09321p_NRCEnvironmentalServices.pdf
PDF 529 KB Posted
- Attached to
- STATEWIDE CONTRACT WA|09321|W32893
- Contract number
- 09321
- Issued by
- Washington
About this file
This document is a Statewide Contract (No. 09321) for Emergency Response to Hazardous Materials, issued by NRC Environmental Services, Inc. The contract covers emergency response services across multiple counties in Washington State, with a comprehensive pricing schedule detailing rates for personnel, equipment, materials, and special operations.
The contract provides detailed pricing for a wide range of emergency response services, including personnel rates for various roles from Incident Commanders to Field Technicians, with different rates for Straight Time (ST), Overtime (OT), and Part-Time (PT). The pricing schedule includes extensive equipment listings covering categories such as boom and accessories, recovery vessels, excavation equipment, trailers, trucks, and specialized items like communication systems and safety gear. Materials are also comprehensively priced, including cleaning supplies, containers, safety equipment, and sorbents. The contract allows for third-party costs to be charged at cost plus 20%, and includes specific terms for billing personnel, equipment usage, and materials, with provisions for minimum charges, operational conditions, and personal protective equipment requirements.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 23
EXHIBIT A
INCLUDED GOODS/SERVICES
Contractor represents and warrants, as previously certified in Contractor’s Bidder’s Certification, that Contractor can commit to respond to each indicated location or county/counties with personnel and equipment, ready to start work immediately on the project with the following maximum response times.
Location Response Time (in minutes)
Adams County 120
Asotin County 120
Benton County 60
Chelan County 180
Clallam County 120
Clark County 120
Columbia County 120
Cowlitz County 120
Douglas County 180
Ferry County 180
Franklin County 60
Garfield County 120
Grant County 180
Grays Harbor County 120
Island County 120
Jefferson County 120
King County 60
Kitsap County 120
Kittitas County 180
Klickitat County 120
Lewis County 120
Lincoln County 120
Mason County 120
Okanogan County 180
Pacific County 120
Pend Oreille County 90
Pierce County 60
San Juan County 120
Skagit County 60
Skamania County 120
Snohomish County 60
Spokane County 120
NRC Environmental Services, Inc.
1-800-899-4672
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 24
Stevens County 90
Thurston County 120
Wahkiakum County 120
Walla Walla County 60
Whatcom County 60
Whitman County 120
Yakima County 90
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 25
Exhibit B
PRICES FOR GOODS/SERVICES
All pricings shall be firm for the Term and all extensions or renewals of the Term except where otherwise provided in this Master Contract and include all costs of the Contractor providing the materials/service including transportation, insurance, and warranty costs.
Item Description Rate
PERSONNEL
Field Personnel ST/HR OT/HR PT/HR IC Incident Commander $140 $210 $280
RM Emergency Response Manager $140 $210 $280
SP Senior Project Manager $140 $210 $280
PM Project Manager $120 $180 $240
LO Licensed Vessel Operator $114 $170 $227
TM Tankerman / PIC $104 $156 $208
SU Superintendent $78 $117 $156
AM Assistant Project Manager (Operations, Planning, Logistics, Finance) $90 $135 $180
PS Project Scientist / Field Chemist $90 $135 $180
FS Field Supervisor $78 $117 $156
BT Bio-Hazard Field Technician $81 $122 $162
SM Support Manager (Purchasing, Communications, Transportation, Decon) $87 $131 $174
VO Vessel Operator $83 $125 $166
MC Mechanic / Welder $75 $113 $150
EO Equipment Operator (Vac, Exc) $113 $170 $227
SF Site Foreman $78 $117 $156
MT Marine Technician $78 $117 $156
DR Driver (Commercial, OTRK, dump) $101 $151 $201
RT Confined Space / Rescue Technician $81 $122 $162
DH Deckhand $85 $127 $170
TE Technician, Emergency Response $81 $122 $162
ST Technician $81 $121 $161
RC Resource Coordinator (Dispatch, Warehouse, Logistics) $62 $93 $124
Professional/Administration ST/HR OT/HR PT/HR
SRSA Subcontracted Response Services Administration (unit is per each) $350 $525 $700
CH Certified Industrial Hygienist $180 $270 $360
TR Trainer $140 $210 $280
HS Health & Safety $90 $135 $180
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 26
IS Information Systems Technician $90 $135 $180
SA Senior Accountant $105 $158 $210
PR Purchaser / Subcontracts Administrator $62 $93 $124
BA Billing Analyst $62 $93 $124
AS Administrative Support / Accountant $56 $84 $112
Special Operations ST/HR OT/HR PT/HR SOXM Project Manager XT (Reactive/Explosive/Cylinder/Compressed Gas) $225 $338 $450
SOFM Project Manager - Fire $225 $338 $450
SOXT Technician XT (Reactive/Explosive/Cylinder/Compressed Gas) $185 $278 $370
SOFF Fire Fighter $160 $240 $320
SOWD Welder (Hazardous Duty Welding) $125 $188 $250
SOTE Special Ops Technician $78 $117 $156
EQUIPMENT
Item Description Unit Rate
Boom and Accessories
1001 Anchor Gear, Set (1 anchor, chain, < 90’ rope, 1 buoy – add’l components $15/each) Day $36
1002 Boom Mooring Light Day $17
1012 Boom Vane Day $285
Boom and Accessories (continued)
1003 Contractor Boom, up to 21” Ft/Day $2
1004 Petro Barrier, up to 24” Ft/Day $3
1005 Ocean Boom, up to 42” Ft/Day $8
1013 Desmi Speed Sweep Boom System Day $2,350
1007 Hydro-Boom System (boom, pumps, power pack, reel) Day $3,459
1008 AmeriCan Fire Boom (500’/ system minimum) Day $3,459
1009 Oil Boom Inflator/Blowers Day $173
1010 Hull Magnets Each/Day $36
1011 Dual-Roller Boom Handler Day $375
Recovery Vessels
2025 OSRV up to 126' (includes Master) Day $13,953
2026 46' Catamaran w/Disk Skimmer Day $5,764
2004 Belt Skimmer Vessel, Marco I-C Hour $454
Portable Recovery
2002 Belt Skimmer, Marco Class XI-C Day $4,794
2005 Brush Skimmer, Lamor Day $4,315
2006 Brush Skimmer, Aquaguard RBS-40 Day $2,997
2007 Brush Skimmer, Aquaguard RBS-25, 35G or 10 Twin Day $2,397
2008 Brush/Drum/Disc Skimmer, Aquaguard RBS-05 Day $1018
2027 Disc Skimmer, Crucial Magna ORD Day $1008
2028 Disc Skimmer, Crucial ORD-XP Day $940
2029 Disc Skimmer, Hoyle T Day $1,383
2009 Disc Skimmer, MI-30, Komara 12K, USE Disc Day $2,157
2010 Disc Skimmer, Vikoma Sea Skimmer Day $2,397
2124 Disc Skimmer, X-150, Elastec Day $5,394
2030 Disc Skimmer, Crucial, Coated Disc 13/30 Day $2,015
2031 VOSS Package (disc skimmer, power pack, hose, knuckle crane, boom vane) Day $4,611
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 27
2011 Drum Skimmer, Roto 70 Day $4,195 2032 Drum Skimmer, Elastec 118G Day $2,444 2012 Drum Skimmer, Action Petroleum Model 60, 48 Day $1,677 2013 Drum Skimmer, Action Petroleum Model 36 Day $1,438 2014 Drum Skimmer, Action Petroleum Model 18, 24 Day $956 2033 Drum Skimmer, Action Petroleum Model 12 Day $692 2034 Drum Skimmer, Crucial Double DB-18H-36 Day $951 2045 Drum Skimmer, Coated, Crucial 1CD-18H-36 Day $1,455 2036 Rope Mop Skimmer, 8 Band Day $2,133 2037 Rope Mop Skimmer, 4 Band Day $1,436 2015 Rope Mop Skimmer, II-9 Day $959 2016 Rope Mop Skimmer, I-4, II-4, ll-6 Day $720 2017 Rope Mop Skimmer Rope, 100’ Day $132 2038 Vacuum System, Elastec Mini-Vac Day $1,061 2039 Vacuum System, Elastec PACS 1000 Day $1,198 2040 Vacuum System, Transvac 500D Day $1,153 2018 Vacuum System, Vacuum Transfer Unit (VTU) Day $1,198 2019 Weir Skimmer, Desmi 250 or Terminator Day $4,195 2041 Weir Skimmer, Elastec Sea Skater Day $1,902 2044 Weir Skimmer, Elastec Ocean Skater Day $2,824 2020 Weir Skimmer, Foilex, vacuum Day $1,798 2021 Weir Skimmer, Foilex, hydraulic Day $2,997 2022 Weir Skimmer, Cascade LP 3000 or Vikoma Fastflow Day $1,918 2023 Weir Skimmer, Skimpak or Oleo, 2” or 3” Day $359 2042 Weir Skimmer, Floating (Desmi Mini-Max, Duckbill, Manta) Day $404 2043 Weathered Oil, USE SWORD (dewatering Bags $85/ea add’l) Day $2,137 Temporary Storage
3001 Bladder Tank, 24 barrel Day $300
3002 Bladder Tank, 25 - 100 barrel Day $600
3003 Bladder Tank, 101 - 240 barrel Day $1,198
3032 Bladder Tank, Canflex, 300 barrel Day $929
3033 Bladder Tank, Canflex, 600 barrel Day $1,343
3004 Container, Intermodal or Connex Storage, 20’ Day $27
3005 Container, Intermodal or Connex Storage, 40’ Day $53
3006 Roll-off Bins, up to 20 cu yd Day $27
3007 Roll-off Bins, over 20 to 40 cu yd Day $53
3013 Roll-off Bins (Vacuum Box), up to 25 cu yd Day $96
3031 Storage Tank, up to 250 bbl/10,500 gal Day $62
3023 Storage Tank, (Frac Tank), 250 bbl/10,500 gal Day $67
3015 Storage Tank, (Frac Tank), 500 bbl/21,000 gal Day $109
3014 Tank Barge Day $13,806
3011 Tank Barge or Barge Set, up to 238 bbl Day $1,787
Support Vessels
4012 OSRV up to 150'-180' (includes Master) Day $20,001
4002 Response Vessel, 65’ Hour $450
4004 Response Vessel, 30’ - 34’ Hour $191
4005 Response Vessel, 25’ - 29’ Hour $150
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 28
4006 Response Vessel, 16’- 24’ Hour $94
4007 Skiffs w/outboard, 15’ or less Hour $62
4008 Skiffs w/o outboard Hour $30
4028 John Boat (15' and under) Day $206
Excavation 5001 Backhoe Day $450
5003 Backhoe Attachment, Breaker Day $263
5004 Backhoe Attachment, Compactor Day $150
5013 Bobcat, Skidsteer or equivalent Day $420
5022 Compaction, Sheepsfoot or Roller Day $298
5021 Dump Truck, 5 cu yd, w/ Plow & Sander Hour $210
5007 Excavator, Mini Day $571
5008 Excavator, up to 37,000 lb. Day $1,029
5009 Excavator, 38,000 to 53,000 lb. Day $1,272
5010 Excavator, over 53,000 lb. Day $1,817
5017 Excavator, over 100,000 lb. Hour $303
5011 Excavator Attachment, Thumb or Wheel Day $424
5012 Excavator Attachment, Hammer Day $666
5014 Hydraulic Attachment, Breaker, Compactor or Grapple Day $210
5026 Skidsteer Attachment Day $115
5015 Loader, up to 3.5 cu yd Day $788
Trailers
6001 Trailer, Confined Space Entry/Rescue Day $2,397
6002 Trailer, Decon, up to 24’ Day $400
6003 Trailer, Dump, 7,000 – 12,000 lb. Day $303
6004 Trailer, Dump, Side/End, 18 yd. Hour $44
6005 Trailer, Emergency Response, up to 24’ Day $448
6000 Trailer, Emergency Response, 25’-39’ Day $692
6006 Trailer, Emergency Response, 40’- 48’ Day $639
6007 Trailer, Equipment, Utility, 1-2 ton Day $121
6008 Trailer, Equipment, Utility, 3-10 ton Day $303
6009 Trailer, Flatbed, up to 48’ Day $303
6010 Trailer, Incident Command Center, 24’ Day $788
6011 Trailer, Incident Command Center, 48’ Day $1,712
6012 Trailer, Low Boy Day $367
6013 Trailer, MTR (boom, boat, skimmer add’l if deployed) Day $424
6014 Trailer, Office Day $242
6044 Trailer, Roll Off Bin, Double Rail Trailer Hour $51 6016 Trailer, Side Dump, 3 axle Day $726
6017 Trailer, Tilt Top, 26 ton Day $303
6018 Trailer, Van, up to 48’ Day $424
6045 Trailer, Vessel Transport Day $1,399
6019 Trailer, Water Buffalo (up to 500 Gallons, with pump) Day $242
6020 Trailer, Wildlife Response and Rehab (supplies add’l) Day $3,028
6021 Trailer, Wildlife Search & Collection Day $1,211
6022 Trailer, Wildlife Support Day $424
Trucks
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 29
7001 Tractor, Diesel Hour $55
7003 Truck, Crane, 1 ton - 6 ton Hour $79
7007 Truck, Dump, up to 10 yard Hour $74
7008 Truck, Dump, over 10 yard Hour $79
7009 Truck, Dump, over 10 yard with pup Hour $85
7016 Truck, Flatbed or Van, 2-Axle, up to 24’ Hour $55
7010 Truck, Gear, less than 1 ton Hour $28
7012 Truck, Gear, 1 ton Hour $54
7014 Truck, Gear, 2 ton - 5 ton Hour $48
7017 Truck, Hazmat Response, up to 26’ Hour $79
7018 Truck, Marine Response Hour $63
7019 Truck, Roll Off Bin, Bobtail Hour $85
7021 Truck, Water, up to 3000 Gallons Hour $133
7022 Truck, Mobile Communications & Command Unit, 34' Day $1,096
Vacuum Trucks/Trailers 8001 Guzzler/Air Mover (filters add’l) Hour $181
8018 HydroExcavator (attachments additional) Hour $263
8017 Hi-Rail Air Mover w/ Air-spade Hour $260
8008 Sweeper - Vacuum & Brush Hour $156
8003 Vacuum Trailer, 120 -130 bbl., Black Iron Hour $38
8004 Vacuum Trailer, 120 -130 bbl., Stainless Hour $55
8006 Vacuum Truck, 35 - 80 bbl. Hour $70
8007 Vacuum Trailer, less than 50 bbl. Hour $31
Vehicles 9003 Auto, Personnel or Support Day $121
9008 Crew, Response or Utility Vehicle, 4wd, or 2wd Day $211
9004 Van, MTR (boom, boat, skimmer add’l if deployed) Day $485
9005 Van, Maintenance, Personnel or Support Day $191
9006 Wildlife Transport-Care Vehicle/Trailer Day $726
Blowers/Compressors 1101 Air Compressor, up to 100 CFM Day $181
1102 Air Compressor, 100 to 185 CFM Day $273
1103 Air Compressor, 210 to 375 CFM Day $394
1104 Blower, Coppus, Electric/Pneumatic Day $121
1105 Blower, Negative Air Exhaust, 6” (consumables add’l) Day $91
1106 Blower, Negative Air Exhaust, 12” (consumables add’l) Day $133
1107 Blower, Venturi, Horn Day $38
1108 Exhaust Duct, 25’ x 6”, 10” or 12” Day $31
Pressure Washers 1214 Dump-Style Gun, Foot Operated, up to 20k psi Day $102
1215 Dump-Style Gun, Single, Safety Surround, up to 40k Day $150
1216 Dump-Style Gun, Dual, Safety Surround, up to 20k psi Day $150
1217 Dump-Style Gun, Multi Gun Valve Control System Day $126
1219 Flange Mount Anti-Withdrawal Device Day $20
1206 Flexible Lance, 50', Rigid Tip, Foot Pedal, up to 5k psi Day $91
1212 Flexible Lance, 50', Rigid/Spinner Tip, Foot Pedal, 5k Day $144
1211 Flexible Lance, 50', Foot Pedal, up to 20k psi Day $151
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 30
1221 Flexible Lance, 50', Foot Pedal, up to 40k psi Day $168 1202 Hydroblaster, 6,000 psi Hour $63 1203 Hydroblaster, 10,000 psi Hour $85 1204 Hydroblaster, 20,000 psi Hour $218 1222 Hydroblaster, 40,000 psi Hour $280 1209 Jetter Trailer Hour $115 1218 Pipe Centralizer, 8” – 36” Diameter Day $38 1207 Pressure Washer, up to 3,000 psi, single Day $303 1210 Pressure Washer, trailered, up to 5,000 psi Day $661 1208 Pressure Washer, 3,000 to 5,000 psi Day $424 1205 Remote Tank Cleaning (Gamajet) Head Day $364 1201 Specialty Nozzles up to 5k psi (Roto, fogging, etc.) Day $55 1213 Specialty Nozzles over 5k psi (Rotating multi-tip) Day $96 Pumps 1311 Drum Vacuum (consumables additional) Each/Day $181 1300 Pump, Up to 1”, Chemical, Hand Operated Each/Day $173 1301 Pump, up to 1”, Petroleum Each/Day $74 1302 Pump, up to 1”, Chemical Each/Day $115 1303 Pump, 2”, Petroleum Each/Day $103 1304 Pump, 2”, Chemical Each/Day $236 1305 Pump, 2”, Chemical Peristaltic Each/Day $424 1306 Pump, 3”, Petroleum Each/Day $121 1307 Pump, 3”, Chemical Each/Day $357 1312 Pump, 3”, Hydraulic (Archimedes/MT30) w/power pack Each/Day $1,817 1308 Pump, 4”, Petroleum Each/Day $211 1309 Pump, 4”, Petro-Submersible Each/Day $394 1324 Pump, Fire, 1800 gpm 150psi Each/Day $2,075 1325 Pump, Sludge Each/Day $922 1310 Pump, 5”- 6”, Petroleum Each/Day $485 1316 Pump, Double Diaphragm, Stainless Steel, 1” Each/Day $242 1317 Pump, Double Diaphragm, Stainless Steel, 2” Each/Day $364 Hoses/Pipes/Fittings 1405 Guzzler/Air Mover Vacuum Breaker Day $39 1406 Guzzler/Air Mover/Jetter Fittings (elbows, tees, etc.) Each/Day $11 1415 Hose, Discharge (lay flat), 2” 50 Ft/Day $13 1416 Hose, Discharge (lay flat), 3” 50 Ft/Day $17 1417 Hose, Discharge (lay flat), 4” 50 Ft/Day $20 1418 Hose, Discharge (lay flat), 6” 50 Ft/Day $31 1401 Hose, Fire, 1.5” 50 Ft/Day $20 1402 Hose, Fire, 2.5” 50 Ft/Day $24 1403 Hose, Guzzler/Air Mover, Pipe, 4” Ft/Day $7 1404 Hose, Guzzler/Air Mover, Pipe, 6” Ft/Day $8 1420 Hose, Hydraulic 50 Ft/Day $31 1428 Hose, Hydroblaster, up to 40,000 psi 50 Ft/Day $145 1407 Hose, Pneumatic 50 Ft/Day $13 1429 Hose, Pressure Washer, up to 6,000 psi 50 Ft/Day $27 1400 Hose, Suction & Discharge, 1”, Petro or Chemical 25 Ft/Day $29
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 31
1408 Hose, Suction & Discharge, 2”, Petro 25 Ft/Day $20
1409 Hose, Suction & Discharge, 2”, Chemical 25 Ft/Day $38
1410 Hose, Suction & Discharge, 3”, Petro 25 Ft/Day $31
1411 Hose, Suction & Discharge, 3”, Chemical 25 Ft/Day $49
1412 Hose, Suction & Discharge, 4”, Petro 25 Ft/Day $44
1413 Hose, Suction & Discharge, 4”, Chemical 25 Ft/Day $74
1414 Hose, Suction & Discharge, 6”, Petro 25 Ft/Day $58
1424 Hose, Teflon, 1” Rubber Jacketed or 2” Stainless Braid Ft/Day $44
1419 Hose, Wash, up to 1” 50 Ft/Day $13
1435 Stinger, Hose Attachment Day $29
Support 1591 7 BBL Spill Kit (delivery add’l) Day $671
1501 Air Knife Day $181
1555 Bag Filter System, Single (Bag filters add’l) Day $74
1502 Bag Filter System, Dual Pod (Bag filters add’l) Day $91
1567 Banding Equipment, 2-inch Hour $38
1583 Butane Flare Kit (includes hoses and nitrogen) Day $114
1503 Carbon Filtration System Day Quote
1504 Chipping Gun, Pneumatic Day $51
1505 Compactor, Hand Operated Day $181
1596 Containment, Storage Tank Day $62
1506 Decon Cleaning Pool, Portable 10’ x 15’ Day $151
1507 Decon Cleaning Pool, Portable 10’ x 30’ Day $242
1508 Decon Cleaning Pool, Portable 20’ x 100’ Day $666
1509 Decon Cleaning Pool, Portable 25’ x 50’ Day $333
1510 Decon Station, Personnel 2 Stage (supplies additional) Day $63
1553 Decon Station, Personnel 3 Stage (supplies additional) Day $91
1580 Drum Dolly Day $47
1511 Electrical Accessories (cords, GFCI, adaptors) Day $19
1573 Floor Buffer (pads add’l) Day $90
1593 Fogger, handheld Day $84
1594 Forklift, offroad Day $739
1512 Forklift, 5K to 10K lb. Day $333
1513 Forklift, Attachment Day $121
1514 Generator, less than 4 kW Day $65
1515 Generator, 4 kW to less than 7.5 kW Day $139
1516 Generator, 7.5 kW to 12.5 kW Day $200
1574 Generator, over 12.5 kW to 67 kW Day $389
1569 Hydrogen Peroxide System (consumables add’l) Day $291
1518 Jackhammer Day $181
1519 Ladder, Extension, Folding or Jacobs Day $49
1557 Laser Level Kit, 1/16” x 100’ Day $68
1558 Laser Level Kit, ¼” x 100’ Day $20
1520 Light Tower, Trailer Mounted Day $211
1521 Light, Explosion-Proof or Wet-Location Day $54
1570 Light, Explosion-Proof, LED String, 10 lights/each Day $533
1522 Light, Stand, Regular, 500W Day $21
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 32
1523 Light, Stand, Regular, 1000W Day $74
1590 Nitrogen Sparger System, Remote Liquid Agitator Day $289
1525 Pipe Plug 4” to 18” (includes 20’ air line hose) Day $115
1526 Pipe Plug 18” to 24” (includes 20’ air line hose) Day $188
1527 Pipe Plug 24” to 36” (includes 20’ air line hose) Day $211
1528 Pipe Plug 36” to 48” (includes 20’ air line hose) Day $261
1529 Pipe Plug 48” to 60” (includes 20’ air line hose) Day $424
1572 Portable Toilet (includes service, wash basin) Day $121
1563 Portable Breathing Air Compressor Day $454
1530 Power Pack, Hydraulic, 1 hp (<0.75 kW) Day $63
1531 Power Pack, Hydraulic, 16 hp (0.75 kW < 12 kW) Day $167
1532 Power Pack, Hydraulic, 40 hp (12 kW < 30 kW) Day $333
1533 Power Pack, Hydraulic, 60 hp (30 kW < 45 kW) Day $605
1592 Salvage Support Package (DC kit, compressor, stingers, etc.) Day $504
1534 Road Closure Signs, reflective Each/Day $63
1536 Sand & Floor Dry Spreader Attachment Day $115
1537 Saw, Chain Day $74
1538 Saw, Cutoff Day $151
1539 Soil Sampler, Hollow Stem Day $63
1584 Specialty Rope Bag (w/ shackles, D-rings, carabiners, pulleys) Day $285
1581 Steel Plate, 4' x 8' Day $144
1582 Steel Plate, 5' x 10' Day $173
1540 Tools, Hand (brooms, shovels, etc.) Each/Day $9
1541 Tools, Mechanical Set Day $63
1542 Tools, Non-Sparking Day $20
1543 Tools, Power, Small (drills, Sawzall, etc.) Each/Day $44
1544 Truck Ramps Day $181
1545 Vacuum, HEPA (filters add’l) Day $303
1546 Vacuum, Shop (filters add’l) Day $63
1547 Vactor/Jetter Attachment (hydro-exca, Drum-It head, nozzles) Each/Day $115
1566 Vapor Extraction System, Portable Day $424
1588 Welder, Extrusion, handheld Day $289
1548 Welding Unit / Torch Set, Portable Day $103
1549 Wildlife Rehabilitation Pool Day $242
1550 Wildlife Shelter, 19’ x 35’ Day $2,423
1551 Wildlife Shelter, 20’ x 20’ Day $909
1552 Yokohama Fenders, 8’ diameter Day $211
Communications 1601 Base Station Day $91
1603 Computer and/or Printer Day $115
1604 GPS Unit Day $63
1605 High Power Repeater System w/Generator Day $364
1606 Radio, UHF or VHF, Portable Day $31
1607 Satellite Phone (includes 20 minutes airtime per day) Day $91
1608 Satellite Dish for HS Internet Day $151
1609 Respirator Comms System Day $142
1610 IT ER Equipment Package – Office in a Box (SM) Day $2,305
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 33
1611 IT ER Equipment Package- Mobile ER Unit (LG) Day $2,997
1612 MIFI Hot Spot Day $46
1616 Small Comms Package (6 IS radios, mikes, charging station) Day $280
Safety 1701 Air Sampling Kit (tubes add’l) Day $49
1702 Chest or Hip Waders, Insulated Cooling Vests Each/Day $31
1704 Eyewash Station Day $44
1705 Drager CMS Meter Day $242
1706 Flotation Work Suit Each/Day $63
1707 Flotation Work Vest, PFD Each/Day $13
1710 Harness (including Lanyard or SRL) Day $31
1730 Hazcat Kit Day $181
1734 Kendrick Extrication Device (KED) Use $237
1759 Lighting, Portable (handheld, head lamp, cordless area lighting, etc.) Each/Day $7
1733 Manometer Day $90
1711 Meter, 4EC Radiation Day $424
1712 Meter, LEL/O2/H2S/CO Day $181
1725 Meter, LEL/O2/H2S/CO/PID Day $309
1713 Meter, Jerome Mercury Day $726
1723 Meter, Lumex Mercury Day $1,029
1714 Meter, Personal, Gillian, Single or 4-gas Each/Day $49
1715 Meter, Personal, Particulate Monitoring Each/Day $181
1716 Meter, PID Day $242
1717 Mercury Vacuum (consumables add’l) Day $909
1724 Remote Drum Drilling Unit Day $726
1757 Rescue Gear, High Line System Day $750
1736 Rescue Gear, SKED Day $29
1737 Rescue Gear, Stokes Basket Day $17
1708 Respirator, Full Face (cartridges add’l) Each/Day $34
1709 Respirator, Half Face (cartridges add’l) Each/Day $27
1758 Road Closure, Barricades, Cones, Delineators Each/Day $8
1719 SCBA or Egress Bottles w/ Lines Each/Day $164
1729 SCBA or Egress Bottles w/ Lines, Refill Each/Day $31
1731 Shin and Metatarsal Guards, Aluminum Day $32
1720 Six Pack / Regulated Air Supply (includes up to 300’ airline) Day $364
1738 Support Station, Table and Chairs Day $144
1739 Support Station, Canopy Day $30
1759 Sweeper, power handheld Day $7
1740 Swift Water PPE Equipment (River Vest, Helmet, Throw Bag) Day $68
1721 Tripod and Winch Day $303
1732 Turtle Armor Suit (Torso, Chaps, Gaiters, Gauntlets) Day $102
Dispersants/Aircraft
1909 Douglas DC-4/Convair 340 Spray Aircraft (includes first Air Crew) Hour $10,295
1910 Douglas DC-6 Spray Aircraft (includes first Air Crew) Hour $11,190
1911 Spotter Aircraft (includes first Air Crew) Hour Cost+20%
1912 Dispersant Loading Pumps Day $582
1913 Dispersant, Applied ($10/gallon on Standby) Gallon Cost +20%
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 34
1914 Portable Dispersant Spray System Day $2,911
MATERIALS
Bags/Sheeting
M100 Bulk Bag, 1 yard Each $38
M113 Dunnage Bags Each $49
M101 Plastic Bag, 36” x 60”, 6 mil, 50/Roll or Box Roll/Box $150
M102 Plastic Bag, 36” x 60” (drum liner) Each $5
M103 Roll Off Bin Liner Each $44
M104 Sheeting, 20’ to 32’ x 100’, 10 mil Roll $188
M105 Sheeting, 20’ to 32’ x 100’, 6 mil Roll $139
M110 Sheeting, 8' to 20' x 100’, 4 mil Roll $83
M111 Sheeting, 20’ x 100’, Flame Retardant, 6 mil Roll $95
M112 Sheeting, 12’ x 100’, Flame Retardant, 6 mil Roll $62
Cleaners M205 Cleaner, Hand, 14 oz. Container Each $8
M200 Cleaner, Hand, 1 Gallon Container Each $38
M201 Cleaner, Marine/Industrial (Simple Green or equivalent) Gallon $31
M202 Bleach Gallon $7
M204 Decon Solvent (HD Citrus Degreaser, Penetone, PES-51) Gallon $97
M211 Disinfectant (IPA, Misty Biodet, Sporicidin, Zep DZ-7 ) Gallon $60
M209 Encapsulant Solution Gallon $55
M208 Hydrogen Peroxide Fogging Aerosol Gallon $74
M210 Mastic Remover Gallon $19
M207 Mercury Cleaning Solution Gallon $79
M206 Mercury Vapor Suppressant Pound $44
M212 VOC Suppressant (BioSolve, Gold Crew) Gallon $105
Containers M318 1 Gallon, Poly Pail Each $13
M301 5 Gallon, Bucket with Lid, Poly or Metal Each $23
M313 5 Gallon, DOT Container with Lid Each $27
M302 10-15 Gallon, Steel Each $115
M319 15 Gallon, Poly Each $96
M303 20 Gallon, Open Top, Steel Each $90
M304 30 Gallon, Open or Close Top, Refurbished Each $97
M320 30 Gallon, Open or Close Top, Steel, New Each $109
M305 55 Gallon, Close Top, Steel, Refurbished Each $74
M314 55 Gallon, Close Top, Steel, New Each $109
M306 55 Gallon, Open Top, Steel, Refurbished Each $78
M315 55 Gallon, Open Top, Steel, New Each $109
M316 55 Gallon, Open or Close Top, Poly, Refurbished Each $86
M307 55 Gallon, Open or Close Top, Poly, New Each $109
M308 85 Gallon, Overpack, Unlined, Black Each $273
M309 85 Gallon, Overpack, Lined, Yellow Each $309
M310 95 Gallon, Overpack, Poly Each $321
M317 275-300 Gallon, Liquid Tote, DOT, Recon Each $279
M311 275-300 Gallon, Liquid Tote, DOT, New Each $545
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 35
M321 Fluorescent Tube Disposal Container, 4’ Each $47
M322 Fluorescent Tube Disposal Container, 8’ Each $83
M312 Triwall Box, Cubic Yard, DOT Approved Each $151
Safety M400 Acid Suit, 1 Piece Each $109
M401 Boot, Steel Toed, PVC/Nitrile Pair $35
M442 Face Shield Each $13
M402 Glove, Work Glove Pair $5
M403 Glove, Inner, Cotton, Latex or Nitrile Pair $2
M404 Glove, Inner, Cotton, Latex or Nitrile, 50 per Box Box $45
M405 Glove, Silver Shield Pair $7
M406 Glove, Medium Duty, PVC Pair $6
M407 Glove, Heavy Duty, PVC Pair $11
M620 Negative Air Exhaust Consumables Change Out Each $206
M513 Orange Construction Fence, 4’x100’ Roll $78
M641 Pallet Each $19
M607 Petro Flag Test Kit Per Test $44
M408 Glove, Heavy Duty, Butyl Rubber Pair $38
M409 Hard Hat Each $35
M410 Overboot, Disposable Pair $10
M446 PBI / FR Cotton / Nomex Coveralls, replacement Each $415
M426 Protective Gear Level B Each $504
M427 Protective Gear Level B, Change Each $168
M428 Protective Gear Level C Each $73
M429 Protective Gear Level C, Change Each $58
M430 Protective Gear Level D Each $44
M431 Protective Gear Level D, Change Each $27
M432 Rain Gear, 2 Piece Set $27
M445 Rescue Rope, Lifeline or Tagline, 10' Each $17
M433 Respirator Cartridge, Single, OV, Acid Gas, P100 Pair $35
M443 Respirator Cartridges, Combo Pair $48
M434 Respirator Cartridge, Mercury/chlorine Pair $66
M436 Safety Eyewear Each $10
M438 Safety Vest Each $40
M444 Thermo Pro/Tychem TK Level B Suit Each $545
M439 Tyvek Suit, Saran-Coated, Disposable Each $38
M440 Tyvek Suit, Uncoated, Disposable Each $17
M441 Tyvek Suit, Poly-Coated, Disposable Each $19
M489 Tyvek Suit, Poly-Coated, Fire Resistant, Disposable Each $75
Sorbents
M500 Absorbent, Chemical Stabilizer, 35 lb. Bag $158
M501 Absorbent, Absorb X Bag $23
M502 Floor Dry, 40 lb. Bag $15
M503 Neutralizer, citric acid Bag $190
M520 Neutralizer, Ash or Bicarbonate Bag $39
M519 Neutralizer, Liquid Gallon $49
M504 Oil Snare on Rope, 50 ft/Bag Bag $163
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 36
M505 Oil Snare, 30/Carton Carton $133
M506 Sorbent Boom 5” x 10’, 4/Bale Bale $121
M507 Sorbent Boom 8” x 10’, 4/Bale Bale $224
M508 Sorbent Roll, SXT 638, 38” x 144’ x 3/8” Roll $224
M509 Sorbent Sheet 17” x 19” x 3/8”, 100/Bale Bale $91
M510 Sorbent Sweep 17” x 100’ x 3/8” Each $158
M514 Straw Wattles, 25 ft/Roll Roll $63
M512 Universal Pads, 11"x13" or equivalent, 50/Bale Bale $109
M511 Vermiculite, 4 cu ft/Bag Bag $38
Miscellaneous M627 Abatement Supplies (scrapers, mop-heads, etc.) Each $12
M621 Air Mover Dry Filter Sock Each $23
M600 Banner Tape, 3” Roll $27
M638 Brake Cleaner Can $11
M619 Catch Basin Filter Each $66
M632 Chemical Indicator Paper Package $37
M626 Chemtape Roll $49
M601 Cotton Rags, 25 lb. Box/Bale Each $63
M602 Decon Pool, Small Personnel Each $38
M617 Flex Hose, Consumable, 4” Foot $3
M618 Flex Hose, Consumable, 6” Foot $5
M628 Floor Buffer Pads Each $60
M604 Duct Tape, 2” Roll $11
M639 Glue (3M Aerosol) Can $17
M622 HEPA Vacuum Consumables, Standard Each $62
M625 HEPA Vacuum Consumables, Tornado Filter Each $300
M623 HEPA Vacuum Consumables, Complete Each $539
M631 Lead Paint Field Screening Test Kit - 5 Tests Each $54
M642 Jute Netting (includes staples) Roll $85
M653 Mastic Tape Roll $161
M606 Mercury Vacuum Consumables Change Out Each $91
M492 Nitrogen Cylinder Refill Each $69
M141 Plug and Patch Kit Each $173
M613 Poly Rope, 600’, up to 1/2” Roll $109
M651 Portland Cement Bag $21
M630 Scrubbing Pads Each $6
M603 Sampling Tubes and Supplies Each $25
M614 Sand Bags, Filled Each $11
M633 Silt Fence, 100' Roll $133
M616 Sprayer, Handheld (Hudson), 3 Gallon Each $68
M801 Water, Drinking, 24/Case Case $19
M850 Mileage for Car (M850 + Eq Item#) Mile $0.90
M851 Mileage for Trucks/Vans (M851+ Eq Item#) Mile $1
M852 Mileage for Commercial Trucks Mile $1.29
M860 Equipment Fuel (Gasoline or Diesel) Gallon $8
M883 Fuel - Extra Heavy Equipment (Guzzler, Jetter, Large Yellow Iron >89 HP, and similar) Hour
Operated $45
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 37
M884 Fuel - Heavy Equipment (Tractors, Vacuum Trucks, >50 HP Water Blasters, Compressors, Large Generators, Small Yellow Iron <89 HP, PTO-driven, similar)
Hour Operated
$34
M885 Fuel - Light Equipment (Pressure Washers, Compressors <50 HP, Light
Towers, Small Generators, and similar).
Hour Operated
$28
M880 Bridge Toll, Vehicle, 2 axle Each $15
M881 Bridge Toll, Vehicle, 3 axle Each $27
M886 Bridge Toll, Vehicle, 4 axle Each $38
M882 Bridge Toll, Vehicle, 5 axle Each $49
SPECIAL OPERATIONS
Response Units 6024 Trailer, Reactive/Explosive/Special Operations Day $839
6025 Trailer, Emergency Breathing Air Day $5,595
6027 Trailer, Emergency Response Enclosed 20' Day $560
6028 Trailer, Transfer compressed gas, static liquid 40-48' Day $1,119
6029 Trailer, RV w/ Living Quarters (M & I not Included) Day $560
6030 Trailer, Utility Day $224
6035 Truck, 1-Ton Crew Cab Day $224
6032 Truck, 1 1/2 Ton Crew Cab Day $336
6033 Truck, 2 1/2 Ton Crew Cab Day $448
6046 Truck, 10 ton Rescue, Quad Cab, 4x4, SRS Canada Day $755
6047 Truck, Brush/Fast Attack w/300 Gallon Water Tank Hour $168
6031 Truck, Emergency Response Day $392
6048 Truck, Hi-Rail Brush/Fast Attack w/300 Gallon Water Tank Hour $224
6036 Truck, Light / Sedan Day $196
6034 Truck, Mobile Command Day $560
6037 Truck, Special Operations Semi- Over the road Day $727
6049 UTV, 4 or 6 Wheel Unit Day $392
6050 UTV, Wildland Unit, with fire suppression or rescue set up Day $560
Power Packs & Compressors
1109 Corken Compressor (291T / Corrosive Compatible) Day $878
1110 Corken Compressor (491T / Corrosive Compatible) Day $1,175
1177 Corken Compressor (490 LPG/NH3) Day $1,175
1564 Hydraulic Power Pack, 75 hp with 100 ft. of Hydraulic Day $839
1576 PTO Hydraulic Power Unit, with 100 ft. of Hydraulic Day $615
Pumps 1314 Corken/Blackmer, Stainless Steel Sliding Vane (3") Day $783
1315 Corken/Blackmer, Coro Vane or Equivalent (3”) Day $783
1319 Drum Pump, Stainless Steel (3”) Positive Displacement Day $587
1320 Double Diaphragm, Aluminum (2”) Day $252
1321 Double Diaphragm, Poly-Pro (2”) Day $336
1322 Double Diaphragm, Poly-Kynar/Teflon (1”) Day $224
1318 Fire/Dispersant Day $297
1313 Jet Pump (gas eductor) 1” or 2” Day $308
1323 Roper Vane Pump, Carbon Steel (3”) Day $588
1426 Stinger, 2”, CPVC/SS/Carbon Day $168
1327 10 HP Magnetic Drive, non-contact pump, Teflon Day $839
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 38
1328 15 HP Magnetic Drive, non-contact pump, Teflon Day $895
Hoses 1423 Chlorine Transfer, certified Ft/Day $67
1432 Crosslinked Polyethylene Hose (2”) Ft/Day $17
1433 Crosslinked Polyethylene Hose (1”) Ft/Day $6
1421 LPG/NH3, 1” Vapor Ft/Day $13
1422 LPG/NH3, 2” Liquid Transfer Ft/Day $28
1430 Teflon, Rubber Jacketed (1”) Ft/Day $39
1431 Teflon, Stainless Steel Braid (2”) Ft/Day $39
1427 Transfer Fittings (gauges, nipples, risers, etc.,) Transfer $336
1425 Stainless Steel Hose (2”) Ft/Day $39
1434 Ultra-High Molecular Weight Polyethylene Hose 2” Ft/Day $17
Fire Fighting
1823 Complete Turnout/Bunker Gear Day $319
1821 Eductor (1”, 1 ½”) 60 to 95 gpm Day $84
1822 Eductor (2 ½”) 250 gpm Day $112
1806 Fire Hose (1” to 3”) Double Jacketed Ft/Day $2
1807 Fire Hose (4” to 6”) LDH Ft/Day $3
1808 Fire Hose Tester Day $280
1825 Fire Fighting Fittings Charge Day $560
1805 Fire Fighting Quick-out Kits (flight ready) + mob Day $1,119 1826 Flash Suit Day $336
1824 Frameless Bladder (10,000 gallon) Day $615
1813 Job Box (Tools, Adapters, Fittings) Day $1,679
1803 Mounted Monitor – (300-1250gpm) + consumables Day $1,399
1814 Monitor & Nozzle, 2 ½” Inlet (500 GPM Ground set) Day $504
1815 Monitor & Nozzle, 2 ½” Inlets (1250 GPM Ground Set) Day $839
1816 Nozzle (1”, 1 ½”) Day $218
1817 Nozzle (2 ½ “) Day $252
1818 Nozzle, High-X (1 ½”) Day $392
1819 Nozzle, Piercing (1 ½”) Day $252
1820 Nozzle, Foam Pro Day $280
1809 Pito Flow Meter Day $140
1804 Portable Fire Pump (650gpm NFPA Rated) + Day $2,462
1812 Pressure Pump, Fire, 250 psi, 200 gpm Day $280
1810 Suction Hose (4”) Section $140
1811 Suction Hose (6”) Section $168
1800 Trailer, Portable Fire w/ Pump Day $448
1801 Trailer, Fire Fighting Foam, Type I, 550 gal + Day $3,917
1802 Trailer, Fire Fighting Foam, Type II, 275 gal + Day $1,679
Miscellaneous 1703 Chlorine A/B/C Response Kits (gaskets add’l) Day $587
1577 Fabrication, Specialty Tool Charge Day $336
1559 Flare, Ground Set, 2” Day $280
1560 Flare, Ground Set, 3” Day $392
1561 Flare, Stack, 2” Day $140
1562 Flow Meter, 2”, Stainless Steel Day $196
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 39
1578 Mag-Drill Day $252
1571 Manway Adapter, 14"-22", Stainless Steel Day $392
1728 Midland Capping Kit Day $1,399
1579 SRV Puller / Excess Flow Valve Defeater Day $560
1580 Thermal Imager Day $671
1565 Trident Magnetic Patch Day $1,119
1703 Chlorine A/B/C Response Kits (gaskets add’l) Day $587
1722 Truck Rollover/Cylinder Drill Kit/Betts Valve Day $504
Materials M635 AR-AFFF Foam Gallon $62
M636 High-X Foam Gallon $62
M634 Manway Gaskets Each $280
M425 Responder (encapsulated, Level A) Each $1,455 M447 Responder (encapsulated, Level A with flash cover) Each $3,357
M853 Mileage, Special Ops Trailer Mile $1.68
M854 Mileage, Special Ops Truck Mile $1.68
M855 Mileage, Special Ops Truck (1 1/2 ton, 2 1/2 ton) Mile $2.80
M858 Mileage, Special Ops Tractor or Rescue Truck (10 ton) Mile $2.80
Mark Up
Third Party Costs All third party costs incurred by NRC, including but not limited to: subcontractors, vendors, suppliers, materials, additional insurance premiums, and surety bond fees will be charged at a minimum of Cost plus twenty percent (20%) administrative fee.
TERMS AND CONDITIONS
General
Customer’s request for Contractor to perform services constitutes an agreement to pay for those services pursuant to the Personnel, Equipment and Material Terms below, regardless of any estimates provided by Contractor. Charges will be based on the most current DES Master Contract Rate Schedule. Contractor will utilize company owned resources, whenever possible, and invoice Customer for said resources at rates published herein. However, in the event Contractor cannot complete the work with company owned resources and is required to utilize a 3rd party vendor, supplier or subcontractor, Customer will pay for the costs plus the Rate Schedule Mark Up. Disposal at Contractor owned facilities will be charged at the current published rates for each facility.
Personnel
1. Personnel will be billed portal to portal in half-hour increments. A 4-hour minimum applies to all projects except for those over 50 miles from Contractor personnel assigned office location which will be charged an 8-hour minimum.
2. All Personnel rates are subject to the following: a) Weekdays: Hours 0 through 8 charged at Straightime (ST); Hours over 8 through 12 charged at Overtime (OT); Hours over 12 charged at Double Time (DT). Changes to start times for Weekday ST, OT and DT may be requested by Client and may be approved by NRC on a case-by-case basis for longer projects. b) Saturday: First 12 hours charged at OT; hours over first 12 hours charged at DT. c) Sundays and Holidays: All time charged at DT. Applicable Holidays are listed at https://app.leg.wa.gov/rcw/default.aspx?cite=1.16.050. Other holidays may apply when pursuant to applicable union contract requirements when mutually agreed upon in writing. d) ST, OT and DT rates are applied per a) – c) above regardless of the number of hours worked for any Client on any particular day. Rates for hours subsequent to a break of less than 8 hours are charged at the appropriate OT or DT rate continuous to hours prior to the break. All time for providing expert testimony in any court, deposition or hearing, etc. including preparation and travel time, charged at DT.
3. All project specific personnel, including accounting, administrative, personnel support, logistics and management, whether on site, at Contractor offices, or at support locations, are chargeable. All personnel are charged according to the above rates, regardless of full-time, part-time or third-party labor source status, unless provided as part of a specified subcontracted service. Personnel charged per their standard category rates for participation in any activity provided on behalf of the Customer including depositions, interviews, document preparation, etc.
STATEWIDE CONTRACT NO. 09321 – EMERGENCY RESPONSE TO HAZARDOUS MATERIALS 40
4. Meals and lodging will be billed at the SAAM rates for the relevant area.
Equipment
1. Contractor does not rent equipment in a bare condition. All equipment shall be operated and controlled by Contractor or Contractor-approved subcontractor personnel. Contractor maintains exclusive rights to assign specific equipment operators and/or vessel crews for response operations. All equipment sent to site by Contractor shall be in a basic operating condition. Additional components charged to Customer include, but are not limited to, multiple hose lengths, blast shields, specialty tips or fittings, specialty connections, noise abatement, catalytic converters, etc. Equipment prices do not include fuel, operator or mobilization unless otherwise stated. Fuel consumed in non-mileage related operation of equipment, including vehicle and non-vehicle equipment and vessels, will be charged per Material rates. Equipment that requires electrical connection to owner/facility provided power shall only be connected by licensed electricians experienced in the type of connection required and voltage rating. Equipment that requires air power to operate may be attached to owner/facility provided that the pressure and connections are compatible with Contractor equipment and that shut off valves are in compliance with regulations.
2. Day rates are based on 8 hours of operation. Minimum charge for day rate equipment is daily charge per day with additional hours over 8 charged in half-day increments for up to a total of 3 days’ charge during a 24-hour period. Minimum call out for hourly equipment is 4 hours per day except for a 5-hour minimum per day for ALL aircraft. Customers will be charged for unused requested equipment until released and returned to service per Note 2.
3. Mobile Communications & Command Unit rate includes the following subsystems: UHF-FM, VHF-FM, VHF Marine, fax machine, copier and satellite system capability (with VOIP/Internet).
Materials
1. All materials and supplies utilized, whether listed in daily reports or not, are chargeable in full quantity amounts as indicated by the identified unit, i.e., gallon, roll, each.
2. The number of change-outs of Personal Protective Equipment (PPE) are based on conditions occurring in the work area. PPE shall be changed at a frequency that conforms to safety practices to prevent exposure to employees during the work activity. PPE categories:
• Level D: Coveralls/Uniform, Steel Toe Boots, Safety Glasses, Work Gloves, Hard Hat and Safety Vest as applicable;
• Level C: Level D plus, Disposable Tyvek, Full Face or Half Face Respirator (excluding cartridges); and
• Level B: Level C plus SCBA or supplied air (includes mask, 100’ air supply hose, supplied air, bottle manifold and egress bottle).
3. Contractor reserves the right to substitute products of equal quality and construction without affecting the performance. Contractor applies the Brand Name of a product as a reference only and reserves the right to substitute as it deems necessary.
4. Contractor use of facility-directed or Customer-directed decontamination products, including but not limited to degreasing agents, cleaners, strippers, conditioners, cutter stock, etc., shall be done at the facility’s or Customer’s risk.
File details come from the government source that posted it. Updated .