Camp Varnum Room Finish Schedule.pdf
PDF 162 KB Posted
- Attached to
- RIARNG CAMP VARNUM T-18 RENOVATIONS
- Solicitation number
- RFQ26006763
- Issued by
- Providence County, Rhode Island
About this file
This is a Room Finish Schedule document for Building T-18 at Camp Varnum, prepared in conjunction with the Rhode Island Army National Guard's renovation project managed through the State of Rhode Island Division of Purchases. The schedule specifies interior finishes for three areas: dormitory rooms, bathrooms, and stairs. Dormitory spaces feature wood baseboards, luxury vinyl tile (LVT) flooring, wood framing, gypsum drywall with paint finishes on both walls and ceilings, and a finished height of 7'-6" with one fire-rated view (VIF 1, 2). Bathrooms are finished with concrete epoxy flooring, gypsum drywall with paint on walls and ceilings at 8'-0" height with VIF 1, 3 designation. Stair areas include wood baseboards and framing, LVT flooring, and gypsum finishes at a 16'-4.5" height with VIF 1, 2 classification. Second-floor dormitory spaces match the first-floor dormitory specifications at 8'-10.5" height.
The specification document establishes three critical fire and moisture safety requirements: all gypsum wall and ceiling boards shall be 5/8" thickness; gypsum materials at stairs must be one-hour fire-rated; and gypsum materials in bathrooms must be water-resistant. These finish standards align with the broader T-18 renovation scope that includes life safety upgrades, mechanical systems, electrical work, plumbing, flooring replacement, and structural improvements required to comply with Rhode Island Building Code Commission and State Building and Fire Code standards. The schedule references approved construction design prints completed by Rowse Architects Inc. and is part of the comprehensive energy-efficient modernization project with a September 2026 anticipated start date and 16-month timeline to substantial completion.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DORMITORY WD LVT WD GYP PNT GYP PNT 7'-6" ± VIF 1, 2
FIN BASEMAT
ROOM FLOOR
ROOM FINISH SCHEDULE
REMARKS
WALLS CEILING
HGTMAT FIN MAT FIN TYPE
REMARKS:
BATHROOM CONC EPOXY CONC GYP PNT GYP PNT 8'-0" ± VIF 1, 3
STAIR WD LVT WD GYP PNT GYP PNT 16'-4 1/2" ± VIF 1, 2
2. GYPSUM WALL AND CEILING BOARDS SHALL BE 1 HOUR FIRE RATED AT STAIRS.
DORMITORY - 2ND FLR WD LVT WD GYP PNT GYP PNT 8'-10 1/2" ± VIF 1, 2
3. GYPSUM WALL AND CEILING BOARDS SHALL BE WATER RESISTANT AT BATHROOM
1. GYPSUM WALL AND CEILING BOARDS SHALL HAVE A THICKNESS OF 5/8"
| Sheets and Views |
| 24029A - Drawing Set-RM FIN SCH |
File details come from the government source that posted it. Updated .