CN-370000-CN300-T14.pdf
PDF 2 MB Posted
- Contract number
- CN300
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form and supporting proposal documentation from the Florida Department of Environmental Protection (FDEP) for a scope of work assignment under Contract CN300. The assignment is issued to Colliers Engineering & Design (formerly Bergmann Associates), with Michael Leonard, P.E. serving as the consultant representative. The project is located at St. Andrews State Park in Florida, with FDEP's Ralph Perkins serving as the contract manager. The task assignment was executed on March 6-11, 2024, with a completion date of May 11, 2026.
The contract encompasses scope of work development and permitting services for fishing pier repairs at St. Andrews State Park, structured across six subtasks: preliminary scope of work preparation including replacement of specific piles and bracing ($6,830.00); FDEP de minimis exemption application ($1,880.00); de minimis authorization coordination ($1,456.00); USACE permit application ($6,372.00); USACE authorization coordination ($2,184.00); and final scope of work incorporation ($1,186.00). The total fixed-price cost is $19,908.00 with no reimbursable costs. Payment is contingent upon FDEP approval of deliverables for each subtask. The project schedule allocates between 5 and 60 days per subtask, with all work to conclude by May 11, 2026. The scope includes site-specific repairs identified in a September 2023 inspection, with explicit exclusions for field delineations, water level determinations, and bathymetric surveys.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT NOTIFICATION FORM
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description of Task:
Project Manager:
Schedule Start Date: Fixed Price Cost:
Completion Date: Cost Reimbursement not to exceed:
Total Task Amount:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 digit FLAIR Code: Total:
CN300 TA14 FDEP 61417
Pier Repairs
Colliers Engineering & Design (Formerly Bergmann Associates)
Michael Leonard, P.E. (904) 528-9685 Michael.Leonard@ColliersEng.com
Ralph Perkins or successor (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
Scope of work development and permitting for necessary fishing pier repairs at St. Andrews State Park per attached dated March 1, 2024.
Richard Marcil or successor
Upon execution $ 19,908.00 May 11, 2026 $ 0.00
$ 19,908.00
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2024.03.06 16:28:09 -05'00'
Richard Marcil Richard Rene Marcil, III
Digitally signed by Richard Rene Marcil, III Date: 2024.03.06 14:14:42 -05'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2024.03.07 13:37:47 -05'00'
Michael Leonard, P.E. michael p leonard Digitally signed by michael p leonard Date: 2024.03.08 16:47:07-05'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2024.03.11 15:51:43 -04'00'
61417 37501000067 080039/24 675002 U3200 131500 XR $ 19,908.00
$ 19,908.00
St. Andrews State Park
| CN300 TA14 Task Form.pdf |
| CN300 TA14 Backup.pdf |