Attachment_J.1_Standard_Contract_Provisions_Goods_and_Services.pdf

PDF 194 KB Posted

Attached to
Third-Party Commissioning Services State and local contract opportunity
Solicitation number
DCAM-26-CS-RFP-0002A
Issued by
District of Columbia, District of Columbia

About this file

This is a Standard Contract Provisions document for goods and services contracts issued by the District of Columbia Department of General Services (DGS). The document establishes the general contractual terms and conditions applicable to all contracts awarded by DGS, including those for commissioning services. The Standard Contract Provisions encompass 38 articles covering essential contract administration requirements such as covenant against contingent fees, shipping instructions, patent liability, quality standards, inspection procedures for both supplies and services, default remedies, indemnification obligations, dispute resolution mechanisms, termination rights (both for default and convenience), and record retention requirements. The contract establishes that the District may terminate contracts without liability if contingent fees have been offered, if the contractor fails to perform within specified timeframes, or if the contractor fails to cure deficiencies within ten days of notification. The document also specifies that all disputes must be resolved through a formal claims process, with contractors required to submit written claims to the Contracting Officer within thirty days of the circumstances giving rise to the claim, and the Contracting Officer issuing decisions within 120 days.

The Standard Contract Provisions require contractors to maintain the highest quality standards and provide materials and services suitable for their intended purposes, with the District retaining the right to inspect and test all supplies and services at any time during performance. The contract includes provisions for non-discrimination and affirmative action in compliance with the District of Columbia Human Rights Act, mandates adherence to the Service Contract Act of 1965 regarding minimum wage and fringe benefits for service employees, and requires submission of cost and pricing data for procurements exceeding $100,000 or awarded through competitive sealed proposals. Contractors must maintain books and records for three years after contract termination and are subject to examination by authorized District, Federal, or audit representatives. The provisions also address force majeure events, requiring contractors to notify the Contracting Officer within 72 hours of any inability to perform due to circumstances beyond their control, though no monetary damages are available for force majeure-related performance failures. Administrative liquidated damages of $250 per day may be assessed for failure to submit required deliverables on schedule, and the District retains the right to withhold payments or pursue other remedies for non-compliance with contract terms.

View the file

Other files for this state and local contract opportunity

Other files attached to Third-Party Commissioning Services, newest first.
File Type Posted
Attachment_J.10_Price_Schedule_Revised.pdf PDF
Attachment_J.10_Price_Schedule.docx DOCX document
Attachment_J.10_Price_Schedule.docx DOCX document
Attachment_J.10_Price_Schedule_Revised.pdf PDF
Attachment_J.9_Revised_Past_Performance_Evaluations_Commissioning.pdf PDF
Attachment_J.9_Revised_Past_Performance_Evaluations_Commissioning.pdf PDF
Attachment_J.2_US_DOL_Service_Contract_Act.pdf PDF
Attachment_J.8_CONTRACTOR_SELF_CERTIFICATION_V004_09.12.2024.pdf PDF
Attachment_J.2_US_DOL_Service_Contract_Act.pdf PDF
Attachment_J.4_Non_Construction_First_Source_Employment_Agreement_2.pdf PDF
Attachment_J.6_SBE_Subcontracting_Plan.pdf PDF
Attachment_J.7_Offeror's_Certification_Form.pdf PDF
DCAM-26-CS-RFP-0002A.pdf PDF
Attachment_J.3_EEO_Compliance_Documents.pdf PDF
Attachment_J.1_Standard_Contract_Provisions_Goods_and_Services.pdf PDF
Attachment_J.7_Offeror's_Certification_Form.pdf PDF
Attachment_J.10_Price_Schedule.docx DOCX document
Attachment_J.8_CONTRACTOR_SELF_CERTIFICATION_V004_09.12.2024.pdf PDF
Attachment_J.9_Past_Performance_Evaluations.docx DOCX document
Attachment_J.2_US_DOL_Service_Contract_Act.pdf PDF
Attachment_J.7_Offeror's_Certification_Form.pdf PDF
DCAM-26-CS-RFP-0002A.pdf PDF
Attachment_J.3_EEO_Compliance_Documents.pdf PDF
Attachment_J.6_SBE_Subcontracting_Plan.pdf PDF
Attachment_J.8_CONTRACTOR_SELF_CERTIFICATION_V004_09.12.2024.pdf PDF
DCAM-26-CS-RFP-0002A.pdf PDF
Attachment_J.3_EEO_Compliance_Documents.pdf PDF
Attachment_J.4_Non_Construction_First_Source_Employment_Agreement_2.pdf PDF
Attachment_J.5_2026_Living_Wage_Information.pdf PDF
Attachment_J.1_Standard_Contract_Provisions_Goods_and_Services.pdf PDF
Attachment_J.4_Non_Construction_First_Source_Employment_Agreement_2.pdf PDF
Attachment_J.5_2026_Living_Wage_Information.pdf PDF
Attachment_J.6_SBE_Subcontracting_Plan.pdf PDF
Attachment_J.5_2026_Living_Wage_Information.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

District of Columbia Department of General Services

Standard Contract Provisions

GENERAL PROVISIONS

(Supplies and Services Contract)

Article 1. Covenant Against Contingent Fees:

The Contractor warrants that no person or selling agency has been employed or retained to solicit or secure the contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Contractor for the purpose of securing business. For breach or violation of this warranty, the District will have the right to terminate the contract without liability or in its discretion to deduct from the contract price or consideration or otherwise recover, the full amount of the commission, percentage, brokerage, or contingent fee.

Article 2. Shipping Instructions – Consignment:

Unless otherwise specified in this Invitation for Bids/Request for Proposals, each case, crate, barrel, package, etc., delivered under this contract must be plainly stencil marked or securely tagged, stating the Contractor’s name, contract number and delivery address as noted in the contract. In case of carload lots, the Contractor shall tag the car, stating Contractor’s name and contract number. Any failure to comply with these instructions will place the material at the Contractor’s risk. Deliveries by rail, water, truck or otherwise, must be within the working hours and in ample time to allow for unloading and if necessary, the storing of the materials or supplies before closing time. Deliveries at any other time will not be accepted unless specific arrangements have been previously made with the contact person identified in the contract at the delivery point.

Article 3. Patents:

The Contractor shall hold and save the District, its officers, agents, servants, and employees harmless from liability of any nature or kind, including costs, expenses, for or on account of any patented or unpatented invention, article, process, or appliance, manufactured or used in the performance of this contract, including their use by the District, unless otherwise specifically stipulated in the contract.

Article 4. Quality:

Contractor’s workmanship shall be of the highest grade, and all materials provided under this Contract shall be new, of the best quality and grade, and suitable in every respect for the purpose intended.

Article 5. Inspection Of Supplies:

(a) Definition. “Supplies,” as used in this clause, includes, but is not limited to raw materials, components, intermediate assemblies, end products, source code, object code, and lots of supplies.

(b) The Contractor shall be responsible for the materials or supplies covered by this contract until they are delivered at the designated point, but the Contractor shall bear all risk on rejected materials or supplies after notification of rejection. Upon the Contractor’s failure to cure within ten (10) days after date of notification, the District may return the rejected materials or supplies to the Contractor at the Contractor’s risk and expense.

(c) The Contractor shall provide and maintain an inspection system acceptable to the District covering supplies under this contract and shall tender to the District for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the District during contract performance and for as long afterwards as the contract requires. The District may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under this contract.

(d) The District has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The District will perform inspections and tests in a manner that will not unduly delay the work.

The District assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in the contract. The Contractor shall remain obligated to test and integrate supplies. The Contractor shall remain obligated to deliver supplies suitable for their intended purpose.

(e) If the District performs inspection or test on the premises of the Contractor or subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, without additional charge, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the District will bear the expense of District inspections or tests made at other than Contractor’s or subcontractor’s premises; provided, that in case of rejection, the District will not be liable for any reduction in the value of inspection or test samples.

(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes re-inspection or retest.

(f) The District has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship, are not suitable for the purposes intended, or otherwise not in conformity with contract requirements. The District may reject nonconforming supplies, at any time, with or without disposition instructions and regardless of any prior acceptances.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and when required, shall disclose the corrective action taken.

(h) If the Contractor fails to remove, replace, or correct rejected supplies that are required to be replaced or corrected within ten (10) days, the District may either

(1) by contract or otherwise, remove, replace or correct the supplies and charge the cost to the Contractor; or,

(2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i) If this contract provides for the performance of District quality assurance at source, and if requested by the District, the Contractor shall furnish advance notification of the time (i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract, and (ii) when the supplies will be ready for District inspection.

(j) The District request shall specify the period and method of the advance notification and the District representative to whom it shall be furnished. Requests shall not require more than 2 business days of advance notification if the District representative is in residence in the Contractor’s plant, nor more than 7 business days in other instances.

(k) The District will accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. District failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability upon the District, for non-conforming supplies.

(l) Inspections and tests by the District do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements. Acceptance shall be conclusive, except for latent defects, defects affecting fitness for a particular purpose, a failure of integration tests, a failure of system tests, a failure of any tests affecting performance, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(m) If acceptance is not conclusive for any of the reasons in subparagraph (l) hereof, the District, in addition to any other rights and remedies provided by law, or under provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or non-conforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or noncompliance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement.

When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the District will have the right to return the rejected materials at Contractor’s risk and expense or contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the District thereby. Notwithstanding the foregoing, in addition to all other remedies set forth herein, nothing herein shall be construed to limit the Contracting Officer’s ability to assess liquidated damages.

Article 6. Inspection Of Services:

(a) Definition. “Services” as used in this clause includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the District covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the District during contract performance and for as long afterwards as the contract requires.

(c) The District has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The District will perform inspections and tests in a manner that will not unduly delay the work.

(d) If the District performs inspections or tests on the premises of the Contractor or subcontractor, the Contractor shall furnish, without additional charge, all reasonable facilities and assistance for the safety and convenient performance of these duties.

(e) If any of the services do not conform to the contract requirements, the District may require the Contractor to perform these services again in conformity with contract requirements, at no increase in contract amount. When the defects in services are not corrected by performance, the District may require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and reduce the contract price to reflect value of services performed. Further, the District may have the nonconforming services provided by a person or entity other than the Contractor and charge the cost of such performance to the Contractor. Finally, the District may require the repayment of funds by the Contractor of any amounts paid for non-conforming services. The District’s remedies hereunder are cumulative and are not exclusive.

(f) If the Contractor fails to promptly perform the services again or take the necessary action acceptable to the Contracting Officer to ensure future performance in conformity to contract requirements, the District may (1) by contract or otherwise, perform the services and charge the Contractor any cost incurred by the District, (2) assess liquidated damages, or (3) terminate the contract for default.

The District’s remedies hereunder are cumulative and not exclusive.

Article 7. Waiver:

No Governmental waiver of any breach of any provision of the Contract shall operate as a waiver of such provision or of the Contract or as a waiver of subsequent or other breaches of the same or any other provision of the Contract; nor shall any action or non-action by the Contracting Officer or by the Government be construed as a waiver of any provision of the Contract or of any breach thereof unless the same has been expressly declared or recognized as a waiver by the Contracting Officer or the Government in writing.

Article 8. Default:

(a) The District may, subject to the provisions of paragraph (c) below, by written notice of default to the Contractor, terminate the whole or any part of this contract in any one of the following circumstances:

(1) If the Contractor fails to make delivery of the supplies or to perform the services within the time specified herein or any extension thereof; or

(2) If the Contractor fails to perform any of the other provisions of this contract, or so fails to make progress as to endanger performance of this contract in accordance with its terms, and in either of these two circumstances does not cure such failure within a period of ten (10) days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure.

(b) In the event the District terminates this contract in whole or in part as provided in paragraph (a) of this clause, the District may procure, upon such terms and in such manner as the Contracting Officer may deem appropriate, supplies or service similar to those so terminated, and the Contractor shall be liable to the District for any excess costs for similar supplies or services; provided, that the Contractor shall continue the performance of this contract to the extent not terminated under the provisions of this clause.

(c) Except with respect to defaults of subcontractors, the Contractor shall not be liable for any excess costs if the failure to perform the contract arises out of causes beyond the control and without the fault or negligence of the Contractor. Such causes may include, but are not restricted to, acts of God or of the public enemy, acts of the District or Federal Government in either their sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather;

but in every case the failure to perform must be beyond the control and without fault or negligence of the Contractor. If the failure to perform is caused by the default of the subcontractor, and if such default arises out of causes beyond the control of both the Contractor and the subcontractor, and without the fault or negligence of either of them, the Contractor shall not be liable for any excess cost for failure to perform, unless the supplies or services to be furnished by the subcontractor were obtainable from other sources in sufficient time to permit the Contractor to meet the required delivery schedule.

(d) If this contract is terminated as provided in paragraph (a) of this clause, the District, in addition to any other rights provided in this clause, may require the Contractor to transfer title and deliver to the District, in the manner and to the extent directed by the Contracting Officer, (i) completed supplies, and (ii) such partially completed supplies and materials, parts, tools, dies, jigs, fixtures plans, drawing information, and contract rights (hereinafter called “manufacturing materials”) as the Contractor has specifically produced or specifically acquired for the performance of such part of this contract as has been terminated; and the Contractor shall, upon direction of the Contracting Officer, protect and preserve property in possession of the Contractor in which the District has an interest.

Payment for completed supplies delivered to and accepted by the District will be at the contract price.

Payment for manufacturing materials delivered to and accepted by the District will be at the contract price. Payment for manufacturing materials delivered to and accepted by the District and for the protection and preservation of property shall be in an amount agreed upon by the Contractor and Contracting Officer; failure to agree to such amount shall be a dispute concerning a question of fact within the meaning of the clause of this contract entitled “Disputes”. The District may withhold from amounts otherwise due the Contractor for such completed supplies or manufacturing materials such sum as the Contracting Officer determines to be necessary to protect the District against loss because of outstanding liens or claims of former lien holders.

(e) If, after notice of termination of this contract under the provisions of this clause, it is determined for any reason that the Contractor was not in default under the provisions of this clause, or that the default was excusable under the provisions of this clause, the rights and obligations of the parties shall, if the contract contains a clause providing for termination of convenience of the District, be the same as if the notice of termination had been issued pursuant to such clause. See Clause 20 for Termination for Convenience of the District.

(f) The rights and remedies of the District provided in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law or under this contract.

(g) As used in paragraph (c) of this clause, the terms “subcontractor(s) means subcontractor(s) at any tier.

Article 9. Indemnification:

The Contractor agrees to defend, indemnify and hold harmless the District, its officers, agencies, departments, agents, and employees (collectively the “District”) from and against any and all claims, losses, liabilities, penalties, fines, forfeitures, demands, causes of action, suits, costs and expenses incidental thereto (including cost of defense and attorneys’ fees), resulting from, arising out of, or in any way connected to activities or work performed by the Contractor, Contractor’s officers, employees, agents, servants, subcontractors, or any other person acting for or by permission of the Contractor in performance of this Contract. The Contractor assumes all risks for direct and indirect damage or injury to the property or persons used or employed in performance of this Contract. The Contractor shall also repair or replace any District property that is damaged by the Contractor, Contractor’s officers, employees, agents, servants, subcontractors, or any other person acting for or by permission of the Contractor while performing work hereunder.

The indemnification obligation under this section shall not be limited by the existence of any insurance policy or by any limitation on the amount or type of damages, compensation or benefits payable by or for Contractor or any subcontractor, and shall survive the termination of this Contract. The District agrees to give Contractor written notice of any claim of indemnity under this section. Additionally, Contractor shall have the right and sole authority to control the defense or settlement of such claim, provided that no contribution or action by the District is required in connection with the settlement. Monies due or to become due the Contractor under the contract may be retained by the District as necessary to satisfy any outstanding claim which the District may have against the Contractor.

Disputes between the Contractor and any subcontractors, material suppliers, or any other third parties over payments allegedly owed by the Contractor to a third party shall be resolved exclusively between the Contractor and the third party; the Contractor shall permit no pass-through suits to be brought against the Government by a third party in the Contractor’s name. However, nothing herein shall be construed to prevent the Contractor from paying a subcontractor’s claim and seeking a timely equitable adjustment hereunder.

Article 10. Transfer:

No contract or any interest therein shall be transferred by the parties to whom the award is made; such transfer will be null and void and will be cause to annul the contract.

Article 11. Taxes:

(a) The Government of the District of Columbia is exempt from and will not pay Federal Excise Tax, Transportation Tax, and the District of Columbia Sales and Use Taxes.

(b) Tax exemption certificates are no longer issued by the District for Federal Excise Tax. The following statement may be used by the supplier when claiming tax deductions for Federal Excise Tax exempt items sold to the District.

“The District of Columbia Government is Exempt from Federal Excise Tax –Registration No. 52- 73-0206-K, Internal Revenue Service, Baltimore, Maryland.” Exempt From Maryland Sales Tax, Registered With The Comptroller Of The Treasury As Follows:

a) Deliveries to Glenn Dale Hospital – Exemption No. 4647

b) Deliveries to Children’s Center – Exemption No. 4648

c) Deliveries to other District Departments or Agencies – Exemption No. 09339 “The District of Columbia Government is Exempt from Sales and Use Tax –Registration No. 53- 600, The District of Columbia Office of Tax and Revenue.”

Article 12. Appointment of Attorney:

(a) The bidder/offeror or contractor (whichever the case may be) does hereby irrevocably designate and appoint the Clerk of the District of Columbia Superior Court and his successor in office as the true and lawful attorney of the Contractor for the purpose of receiving service of all notices and processes issued by any court in the District of Columbia, as well as service of all pleadings and other papers, in relation to any action or legal proceeding arising out of or pertaining to this contract or the work required or performed hereunder.

(b) The bidder/offeror or contractor (whichever the case may be) expressly agrees that the validity of any service upon the said Clerk as herein authorized shall not be affected either by the fact that the contractor was personally within the District of Columbia and otherwise subject to personal service at the time of such service upon the said Clerk or by the fact that the contractor failed to receive a copy of such process, notice or other paper so served upon the said Clerk provided the said Clerk shall have deposited in the United States mail, registered and postage prepaid, a copy of such process, notice, pleading or other paper addressed to the bidder/offeror or contractor at the address stated in this contract.

Article 13. Gratuities and District Employees Not To Benefit:

A. If it is found by the Department that gratuities (in the form of entertainment, gifts, payment, offers of employment or otherwise) were offered or given by the Contractor, or any agent or representative of the Contractor, to any official, employee or agent of the District with a view toward securing the Contract or any other contract or securing favorable treatment with respect to the awarding or amending, or the making of any determinations with respect to the performance of the Contract, the Department may, by written notice to the Contractor, terminate the right of the Contractor to proceed under the Contract without liability and may pursue such other rights and remedies provided by law and under the Contract.

B. In the event the Contract is terminated as provided above, the Department shall be entitled:

1. to pursue the same remedies against the Contractor as it could pursue in the event of a breach of the Contract by the Contractor; and

2. as a penalty in addition to any other damages to which it may be entitled by law, to exemplary damages in an amount (as determined by the Department) which shall be not less than ten times the costs incurred by the Contractor in providing any such gratuities to any such officer or employee.

C. Unless a determination is made as provided herein, no officer or employee of the District will be admitted to any share or part of this contract or to any benefit that may arise therefrom, and any contract made by the Contracting Officer or any District employee authorized to execute contracts in which they or an employee of the District will be personally interested shall be void, and no payment shall be made thereon by the District or any officer thereof, but this provision shall not be construed to extend to this contract if made with a corporation for its general benefit. A District employee shall not be a party to a contract with the District and will not knowingly cause or allow a business concern or other organization owned or substantially owned or controlled by the employee to be a party to such a contract, unless a written determination has been made by the head of the procuring agency that there is a compelling reason for contracting with the employee, such as when the District’s needs cannot reasonably otherwise be met. (DC Procurement Practices Act of l985, D.C. Law 6-85, D.C. Official Code, section 2-310.01, and Chapter 18 of the DC Personnel Regulations) The Contractor represents and covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of its services hereunder. The Contractor further covenants not to employ any person having such known interests in the performance of the contract.

Article 14. Disputes:

A. All disputes arising under or relating to this contract shall be resolved as provided herein.

B. Claims by a Contractor against the Government.

(1) Claim, as used in Section B of this clause, means a written assertion by the Contractor seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for the relief sought by the claimant.

(a) All claims by a Contractor against the Government arising under or relating to a contract shall be in writing and shall be submitted to the Contracting Officer for a decision.

(b) Within 120 days after receipt of a claim, the Contracting Officer shall issue a decision, whenever possible taking into account factors such as the size and complexity of the claim and the adequacy of the information in support of the claim provided by the Contractor.

(c) Any failure by the Contracting Officer to issue a decision on a contract claim within the required time period shall be deemed to be a denial of the claim and shall authorize the commencement of an appeal on the claim as otherwise provided.

(d) (1) If a Contractor is unable to support any part of his or her claim and it is determined that the inability is attributable to a material misrepresentation of fact or fraud on the part of the Contractor, the Contractor shall be liable to the Government for an amount equal to the unsupported part of the claim in addition to all costs to the Government attributable to the cost of reviewing that part of the Contractor’s claim.

(2) Liability under this section shall be determined within 6 years of the commission of the misrepresentation of fact or fraud.

(e) All cost data, pricing data, and task data of claims hereunder must be certified as accurate, complete, required, and necessary to the best of the Contractor’s knowledge and belief.

Further, all task or work data in the claim must be described therein to the smallest unit of work or task. The Contracting Officer may require any additional certifications, descriptions or explanations of the claim.

(f) The parties agree that time is of the essence and all claims hereunder must be presented to the Contracting Officer for a final decision within thirty (30) days of the occurrence of the circumstances giving rise to such claim or within thirty (30) days of when the Contractor knew or should have known of the circumstances giving rise to such claim, otherwise compensation for that claim is waived.

(g) The parties agree that there shall be no claims for unabsorbed home office overhead.

(2) The Contractor’s claim shall contain at least the following:

(a) A description of the claim and the amount in dispute;

(b) Any data or other information in support of the claim;

(c) A brief description of the Contractor’s efforts to resolve the dispute prior to filing the claim; and

(d) The Contractor’s request for relief or other action by the Contracting Officer.

(e) The certification of the accuracy, completeness, requirement, and necessity of all aspects of the claim.

(3) The decision of the Contracting Officer shall be final and not subject to review unless an administrative appeal or action for judicial review is timely commenced by the Contractor.

(4) Pending final decision of an appeal, action, or final settlement, a Contractor shall proceed diligently with performance of the contract in accordance with the decision of the Contracting Officer.

C. Claims by the Government against a Contractor

(a) Claim as used in Section C of this clause, means a written demand or written assertion by the Government, including the Contracting Officer, seeking, as a matter of right, the payment of money in a sum certain, the adjustment of contract terms, or other relief arising under or relating to this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for the relief sought by the claimant. Nothing herein shall be construed to require the Government to notify the Contractor prior to the issuance of the Contracting Officer’s final decision.

(b) (1) All claims by the Government against a Contractor arising under or relating to a contract shall be decided by the Contracting Officer, who shall issue a decision in writing and furnish a copy of the decision to the Contractor.

(2) The decision shall be supported by reasons and shall inform the Contractor of his or her rights.

Specific findings of fact shall not be required.

(3) This clause shall not authorize the Contracting Officer to settle, compromise, pay, or otherwise adjust any claim involving fraud.

(4) The decision of the Contracting Officer shall be final and not subject to review unless an administrative appeal or action for judicial review is timely commenced by the Contractor.

(5) Pending final decision of an appeal, action, or final settlement, the Contractor shall proceed diligently with performance of the contract in accordance with the decision of the Contracting Officer.

Article 15. Changes:

The Contracting Officer may, at any time, by written order, and without notice to the surety, if any, make changes in the contract within the general scope hereof. If such change causes an increase or decrease in the cost of performance of this contract, or in the time required for performance, an equitable adjustment shall be made. Any claim for adjustment under this paragraph must be asserted within ten

(10) days from the date the change is offered; provided, however, that the Contracting Officer, if he or she determines that the facts justify such action, may receive, consider and adjust any such claim asserted at any time prior to the date of final settlement of the contract. If the parties fail to agree upon the adjustment to be made, the dispute shall be determined as provided in the Disputes clause at Section 18. Nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.

Article 16. Termination-Generally:

Termination, whether for default or convenience, is not a Government claim. The Contracting Officer may terminate a contract for default, in whole or in part, if the termination is in the best interests of the Government, and the Contractor does any of the following:

(a) Fails to deliver the goods or complete the work or services within the time specified in the contract or any modification;

(b) Fails to make sufficient progress on contract performance so as to endanger performance of the contract within the time specified or in the manner specified in the contract;

(c) Fails or refuses to go forward with the work in accordance with the direction of the Contracting Officer;

(d) Expresses through word or conduct an intention not to complete the work in accordance with the directions of the Contracting Officer;

(e) Fails to perform any of the other provisions of the contract;

(f) Materially deviates from the representations and capabilities set forth in the Contractor’s response to the solicitation.

A termination for default is a final decision of a Contracting Officer. In order to contest a termination for default, the Contractor must submit a certified request to convert the termination for default to a termination for convenience with all documents supporting such conversion and comply with all contract provisions and laws relating to terminations for convenience, including the submission of a certified termination for convenience settlement proposal. The submission of the certified request for conversion to a termination for convenience and certified termination settlement proposal to the Contracting Officer must occur prior to 90 days from the date of the Contracting Officer’s final decision.

DELAYS—If the Contractor refuses or fails to prosecute the work, or any separable part thereof, with such diligence as will insure its completion within the time specified in the Contract, or any extension thereof, or fails to complete said work within specified time, the Government may, by written notice to the Contractor, terminate his right to proceed with the work or such part of the work involving the delay. In such event the Government may take over the work and prosecute the same to completion, by contract or otherwise, and may take possession of and utilize in completing the work such materials, appliances, and plant as may have been paid for by the Government or may be on the site of the work and necessary therefore. Whether or not the Contractor’s right to proceed with the work is terminated, he and his sureties shall be liable for any liability to the Government resulting from his refusal or failure to complete the work within the specified time.

If fixed and agreed liquidated damages are provided in the Contract and if the Government does not so terminate the Contractor’s right to proceed, the resulting damage will consist of such liquidated damages until the work is completed and accepted.

The Contractor’s right to proceed shall not be so terminated nor the Contractor charged with resulting damage if:

1. The delay in the completion the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of the public enemy, acts of the Government in either its sovereign or contractual capacity, acts of another contractor in the performance of a contract with the Government, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, climatic conditions beyond the normal which could be anticipated, or delays of subcontractors or suppliers arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and such subcontractors or suppliers (the term subcontractors or suppliers shall mean subcontractors or suppliers at any tier); and

2. The Contractor, within 72 hours from the beginning of any such delay, (unless the Contracting

Officer grants a further period of time before the date of final payment under the Contract) notifies the Contracting Officer in writing of the causes of delay.

The Contracting Officer shall ascertain the facts and the extent of the delay and extend the time for completing the work when, in his judgment, the findings of fact justify such an extension, and his findings of fact shall be final and conclusive on the parties, subject only to appeal as provided in Article 14 herein.

If, after notice of termination of the Contractor’s right to proceed under the provisions of this Article, it is determined for any reason that the Contractor was not in default under the provisions of this Article, or that the delay was excusable under the provisions of this Article, the rights and obligations of the parties shall be in accordance with Article 6 herein. Failure to agree to any such adjustment shall be a dispute concerning a question of fact within the meaning of Article 7 herein.

The rights and remedies of the Government provided in this Article are in addition to any other rights and remedies provided by law or under the Contract.

Article 17. Termination For Convenience Of The District:

(a) The District may terminate performance of work under this contract in whole or, from time to time, in part if the Contracting Officer determines that a termination is in the District’s interest. The Contracting Officer shall terminate by delivering to the Contractor a Notice of Termination specifying the extent of termination and effective date.

(b) After receipt of a Notice of Termination, and except as directed by the Contracting Officer, the Contractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this clause:

(1) Stop work as specified in the notice.

(2) Place no further subcontracts or orders (referred to as subcontracts in this clause) for materials, services, or facilities, except as necessary to complete the continued portion of the contract.

(3) Terminate all contracts to the extent they relate to the work terminated.

(4) Assign to the District, as directed by the Contracting Officer, all rights, title and interest of the Contractor under the subcontracts terminated, in which case the District will have the right to settle or pay any termination settlement proposal arising out of those terminations.

(5) With approval or ratification to the extent required by the Contracting Officer, settle all outstanding liabilities and termination settlement proposals arising from the termination of subcontracts. The approval or ratification will be final for purposes of this clause.

(6) As directed by the Contracting Officer, transfer title and deliver to the District (i) the fabricated or unfabricated parts, work in process, completed work, supplies, and other materials produced or acquired for the work terminated, and (ii) the completed or partially completed plans, drawings, information, and other property that, if the contract has been completed, would be required to be furnished to the District.

(7) Complete performance of the work not terminated.

(8) Take any action that may be necessary, or that the Contracting Officer may direct, for the protection and preservation of the property related to this contract that is in the possession of the Contractor and in which the District has or may acquire an interest. For items or components in the Contractor’s possession that have not been delivered to the District, the Contractor must return those items to their vendor of origin and provide to the District all documentation of the return and all evidence of any restocking fees paid. Otherwise, such items and components must be inventoried and documented by part number or serial number and delivered to the Contracting Officer in the manner so instructed.

(9) Use its best efforts to sell, as directed or authorized by the Contracting Officer, any property of the types referred to in subparagraph (6) above; provided, however, that the Contractor (i) is not required to extend credit to any purchaser and (ii) may acquire the property under the conditions prescribed by, and at prices approved by, the Contracting Officer. The proceeds of any transfer or disposition will be applied to reduce any payments to be made by the District under this contract, credited to the price or cost of the work, or paid in any other manner directed by the Contracting Officer.

(c) After the expiration of thirty (30) days (or such longer period as may be agreed to) after receipt by the Contracting Officer of acceptable inventory schedules, the Contractor may submit to the Contracting Officer a list, certified as to quantity and quality of termination inventory not previously disposed of excluding items authorized for disposition by the Contracting Officer. The Contractor may request the District to remove those items or enter into an agreement for their storage. Within fifteen (15) days, the District will accept title to those items and remove them or enter into a storage agreement. The Contracting Officer may verify the list upon removal of the items, or if stored, within forty five (45) days from submission of the list, and shall correct the list, as necessary, before final settlement.

(d) After termination, the Contractor shall submit a final termination settlement proposal to the Contracting Officer in the form and with the certification prescribed by the Contracting Officer. The Contractor shall submit the proposal promptly, but no later than ninety (90) days from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 90 day period. In the event the Contractor was terminated for default and it asserts that it is entitled to a termination for convenience, its certified request for the conversion of the default termination to one for convenience and its certified termination settlement proposal must be submitted to the Contracting Officer prior to the expiration of 90 days from the date of the default termination. With respect to a termination for convenience, if the Contracting Officer determines that the facts justify such action, he may receive and act upon any such termination claim at any time after such one year period or extension thereof. Nothing herein shall be construed to extend the time for the submission of a claim hereunder for a defaulted Contractor beyond 90 days from the date of the default termination. Upon failure of the Contractor to submit his termination claim within the time allowed, the Contracting Officer may, subject to any review required by the Government’s procedures in effect as of the date of execution of the Contract, determine, on the basis of information available to him, the amount, if any, due to the Contractor by reason of the termination and shall thereupon pay to the Contractor the amount so determined. The Parties agree that such a determination is final and binding.

(e) Subject to paragraph (d) above, the Contractor and the Contracting Officer may agree upon the whole or any part of the amount to be paid because of the termination. The amount may include a reasonable allowance for profit on work done. However, the agreed amount, whether under this paragraph (e) or paragraph (f) below, exclusive of costs shown in subparagraph (f)(3) below, may not exceed the total contract price as reduced by (1) the amount of payment previously made and (2) the contract price of work not terminated. The contract shall be amended, and the Contractor paid the agreed amount.

Paragraph (f) below shall not limit, restrict, or affect the amount that may be agreed upon to be paid under this paragraph.

(f) If the Contractor and the Contracting Officer fail to agree on the whole amount to be paid because of the termination work, the Contracting Officer shall pay the Contractor the amounts determined by the

Contracting Officer as follows, but without duplication of any amounts agreed on under paragraph (e) above:

(1) The contract price for completed supplies or services accepted by the District (or sold or acquired under subparagraph (b)(9) above) not previously paid for, adjusted for any saving of freight and other charges.

(2) The total of: (i) The costs incurred in the performance of the work terminated, including initial costs and preparatory expense allocable thereto, but excluding any costs attributable to supplies or services paid or to be paid under subparagraph (f)(1) above; (ii) The cost of settling and paying termination settlement proposals under terminated subcontracts that are properly chargeable to the terminated portion of the contract if not included in subparagraph (f)(1) above; and (iii) A sum, as profit on subparagraph f(1) above, determined by the Contracting Officer to be fair and reasonable; however, if it appears that the Contractor would have sustained a loss on the entire contract had it been completed, the Contracting Officer shall allow no profit under this subparagraph (iii) and shall reduce the settlement to reflect the indicated rate of loss.

(3) The reasonable cost of settlement of the work terminated, including: (i) Accounting, legal, clerical, and other expenses reasonably necessary for the preparation of termination settlement proposals and supporting data; (ii) The termination and settlement of subcontractors (excluding the amounts of such settlements); and (iii) Storage, transportation, and other costs incurred, reasonably necessary for the preservation, protection, or disposition of the termination inventory.

(g) Except for normal spoilage, and except to the extent that the District expressly assumed the risk of loss, the Contracting Officer shall exclude from the amounts payable to the Contractor under paragraph

(f) above, the fair value as determined by the Contracting Officer, of property that is destroyed, lost, stolen, or damaged so as to become undeliverable to the District or to a buyer.

(h) The Contractor shall have the right of appeal, under the Disputes clause, from any determination made by the Contracting Officer under paragraphs (d), (f) or (j), except that if the Contractor failed to submit the termination settlement proposal within the time provided in paragraph (d) or (j), and failed to request a time extension, there is no right of appeal. If the Contracting Officer has made a determination of the amount due under paragraph (d), (f) or (j), the District will pay the Contractor (1) the amount determined by the Contracting Officer if there is no right of appeal or if no timely appeal has been taken, or (2) the amount finally determined on an appeal.

(i) In arriving at the amount due the Contractor under this clause, there shall be deducted:

(1) All unliquidated advances or other payments to the Contractor under the termination portion of the contract;

(2) Any claim which the District has against the Contractor under this contract; and

(3) The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by the Contractor or sold under the provisions of this clause and not recovered by or credited to the District.

(j) If the termination is partial, the Contractor may file a proposal with the Contracting Officer for an equitable adjustment of the price(s) of the continued portion of the contract. The Contracting Officer shall make any equitable adjustment agreed upon. Any proposal by the Contractor for an equitable adjustment under this clause shall be submitted within ninety (90) days from the effective date of termination unless extended in writing by the Contracting Officer.

(k) (1) The District may, under the terms and conditions it prescribes, make partial payments and payments against costs incurred by the Contractor for the terminated portion of the contract, if the

Contracting Officer believes the total of these payments will not exceed the amount to which the Contractor shall be entitled.

(2) If the total payments exceed the amount finally determined to be due, the Contractor shall repay the excess to the District upon demand together with interest computed at the rate of 10 percent (10%) per year. Interest shall be computed for the period from the date the excess payment is received by the Contractor to the date the excess payment is repaid. Interest shall not be charged on any excess payment due to a reduction in the Contractor’s termination settlement proposal because of retention or other disposition of termination inventory until 10 days after the date of the retention or disposition, or a later date determined by the Contracting Officer because of the circumstances.

(l) Unless otherwise provided in this contract or by statute, the Contractor shall maintain all records and documents relating to the terminated portion of this contract for 3 years after final settlement. This includes all books and other evidence bearing on the Contractor’s costs and expenses under this contract. The Contractor shall make these records and documents available to the District, at the Contractor’s office, at all reasonable times, without any direct charge. If approved by the Contracting Officer, photographs, micrographs, or other authentic reproductions may be maintained instead of original records and documents.

Article 18. Recovery Of Debts Owed The District:

The Contractor hereby agrees that the District may use all or any portion of any payment, consideration or refund due the Contractor under the present contract to satisfy, in whole or part, any debt due the District.

Article 19. Retention and Examination Of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .