This document is a Consultant's Task Assignment Notification from the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, Bureau of Design and Construction. The task assignment authorizes Jones Edmunds and Associates, Inc. to provide engineering design services for improvements to the head spring at Ichetucknee Springs State Park in Ichetucknee Springs, Florida. The project is identified as FDEP Contract No. CN218, Task Assignment No. 04, Project No. 60912C, with a completion date of July 8, 2016. The consultant's representative is Walt Nickel, PE, and the FDEP contract manager is Mae Roth. The project manager is Gretchen Miller or successor.
The scope of services encompasses engineering design for ADA access improvements including parking lot modifications, sidewalks, ramps, handrails, boardwalks, platforms, a bulkhead replacement with an ADA-accessible chair lift, drainage features, erosion control, and concrete access paths. The work is structured in five tasks progressing from schematic design (30% construction documents) through final 100% construction documents. The total fixed-price cost is $96,248.46, comprising Jones Edmunds professional services of $84,949.50, Nobles Consulting Group subconsultant services of $6,868.72 for topographical survey, and Universal Engineering Services subconsultant services of $4,430.24 for geotechnical investigations. The project includes preparation of permit applications, technical specifications, and construction cost estimates. No cost reimbursement is permitted to exceed zero dollars, and the work commences upon execution with all deliverables including signed and sealed construction plans, specifications, and cost opinions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN218-T2CO2.pdf | ||
| CN-370000-CN218-T5.pdf | ||
| CN-370000-CN218-T7CO1.pdf | ||
| CN-370000-CN222-TA8.pdf | ||
| CN-370000-CN218-CMC2.pdf | ||
| CN-370000-CN218-T1CO1.pdf | ||
| CN-370000-CN218-T1CO1.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN218-T2CO4.pdf | ||
| CN-370000-CN218-T3.pdf | ||
| CN-370000-CN218-T2.pdf | ||
| CN-370000-CN218-T2CO1.pdf | ||
| CN-370000-CN218-T7.pdf | ||
| CN-370000-CN218-T8.pdf | ||
| CN-370000-CN218-T9 memo.pdf | ||
| CN-370000-CN218.pdf | ||
| CN-370000-CN218-CMC1.pdf | ||
| CN-370000-CN218-CMC3.pdf | ||
| CN-370000-CN218-T1.pdf | ||
| CN-370000-CN218-T10.pdf | ||
| CN-370000-CN218-T11.pdf | ||
| CN-370000-CN218-T2CO3.pdf | ||
| CN-370000-CN218-T4CO1.pdf | ||
| CN-370000-CN218-T6.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
December 2015 Page 1
SCOPE OF SERVICES
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
DIVISION OF RECREATION AND PARKS
BUREAU OF DESIGN AND CONSTRUCTION
ICHETUCKNEE SPRINGS STATE PARK
IMPROVEMENTS TO HEAD SPRING
ENGINEERING DESIGN SERVICES
JONES EDMUNDS OPPORTUNITY NO. 95693-080-14
December 23, 2015
The following Scope of Services is for Jones Edmunds & Associates, Inc. to provide engineering design services to the Florida Department of Environmental Protection, Division of Recreation and Parks, Bureau of Design and Construction (BDC) for improvements at the Ichetucknee
Springs State Park head spring.
1.0 BACKGROUND
Under a separate task for BDC, Jones Edmunds prepared a Conceptual Plan for the head spring improvements (Attachment 1). The Conceptual Plan included the repair of a failed bulkhead at the head spring, new pedestrian access routes linking the parking lot with the head spring area and to the restroom facility and picnic areas, and the addition of boardwalks and platforms. Jones
Edmunds will use the Conceptual Plan as a basis to develop permit and construction-level documents. However, the observation deck depicted in the Conceptual Plan has been removed and replaced with a junction/platform.
2.0 SCOPE OF SERVICES
Jones Edmunds will provide Design Development Plans for the following Conceptual Plan design concepts (see Attachment 1 for an annotated Concept Plan for item number references).
Item No. 1: Construct a new Americans with Disabilities Act (ADA)-compliant sidewalk along the parking area north of the head springs.
Item No. 2: Construct a new ADA-compliant ramp and handrail connecting the sidewalk in #1 to the sidewalk in #3.
Item No. 3: Remove the existing sidewalk and construction new sidewalk from #2 to the picnic area.
Item No. 4: Construct drainage features (inlets, pipes, spreader swale).
Item No. 5: Install timber beams for erosion control.
Item No. 6: Relocate existing grills.
Item No. 7: Construct new sidewalk with stone walls from #3 to #8.
Item No. 8: Construct stabilized granite fines area.
Item No. 9. Construct a new concrete ADA-compliant access path to the existing restrooms.
December 2015 Page 2
Item No. 10: Install additional benches at various locations.
Item No. 11: Construct an elevated wooden boardwalk.
Item No. 12: Replace existing below-water wood steps with new concrete steps.
Item No. 13: Replace approximately 50 feet of existing bulkhead in head springs, including an ADA accessible chair lift (non-electric, manual-hydraulic lift).
2.1 Scope Task 1 – Schematic Design Documents (30% Construction Documents)
Jones Edmunds will perform the following under this Task:
2.1.1 Scope Task 1 Description
• Conduct an on-site project kickoff meeting with BDC and Park staff to discuss the project as defined in the Conceptual Plan and further discuss the functions and features needed for the proposed Park improvements so that the project meets BDC’s needs and objectives.
• Obtain additional topographical information to augment available survey data. A topographical survey, dated November 25, 2013, was completed by Nobles
Consulting Group, Inc. during the previous Task Order. However, the approved
Conceptual Plan includes areas outside the original survey.
• Obtain geotechnical information within the project site to aid in the design of the bulkhead repair, walkways, boardwalks, and platforms. Jones Edmunds will subcontract with Universal Engineering Services, Inc. (UES) for a geotechnical investigation at the site. BDC or Park staff will monitor the geotechnical borings for potential archaeological findings.
• Conduct ecological resources investigations within the project footprint, including determining and locating wetlands and evidence of threatened or endangered species.
• Provide bulkhead reconstruction alternatives.
• Investigate cost-effective siting of ADA parking in relation to site grading and proposed access paths.
• Prepare preliminary plan and profile views of the proposed pedestrian walkways and boardwalks. The routing of these shall be as indicated in the Concept Plans. If routing changes are to be made, Jones Edmunds expects those to be agreed on during this task.
• Schedule and attend a pre-application meeting with the Suwannee River Water
Management District (SRWMD) to discuss applicable permit types (General Permit expected) and permitting-related concerns of the proposed improvements.
• Prepare an engineer’s preliminary estimate of probable construction costs.
2.1.2 Scope Task 1 Deliverables
The following deliverables will be provided:
December 2015 Page 3
• Kick-off meeting minutes; 1 hard copy and 1 portable document format file (PDF)
• Geotechnical report; 1 copy and 1 PDF
• Preliminary plan drawings containing plan and profile drawing(s) of the pedestrian walkway and boardwalks, typical walkway and boardwalk sections, and expected boardwalk foundations type; 11-inch-x-17-inch sheets, 3 hard copies and 1 PDF
• Meeting minutes of the SRWMD pre-application meeting
• Engineer’s preliminary estimate of probable construction costs; 8-1/2-inch-x-11-inch, 2 hard copies and 1 PDF
Jones Edmunds expects to provide these services within 60 calendar days from authorizations.
2.1.3 Scope Task 1 Performance Measures
Deliverables will be reviewed by BDC to confirm they are complete, accurate, and timely. A teleconference will be conducted between Jones Edmunds and BDC to discuss the deliverables after BDC review of the deliverables. We expect no major site revision or design changes after this phase, including foundation types for the boardwalks.
2.1.4 Scope Task 1 Fixed Price Cost
These services will be provided for the following fixed prices:
Jones Edmunds Professional Services $24,726.00
Subconsultant – Nobles Consulting Group $6,868.72
Subconsultant – Universal Engineering $4,430.24
Subtotal $36,024.96
A detailed fee estimate is provided in Attachment 2
2.2 Scope Task 2 – 50% Construction Documents (Permit Level Documents)
2.2.1 – Scope Task 2 Description
• Prepare Construction-level plans that will likely consist of:
o Cover sheet o Abbreviations, legend, and general notes sheet o Existing conditions plan o Demolition plan o Site plan o Path and boardwalk profiles o Horizontal geometry plan of ADA parking facilities, walkways, and boardwalks o Horizontal geometry plan details of boardwalk and junctions/platforms o Preliminary framing and foundation plans for the boardwalks and junctions/platforms o Preliminary grading plan
December 2015 Page 4 o Miscellaneous construction details o Stormwater Pollution Prevention Plan and details
• Prepare stormwater water quality calculations and design stormwater treatment swales within the immediate project upland areas as required by SRWMD for the new impervious and semi-impervious improvements.
• Prepare a list of technical specifications for proposed design elements.
• Prepare an engineer’s estimate of probable construction costs and provide a comparison to the BDC’s available budget.
2.2.2 Scope Task 2 Deliverables
• 50% Construction Plans; 11-inch-x-17-inch sheets, 3 hard copies and 1 PDF
• List of technical specifications; 8-1/2-inch-x-11-inch, 3 hard copies and 1 PDF
• Engineer’s estimate of probable construction costs; 8-1/2-inch-x-11-inch, 2 hard copies and 1 PDF
The 50% Construction Plans will conform to our contract requirements with BDC including BDC’s drawing standards, title blocks, and cover sheet.
Jones Edmunds expects to provide these services within 45 calendar days after BDC approval of the 30% submittal, exclusive of BDC review times.
2.2.3 Scope Task 2 Performance Measures
timely. A teleconference will be conducted between Jones Edmunds and BDC to discuss the deliverables after BDC review of the deliverables. In-scope review comments will be incorporated into the 90% submittal as appropriate.
2.2.4 Scope Task 2 Fixed Price Cost
Jones Edmunds Professional Services $24,420.00
Subconsultant – Nobles Consulting Group $0.00
Subconsultant – Universal Engineering $0.00
Subtotal $24,420.00
2.3 Scope Task 3 – Environment Resources Permit Application
2.3.1 – Scope Task 3 Description
Upon BDC review and approval of the 50% Construction Documents, Jones Edmunds will prepare and submit an application for an ERP, General Permit. In accordance with
Rule 62-330.488, FAC, to qualify for this General Permit boardwalks in wetlands or
December 2015 Page 5 surface waters must be less than 6 feet in width and less than 10,000 square feet. This
Scope of Services assumes that these conditions will be met.
2.3.2 Scope Task 3 Deliverables
The following deliverables will be provided:
• ERP – General Permit Application and supporting documents will be submitted to
SRWMD; electronic submittal to SRWMD and 1 hard copy and 1 PDF to BDC.
Jones Edmunds expects to submit the ERP application within 7 calendar days after BDC approval of the 50% submittal.
2.3.3 Scope Task 3 Performance Measures
Jones Edmunds’ services include responding to one reasonable request for additional information (RAI). The RAI response within this Task includes those required to correct design or regulatory deficiencies in the application package. Other revisions requested by the regulatory agency that change the design are considered Additional Services.
2.3.4 Scope Task 3 Fixed Price Cost
These services will be provided for the following fixed prices:
Jones Edmunds Professional Services $7,501.50
Subconsultant – Nobles Consulting Group $0.00
Subconsultant – Universal Engineering $0.00
Subtotal $7,501.50
2.4 Scope Task 4 – 90% Construction Documents
Jones Edmunds will perform the following under this Task:
2.4.1 – Scope Task 4 Description
• Advance the 50% Construction Documents to a 90% complete level. We expect the following drawing to be included:
o Cover sheet o Abbreviations, legend, and general notes sheet o Existing conditions plan o Demolition plan o Site plan o Geometric/coordinate plan o Path typical sections o Path and boardwalk profiles o Grading plan o Horizontal geometry plan details of boardwalk and junctions/platforms o Structural details for boardwalks, boardwalk junctions/platforms, bulkhead repairs, stairs, and stone walls along paths o Miscellaneous construction details o Stormwater Pollution Prevention Plan and details
• Prepare technical specifications for proposed civil and structural design elements.
December 2015 Page 6
• Update the engineer’s estimate of probable construction costs.
2.4.2 Scope Task 4 Deliverables
• 90% Construction Plans; 11-inch-x-17-inch sheets, 3 hard copies and 1 PDF
• Technical specifications; 8-1/2-inch-x-11-inch, 3 hard copies and 1 PDF
• Engineer’s estimate of probable construction costs; 8-1/2x11, 2 hard copies and
1 PDF
The 90% Construction Plans will conform to our contract requirements with BDC including BDC’s drawing standards, title blocks, and cover sheet.
Jones Edmunds expects to provide these services within 20 calendar days after BDC approval of the 50% submittal, exclusive of BDC review times.
2.4.3 Scope Task 4 Performance Measures
timely. Jones Edmunds will meet in person with BDC staff in Tallahassee to review the submittal and discuss comments. In-scope review comments will be incorporated into the
100% submittal as appropriate.
2.4.4 Scope Task 4 Fixed Price Cost
Jones Edmunds Professional Services $22,425.00
Subconsultant – Nobles Consulting Group $0.00
Subconsultant – Universal Engineering $0.00
Subtotal $22,425.00
2.5 Scope Task 5 – 100% Construction (Final Documents)
2.5.1 Scope Task 5 Description
The 100% Construction Document phase will involve preparing final design drawings and technical specifications based on BDC comments on the 90% submittal. The final drawings and specifications will be prepared for BDC to use in bidding and construction.
This phase will include preparing an updated construction cost opinion based on the final design drawings and specifications.
2.5.2 Scope Task 5 Deliverables
• 100% Construction Plans, signed and sealed; 11-inch-x-17-inch sheets and 22-inch-x-
34-inch sheets, 6 hard copies each, and 1 PDF of the AutoCAD drawings
• Technical specifications, signed and sealed; 8-1/2-inch-x-11-inch, 6 hard copies and 1
December 2015 Page 7
• Engineer’s estimate of probable construction costs, signed and sealed; 8-1/2-inch-x-
11-inch, 6 hard copies and 1 PDF
The Construction Plans will conform to our contract requirements with BDC including
BDC’s drawing standards, title blocks, and cover sheet.
Jones Edmunds expects to provide these services within 7 calendar days after BDC approval of the 90% submittal.
2.5.3 Scope Task 5 Performance Measures
timely.
2.5.4 Scope Task 5 Fixed Price Cost
Jones Edmunds Professional Services $5,877.00
Subconsultant – Nobles Consulting Group $0.00
Subconsultant – Universal Engineering $0.00
Subtotal $5,877.00
2.6 Total Fee Summary
Jones Edmunds will provide these services for the total fixed prices:
Jones Edmunds Professional Services $84,949.50
Subconsultant – Nobles Consulting Group $6,868.72
Subconsultant – Universal Engineering $4,430.24
Total $96,248.46
3. PROPOSAL CLARIFICATIONS
The following proposal clarifications govern this Scope of Services. Excluded items may be provided by Jones Edmunds as an Additional Service upon written agreement.
A. Obtaining a County building permit will be handled by BDC using signed-and-sealed drawings provided by Jones Edmunds.
B. Involvement with or participation in art selection committees is excluded.
C. Bidding and construction-phase services are excluded.
D. Design and coordination of temporary facilities to be used during the demolition and construction period are excluded.
E. Revisions to the survey, design plans, and/or technical specifications due to a change in existing conditions at the site after the execution of the Task Assignment are excluded.
F. Obtaining authorization to use Sovereignty Submerged Lands will be handled by BDC.
December 2015 Page 8
G. Permit fee, plan review fees, and other regulatory fees are excluded and are assumed to be paid directly by BDC.
H. Activities related to zoning, comprehensive plan, fire marshal, and building permitting approvals through the County are excluded and are assumed to be handled by BDC.
I. Wetland mitigation design and permitting are excluded. If these services are determined to be required after the design starts, Jones Edmunds is available to provide such services as Additional Services.
J. Archaeological surveying, permitting, and mitigation are excluded.
K. Coordinating historical preservation is excluded.
L. The project site is assumed to be free of soil and groundwater contamination and hazardous materials (e.g., asbestos, metals, PCBs.) Therefore, associated investigation, testing, analysis, and abatement design are excluded.
M. All drawings and specifications will be prepared using English units.
N. Landscape plans are not expected and are excluded.
O. Site lighting plans are not expected and are excluded.
P. A tree clearing permit, if required, will be obtained by the Contractor.
END OF SCOPE OF WORK
ATTACHMENT 1
(To Scope of Services)
ANNOTATED HEAD SPRINGS CONCEPTUAL PLAN
SWaldroff Text Box
HEAD
SPRING
SWaldroff Callout
CONCRETE PLATFORM WITH STONE CURB
45' X 25'
SWaldroff Callout
ITEM # 13 - ACCESSIBLE CHAIR LIFT
SWaldroff Text Box
PICNIC AREA
SWaldroff Callout
EXISTING FOOT PATH
SWaldroff Callout
EXISTING BOARDWALK
SWaldroff Callout
ITEM #12 - STONE STEPS
SWaldroff Text Box
SWaldroff Callout
ITEM #11 - BENCH (TYPICAL0
SWaldroff Callout
STAIR
SWaldroff Callout
ITEM #11 - 6' WIDE HC RAMP WOOD 1:12 SLOPE
SWaldroff Callout
ITEM #11 - OBSERVATION DECK
SWaldroff Callout
EXISTING
STONE WALLS
SWaldroff Callout
ITEM #4 - DRAINAGE PIPE BELOW WALKWAY
SWaldroff Callout
ITEM # 4 - DRAINAGE INLET/CATCH BASIN
SWaldroff Text Box
SWaldroff Callout
ITEM # 4 - SWALE
SWaldroff Callout
ITEM #4 - SWALE
SWaldroff Callout
ITEM #4 - DRAINAGE INLET/CATCH BASIN
SWaldroff Callout
ITEM #4 - DRAINAGE PIPE BELOW EXISTING GRADE (MIN. 3' FROM SIDEWALK)
SWaldroff Callout ITME #3 - REMOVE EXISTING SIDEWALK. CONSTRUCT NEW 6' WIDE ADA COMPLIANT CONCRETE SIDEWALK. ALTERNATE 8' WIDE
SWaldroff Callout
EXISTING FENCE
SWaldroff Text Box
SWaldroff Callout
EXISTING DRAINAGE PATH
SWaldroff Callout
DRAINAGE PIPE DISCHARGE HERE
SWaldroff Callout ITEM #7 - NEW 6' WIDE CONCRETE SIDEWALKWITH STONE WALLS. 1:20 SLOPE ALTERNATE 8' WIDE
SWaldroff Text Box 34.5'
SWaldroff Text Box
EST. HIGH WATER - TBD
EST. AVERAGE WATER - TBD
SWaldroff Text Box 25.5'
SWaldroff Text Box 25'
SWaldroff Text Box 26'
SWaldroff Text Box 28'
SWaldroff Arc
SWaldroff Text Box 37'
SWaldroff Text Box 32'
SWaldroff Text Box 29.5'
SWaldroff Text Box 27'
SWaldroff Text Box 42.5'
SWaldroff Text Box 41.5'
SWaldroff Text Box 40.5'
SWaldroff Text Box 38'
SWaldroff Text Box 38'
SWaldroff Text Box 39'
SWaldroff Text Box 40'
SWaldroff Text Box 41'
SWaldroff Text Box 42'
SWaldroff Text Box 43'
SWaldroff Text Box 44'
SWaldroff Pen
SWaldroff Pen
SWaldroff Text Box 45'
SWaldroff Text Box 42'
SWaldroff Text Box 41'
SWaldroff Text Box 40'
SWaldroff Pen
SWaldroff Text Box 39'
SWaldroff Text Box 38'
SWaldroff Text Box 37'
SWaldroff Text Box 35'
SWaldroff Text Box 36'
SWaldroff Text Box 34'
SWaldroff Text Box 33'
SWaldroff Text Box
TRAIL
SWaldroff Callout
ITEM #8 - STABILIZED GRANITE FINES
SWaldroff Text Box 37'
SWaldroff Callout
ITEM #11 - BENCH
SWaldroff Callout
ITEM #8 - EXISTING WOOD STEPS. ALTERNATE - NEW CONCRETE
SWaldroff Text Box 39.3'
SWaldroff Text Box
TO RESTROOMS
SWaldroff Snapshot
SWaldroff Line
SWaldroff Line
SWaldroff Callout
ITEM #1 - NEW SIDEWALK PER ADA ACCESS REQUIREMENTS
SWaldroff Line
SWaldroff Line
SWaldroff Text Box 39.5'
SWaldroff Line
SWaldroff Text Box 38.5'
SWaldroff Line
SWaldroff Arc
SWaldroff Callout
ITEM #4 - SHALLOW SPREADER SWALE
SWaldroff Callout
ITEM # 5 - TIMBER BEAMS FOR EROSION CONTROL
SWaldroff Callout
ITEM #6 RELOCATE GRILLE
SWaldroff Arc
SWaldroff Arc
SWaldroff Callout
REVISED SIDEWALK LAYOUT
SWaldroff Callout
ITEM #2 - ADA RAMP AND HANDRAIL
SWaldroff Callout
ITEM #13 - REPLACE EXISTING BULKHEAD
SWaldroff Callout
ITEM #10 - ADD 6 NEW WOODEN BENCHES - LOCATIONS TO BE DETERMINED
WNickel Text Box
WNickel Text Box
ATTACHMENT 1
(TO SCOPE OF SERVICES)
ATTACHMENT 2
FEE ESTIMATE
Fee Summary
Fee Detail
Attachment 2 - Fee Estimate, Fee Summary Page 1 of 1
Total Total
Task No. Task Description Hours Dollars
1 Schematic Design Documents (30% Construction Documents) 188 $36,024.96
2 50% Construction Documents (Permit Level Documents) 209 $24,420.00
3 Environment Resources Permit Application 60 $7,501.50
4 90% Construction Documents 191 $22,425.00
5 100% Construction (Final Documents) 51 $5,877.00
SUBTOTAL 699 $96,248.46
TOTAL FEE AMOUNT 96,248.46$
ATTACHMENT 2 - FEE ESTIMATE, FEE SUMMARY
BUREAU OF DESIGN AND CONSTRUCTION
FDEP - DIVISION OF RECREATION AND PARKS
ICHETUCKNEE SPRINGS STATE PARK
IMPROVEMENTS TO HEAD SPRING
ENGINEERING SERVICES
FEE SUMMARY
Jones Edmunds Proposal No.: 95693-080-14
Attachment 2 - Fee Estimate, Fee Detail Page 1 of 1
Project Name: Prepared On: 12/23/15
Client: FDEP, Bureau of Design and Construction Prepared By: W. Nickel
Opportunity Number:
Attachment 2 - Fee Estimate, Fee Detail
CIV/ENV CIV/ENV CIV/ENV CIV/ENV FAC FAC FAC FAC CIV/ENV DocProd CIV/ENV FAC CONSTR. = Department/Group
PM Civil. CADD Biologist Struc.Eng. Struc. Eng. Int. Architecture Struc/Arch Admin. Admin. Sr. Eng./QC
Sr.
Eng./QC
Constr.
Admin.
= Role
Project
Manager
Licensed PE, AIA, or PG
Project
Engineer, Architect, or
Scientist
CADD
Designer
Project
Engineer, Architect, or
Scientist
Sr. Project
Engineer, Architect, or
Scientist
Engr Intern-
Geologist, Hydro
Geologist, Scientist
Sr. Project
Engineer, Architect, or
Scientist
Sr. CADD
Designer
Sr. Admin
Assistant
Sr. Admin.
Assistant
Project
Officer
Project
Officer Const Adm = Position Classification
$153.00 $135.00 $87.00 $135.00 $171.00 $97.50 $171.00 $94.50 $82.50 $82.50 $235.50 $235.50 $102.00
Scope
Task
No. Task Description
Labor
Hours Labor Cost
Expenses:
Misc.
Expenses:
Cadd Hours
(@ $12.5/hr)
Expenses: GIS
Hours (@
$5.00/hr) Subconsultants
Total Fixed
Fee
Expenses
1 Schematic Design Documents (30% Construction Documents) 0.0 $0.00 $0.00 $0.00
Startup/Kickoff Meeting (at Park) 4 4 1 9.0 $1,239.00 $0.00 $1,239.00
Project Mgmt & Coordination 4 4.0 $612.00 $0.00 $612.00
Permitting requirements, pre-app/verfication meeting 1 4 6 11.0 $1,503.00 $0.00 $1,503.00
Survey coordination 1 1 4 6.0 $636.00 $6,868.72 $6,868.72 $7,504.72
Geotechnical investigations & report coordination 1 1 2 4.0 $630.00 $4,430.24 $4,430.24 $5,060.24
Ecological investigations & mapping 1 8 12 21.0 $2,451.00 $0.00 $2,451.00
Bulkhead options 2 2 16 4 1 1 1 27.0 $4,263.00 $0.00 $4,263.00
Parking lot/ADA options 4 1 5.0 $711.00 $0.00 $711.00
Preliminary P/Ps for walkways and boardwalks 1 6 16 1 24.0 $2,526.00 $0.00 $2,526.00
Typical walkway and boardwalk sections 1 4 8 4 1 18.0 $2,244.00 $0.00 $2,244.00
Boardwalk foundation options 1 1 4 4 10.0 $1,350.00 $0.00 $1,350.00
Preliminary site plan 1 8 6 15.0 $1,755.00 $0.00 $1,755.00
Construction cost opinion 1 8 3 2 0 14.0 $1,941.00 $0.00 $1,941.00
Submittal Preparation / QC 1 2 2 1 1 1 1 1 1 1 12.0 $1,641.00 $0.00 $1,641.00
Design review meeting At BDC Office 8 8.0 $1,224.00 $0.00 $1,224.00
Subtotal 27 46 45 19 30 2 3 8 1 1 2 2 2 188.0 $24,726.00 $0.00 0 0 $11,298.96 $11,298.96 $36,024.96
2 50% Construction Documents (Permit Level Documents) 0.0 $0.00 $0.00 $0.00
Project Mgmt & Coordination 4 4.0 $612.00 $0.00 $612.00
Cover sheet/general notes 1 2 3.0 $309.00 $0.00 $309.00
Existing conditions 2 2.0 $174.00 $0.00 $174.00
Demolition plan 1 1 2.0 $222.00 $0.00 $222.00
Site plan 1 8 16 25.0 $2,625.00 $0.00 $2,625.00
Typical sections 2 2 4.0 $444.00 $0.00 $444.00
Path and boardwalk profiles 1 12 12 25.0 $2,817.00 $0.00 $2,817.00
Grading plan 1 5 16 22.0 $2,220.00 $0.00 $2,220.00
Structural calculations 9 20 29.0 $3,489.00 $0.00 $3,489.00
Preliminary structural plans, sections, & details 8 20 28.0 $3,318.00 $0.00 $3,318.00
Construction details - general, civil 4 8 12.0 $1,236.00 $0.00 $1,236.00
Construction details - architectural 4 8 12.0 $1,440.00 $0.00 $1,440.00
Stormwater pollution prevention plan and details 1 4 5.0 $483.00 $0.00 $483.00
List of technical specifications 1 1 1 3.0 $477.00 $0.00 $477.00
Construction cost opinion 1 8 1 4 1 15.0 $1,965.00 $0.00 $1,965.00
Submittal preparation & QC 2 2 2 1 1 1 1 1 1 12.0 $1,671.00 $0.00 $1,671.00
Design review meeting teleconference 2 2 2 6.0 $918.00 $0.00 $918.00
Subtotal 12 47 65 0 22 44 6 9 1 0 1 1 1 209.0 $24,420.00 $0.00 0 0 $0.00 $0.00 $24,420.00
3 Environment Resources Permit Application 0.0 $0.00 $0.00 $0.00
Project Mgmt & Coordination 2 2.0 $306.00 $0.00 $306.00
SRWMD General Permit Application 2 16 8 8 6 1 41.0 $4,972.50 $0.00 $4,972.50
Coordination with BDC 2 2.0 $306.00 $0.00 $306.00
RAI Response 2 4 4 3 1 1 15.0 $1,917.00 $0.00 $1,917.00
Subtotal 8 20 12 11 0 0 0 0 0 7 2 0 0 60.0 $7,501.50 $0.00 0 0 $0.00 $0.00 $7,501.50
4 90% Construction Documents 0.0 $0.00 $0.00 $0.00
Project Mgmt & Coordination 4 4.0 $612.00 $0.00 $612.00
Cover sheet/general notes 1 1.0 $87.00 $0.00 $87.00
Existing conditions 2 2.0 $174.00 $0.00 $174.00
Demolition plan 2 2.0 $174.00 $0.00 $174.00
Site plan 1 2 8 11.0 $1,119.00 $0.00 $1,119.00
Geometry plan 1 4 5.0 $483.00 $0.00 $483.00
Typical sections 1 4 5.0 $483.00 $0.00 $483.00
Path and boardwalk profiles 1 2 12 15.0 $1,467.00 $0.00 $1,467.00
Grading plan 1 2 6 9.0 $945.00 $0.00 $945.00
Structural plans, sections, & details 1 8 20 8 37.0 $4,227.00 $0.00 $4,227.00
Construction details - general, civil 1 2 6 9.0 $945.00 $0.00 $945.00
Construction details - architectural 4 4 8.0 $1,062.00 $0.00 $1,062.00
Stormwater pollution prevention plan and details 2 2.0 $174.00 $0.00 $174.00
Technical specifications 1 12 4 12 4 8 41.0 $4,971.00 $0.00 $4,971.00
Construction cost opinion 1 4 4 2 4 1 1 17.0 $2,046.00 $0.00 $2,046.00
Submittal preparation & QC 2 2 2 1 1 2 2 2 14.0 $2,149.50 $0.00 $2,149.50
Design review meeting at FDEP 8 1 9.0 $1,306.50 $0.00 $1,306.50
Subtotal 21 28 53 0 15 36 9 12 1 9 2 2 3 191.0 $22,425.00 $0.00 0 0 $0.00 $0.00 $22,425.00
5 100% Construction (Final Documents) 0.0 $0.00 $0.00 $0.00
Final plan edits 0 5 12 2 4 1 8 32.0 $3,378.00 $0.00 $3,378.00
Final spec edits 1 3 1 2 1 2 10.0 $1,260.00 $0.00 $1,260.00
Construction cost opinion 1 1 2.0 $288.00 $0.00 $288.00
Submittal preparation & QC 1 1 2 1 1 1 7.0 $951.00 $0.00 $951.00
Subtotal 3 10 14 0 4 6 2 8 1 2 1 0 0 51.0 $5,877.00 $0.00 0 0 $0.00 $0.00 $5,877.00
Grand Total 71 151 189 30 71 88 20 37 4 19 8 5 6 699 $84,949.50 $0.00 0 0 $11,298.96 $11,298.96 $96,248.46
Staffing Plan
95693-080-14
Head Spring HC Access Walkways
Ichetucknee Springs State Park
Fixed Fees
Hours
Contract Billing Rates
Fixed Fee Labor Fixed Fee Expenses
Total Fixed
Fee Labor and
Expenses
ATTACHMENT 3
PROPOSAL FOR TOPOGRAPHICAL SURVEY
December 22, 2015
Mr. Walter A. Nickel, PE Director, Civil/Environmental / Vice President Jones Edmunds & Associates, Inc.
730 NE Waldo Road Gainesville, FL 32641
Ichetucknee River State Park Ichetucknee Head Spring Additional Survey
Dear Walter:
Nobles Consulting Group, Inc. is pleased to offer you the following proposal to prepare a Topographic Survey of a 3.6-acre site adjacent to the headspring for design of A.D.A. compliant walkways and access. The survey limits are Southwest of our topographic survey done in November of 2013 are shown on the attached Site Map. The easterly limit of the additional survey area is the bottom of the spring run below the southwest bank.
Control to be used for the survey and during construction will be extended to the South and West. The survey data will be added to the original drawing to provide complete mapping and a detailed digital terrain model for the entire project area.
The Topographic Survey will be prepared to meet the Standards of Practice for Surveying and Mapping and will include the following:
1. State Plane Coordinate Data referenced to North American Datum of 1983 (NAD 83).
2. Elevations referenced to North American Vertical Datum of 1988 (NAVD 88) with a conversion factor to National Geodetic Vertical Datum of 1929 (NGVD 29.
3. Monumented Baseline of Survey for use during construction.
4. Location, description, and elevation of additional bench marks set (four minimum).
5. Contours and contour labels at one-foot intervals taken on a 50-foot grid and at all breaks in grade with spot elevations shown as needed to depict the existing site grades.
6. Location, size, material, and control elevations of existing storm water structures, if any.
7. Locations, elevations, size, and material of existing pavement and structures, particularly the existing sidewalks.
8. Trees, 8” DBH and larger, approximately 225, within the survey limits.
9. FEMA Flood Zone Designations and flood elevations.
The fee for the Topographic Survey will be $6,868.72.
Drawings and files will be prepared in AutoCAD Civil 3D, formatted for 1”=20’ display, and will adhere to FDEP Bureau of Design and Construction CADD Standards. Five signed and sealed copies and a CD-Rom disk containing the AutoCAD drawing file along with points, break lines, and digital terrain models in AutoCAD Civil 3D will be submitted to you upon completion.
Sincerely, NOBLES CONSULTING GROUP, INC.
M. Kevin Mears, P.S.M.
Project Manager
DATE:
PROJ. NO.:
DESC.:
CREW HDS CREW HDS TECH CADD/TECH PLS CLERICAL CONSULTANT TOTAL # %
$0.00 1 $0.00 2 $0.00 3
4 2 0.25 $692.13 4 10% $0.00 5 $0.00 6 $0.00 7 $0.00 8 $0.00 9 $0.00 10
22 17.01 2.25 $4,276.56 11 62% HDS Topography Survey $0.00 12
12 2.009 0.5 $1,798.10 13 26% $0.00 14 $0.00 15 $0.00 16 $0.00 17 $0.00 18 $0.00 19 $0.00 20 $0.00 21 $0.00 22 $0.00 23 $0.00 24 $0.00 25 $0.00 26 $0.00 27
HDS Data Reduction and Extraction $0.00 28 1 $101.94 29 1%
$0.00 30 38 0 0 21.019 4 0 Total Hours Work Hours Field Days Office Days
$134.99 $63.34 $101.94 63.019 10 3 3 $5,129.62 $0.00 $0.00 $1,331.34 $407.76 $0.00 $6,868.72
$0.00 $0.00 31 $0.00 $0.00 32
Per diem $0.00 Personnel Lodging $0.00 2
$0.00 33 $5,129.62 $0.00 $0.00 $1,331.34 $407.76 $0.00 $0.00 $6,868.72
Acreage 3.6 per Ac. $1,908 Perimeter 2,840 $ per LF $2.42 miles 0.54 mi. per day 0.18 $ per mile 12770.02
TOTAL PROJECT FEES
Total Survey fees
Total direct expenses Total Consultant fees
TOTAL
Total Per diem and Lodging
PROJECT DATA
Total Labor and Overhead
Direct Expenses Consultants
Total Hours
Project Administration/Management
Traverse for topo approx. 12 stations
Wetlands not included in this scope
With contours, visible improvements and utilities
Approximately 225 8" DBH min.
Hourly Rate
Data Reduction/Computations/Analyse Record Plat preparation
Tree Location Survey Roadway Cross-Sections/Profiles
Property/R/W/Easement Staking
December 22, 2015
TASK
Deed Research
Bench Levels Geodetic Control pr14-KM006
February 17, 2015SURVEYING AND MAPPING
ESTIMATE
Walter Nickel
PREPARED BY: Kevin Mears
REQUESTED BY:
ESTIMATE DUE BY:
Boundary Survey drawings
MHWL/OHWL Survey
Construction Staking
Hydrographic Survey
Geotechnical Staking
Reference Points
Revised Scope
Conventional Traverse Monumentation / Evidence Ties Alignment
Side Street Survey
NOBLES CONSULTING GROUP, INC.
Ichetucknee Head Spring
Additional Topographic Survey
DESCRIPTION/SCOPE
COMMENTS
Aerial Targets/Photo ID Points
Control Survey
Utilities Survey
Jurisdictional Line Survey
Topography Survey
Drainage Outfall and Detention Survey
Supplemental Survey
Property/Easment Sketch & Description
Man-hours Pr14-KM006-Ichetucknee_Head_Spring_Additional_Topo.xls
ATTACHMENT 4
PROPOSAL FOR GEOTECHNICAL INVESTIGATIONS
| CN218 TA04 (2) |
| 2015_12_23-Ichetucknee_Head_Springs_Improvements_Scope_Design-WNickel-AndAllAttachments |