contract Authority, FDEP

Proiect # Grant# Ore Code 61104C 3750 I 000002

29 Di2it FLAIR Code:

000- 012 (Effective 5-19-2016)

Signature Gretchen M '1 I I er

Digitally signed by Gretchen Miller Date: 2017.07.05 15:15:01 .{)4'00'

Signature

Mae Roth

Signature

Signature

11!4 Signature 1

Digitally signed by Mae Roth Date: 2017.07.06 09:38:51 .<J4'00'

Date

Date

Date

Datt 1

Cat/Year Fund Module Ob.tect Code EO Amount

088130/17 000286 U3200 131500 AD $3,058.40

Total: $3,058.40