CN-370000-CN218-T9 memo.pdf
PDF 110 KB Posted
- Contract number
- CN218
- Issued by
- Florida
About this file
This is a memorandum from the Florida Department of Environmental Protection (FDEP) dated April 4, 2019, documenting the relationship between two contracts for the Ichetucknee Springs State Park Project 60912C. The document involves two primary contractors: Jones Edmunds (JE), performing construction administrative services under contract CN 218 TA 9, and Charles Perry Partners Inc. (CPPI), performing actual construction work under contract CN 468. The memorandum was prepared to clarify the connection between these two concurrent contracts for internal FDEP personnel and stakeholders.
The construction administrative services provided by Jones Edmunds commenced upon issuance of the Notice to Proceed (NTP) to the construction contractor CPPI. This timing is clarified in the memorandum as construction administrative services typically begin when a task assignment is issued rather than with an NTP. The project encompasses Ichetucknee Springs Headsprings Phase II and III work, with both contracts actively billing for services as of the memorandum date. The document confirms that the NTP issued to CPPI has been recorded in the FACTS system and that the project remains ongoing with both contracts actively performing and billing for their respective services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN218-CMC2.pdf | ||
| CN-370000-CN218-T1CO1.pdf | ||
| CN-370000-CN218-T1CO1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN218-T2CO4.pdf | ||
| CN-370000-CN218-T3.pdf | ||
| CN-370000-CN218-T2CO2.pdf | ||
| CN-370000-CN218-T5.pdf | ||
| CN-370000-CN218-T7CO1.pdf | ||
| CN-370000-CN222-TA8.pdf | ||
| CN-370000-CN218-T2.pdf | ||
| CN-370000-CN218-T2CO1.pdf | ||
| CN-370000-CN218-T7.pdf | ||
| CN-370000-CN218-T8.pdf | ||
| CN-370000-CN218.pdf | ||
| CN-370000-CN218-CMC1.pdf | ||
| CN-370000-CN218-CMC3.pdf | ||
| CN-370000-CN218-T1.pdf | ||
| CN-370000-CN218-T10.pdf | ||
| CN-370000-CN218-T11.pdf | ||
| CN-370000-CN218-T2CO3.pdf | ||
| CN-370000-CN218-T4.pdf | ||
| CN-370000-CN218-T4CO1.pdf | ||
| CN-370000-CN218-T6.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.dep.state.fl.us
FLORIDA DEPARTMENT OF
Environmental Protection
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard Tallahassee, FL 32399
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
April 4, 2019
Re: Contract: CN 218 TA9 and CN 468
Relationship Between Contracts Ichetucknee Springs State Park
Project: 60912C Construction Administration and Actual Construction
To Whom it May Concern:
Per Brooke Arnold, a memorandum is needed to show the connection between Contraction and Construction Administrative (CA) Services for project 60912C Ichetucknee Springs Headsprings PH II and III.
The CA Services are being performed by Jones Edmunds (JE) under contract CN 218 TA 9. The actual construction is being performed by Charles Perry Partners Inc, (CPPI) under CN 468.
The proposal for JE stated that their work would begin when the Notice to Proceed (NTP) was issued to the contractor CPPI. CA Services typically does not receive an NTP, it typically starts when issued the task assignment. This information is known by the majority of personnel that deal with pay applications, contracts, and/ or projects. CPPI was issued an NTP which has been included in FACTS. The project is ongoing and both CN 468 and CN 218 TA9 have billed for their services.
If you have any questions or concerns, please contact the undersigned at your convenience.
Respectfully, Uyles W. Keen Jr
CPC II, BDC
FDEP
File details come from the government source that posted it. Updated .