This document is a Statement of Qualifications submitted by Black & Veatch Corporation in response to the City of Plant City, Florida's Request for Qualifications (RFQ No. 21-020EN-FC) for a Library of Engineering Services for Continuing Contracts. Black & Veatch is seeking consideration for five of ten available categories: General Engineering, Stormwater Engineering, Water and Wastewater Engineering, Instrumentation and Controls Engineering, and Electrical Engineering. The firm proposes to deliver services including planning, hydraulic modeling, asset management, design, permitting, bidding assistance, construction administration, and operations support for the City's water utility infrastructure projects. Black & Veatch's submission demonstrates the firm's qualifications through an organizational chart detailing local and national resources, with Project Manager Rebecca Oliva (PE, BCEE, ENV SP, PMP) based in the Tampa office and supported by discipline leads in planning, treatment facility design, collection systems, stormwater management, electrical systems, and instrumentation and controls. The firm acknowledges receipt of Addenda Nos. 1, 2, 3, and 4 and takes no exceptions to the RFQ agreement terms.
Black & Veatch emphasizes its competitive advantages through over 100 years of industry experience, $30 billion in completed capital improvements over the past decade, and a track record of serving more than 60 Florida agencies under continuing services contracts with over 1,000 completed work orders. The firm highlights local presence with 300+ professionals across seven Florida offices and extensive relevant experience including the City of Plant City's Wastewater Collection System Master Plan, the City of Lakeland's 8 MGD C. Wayne Combee Water Treatment Plant, and multiple projects for Hillsborough County, Pinellas County, Tampa Bay Water, and other regional utilities. Key personnel possess specialized expertise in hydraulic modeling, treatment processes, pipeline rehabilitation, electrical and controls systems, permitting, and funding services, with most professionals registered Professional Engineers in Florida based in the Tampa or Orlando offices to ensure responsive service. Black & Veatch offers additional specialized services in geotechnical engineering, construction management, and design-build delivery as complementary capabilities to its core engineering disciplines.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANT CITY, FLOR IDA
LI BR A RY OF
E NGI N EER I NG
SERV IC ES FOR
CON T I N U I NG
CON T R AC TS
R F Q 21- 0 2 0 E N - F C
S T A T E M E N T O F Q U A L I F I C A T I O N S
D E C E M B E R 10 , 2 0 2 0
December 10, 2020
City of Plant City Procurement Department 302 W. Reynolds Street, 3rd Floor Plant City, FL 33563
RE: RFQ No. 21-020EN-FC: Library of Engineering Services for Continuing Contracts
Black & Veatch is excited to continue our collaborative partnership with the City of Plant City by continuing to support the City under a continuing services contract. We recognize that these contracts are very important for supporting the City’s various needs and achieving your goals. With that, the City will continue to have full access to Black & Veatch’s expertise and professionals as we are prepared to deliver valuable projects to the City. The specific categories that Black & Veatch is requesting consideration for under this contract are:
| � Category 1 – General Engineering |
| � Category 4 – Stormwater Engineering |
| � Category 6 – Water and Wastewater Engineering |
| � Category 8 – Instrumentation and Controls Engineering |
| � Category 9 – Electrical Engineering |
As our Statement of Qualifications highlights, Black & Veatch is an industry leader in each of these categories and has the technical expertise and experience to provide significant value to the City. Benefits that the City will realize by selecting Black & Veatch for this contract include:
Proactive planning and implementation of successful projects to set the City up for long-term success. We understand the City’s need to provide a continued level of service to your growing utility customer base.
With the City’s population potentially tripling within the next 25 years, we are committed to being a partner by your side in the planning and execution of projects. The next five years are critical to setting the stage for reliable infrastructure to be in place to handle the anticipated future developments and population growth. You can count on Black & Veatch to alleviate the heavy workload that may be placed on your staff during these changing times and that the daily rehabilitation and replacement (R&R) needs, facility upgrades, O&M, regulatory requirements and planning for future growth and system expansion create. We will be accessible and available to support your staff through modeling tasks, evaluations, design services, decision-making on improvements projects, and on-call services, just to name a few.
Access to a diverse range of capabilities and expertise; all in one place. With strong capabilities in a wide array of your engineering needs listed in the Request for Qualifications, Black & Veatch offers a single point of responsibility which is advantageous for the City as you will have access to so many services and engineering disciplines in just one organization. We have arranged the perfect team structure to accomplish streamlined internal coordination while also maximizing collaboration with the City to ensure your priority needs are delivered. Our diverse expertise in planning, hydraulic modeling, asset management, stormwater, water and wastewater pipelines, pump stations and facilities, electrical, instrumentation and controls, construction services, funding, permitting, operations and resiliency allows nearly any multi-disciplinary project to be completed in-house and under a single work order contract, which truly sets us apart.
BLACK & VEATCH CORPORATION
Rebecca Oliva, PE, BCEE, ENV SP, PMP 3405 W. Dr. M.L. King Jr. Blvd, Suite 125
Tampa, Florida 33607 p +1 813-282-4189 | e OlivaR@bv.com
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS1
A few examples of Black & Veatch’s multi-disciplinary projects are the City of Winter Haven’s One Water Master Plan, the City of Lakeland’s new 8 MGD C. Wayne Combee Water Treatment Plant, Pinellas County’s Water and Sewer Optimization Program, and Hillsborough County’s Sanitary Sewer Rehabilitation Construction Inspection Services.
Responsive service delivered by a locally-led team and supported by global industry-leading experts which will translate to innovative, technically-sound and cost-saving solutions that optimize your facilities, systems and operations. By selecting Black & Veatch, the City will be able to tap into a plethora of professional resources, ready to respond to your needs. Our team will engineer innovative solutions that successfully deliver projects to achieve the City’s goals. In addition to our team offering world-class services, most professionals presented on our organization chart are based out of Tampa or Orlando so will be quick to respond to immediate needs the City may have and are also registered Professional Engineers in the state of Florida. In addition to the strong industry leadership in the RFQ Categories of Stormwater, Water and Wastewater, Instrumentation and Controls, and Electrical, Black & Veatch also offers General and specialty services in geotechnical engineering, hydraulic modeling, site design, grant applications and funding, construction inspections, permitting and project management. This unique combination of services offers benefits to the City by allowing you to draw upon an expanded base of services that cater to the exact needs of your customers, City Management and other stakeholders. Your projects will continue to be managed locally out of the Tampa office as others of our existing continuing services contracts are, such as City of Clearwater, Hillsborough County, City of Lakeland, Pinellas County and City of Tampa. With the current pandemic situation we find ourselves in, keeping safety and project efficiency in mind is essential. All Black & Veatch professionals on our deep technical bench are just a virtual conference call away.
By listening to your preferences and needs, we will expeditiously develop customized work order scopes and budgets so that your CCNA projects can get underway quickly to meet your schedules and the broader utility-wide plans.
In alignment with the requirements outlined in the City’s RFQ No.21-020EN-FC, we take no exceptions to the agreement. Black & Veatch acknowledges receipt and review of Addenda Nos. 1, 2, 3 and 4.
Black & Veatch has a proven history of successful projects delivered under similar government contracts for utilities in west-central Florida and we will apply our innovation, experience and lessons learned to successfully manage various work orders under this contract as well. We are excited for the opportunity to provide quality and valuable projects for the City over the next several years and be a part of the Library of Engineering Services for Plant City. Thank you for the opportunity to support to the City and we look forward to achieving your goals together.
Very truly yours, Black & Veatch Corporation
| Rebecca Oliva | Andrew Westfall |
| Project Manager | Client Services Director |
BLACK & VEATCH 2
The City will successfully meet its diverse engineering needs by having access to Black & Veatch’s comprehensive capabilities.
Black & Veatch possesses the depth of expertise and capacity required to meet the varied needs that may arise during the course of the Library of Engineering Services for Continuing Contracts agreement. In addition to our world-class water, wastewater, reclaimed water, potable reuse, instrumentation and controls, electrical and stormwater qualifications, we offer in-house specialized services - such as geotechnical, construction management and funding - that provide additional value to the City.
Black & Veatch has successfully completed more than $30 billion in capital improvements in the United States during the past 10 years. Our projects cover all phases of the project lifecycle – planning, design, bidding services, construction phase services, construction observation services, and post construction services, such as commissioning and operations support. Our practical understanding and robust project management tools enhance our ability to help our clients make timely, value-based decisions during all phases and functions of the project, including cost and schedule management, quality control, and contract administration. Black & Veatch is both a top engineering design firm, as well as a leading contractor.
While Black & Veatch is a global industry leader in the areas we serve, we deliver projects locally.
Through our Tampa area professionals, such as Project Manager Rebecca Oliva, Water/Wastewater Planning Lead Amanda Schwerman, Client Services Director Andy Westfall, and most of our discipline leads, the City will receive responsive service with readily available access to all the capabilities that Black & Veatch has to offer. Rebecca has served as Project Manager for more than 30 work order-based projects (each under $500,000) and possesses the experience and qualifications required to deliver projects of this size and nature. Holding the Project Management Professional (PMP) credential, Rebecca is currently serving as the Project Manager for the City’s Lift Station 2 Basin Evaluation project. Amanda and Andy have led the City’s Wastewater Collection System Master Plan project.
Our team’s extensive planning and design experience in Florida will translate to cost-saving solutions that optimize your infrastructure systems, networks, facilities and operations. We are also a Florida-licensed contractor and will leverage our construction experience and local market knowledge to minimize risk and ultimately provide higher quality constructed facilities to the City.
Black & Veatch has worked in Florida since the 1950s. Our services have included engineering services, peer review, studies, planning, preliminary and final design, construction phase services, and design-build on a wide variety of projects undertaken throughout all regions in the state, nation, and world.
Black & Veatch will continue to leverage market knowledge, diverse expertise, planning tools, modeling software, and contractor experience to benefit the City with constructible designs and accurate cost estimates just as we have been doing to successfully deliver the City of Plant City’s Wastewater Collection System Master Plan.
Executive SummaryExecutive Summary
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS3
Executive Summary
BLACK & VEATCH IN FLORIDA
Our wide range of disciplines include: civil, structural, stormwater, studies, design, reclaimed water, geotechnical, environmental, electrical, and mechanical engineering, as well as permitting, bidding assistance, construction contract administration, resident engineering, startup and commissioning, operations, science, planning, and finance. Our experience in Florida includes serving more than 60 different agencies under continuing services contracts, in which we have completed more than 1,000 individual work orders.
We will leverage our experience and lessons learned to tailor solutions that will provide the City superior services for projects under this contract. The City will benefit from our team’s long history working with Florida stakeholders and detailed understanding of local, regional, and state policies.
Black & Veatch’s Florida team also has access to national and international resources to bring additional in-house expertise to each project. Our team will help advance Plant City’s objectives and maintain the exceptional level of service that you currently provide to your utility customers.
VISION FOR
THE FUTURE
Black & Veatch will work closely with the City to ensure that our solutions meet today’s needs while also aligning with the City’s long-term vision and success.
Category No. Category Descriptions Black & Veatch Submission
1 General Engineering ü
2 Transportation Engineering
3 Environmental Engineering
4 Stormwater Engineering ü
5 Geotechnical Engineering
6 Water and Wastewater Engineering ü
7 Sub-Surface Utility Engineering
8 Instrumentation & Controls Engineering ü
9 Electrical Engineering ü 10 Registered Surveying and Mapping
Black & Veatch is requesting consideration for the RFQ categories checked below.
BLACK & VEATCH 4
Executive Summary
TABLE OF CONTENTS
EXECUTIVE SUMMARY
TAB A | ABILITY OF PROFESSIONAL PERSONNEL & STAFF EXPERIENCE
TAB B | RELEVANT EXPERIENCE
Planning and Asset Management Water and Wastewater Treatment Facility Experience Sewer System Condition Assessment and Rehabilitation Collection and Distribution System Experience Electrical and Instrumentation & Controls Funding Services, Permitting and Project Controls Relevant/Related Experience and References
TAB C | LOCATION/ACCESSIBILITY
TAB D | VOLUME OF SIMILAR CONTR ACTS WITH GOVERNMENT AGENCIES
TAB E | CURRENT AND PROJECTED WORKLOAD
TAB F | CERTIFIED MINORITY BUSINESS ENTERPRISE
TAB G | LOCAL PREFERENCE
APPENDIX A | FORMS
APPENDIX B | LICENSES & CERTIFICATIONS
APPENDIX C | PROOF OF INSUR ANCE
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS5
COMMITTED TO THE CITY’S SUCCESS
The City’s Continuing Engineering Services Contract is intended to provide the City with access to engineering services for projects and challenges associated with the wide range of water utility infrastructure for which the City is responsible.
The City’s facilities and operations are diverse, and so must be the engineering services you have access to under this contract. The Black & Veatch team has what it takes to provide diverse expertise and exceptional value to the City of Plant City. We have the qualifications, experience, professional personnel, and approach to ensure success. Just as importantly, our team has a strong commitment to the City’s goals.
TEAM ORGANIZATION, MANAGEMENT,
AND QUALIFICATIONS
We have assembled a team of highly qualified professionals to meet the City’s needs under this contract. Our team combines proven project management with experienced local staff and specialized expertise to address any need that may arise relative to the City’s Continuing Engineering Services Contract. We have included team members with expertise to deliver the full array of services described in the City’s RFQ Categories 1, 4, 6, 8 and 9.
Our organization chart showcases local professionals and deep technical bench to truly service an extremely broad range of services. Following is our organizational chart, and we have arranged our professionals by the categories listed in the Request for Qualifications, to align with the importance of these categories to meet the City’s needs. The subcategories show world-class experts that may be called upon to conduct a detailed, topic-specific study or contribute to a larger design project, all to compliment City staff.
COMPANY INFORMATION
IN BUSINESS AS A
PRIVATE
CORPORATION
100+ YE
A
RS
10K+ GLOBAL
WORKFORCE
IN FLORIDA
300+
PROFESSIONALS IN FLORIDA
OFFICES
FORT MYERS
TAMPA
ORLANDO
CORAL SPRINGS
CORAL GABLES
LAKE WORTH
JACKSONVILLE
PROJ ECT M ANAG E R :
Rebecca Oliva 3405 W. Dr. M.L. King Jr. Blvd, Ste. 125 Tampa, Florida 33607 813-282-4189 | OlivaR@bv.com
Access to a diverse range of engineering disciplines and service capabilities, all in one place. The City will benefit from efficient designs and effective planning for your projects from our well-rounded, full-service firm, delivered at the local level. Technical work will not need to be subcontracted out.
TA B A
Ability of Professional Personnel & Ability of Professional Personnel & Staff ExperienceStaff Experience
BLACK & VEATCH 6
Ability Of Professional Personnel & Staff Experience
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS7
CLIENT SERVICES DIRECTOR
Andy Westfal l , PE, ENV SP*
PROJECT MANAGER
Rebecca Oliva, PE, BCEE, ENV SP, PMP*
CATEGORY 4 | S TO R M WAT E R
Jon Dinges, PE*
Infrastructure Systems Walt Reigner, PE Stormwater/Drainage Steve Lienhart, PE* Watershed Management Planning Jon Dinges, PE* Infrastructure Design Sam Miller, PE** Andrew Smith, PE, CFM, ENV SP H&H Modeling Dianys Arocho, PE Pablo Gonzalez, PhD, PE Water Quality Modeling Drew Ackerman, PE
Stormwater Utility/ Finance Steve Lienhart, PE* Prabha Kumar Watershed Restoration Robert Moresi, PG* Andrew Smith, PE, CFM, ENV SP Green Infrastructure Andrew Smith, PE, CFM, ENV SP Laura Adams Community-Based Partnerships Bruce Allender Federal, State, & Local Grants Robert Chambers, MBA
QUALITY MANAGER
Bobby Burchet t , PE, ENV SP*
CITY OF PLANT CITY
SERVICES TO BE SUBCONTRACTED AS NEEDED
| � Surveying/Mapping/Underground Utility Location |
| � Geotechnical/Materials Testing |
| � Environmental Science |
| � Laboratory Testing |
| � Corrosion Condition Assessment |
| � Public Relations |
| � Grit Characterization Studies |
| � Roadway Design |
CATEGORY 8 |
INSTRUMENTATION &
CONTROLS
Richard Taylor, PE*
I&C Engineer Larry Brouillette, PE** Systems Integration Laurie Kusmaul
CATEGORY 9 |
ELECTRICAL
Richard Taylor, PE*
Electrical Engineer David Garcia Generators Larry Pittman, PE ARC Flash Analysis, Light Replacement, Point Repairs Ryan Binkley, PE
*Based out of Tampa Office ** Based out of Orlando Office
CATEGORY 6 | WATER & WASTEWATER PLANNING
Amanda Schwerman, PE*
Hydraulic Modeling Katy Weidner, PE Casey Marika* Condition Assessment Brian Ball, PE Adaptive Planning Tools/Power BI Tim Collazuol Direct & Indirect Potable Reuse Jo Ann Jackson, PE** Emilie Moore, PE* Collection & Distribution Amanda Schwerman, PE* CIP Planning Deanna Hamilton, PE* Asset Management Nick Wyatt, PE* Martin Jones Physical Security Olena Lytvyn Cyber Security Laurie Kusmaul
Optimization Bobby Burchett, PE, ENV SP* Funding Services Robert Chambers, MBA Pipe Assessments/ Rehabilitation Ricardo Vieira, PE Level of Service Martin Jones, PE Risk-Based Prioritization Amanda Zarazua, PE GIS/Mapping Brian Lendt, GISP CMMS/Cityworks Nick Wyatt, PE* Resiliency/Coastal Hazards Beth Quinlan Smart Cities/Utility Ben Cownie, PE
CATEGORY 6 | WATER & WASTEWATER DESIGN
Rebecca Oliva, PE, BCEE, ENV SP, PMP*
Wastewater Process Timur Deniz, PE** Water Treatment Arturo Burbano, PhD, PE, PMP Vasu Veerapaneni, PE Odor Control Lynne Moss Disinfection Gary Hunter
PFAS
Emily Tummons Treatment Facilities Design Deanna Hamilton, PE* Mike Tache, PE* WWTP Operations Kathy McGrath WTP Operations Ron Parker* Christopher Owens*
Biosolids Management Kenny Blanton, PE** Water, Sewer & Reclaimed Pipelines Ryan Eck, PE* Pump Stations/Storage Tanks Nick Eckhardt, PE*
Pumps/Hydraulics/Surge Bobby Burchett, PE, ENV SP* BNR Process Dr. James Barnard Chemical Feed Ed Vogt, PE Well Design Anamaria Sarmiento, PG Injection/Recharge/ASR Wells Ed Rectenwald, PG
CATEGORY 1 | GENERAL ENGINEERING (AND ADDITIONAL SERVICES)
Steven King, PE*
PROJECT MANAGEMENT SUPPORT STAFF
Commercial Lead - Tom Rucker
Project Accountant - Haley Brock, CPA Project Controls - Jenna Daniels
Adminis t ra t ive/ Cler ical - Saira Rivera* & Sheree Li t t le*
Geotechnical Jeff Beriswill, PE* Mark Chomtid, PhD, PE* Site Design Ryan Eck, PE* Construction & Engineering Inspections Sid Chougule, CHST*
Regulatory Permitting Steven King, PE*
CAD/GIS
Clayton Glatt Nick Wyatt, PE
Constructibility/Value Engineering Roger Smith Cost Estimating Chad Barker** Architectural Dennis Trupka, RA
Natural Gas/Fuel Systems David Long, PE Energy Optimization Bobby Burchett, PE, ENV SP* Renewable Energy/Solar Power Chris Rogge, PE
Acoustical Modeling Ryan Baker Structural Brad Vanlandingham, PE** HVAC/Plumbing Michele Roth, PE
Construction Management George Joyce, PE, PMP* Technical Editors Cindy Fredrick Jeannie Gordon Design-Build/ Alternate Delivery Justin Sobol, DBIA, PMP
Services Listed in RFQ Black & Veatch Professional or Department Responsible
Change Order Negotiation
Rebecca Oliva, Project Manager Andy Westfall, Client Services Director Tom Rucker, Commercial Management Discipline/ Project Technical Leads, as applicable
Claims Management Tom Rucker, Commercial Management Black & Veatch Legal Department Administrative Support Staff
Cost Control*
Rebecca Oliva, Project Manager Haley Brock, Project Accountant Jenna Daniels, Project Controls Associate Discipline/ Project Technical Leads, as applicable
Cost Estimating of the Guaranteed Maximum Price
Chad Barker, Lead Estimator Roger Smith, Sr. Project Manager in Design-Build Group Justin Sobol, Director of Project Development – Design- Build Water East Region
Constructability Analysis George Joyce, Program Management and Construction Management (PMCM) Operations Manager Roger Smith, Sr. Project Manager in Design-Build Group
Design Discipline/ Project Technical Leads, as applicable Engineering Support Staff
Life Cycle Cost Analysis Chad Barker, Lead Estimator Discipline/ Project Technical Leads, as applicable Engineering Support Staff
Project Close Out*
Rebecca Oliva, Project Manager Haley Brock, Project Accountant Jenna Daniels, Project Controls Associate Administrative Support Staff
Quality Control (Construction) Bobby Burchett, Quality Control Lead George Joyce, PMCM Operations Manager
Value Engineering Roger Smith, Sr. Project Manager in Design-Build Group
The City will receive expedited project delivery by having access to a team with a depth of local project execution resources, complemented by the additional expertise of Black & Veatch professionals in our global firm.
*All projects, regardless of scope, will have these services.
BLACK & VEATCH 8
ANDY WESTFALL, PE, ENV SP
C L I E N T S E R V I C E S D I R E C T O R
Mr. Westfall has decades of successful experience managing and executing water, wastewater, and reclaimed water projects. Andy is a career Black & Veatch professional based in the firm’s Tampa, Florida office. His 30+ years of experience has been dedicated to managing and executing water, wastewater, and reclaimed water projects for municipal utility clients in the Tampa Bay area and around the state including numerous Continuing Engineering Services contracts. His project experience includes engineering studies, master planning, preliminary and detailed design, permitting, bidding, and construction phase engineering services for a wide range of water infrastructure projects. His strengths include attentive and successful project management, client responsiveness, and team / staff development. He has served as Director for numerous continuing engineering services contracts in Florida.
PROJECT EXPERIENCE
Plant City | Wastewater System Master Plan; Plant City, FL Project Manager. Performing comprehensive master plan for the City’s wastewater collection system. Tasks include field data collection, population and demand projections, treatment capacity evaluation, hydraulic model update and calibration, hydraulic analysis, reliability evaluation, CIP planning and master plan documentation.
Hillsborough County | Valrico AWTP Energy Optimization and Renewable Energy Study; Valrico, FL Project Manager. Performed a study to evaluate opportunities to reduce electrical energy use and cost at the Hillsborough County’s 12 MGD advanced water reclamation facility. The project included a feasibility assessment for installation of a 2 MW solar photovoltaic energy generation facility to provide for energy needs of the plant to a fee power back the electric grid.
St. Petersburg | Southeast Water Reclamation Facility Electrical Switchgear Replacement;
St. Petersburg, FL Project Manager. Black & Veatch is performing an evaluation to prioritize the widespread replacement of electrical infrastructure needed throughout the plant, including switchgear, MCC, transformers, engine generators, PLCs, lighting panels, etc.
The team is evaluating alternative configurations for the upgraded electrical distribution system. The project also includes design, permitting, bid phase and construction phase services. Project challenges include a construction sequencing, extremely constrained site, and the need to elevate electrical equipment 5 feet above grade for hurricane surge protection.
City of Venice | Utility System Energy Optimization Study; Venice, FL Project Manager. Performed a study to evaluate opportunities to reduce electrical energy use and cost at the Hillsborough County’s 12 MGD advanced water reclamation facility. The project included a feasibility assessment for installation of a 2 MW solar photovoltaic energy generation facility to provide for energy needs of the plant to a fee power back the electric grid.
EDUCATION
BS, Civil Engineering, University of Texas at Austin, 1989
YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE – 1994, Florida, 47693
PROFESSIONAL
ASSOCIATIONS
American Water Works Association Water Environment Federation Florida Water Environmental Association
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS9
REBECCA OLIVA, PE, BCEE, ENV SP, PMP
P R O J E C T M A N A G E R A N D W / W W D E S I G N L E A D
Ms. Oliva’s career experience includes water/wastewater system and facility planning, design, construction, permitting, project management, pump station design and rehabilitation, pressurized and gravity pipeline design, stormwater site planning and permitting, water/wastewater pilot studies, biosolids treatment and disposal, solid waste master planning and permitting, energy efficiency funding assistance programs, wellfield monitoring and permitting, life cycle analyses, Envision sustainability rating system services, construction observation and administration services, and energy efficiency programs. A PMP since 2018, she has over eight years of project management and controls experience on projects under continuing contracts.
PROJECT EXPERIENCE
City of Plant City | Lift Station 2 Basin Evaluation; Plant City, FL Project Manager. Currently performing the development of alternatives to solve the City’s challenges with the condition of the lift station, electrical systems, and flow to/ from the lift station.
Hillsborough County | Northwest Regional WRF - Solids Dewatering Facility Design;
Hillsborough County, FL Project Manager. This design project is a $895,000 Task Order under Black & Veatch’s General Engineering Services Agreement with Hillsborough County. It includes the design of a new biosolids dewatering facility in a unique delivery collaboration with the County. Rebecca worked with the Engineering Manager, Steve King, to oversee nearly 100 professionals for the 60%, 90%, and 100% deliverables on schedule and under budget. All engineering disciplines, architecture, cost estimating and BIM modeling professionals collaborated on this innovative design, which is currently in the bid phase.
City of Winter Haven | One Water Master Plan; Winter Haven, FL Assistant Project Manager. Supports Jon Dinges in the execution of the Integrated/ One Water Master Plan for the City. Maintains an organized document management system and management of eight subconsultants and participates in meetings with the City, subconsultants, and stakeholders. Helps administer the day-to-day activities for successful execution of the project and delivery of the quality work products to the City.
City of Clearwater, City of Tampa, Gainesville Regional Utilities, FL | American Water Infrastructure Act (AWIA) Services; Florida Project Manager. These work-order-based projects under three different continuing services agreements included completion of Risk and Resilience Assessments (RRA) and Emergency Response Plans (ERP) for the 2020 Environmental Protection Agency (EPA) deadlines under the AWIA. Oversaw the internal project management activities, such as Work Order scope and fee development, budget monitoring, progress reporting, and safety plan reviews. The completed phases ended ahead of schedule and under budget.
EDUCATION
ME, Environmental Engineering, University of Florida, 2011 BS, Environmental Engineering, University of Florida, 2007 BA, Spanish, University of Florida, YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE - 2012, FL 74778
Envision Sustainability Professional, Board Certified Environmental Engineer, 2018 Project Management Professional, 2018
PROFESSIONAL
ASSOCIATIONS
American Water Works Association Water Environment Federation Institute for Sustainable Infrastructure Project Management Institute American Academy of Environmental Engineers and Scientists
BLACK & VEATCH 10
ROBERT (BOBBY) BURCHETT, PE, ENV SP
Q U A L I T Y M A N A G E R
Mr. Burchett has 20 years of experience providing engineering consulting services to municipal clients for a variety of water, wastewater, and reclaimed water projects.
His experience includes water and wastewater system planning; and detailed design, permitting and construction phase services for water and wastewater system infrastructure. He has extensive experience serving as a technical advisor and quality control manager on numerous water, wasterwater and reclaimed water projects throughout Florida.
PROJECT EXPERIENCE
Pasco County | Continuing Professional Services; New Port Richey, FL
Quality Control Manager. Black & Veatch has completed a number of projects for Pasco County under a Continuing Services Contract since 2016. Projects have included Embassy Hills WWTP Assessment; Consulting Services to Address Boyette Reservoir Pump Motors Issues; Cypress Manor WWTF Condition Assessment and FDEP Permit Renewal Support; and the Lacoochee Well Improvements.
Hillsborough County | Professional Engineering Services for Misc. Water, Wastewater, and Reclaimed Water Projects; Hillsborough County, FL Quality Control Manager. Black & Veatch is providing services to Hillsborough County on an as-needed basis to support projects related to the County’s potable water, wastewater, and reclaimed water facilities. These projects involve a wide range of infrastructure types and include a wide range of services such as studies, master planning, preliminary and detailed design, permitting, bidding services, construction administration, and construction inspection. More than 30 individual assignments have been undertaken for the County under this contract.
Pinellas County | Water and Sewer Optimization Program; Clearwater, FL Quality Control Manager. As part of the study, Black & Veatch worked closely with County staff to define and implement cost-saving optimization improvements and long-term sustainable solutions for multiple facilities and systems. Tasks included a staffing evaluation, wastewater process modeling, treatment process optimization studies, water and wastewater energy efficiency evaluations, two wastewater treatment facility master plans, a biosolids master plan, project prioritization assessments, and CIP planning support.
Tampa Bay Water | System Engineer; Hillsborough, Pinellas and Pasco Counties, FL
Quality Control Manager. Responsible for planning and engineering analyses to support the management and operation of the Tampa Bay Water regional system. Tasks have included: hydraulic, transient & water quality modeling; system reliability & optimization planning; standard specification updates; technical reviews of reports & designs; assistance in addressing construction, operations & maintenance issues;
evaluation of system wide impacts associated with Member Government POC modifications; cost estimating; and bond covenant support.
EDUCATION
BS, Civil Engineering, Georgia Institute of Technology, 2000
YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE – 2006, FL, 64762
Envision™ Sustainability Professional
PROFESSIONAL
ASSOCIATIONS
American Water Works Association
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS11
AMANDA SCHWERMAN, PE
WAT E R & WA S T E WAT E R P L A N N I N G L E A D
Ms. Amanda Schwerman is Black & Veatch’s Regional Planning and Asset Management Lead. She is an expert hydraulic modeler, utility planning engineer and risk and resilience assessor. Her recent water projects include AWIA support services for GRU, City of Tampa and City of Clearwater. She has also recently completed master plans for the City of Tampa, Tampa Bay Water, City of Venice, City of Plant City and DeSoto County, and Fort Myers which included risk assessment components. Amanda also has experience in asset management specific projects, including projects for the City of Tampa, Fort Myers, and Toho Water Authority.
PROJECT EXPERIENCE
Plant City | Wastewater System Master Plan; Plant City, FL Engineering Manager/ Technical Lead. Comprehensive master plan for the City’s wastewater collection system. Tasks include field data collection, population and demand projections, treatment capacity evaluation, hydraulic model update and calibration, hydraulic analysis, reliability evaluation, CIP planning and master plan documentation.
City of Tampa | Potable Water Master Plan; Tampa, FL Project Manager & Lead Modeler. Responsible for executing the potable water master plan and deliverables. The project included: Updating and calibrating the existing hydraulic model using InfoWater, distribution analysis and improvements for four planning years, pumping and storage facility capacity assessments, resiliency and reliability assessments, asset management program development, risk based pipeline prioritization using InfoMaster, capital improvement program and Master Plan documentation.
Tampa Bay Water | Long-Term Master Water Plan & Program Feasibility; Pinellas, Pasco and Hillsborough Counties, FL Risk and Resilience Engineer. Focused on the potable reuse feasibility tasks. Tampa Bay Water (TBW) is required to update their Long-Term Master Water Plan (LTMWP) every five years. This project included updating both the Feasibility Program and the LTMWP, to evaluate the Board approved projects listed in the 2013 LTMWP and to narrow down the project list to one or more projects that will meet the region’s drinking water demand once the demand forecast indicates more supply is needed. In addition to the Board approved projects, several potable reuse projects were included.
Pinellas County | SCADA Water/ Wastewater Vulnerability Assessment | Pinellas County, FL Assistant Project Manager. Black & Veatch performed a strategic review of the Pinellas County Utilities Supervisory Control and Data Acquisition (SCADA) policies and procedures, identified risks and opportunities within the County’s physical, information technology (IT), SCADA, and associated water assets; and then identified top priority actionable improvements.
EDUCATION
MS, Environmental Science and Engineering, Colorado School of Mines BS, Engineering, Colorado School of Mines 2005
YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE – 2010, FL, 70751
Envision™ Sustainability Professional
PROFESSIONAL
ASSOCIATIONS
American Water Works Association (Engineering Modeling Applications Committee, and M32 Update Contributor) Water Environmental Federation (Collections Systems Committee, Workshop subcommittee Vice Chair) Florida Water Environment Association WateReuse Association (Trustee 2016-
BLACK & VEATCH 12
JON DINGES, PE
S T O R M WAT E R L E A D
Mr. Dinges has more than 25 years of experience in civil and environmental engineering with a water resources focus. Jon has extensive experience with water management districts as he worked for more than 15 years with Suwannee River Water Management District (SRWMD) where he served in roles of increasing responsibility, including Assistant Executive Director. Jon’s program and project experience includes storm water, floodplain restoration and management, water supply assessment and planning, water quality improvement, hydrologic assessment and restoration, establishment of minimum flows and levels, modernization of water resource data collection and management systems, natural systems restoration, and resource management planning. He also directed the District’s consumptive use permitting, environmental resource permitting, and water well permitting regulatory programs and served on coordination teams with other water management districts for water supply planning.
PROJECT EXPERIENCE
St. Johns River Water Management District | Levee Systems Emergency Action Planning | Brevard, Indian River, Lake, Marion, Orange, and Osceola Counties, FL Engineering Manager. Black & Veatch was retained by the SJRWMD to develop an Emergency Action Plan (EAP) for each county within the SJRWMD served by the above-mentioned flood protection projects. Development of each EAP was based on guidance documents published by the USACE. The project included collecting and reviewing available District publications such as the draft System-Wide Improvement Framework, District-wide Emergency Operations Procedures, GIS basin maps.
City of Winter Haven One Water Master Plan | Polk County, FL Project Manager. The Winter Haven One Water Master Plan is a comprehensive, watershed-based planning approach to address the challenges of rapid development in a region with impaired waters and hydrologically-impacted natural systems. This project involves planning all aspects of Winter Haven’s water future in a 50-year timeframe including water, wastewater, and reclaimed water systems, stormwater assessment, watershed restoration, and management strategies for improving water quality of impaired waters. Essential elements of the planning process include public and stakeholder engagement, water conservation planning, water supply planning, population projections, hydrologic optimization, project conceptualization, future land use planning, economic analysis of solutions, and funding plans.
Florida Department of Environmental Protection | Basin Management Action Plan Technical Support; FL Technical Reviewer. Provided scope development, technical approaches, and technical review of work products for various Basin Management Action Plan support tasks under a continuing services contract with the Florida Department of Environmental Protection.
Tasks included work on surface and groundwater systems, and included development of tools to estimate nutrient load reduction to natural systems.
EDUCATION
BS, Environmental Engineering, University of Florida, 1994 AA, Pre-Engineering, Florida Gateway College, 1991
YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE – 1999, FL 54747
PROFESSIONAL
ASSOCIATIONS
Florida Engineering Society American Water Resources Association
PROFESSIONAL
DEVELOPMENT
University of Florida Executive Education, Project Management Certificate Program
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS13
RICHARD TAYLOR, PE
I & C / E L E C T R I C A L L E A D
Mr. Taylor is a Senior Electrical and I&C Engineer with over 40 years of experience.
He has led electrical and I&C engineering services on over 50 projects completed under continuing services contracts for Florida Utilities including Pinellas, Pasco, Hillsborough and Manatee Counties, Tampa Bay Water, Peace River, and the Cities of Tampa, St. Petersburg, and Lakeland. The City will benefit from Richard’s combined expertise in both electrical and I&C systems.
PROJECT EXPERIENCE
Hillsborough County | Professional Engineering Services for Misc. Water, Wastewater, and Reclaimed Water Projects; Hillsborough Co., FL Electrical Engineer. Providing services to Hillsborough County on an as-needed basis to support projects related to the County’s potable water, wastewater, and reclaimed water facilities. These projects involve a wide range of infrastructure types and include a wide range of services such as studies, master planning, preliminary and detailed design, permitting, bidding services, construction administration, and construction inspection.
City of Hollywood | Energy Efficiency Master Plan; Hollywood, FL Design Engineer. Led the field evaluation for the development of a high-level review of the SCADA system for the City of Hollywood’s WTP and SRWWTP, as part of a comprehensive Energy Efficiency Master Plan performed by Black & Veatch. The evaluation included automation and control system improvements related to ECMs as well as longer term SCADA system recommendations for enhanced performance and optimized operations.
City of Lakeland | Williams WTP, Glendale, and Northside WWTP Disinfection Facility Improvements; Lakeland, FL Design Engineer. Design of improvements to chlorine gas storage and feed facilities.
Improvements included emergency chlorine gas scrubber systems, replacement gas chlorine feeders, improvements to process control strategies, and incorporation of chlorine gas facility improvements into each plant’s process control automation system.
Prepared specifications and drawings, review of contractor submittals, supervision of contractor-performed construction and system integration services.
Tampa Bay Water | System Enhancements, Regional Water Supply Facilities; Tampa, FL Design Engineer. Water treatment facility modifications to electrical equipment, controls and automation. The project included the design of diesel fueled engine-generators, medium voltage electrical switchgear modifications, conversion of an existing 2000 hp high service pump from fixed speed to variable frequency speed control, a water booster pump system, aqua ammonia chemical feed system, PLC-based process controls for additional process and electrical systems and expansion of Tampa Bay Water’s SCADA system to accommodate facility improvements.
EDUCATION
BS, Electrical Engineering, Georgia Tech, 1976
YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE – 1983, FL, 33376
PE – 1981, GA, 13031
Certification – OSHA 30-Hour (5/14/2013)
PROFESSIONAL
ASSOCIATIONS
National Society of Professional Engineers
BLACK & VEATCH 14
STEVEN KING, PE
G E N E R A L E N G I N E E R I N G L E A D ; P E R M I T T I N G
Mr. King has gained a variety of experience in Civil Engineering and Project Management since graduating. Design projects have included many different types of water/wastewater projects including: RO WTP upgrades, RO WTP studies, energy efficiency studies, WTP pump stations, ground storage tanks, water and wastewater plant design, project management, utility investigation, water supply, pipeline design, regulatory compliance and permit preparation and review. Steven has extensive experience obtaining regulatory approvals for a variety of water and wastewater projects.
Prior experience includes working as Permitting Supervisor during a seven-year employment with FDEP.
PROJECT EXPERIENCE
City of Venice | Utility System Energy Use & Efficiency Study; Venice, FL Engineering Manager. The study includes a detailed review of the existing energy use, existing utility bills, proposed energy savings opportunities, equipment improvement recommendations and a high-level review of solar PV opportunities. The study included a detailed review of the WTP, WRF, wells and lift stations. Recommendations were noted for possible ways the City could reduce energy use by changing operations and potentially updating equipment.
Hillsborough County | Northwest Regional WRF - Solids Dewatering Facility Design;
Hillsborough County, FL Engineering Manager. This design project is a $895,000 Task Order under Black & Veatch’s General Engineering Services Agreement with Hillsborough County. It includes the design of a new biosolids dewatering facility in a unique delivery collaboration with the County. Steve worked with the Project Manager, Rebecca Oliva, to oversee nearly 100 professionals for the 60%, 90%, and 100% deliverables on schedule and under budget. All engineering disciplines, architecture, cost estimating and BIM modeling professionals collaborated on this innovative design, which is currently in the bid phase.
Hillsborough County | Valrico AWTP Energy Optimization & Renewable Energy Study; Valrico, FL Engineering Manager. The study includes a detailed review of the existing energy use, existing utility bills, proposed energy savings opportunities, equipment improvement recommendations and a detailed initial design of an optimized solar photovoltaic system.
Peace River Manasota Regional Water Supply Authority | Peace River Facility Renewable Energy Study; Arcadia, FL Engineering Manager. Responsible for a Solar PV feasibility study for the Peace River facility. The report focused on the opportunity to add solar PV to the land owned by the Authority. There were four sizes reviewed from small demonstration-scale systems all the way to 75 MW utility scale systems. The report presented the potential costs to the Authority as well as potential payback and other financial and technical aspects. In addition, the findings were presented to the Authority Board for their review and information.
EDUCATION
BS, Chemical Engineering, University of South Florida, 1998
YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE – 2012, FL, 74954
PROFESSIONAL
ASSOCIATIONS
American Water Works Association
CITY OF PLANT CITY | ENGINEERING SERVICES FOR CONTINUING CONTRACTS15
JEFF BERISWILL, PE
G E O T E C H N I C A L
Mr. Beriswill has more than 30 years of geotechnical design and construction experience. Jeff’s extensive knowledge and experience directing activities associated with water resources and geotechnical projects range from market development, technical reviews, engineering analyses and supervision, and organization of field and laboratory testing programs. His broad background allows him to effectively and efficiently plan and operate projects on time and within budget. He is responsible for all aspects of project management for geotechnical and multidisciplinary projects.
PROJECT EXPERIENCE
STA-1W Expansion No. 1 Design and Construction | South Florida Water Management District; Palm Beach County, FL Project Director. Provided geotechnical engineering support services to MWH Americas, Inc. for the site investigation and design of a 6,500-acre expansion of the STA-1W stormwater treatment area located immediately west of the Arthur R. Marshall Loxahatchee National Wildlife Refuge. The project is a component of the Restoration Strategies projects identified to assist in meeting the Water Quality Based Effluent Limit (WQBEL) that would achieve compliance with the State of Florida’s numeric phosphorus criterion as determined by the EPA. Directed the collection of field and laboratory test data, lead the development of the geotechnical data report and the geotechnical design report, completed seepage analyses for selected levee and control structures, and assisted in the development of the preliminary design report. Also provided the resident engineer and engineering support services during construction.
Southwest Florida Water Management District | Wysong Water Conservation Structure Alternatives Analysis and Design Project Manager. Investigate and determine conceptual rehabilitation alternatives for the Wysong Water Conservation Structure. Performed topside and underwater inspections to conduct a detailed condition assessment, performing a structural analysis for the navigation lock, and developing conceptual rehabilitation alternatives and final report. Black & Veatch is developing up to three conceptual rehabilitation alternatives for the main spillway and one replacement alternative for the navigation lock based on the findings of the condition assessment. The alternatives must achieve SWFWMD’s goals for the system, including maintaining current river hydrology, mitigating scour and erosion effects around the structure, enhancing flexibility to operate the structure for a wide range of elevations, minimizing environmental impacts, and increasing ease of routine maintenance and annual inspections.
Lake Manatee Dam Phase I Repairs | Bradenton, FL Project Director. Oversaw design, permitting, and construction management of emergency repairs associated with an in-stream reservoir constructed in the 1960s.
Repairs predominately consisted of the construction of temporary work platforms, a 3,000-foot-long, 90- to 110-foot-deep trench remix deep (TRD) cutoff wall through the central portion of the earth embankment, and a 300-foot-long jet grout wall in the vicinity of the principal spillway. Close cooperation was required between the owner, state, contractor, and engineer to meet the accelerated repair schedule.
EDUCATION
MS, Civil Engineering (Geotechnical), University of Florida BS, Civil Engineering, University of Florida
YEARS OF EXPERIENCE
PROFESSIONAL
REGISTRATION
PE - FL, 41823
PE - IL, 062.067791
PE - MO, 2010039814
PE - NC, 02267
PROFESSIONAL
ASSOCIATIONS
Society for Mining, Metallurgy, and Exploration American Society of Dam Safety Officials Florida Engineering Society American Society of Civil Engineers
BLACK & VEATCH 16
Kathryn McGrath WWTP Operations
Ron Parker WTP Operations
� Orange County Utilities, FL | Training Program for Plant and Field Specialists; Operations Specialist
� Sacramento Regional Sanitation District, CA | EchoWater Project;
Operations Specialist
� City of Mesa, AZ | Signal Butte WTP; Operations Specialist
EDU | Applied Associates Degree
YRS EXP | 35
PROF REG | Wastewater Treatment Plant Operator’s License - FL, WWA0006345
� Hillsborough County, FL | Misc.
Professional Engineering Services Contract; Operations Specialist
� City of St. Petersburg, FL | Potable Water, Wastewater, and Reclaimed Water Projects Contract; Operations Specialist
� Tampa Bay Water, FL | System Engineer; Operations Specialist
EDU | BS, Education
YRS EXP | 35
PROF REG | Cert. Class IV Water Supply Operator - KS; Cert. Grade 4
WTO, AZ
Robert Chambers, MBA Funding
Deanna Hamilton, PE Water & Wastewater Treatment Facilities Design
Ricardo Vieira, PE Pipe Assessments/ Rehabilitation
� Miami-Dade Water and Sewer Dept.
(MDWASD), FL | SP-1 Transmission Force Main Phase 3; Project Manager
� MDWASD, FL | Consent Decree Water Collection Transmission System; Project Manager.
� MDWASD, FL | Program Management Consultant Contract to Establish a Comprehensive Infrastructure Assessment and Replacement Program; Deputy Program Manager
EDU | BS, Civil Engineering
YRS EXP | 21
PROF REG | PE - FL, 73166
� Hillsborough County, FL | Miscellaneous Professional Engineering Services Contract;
Project Engineer
� Pinellas County, FL | Water and Sewer Optimization Program; Civil Engineer
� Tampa Bay Water, FL | System Engineer; Civil Engineer
� Manatee County, FL | Southeast WRF Plant Drain Sump PS; Civil Engineer
EDU | BS, Civil Engineering
YRS EXP | 10
PROF REG | PE - FL, 84099
� Palm Beach County Water Utilities Department | Strategic Sustainability Plan; Project Manager
� City of North Miami | Water and Sewer Financial Consulting Services;
Client Manager
� Puerto Rico Aqueduct and Sewer Authority | Water & Wastewater Rate Study…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .