This document package contains architectural, mechanical, electrical, fire protection, and plumbing drawings for infrastructure upgrades at the Iowa City VA Medical Center. The drawings depict proposed demolition and construction work for multiple buildings on the medical center campus. They include floor plans, enlarged plans, elevations, sections, schedules and details. Proposed upgrades include renovations to data centers, electrical rooms, mechanical rooms and other clinical areas. The solicitation seeks a design-build contractor to complete the infrastructure upgrades according to the specifications and drawings provided.

View the file

Other files

File Type Posted
Amendment 0005 Attachment 2 - Brand Name Items - Johnson Control_Redacted.pdf PDF
Amendment 0005 Attachment 1 - Spec Section 260541.docx DOCX document
36C77622R0094 0005.docx DOCX document
36C77622R0094 0004.docx DOCX document
36C77622R0094 0004 - Attachment 1 - Additional RFI Responses.docx DOCX document
IMG_0087.jpg JPG image
IMG_0102.jpg JPG image
IMG_0088.jpg JPG image
IMG_0090.jpg JPG image
IMG_0092.jpg JPG image
IMG_0097.jpg JPG image
IMG_0086.jpg JPG image
IMG_0095.jpg JPG image
IMG_0099.jpg JPG image
IMG_0100.jpg JPG image
IMG_0089.jpg JPG image
IMG_0094.jpg JPG image
IMG_0091.jpg JPG image
IMG_0096.jpg JPG image
IMG_0101.jpg JPG image
36C77622R0094 0003.docx DOCX document
IMG_0085.jpg JPG image
IMG_0093.jpg JPG image
IMG_0098.jpg JPG image
Attachment 1 - RFI Answered.docx DOCX document
Attachment 2 - ICRA forms EHRM project.pdf PDF
36C77622R0094 0002.docx DOCX document
BUILDING WRAP PRODUCT DATA FOR SPEC.docx DOCX document
RackHat_V1-1.pdf PDF
HDPE LUMBER PRODUCT DATA FOR SPEC.docx DOCX document
VINYL RACK HAT PRODUCT DATA FOR SPEC.docx DOCX document
RFIs FROM GCs Resp All Disciplines 07 06 22.docx DOCX document
North American Fiberboard Association.pdf PDF
GEOFOAM PRODUCT DATA FOR SPEC.docx DOCX document
STRUCTURAL FIBERBOARD SHEATHING PRODUCT DATA FOR SPEC.docx DOCX document
Attachment 2 - Site Visit Sign in Sheet 6.9.22.pdf PDF
Attachment 7 - 231_01-A409 ADD 1.pdf PDF
Attachment 3 - Bandcroft addendum 1.docx DOCX document
Attachment 5 - 105 - 01-ET409EP ADD 1.pdf PDF
Attachment 8 - 246_01-FX409 ADD 1.pdf PDF
Attachment 4 - 88 - 01-ET109RP ADD 1.pdf PDF
Attachment 6 - 159 - 01-409-RSP ADD 1.pdf PDF
Attachment 10 - 282_01-E409 ADD 1.pdf PDF
36C77622R0094 0001.docx DOCX document
Attachment 9 - 264_01-M415 ADD 1.pdf PDF
Attachment 1 - Geotechnical Engineering Report.pdf PDF
Attachment 8 - 636A821700_BID 20220408 Dwgs_Part6.pdf PDF
Attachment 16 - VA 6500.6 Appendix C.pdf PDF
Attachment 15 - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Attachment 2 - 636A821700_BID 20220408 Spec V2.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRAC

CRAC-209

CRAC-210

C

D

C.9

B.9

9 109.2 9.8

G.1

H.9

A

G.2

H.8

UP

UP

UPUP

UP

UP

UP

BUS A2

BUS B2 C

R

AC

C R

AC

VESTIBULE

1S38

HVAC RETURN OPENING

HVAC RETURN OPENING

J J

TYP. FOR 27

J

PNL 'C2HB'

PNL 'C2HA'

PNL 'EQ2H'

BUS A1

BUS B1

T

PNL '2LA'

45KVA TRANSFORMER.

TRANSFORMER SHALL BE CEILING MOUNTED.

PROVIDE CHANNEL MOUNTING HARDWARE AS

REQUIRED.

100A ENCLOSED CIRCUIT

BREAKER

2LA-10

2LA-4

2LA-8

2LA-7

2LA-6

C2LA-1,3,5

2LA-5

2LA-5 2LA-4 2LA-4

2LA-22LA-2

2LA-4

2LA-2

2LA-6

2LA-6

2LA-8

2LA-8

2LA-8EQ2H-25,27,29 EQ2H-31,33,35

GFCI/WP

PNL 'C2LA'

PNL 'C2LB'

2LA-5

2LA-5

2LA-102LA-10 2LA-10

2LA-12,14,16

C2LA-2,4,6

C2LB-1,3,5

C2LA-7,9,11

C2LB-7,9,11 2LA-11,13,15C2LA-13,15,17

PWR

CABINET

1087LBS

I/O CABINET

463LBS

TRANSFORMER

CABINET

2640LBS

VRLA

BATTERY

3643LBS

VRLA

BATTERY

3643LBS

PW

R

CA

BIN

ET

LB

S

I/O

CA

BIN

ET

3L

BS

TR

AN

SF

OR

ME

R

CA

BIN

ET

LB

S

VR

LA

BA

TT

ER

Y

LB

S

VR

LA

BA

TT

ER

Y

LB

S

EQ2H-20,22,24

EQ2H-26,28,30

EQ2H-32,32,34

J J

JJ

7 8 9 10 11 12

A

11.19.99.18.17.1

HVAC RETURN OPENING C

D

C.9

B.9

9 109.2 9.8

G.1

H.9

A

G.2

H.8

UP

UP

UPUP

UP

UP

UP

C R

AC

BC

R

AC

A

PLATFORM

LIFT

VESTIBULE

1S38

S

X1

X1

A1

A1

A1

A1

A1

A2

A2

A1

A1

A2A2

A1A1A1A1

A2

HVAC RETURN OPENING

P M

P

S

S

S

B1

OS

OS

OS OS

OS

OS

OS

OS

SD

SD SDC2HA-1

C2HA-1 C2HA-1

C2HA-1C2HA-1

C2HA-1C2HA-1

C2HA-1

C2HA-1

C2HA-1

C2HA-1

C2HA-1

C2HA-1

C2HA-1

SD

SD

SD

SD

M

MM

M

S

S

S S

S S

B

B B

B B

TYP.

TYP.

BLDG FIRE ALARM

SPEAKER STROBE

(TYP.)

CP

A1

A1

C2HA-1

C2HA-1

A2

C2HA-1

A2

C2HA-1

A2

C2HA-1

A2

C2HA-1

A2

C2HA-1

A2

C2HA-1

A2

C2HA-1

C2HA-1C2HA-1C2HA-1

A1A1A1A1A1

C2HA-1 C2HA-1C2HA-1C2HA-1C2HA-1

A1A1A1A1A1

C2HA-1 C2HA-1C2HA-1C2HA-1C2HA-1

7 8 9 10 11 12

A

11.19.99.18.17.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A k:

\c cg _p ro je ct s\

\1 8-c2 d0 vi sn id iq (n or th d ak ot a io w a)

\3 6c

1r eh rm io w a ci ty

, i a\

0-d es do cs

\4

- d ra w in gs \W

O R

KI

N

G \A

C

AD

\3 6C

-1 8-

1-

-E

1.

2.

dw g 4/

7/

:0 0:

P

M

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

ELECTRICAL - BUILDING 02 - DATA

CENTER

CC FK 02-E401.2

SD

SD

A A A A A A

A

AA A A A A

A

A C.9

B.9

9.2 9.8

G.1

H.9

G.2

H.8

UP

UP

UP

UP

UP

UP

UP

UP

UP

ACCU-210

5 TONS

ACCU-209

5 TONS

ACCU-208

ACCU-2 ACCU-1

RTU-1

1000 CFM

EQ2H-2,4,6 EQ2H-7,9,11 EQ2H-1,3,5

EQ2H-14,16,18

EQ2H-8,10,12

EQ2H-19,21,23

2LA-1

PROVIDE STEEL CHANNEL

AS REQUIRED. (TYPICAL

FOR ALL RECEPTACLE ON

ROOF.)

GFCI/WP

GFCI/WP GFCI/WP

GFCI/WP

GFCI/WPGFCI/WP

2LA-1

2LA-1 2LA-3

2LA-3

2LA-3

A

A

A

A

TYP

TYP

7 8 9 10 11 12

A

11.19.99.18.17.1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A k:

\c cg _p ro je ct s\

\1 8-c2 d0 vi sn id iq (n or th d ak ot a io w a)

\3 6c

1r eh rm io w a ci ty

, i a\

0-d es do cs

\4

- d ra w in gs \W

O R

KI

N

G \A

C

AD

\3 6C

-1 8-

1-

-E

1.

3.

dw g 3/

/2

4:

:1

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

ELECTRICAL - BUILDING 02 - DATA

CENTER - ROOF PLAN

CC FK 02-E401.3

07-A401

07-E401

07-FX401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K C

C G

P

R O

J E

C T

S

C

D

V

I S

N

I D

I Q

N o r t h

D a k o t a o w a C

R

E

H R

M

I o w a

C i t y

I A

D e s D o c s

D r a w i n g s W

O R

K I N

G A

C A

D C

A d w g

A

M

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

ARCHITECTURAL - FLOOR PLAN -

BUILDING 07 - FIRST FLOOR

XX XX 07- A101

AutoCAD SHX Text 01-7

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 03-7

AutoCAD SHX Text 02-7

AutoCAD SHX Text 05-7

AutoCAD SHX Text 04-7

AutoCAD SHX Text 06-7

AutoCAD SHX Text

OPEN AIR COVERED AREA WITH CHAIN LINK FENCE

AutoCAD SHX Text 07-7

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

TO MEZZANINE

AutoCAD SHX Text

BLDG 11

AutoCAD SHX Text

TRANSFORMER PAD

AutoCAD SHX Text

BLDG 33

AutoCAD SHX Text

TRANSFORMER PAD

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECTURAL - BUILDING 7 - FIRST FLOOR

AutoCAD SHX Text

NORTH

ldikova Snapshot

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K C

C G

P

R O

J E

C T

S

C

D

V

I S

N

I D o r t h

D a k o t w a C

R

E

H R

M

I o w a

C i t y

I A

D e s D o c s

D r a w i n g s W

O R

K I N

G A

C A

D C

A d w g

A

M

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

ARCHITECTURAL - ENLARGED FLOOR

PLAN - BUILDING 07 - FIRST FLOOR

XX XX 07-A401

AutoCAD SHX Text

AREA OF WORK

AutoCAD SHX Text B

AutoCAD SHX Text

SCALE: 1"=16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 0'

AutoCAD SHX Text 32'

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING PARTITION

AutoCAD SHX Text

EXISTING DOOR

AutoCAD SHX Text

AREA OF DEMOLITION WORK, SEE KEYNOTES

AutoCAD SHX Text

NEW PARTITION SURFACE MATERIAL

AutoCAD SHX Text

FLOOR PLAN LEGEND

AutoCAD SHX Text

ROOM NAME ROOM NUMBER

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. A. SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW IN EACH TR CLOSET. B. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. C. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. D. SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA CENTER. E. PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS DURING CONSTRUCTION. F. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. G. INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM FINISH SCHEDULE SHEET 512. H. PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS I. FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN INCLUDED ON 75% SUBMITTAL. J. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE INVESTIGATION ALL DIMENSIONS, EXISTING COMPONENTS OF NEW AND EXISTING COLUMN LOCATIONS MUST BE VERIFIED IN FIELD.

AutoCAD SHX Text

DEMOLITION PLAN LEGEND

AutoCAD SHX Text EXISTING CONSTRUCTION TO BE REMOVED IN ITS ENTIRETY, INCLUDING WALL SWITCHES, OUTLETS, THERMOSTATS, ETC. PATCH ABUTTING WALLS, FLOORS AND CEILINGS AS REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE DEMOLITION IS COMPLETED.

AutoCAD SHX Text

EXISTING CONSTRUCTION TO REMAIN

AutoCAD SHX Text

FLOOR PLAN KEY NOTES

AutoCAD SHX Text X

AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 2. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH COATS OVER PATCHED/REPAIRED WALL SURFACES. 3. EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO MEET VA PSRDM REQUIREMENTS - 1/2" SILICONE SEALANT AT ALL (4) SIDES. 4. REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE AT ALL (4) EDGES. 5. FUTURE USE OF UTILITY CLOSET TO BE DETERMINED BY VA OR CURRENTLY UNDER CONSTRUCTION. SEE MEP & IT DRAWINGS FOR ADDITIONAL SOW IN THIS AREA. 6. EXISTING RAISED COMPUTER FLOORING TO REMAIN.

AutoCAD SHX Text

EXISTING DOOR TO BE REMOVED

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE 2. REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING AND SUPPORTS. 3. REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED MOLDINGS , TRIM, WIRESUPPORTS, AND/OR BRACING THROUGHOUT THE AREA. 4. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS 5. REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS 6. REMOVE EXISTING GYPSUM BOARD CEILING. REMOVE EXISTING GYPSUM BOARD CEILING. 7. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. 8. REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM DISPLACEMENT WITH THE VA. 9. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. 10. REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE. PREP AND LEVEL EXISTING CONCRETE FLOOR TO RECEIVE NEW FINISH. 11. REMOVE VINYL BASE ALONG EXISTING WALL. REMOVE VINYL BASE ALONG EXISTING WALL. 12. G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED EQUIPMENT AND TURN OVER TO V.A. 13. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA. 14. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. #####. . 15. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING FOR ACCESS. 16. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER AND SHALL EXTEND TO UNDERSIDE OF STRUCTURE. 17. FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

AutoCAD SHX Text X

AutoCAD SHX Text

DEMO CEILING KEYNOTES

AutoCAD SHX Text

17. REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING GRID, TILE , RELATED MOLDINGS, TRIM, WIRESUPPORTS AND/OR BRACING. G.C. SHALL TEMPORARY SUPPORT REMAINING EXISTING ACT CEILING SYSTEM UNTIL NEW WALL IS CONSTRUCTED. NEW ACT CEILING SYSTEM AND TILES SHALL BE INSTALLED TO MATCH EXISTING.

AutoCAD SHX Text NEW FULLY RECESSED FIRE EXTINGUISHER CABINET TO BE INSTALLED. PATCH AND MATCH EXISTING CONDITIONS

AutoCAD SHX Text

BUILDING 7 - FIRST FLOOR KEY PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 1'

AutoCAD SHX Text 6'

AutoCAD SHX Text 3/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

RM 04-7 - DEMOLITION PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 1'

AutoCAD SHX Text 6'

AutoCAD SHX Text 3/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

RM 7 - NEW WORK PLAN

AutoCAD SHX Text

NORTH

EQUIP RM

GENERAL FIRE PROTECTION NOTES

FIRE PROTECTION KEY NOTES

NOT ALL KEYNOTES APPLICABLE TO THIS DRAWING.

1. EXISTING AUTOMATIC SPRINKLER HEAD - TO REMAIN

2. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED.

3. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW

UPRIGHT SPRINKLER TO BE INSTALLED IN SAME LOCATION.

4. EXISTING AUTOMATIC SPRINKLER HEAD LOCATION - TO BE RELOCATED AS INDICATED WITH NEW

UPRIGHT AUTOMATIC SPRINKLER HEAD.

5. INSTALL NEW SEMI-RECESSED AUTOMATIC SPRINKLER HEAD.

6. INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD..

7. EXISTING LAY-IN TILE CEILING TO REMAIN, OR BE ADJUSTED BY GENERAL CONTRACTOR PER

ARCHITECTURAL DRAWING.

8. EXISTING LAY IN CEILING TO BE REMOVED BY GENERAL CONTRACTOR

9. EXISTING PLASTER CEILING TO BE REMOVED BY GENERAL CONTRACTOR.

10. ROOM SHALL HAVE NO CEILING.

11. NEW ROOM CONFIGURATION WILL REQUIRE FIELD ADJUSTMENT TO EXISTING SPRINKLER LAYOUT.

12. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW SEMI

RECESSED SPRINKLER HEAD TO BE INSTALLED IN SAME LOCATION.

13. SEE ARCHITECTURAL DRAWING FOR WORK IN ROOM(S) BELOW THIS AREA. ARCHITECTURAL AND

STRUCTURAL WORK MAY INCLUDE FIRE PROTECTION ADJUSTMENT DUE TO FIELD CONDITIONS.

A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND

SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER

DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE

PROTECTION CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS, BRANCH

PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN. REFER TO SPECIFICATION FOR DESIGN

CRITERIA.

B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, DATED JUNE 1, 2021.

C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.

D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND FEED MAINS, SERVING NEW

SPRINKLER LOCATIONS WITH MODIFIED ARM-OVER CONNECTIONS FED FROM EXISTING OUTLET.

SHOW ALL PIPING ON SHOP DRAWING SUBMITTAL.

E. CONTRACTOR TO TURN VERTICAL POSITION OF BRANCH 90 DEGREE FITTING FROM FACING

DOWNWARD TO UPWARD AND INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD TO MAINTAIN

FIRE SUPPRESSION PIPING ACTIVE DURING THE CONSTRUCTION. AT THE CONCLUSION OF THE

CONSTRUCTION, REVERSE THE 90 DEGREE FITTING TO ITS ORIGINAL CONFIGURATION, AND

PENDENT AUTOMATIC SPRINKLER HEADS WILL BE INSTALLED, WHERE REQUIRE.

F. AT LOCATIONS WHERE THE EXISTING AUTOMATIC SPRINKLERS ARE REMOVED, RELOCATED, OR

RE-INSTALLED, ONLY NEW AUTOMATIC SPRINKLER HEADS SHALL BE USED. NO AUTOMATIC

SPRINKLER HEADS SHALL BE RE-USED, IN ACCORDANCE WITH THE NFPA #13 REQUIREMENTS.

G. SEE ARCHITECTURAL DRAWINGS GENERAL NOTES AND KEY NOTING TO COORDINATE WORK.

H. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION

OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING

CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO

RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE

INVESTIGATION. ALL DIMENSIONS EXISTING COMPONENTS OF NEW AND EXISTING COLUMN

LOCATIONS MUST BE VERIFIED IN FIELD.

I. COORDINATE FINAL LOCATION OF AUTOMATIC SPRINKLER HEAD IN FIELD. ADJUST SO HEAD AND

FITTINGS ARE NOT DIRECTLY ABOVE DATA RACKS.

J. FIRE PROTECTION CONTRACTOR SHALL REVIEW WORK OF ALL TRADES TO VERIFY THE EXTENT OF

WORK IN ROOM AND COORDINATE.

K. REFER TO OVERALL ARCHITECTURAL FLOOR PLAN, OF THIS FLOOR, SHOWING EXTENT OR CABLE

AND CABLE TRAY MODIFICATIONS OF CEILING. COORDINATE FIRE PROTECTION WORK WITH

CEILING WORK. WHEREVER REQUIRED REMOVE EXISTING AUTOMATIC SPRINKLER HEAD

ASSEMBLY AND INSTALL A NEW A/S HEAD ASSEMBLY OF SAME TYPE IN REPAIRED CEILING.

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

8\

-1

6C

9D

V

IS

N

ID

IQ

(N or th D ak ot a

Io w

a) \3

6C

1R

EH

R M

Io w a

C ity

, I A\

0-

D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A C

AD

\3

6C -1

8-

1-

-F X4

.d w g

/7

/2

1:

:0

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

FIRE PROTECTION - ENLARGED

PLAN - BUILDING 07 - FIRST FLOOR

JPK RRR 07-FX401

KEY PLAN

N

HAZARDOUS

NON-RATED SMOKE PARTITION

1 HOUR SMOKE PARTITION

2 HOUR SMOKE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

HEALTHCARE OCCUPANCY

1 BUILDING 7 - FIRST FLOOR RM 7 ENLARGED PLAN

APPROXIMATE LOCATION OF IT RACK. COORDINATE WITH IT

DRAWINGS AND VA FOR EXACT LOCATION PRIOR TO ROUGH IN

AND INSTALLATION.

IT RACK

CONTRACTOR SHALL CONNECT CIRCUIT TO

NEAREST NORMAL PANEL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A k:

\c cg _p ro je ct s\

\1 8-c2 d0 vi sn id iq (n or th d ak ot a io w a)

\3 6c

1r eh rm io w a ci ty

, i a\

0-d es do cs

\4

- d ra w in gs \W

O R

KI

N

G \A

C

AD

\3 6C

-1 8-

1-

-E

1.

dw g

4/ 7/

2:

:2

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

ELECTRICAL - ENLARGED PLAN -

BUILDING 07 - FIRST FLOOR

CC FK 07-E401

16-A401

16-M401

07-E401

07-FX401

07-E401

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K C

C G

P

R O

J E

C T

S

C

D

V

I S

N

I D o r t h

D a k o t w a C

R

E

H R

M

I o w a

C i t y

I A

D e s D o c s

D r a w i n g s W

O R

K I N

G A

C A

D C

A d w g

A

M

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

ARCHITECTURAL - FLOOR PLAN -

BUILDING 16 - FIRST FLOOR

XX XX 16- A101

AutoCAD SHX Text 08-16

AutoCAD SHX Text 02-16

AutoCAD SHX Text 03-16

AutoCAD SHX Text 04-16

AutoCAD SHX Text 06-16

AutoCAD SHX Text 05-16

AutoCAD SHX Text

01ST-16

AutoCAD SHX Text 01-16

AutoCAD SHX Text

01ST-16

AutoCAD SHX Text 02A-16

AutoCAD SHX Text Mezzanine

AutoCAD SHX Text 07-16

AutoCAD SHX Text

01ST-16

AutoCAD SHX Text 07-16A

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECTURAL - BUILDING 16 - MEZZANINE

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECTURAL - BUILDING 16 - FIRST FLOOR

AutoCAD SHX Text

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K C

C G

P

R O

J E

C T

S

C

D

V

I S

N

I D o r t h

D a k o t w a C

R

E

H R

M

I o w a

C i t y

I A

D e s D o c s

D r a w i n g s W

O R

K I N

G A

C A

D C

A d w g

A

M

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

ARCHITECTURAL - ENLARGED FLOOR PLAN -

BUILDING 16 - MEZZANINE

XX XX 16- A401

AutoCAD SHX Text 07-16

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text

ROOM 1B01

AutoCAD SHX Text

XXXXX

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING PARTITION

AutoCAD SHX Text

EXISTING DOOR

AutoCAD SHX Text

AREA OF DEMOLITION WORK, SEE KEYNOTES

AutoCAD SHX Text

NEW PARTITION SURFACE MATERIAL

AutoCAD SHX Text

FLOOR PLAN LEGEND

AutoCAD SHX Text

ROOM NAME ROOM NUMBER

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. A. SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW IN EACH TR CLOSET. B. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. C. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. D. SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA CENTER. E. PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS DURING CONSTRUCTION. F. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. G. INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM FINISH SCHEDULE SHEET 512. H. PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS I. FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN INCLUDED ON 75% SUBMITTAL. J. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE INVESTIGATION ALL DIMENSIONS, EXISTING COMPONENTS OF NEW AND EXISTING COLUMN LOCATIONS MUST BE VERIFIED IN FIELD.

AutoCAD SHX Text

DEMOLITION PLAN LEGEND

AutoCAD SHX Text EXISTING CONSTRUCTION TO BE REMOVED IN ITS ENTIRETY, INCLUDING WALL SWITCHES, OUTLETS, THERMOSTATS, ETC. PATCH ABUTTING WALLS, FLOORS AND CEILINGS AS REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE DEMOLITION IS COMPLETED.

AutoCAD SHX Text

EXISTING CONSTRUCTION TO REMAIN

AutoCAD SHX Text

FLOOR PLAN KEY NOTES

AutoCAD SHX Text X

AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 2. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH COATS OVER PATCHED/REPAIRED WALL SURFACES. 3. EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO MEET VA PSRDM REQUIREMENTS - 1/2" SILICONE SEALANT AT ALL (4) SIDES. 4. REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE AT ALL (4) EDGES. 5. FUTURE USE OF UTILITY CLOSET TO BE DETERMINED BY VA OR CURRENTLY UNDER CONSTRUCTION. SEE MEP & IT DRAWINGS FOR ADDITIONAL SOW IN THIS AREA. 6. EXISTING RAISED COMPUTER FLOORING TO REMAIN.

AutoCAD SHX Text

EXISTING DOOR TO BE REMOVED

AutoCAD SHX Text

DEMOLITION KEY NOTES

AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE 2. REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING AND SUPPORTS. 3. REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED MOLDINGS , TRIM, WIRESUPPORTS, AND/OR BRACING THROUGHOUT THE AREA. 4. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS 5. REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS 6. REMOVE EXISTING GYPSUM BOARD CEILING. REMOVE EXISTING GYPSUM BOARD CEILING. 7. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. 8. REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM DISPLACEMENT WITH THE VA. 9. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. 10. REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE. PREP AND LEVEL EXISTING CONCRETE FLOOR TO RECEIVE NEW FINISH. 11. REMOVE VINYL BASE ALONG EXISTING WALL. REMOVE VINYL BASE ALONG EXISTING WALL. 12. G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED EQUIPMENT AND TURN OVER TO V.A. 13. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA. 14. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. #####. . 15. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING FOR ACCESS. 16. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER AND SHALL EXTEND TO UNDERSIDE OF STRUCTURE. 17. FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

AutoCAD SHX Text X

AutoCAD SHX Text

DEMO CEILING KEYNOTES

AutoCAD SHX Text

17. REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING GRID, TILE , RELATED MOLDINGS, TRIM, WIRESUPPORTS AND/OR BRACING. G.C. SHALL TEMPORARY SUPPORT REMAINING EXISTING ACT CEILING SYSTEM UNTIL NEW WALL IS CONSTRUCTED. NEW ACT CEILING SYSTEM AND TILES SHALL BE INSTALLED TO MATCH EXISTING.

AutoCAD SHX Text NEW FULLY RECESSED FIRE EXTINGUISHER CABINET TO BE INSTALLED. PATCH AND MATCH EXISTING CONDITIONS

AutoCAD SHX Text

BUILDING 16 - FIRST FLOOR KEY PLAN

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 1'

AutoCAD SHX Text 6'

AutoCAD SHX Text 3/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

RM 07-16 - DEMOLITION PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 1'

AutoCAD SHX Text 6'

AutoCAD SHX Text 3/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

RM 07-16 - NEW WORK PLAN

AutoCAD SHX Text

NORTH

001_G001
G001 COVER SHEET
004_G004
G004 DRAWING INDEX
002_G002
G002 DRAWING INDEX
003_G003
G003 DRAWING INDEX
005_G005
G005 CODE ANALYSIS
006_GI001
GI001 GENERAL - CONTRACTOR & BASIS-OF-DESIGN PROTOCOL NOTES
007_GI002
GI002 GENERAL - PROTECTION PROTOCOL, SCOPE OF WORK AND MISC. NOTES
008_GI003
GI003 GENERAL - DEMOLITION NOTES
009_GI100SB
GI100SB GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SUB BASEMENT
010_GI100
GI100 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - BASEMENT
011_GI101
GI101 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - FIRST FLOOR
012_GI102
GI102 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SECOND FLOOR
013_GI103
GI103 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - THIRD FLOOR
014_GI104
GI104 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - FOURTH FLOOR
015_GI105
GI105 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - FIFTH FLOOR
016_GI106
GI106 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SIXTH FLOOR
017_GI107
GI107 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SEVENTH FLOOR
018_GI108
GI108 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - EIGHTH FLOOR
019_GI109
GI109 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - NINTH FLOOR
020_GI110
GI110 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - TENTH FLOOR
021_02-GI302
02-GI302 GENERAL - LIFE SAFETY - BLDG 2 - SECOND FLOOR
022_GI403
GI403 GENERAL - INFECTION CONTROL - CLASS III DETAILS
023_GI404
GI404 GENERAL - INFECTION CONTROL - CLASS IV DETAILS
024_GTM100
GTM100 GENERAL - TRAFFIC MANAGEMENT - OVERALL SITE PLAN
025_GTM101
GTM101 GENERAL - TRAFFIC MANAGEMENT
026_GTM102
GTM102 GENERAL - TRAFFIC MANAGEMENT
027_GTM103
GTM103 GENERAL - TRAFFIC MANAGEMENT
028_GTM104
GTM104 GENERAL - TRAFFIC MANAGEMENT
029_GTM105
GTM105 GENERAL - TRAFFIC MANAGEMENT
042_A001
A001 ABBREVIATIONS, SYMBOLS, & STANDARD MOUNTING HEIGHTS
043_A511
A511 ARCHITECTURAL - PARTITION TYPES
1
044_A512
A512 ARCHITECTURAL - FINISHES AND SIGNAGE
045_A601
A601 ARCHITECTURAL - DOOR SCHEDULE & DETAILS
DOOR TYPES
46_FX001
FX001 FIRE PROTECTION - GENERAL NOTES, ABBREVIATIONS, & SYMBOLS
47_FX501
FX501 FIRE PROTECTIONS - DETAILS
48_P001
P001 PLUMBING - GENERAL NOTES, ABBREVIATIONS, & SYMBOLS
49_P501
P501 PLUMBING - DETAILS
50_M001
M001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND NOTES
51_M501
M501 MECHANICAL DETAILS
52_M502
M502 MECHANICAL DETAILS
53_M503
M503 MECHANICAL DETAILS
54_M601
M601 MECHANICAL EQUIPMENT SCHEDULES
55_M602
M602 MECHANICAL EQUIPMENT SCHEDULES
56_M603
M603 MECHANICAL EQUIPMENT SCHEDULES
57_M701
M701 MECHANICAL - TEMPERATURE CONTROLS & SEQUENCE OF OPERATION
58_M702
M702 MECHANICAL - TEMPERATURE CONTROLS & SEQUENCE OF OPERATION
59_M703
M703 MECHANICAL - TEMPERATURE CONTROLS & SEQUENCE OF OPERATION
60 - E001
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTES
61 - E501
E501 ELECTRICAL - DETAILS
62 - E502
E502 ELECTRICAL - DETAILS
63 - E503
E503 ELECTRICAL - DETAILS
64 - E601
E601 ELECTRICAL - ONELINE
65 - E701
E701 ELECTRICAL - PANEL AND LIGHT FIXTURE SCHEDULES
177_01-A100SB.1
01-A100SB.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SUBBASEMENT
178_01-A100SB.2
01-A100SB.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SUBBASEMENT
179_01-A100.1
01-A100.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT
180_01-A100.2
01-A100.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT
181_01-A100.3
01-A100.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT
182_01-A100.4
01-A100.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT
183_01-A101.1
01-A101.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR
184_01-A101.2
01-A101.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR
185_01-A101.3
01-A101.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR
186_01-A101.4
01-A101.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR
187_01-A101.5
01-A101.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR
188_01-A102.1
01-A102.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR
189_01-A102.2
01-A102.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR
190_01-A102.3
01-A102.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR
191_01-A102.4
01-A102.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR
192_01-A102.5
01-A102.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR
193_01-A103.1
01-A103.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR
194_01-A103.2
01-A103.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR
195_01-A103.3
01-A103.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR
196_01-A103.4
01-A103.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR
197_01-A103.5
01-A103.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR
198_01-A104.1
01-A104.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR
199_01-A104.2
01-A104.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR
200_01-A104.3
01-A104.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR
201_01-A104.4
01-A104.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR
202_01-A104.5
01-A104.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR
203_01-A105.1
01-A105.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIFTH FLOOR
204_01-A105.2
01-A105.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIFTH FLOOR
205_01-A105.3
01-A105.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIFTH FLOOR
206_01-A106.1
01-A106.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SIXTH FLOOR
207_01-A106.2
01-A106.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SIXTH FLOOR
208_01-A106.3
01-A106.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SIXTH FLOOR
209_01-A107.1
01-A107.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SEVENTH FLOOR
210_01-A107.2
01-A107.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SEVENTH FLOOR
211_01-A108.1
01-A108.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - EIGHTH FLOOR
212_01-A108.2
01-A108.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - EIGHTH FLOOR
213_01-A109.1
01-A109.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - NINTH FLOOR
214_01-A109.2
01-A109.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - NINTH FLOOR
215_01-A110.1
01-A110.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - TENTH FLOOR
216_01-A110.2
01-A110.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - TENTH FLOOR
217_01-A400SB
01-A400SB ARCHITECTURAL- ENLARGED FLOOR PLAN - BUILDING 01 - SUB BASEMENT
218_01-A400
01-A400 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - BASEMENT
219_01-A401
01-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - FIRST FLOOR
220_01-A401.A
01 A401.A ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILIDNG 01 - FIRST FLOOR
221_01-A402
01-A402 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - SECOND FLOOR
222_01-A402.A
01-A402.A ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - SECOND FLOOR
223_01-A403
01-A403 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - THIRD FLOOR
224_01-A403.A
01-A403.A ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - THIRD FLOOR
225_01-A404
01-A404 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - FOURTH FLOOR
226_01-A404.A
01-A404.A ARCHITECTURAL- ENLARGED FLOOR PLAN - BUILDING 01 - FOURTH FLOOR
227_01-A405
01-A405 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - FIFTH FLOOR
228_01-A406
01-A406 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - SIXTH FLOOR
229_01-A407
01-A407 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 -SEVENTH FLOOR
230_01-A408
01-A408 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - EIGHTH FLOOR
231_01-A409
01-A409 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - NINTH FLOOR
232_01-A410
01-A410 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - TENTH FLOOR
233_01-A411
01-A411 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - BASEMENT
234_01-A412
01-A412 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - THIRD FLOOR
235_01-A413
01-A413 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - 7TH, 8TH
236_01-FX400SB
01-FX400SB FIRE PROTECTION - ENLARGED PLAN-BUILDING 1 - SUB-BASEMENT
237_01-FX400
01-FX400 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - BASEMENT
238_01-FX401
01-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - FIRST FLOOR
239_01-FX402
01-FX402 FIRE PROTECTION - ENLARGED PLAN- BUILDING 1 - SECOND FLOOR
240_01-FX403
01-FX403 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - THIRD FLOOR
241_01-FX404
01-FX404 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - FOURTH FLOOR
242_01-FX405
01-FX405 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - FIFTH FLOOR
243_01-FX406
01-FX406 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - SIXTH FLOOR
244_01-FX407
01-FX407 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - SEVENTH FLOOR
245_01-FX408
01-FX408 FIRE PROTECTION - ENLARGED PLAN- BUILDING 1 - EIGHTH FLOOR
246_01-FX409
01-FX409 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - NINTH FLOOR
247_01-FX410
01-FX410 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - TENTH FLOOR
248_01-P408
01-P408 PLUMBING - ENLARGED PLAN - BUILDING 01 - EIGTH FLOOR
249_01-M400
01-M400 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SUB BASEMENT
250_01-M401
01-M401 MECHANICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT
251_01-M402
01-M402 MECHANICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT
252_01-M403
01-M403 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR
253_01-M404
01-M404 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR
254_01-M405
01-M405 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR
255_01-M406
01-M406 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SECOND FLOOR
256_01-M407
01-M407 MECHANICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR
257_01-M408
01-M408 MECHANICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR
258_01-M409
01-M409 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FOURTH FLOOR
259_01-M410
01-M410 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FOURTH FLOOR
260_01-M411
01-M411 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIFTH FLOOR
261_01-M412
01-M412 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SIXTH FLOOR
262_01-M413
01-M413 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SEVENTH FLOOR
263_01-M414
01-M414 MECHANICAL - ENLARGED PLAN - BUILDING 01 - EIGHTH FLOOR
264_01-M415
01-M415 MECHANICAL - ENLARGED PLAN - BUILDING 01 - NINTH FLOOR
265_01-M416
01-M416 MECHANICAL - ENLARGED PLAN - BUILDING 01 - TENTH FLOOR
266_01-M417
01-M417 MECHANICAL - TR REINFORCEMENT
267_01-M418
01-M418 MECHANICAL - TR REINFORCEMENT
268_01-M419
01-M419 MECHANICAL - TR REINFORCEMENT
269 - 01-E100
01-E100 ELECTRICAL - SITE PLAN
270 - 01-E400SB
01-E400SB ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SUB BASEMENT
271 - 01-E400
01-E400 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT
272 - 01-E401A
01-E401A ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR
273 - 01-E401B
01-E401B ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR
274 - 01-E401.1
01-E401.1_void
275 - 01-E402
01-E402 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SECOND FLOOR
276 - 01-E403
01-E403 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR
277 - 01-E404
01-E404 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FOURTH FLOOR
278 - 01-E405
01-E405 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FIFTH FLOOR
279 - 01-E406
01-E406 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SIXTH FLOOR
280 - 01-E407
01-E407 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SEVENTH FLOOR
281 - 01-E408
01-E408 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - EIGHTH FLOOR
282 - 01-E409
01-E409 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - NINTH FLOOR
283 - 01-E410
01-E410 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - TENTH FLOOR
284 - 01-E411
01-E411 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT
285 - 01-E412
01-E412 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR
286 - 01-E413
01-E413 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - 7TH, 8TH
301_02-A001
02-A001 ARCHITECTURAL - ORIENTATION & ICRA PLAN - BLDG 02 - 1ST FLOOR
302_02-A002
02-A002 ARCHITECTURAL - ORIENTATION & ICRA PLAN - BLDG 02 - 2ND FLOOR
303_02-AD101.1
02-AD101.1 ARCHITECTURAL - DEMOLITION PLAN - BLDG 02 - 1ST FLOOR
304_02-AD102.1
02-AD102.1
305_02-AD301
02-AD301 ARCHITECTURAL - DEMOLITION SECTIONS & DETAILS - BLDG 02
306_02-A101.1
02-A101.1 ARCHITECTURAL - ENLARGED FLOOR PLAN - BLDG 02 - 1ST FLOOR
307_02-A102.1
02-A102.1 ARCHITECTURAL - ENLARGED FLOOR PLAN - BLDG 02 - 2ND FLOOR
308_02-A103.1
02-A103.1 ARCHITECTURAL - ENLARGED ROOF PLAN - BLDG 02 - DATA CENTER
309_02-AC102.1
02-AC102.1
310_02-A201
02-A201 ARCHITECTURAL - EXTERIOR ELEVATIONS-SECTIONS - BLDG 02
311_02-A202
02-A202
312_02-A301
02-A301
313_02-A401
02-A401 ARCHITECTURAL - INTERIOR ELEVATIONS, FFE SCHEDULE AND DETAILS
314_02-A501
02-A501 ARCHITECTURAL - WALL TYPES AND WALL SECTIONS - BLDG 02
315_02-A502
02-A502 ARCHITECTURAL - WALL SECTIONS AND DETAILS - BLDG 02
316_02-A503
02-A503 ARCHITECTURAL - PLAN DETAILS - BLDG 02
317_02-A504
02-A504 ARCHITECTURAL - DETAILS - BLDG 02
318_02-FX101
02-FX101 FIRE PROTECTION - BUILDING 02 - FIRST FLOOR
319_02-FX102
02-FX102 FIRE PROTECTION - BUILDING 02 - SECOND FLOOR DATA CENTER
320_02-P101
02-P101
321_02-P102
02-P102 PLUMBING - BUILDING 2 - SECOND FLOOR DATA CENTER
323_02-P401
02-P401
324_02-MD102
02-MD102 MECHANICAL - BUILDING 02 - DATA CENTER - DEMOLITION PLAN
325_02-M102
02-M102 MECHANICAL - BUILDING 02 - DATA CENTER
326_02-M103
02-M103 MECHANICAL - BUILDING 02 - DATA CENTER ROOF
327_02-M401
02-M401 MECHANICAL - ENLARGED PLAN - BUILDING 02 - WAREHOUSE
328 - 02-E401.1
02-E401.1 ELECTRICAL - BUILDING 02 - MAIN ELECTRICAL ROOM
329 - 02-E401.2
02-E401.2 ELECTRICAL - BUILDING 02 - DATA CENTER
330 - 02-E401.3
02-E401.3 ELECTRICAL - BUILDING 02 - DATA CENTER - ROOF PLAN
332_07-A101
07-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 07 - FIRST FLOOR
333_07-A401
07-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 07 - FIRST FLOOR
334_07-FX401
07-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 07 - FIRST FLOOR
335 - 07-E401
07-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 07 - FIRST FLOOR
336_16-A101
16-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 16 - FIRST FLOOR
337_16-A401
16-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 16 - MEZZANINE
338_16-FX401
16-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 16 - FIRST FLOOR
339_16-M401
16-M401 MECHANICAL - ENLARGED PLAN - BUILDING 16
340 - 16-E401
16-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 16 - FIRST FLOOR
341_20-A101
20-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 20 - FIRST FLOOR
342_20-A401
20-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 20 - FIRST FLOOR
343_20-FX401
20-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 20 - FIRST FLOOR
344_20-M401
20-M401 MECHANICAL - ENLARGED PLAN - BUILDING 20 - FIRST FLOOR
345 - 20-E401
20-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 20 - FIRST FLOOR
346_40-A103
40-A103 ARCHITECTURAL - FLOOR PLAN - BUILDING 40 - THIRD FLOOR
347_40-A401
40-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN BUILDING 40 - THIRD FLOOR
348_40-FX401
40-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 40 - THIRD FLOOR
349_40-M401
40-M401 MECHANICAL - ENLARGED PLAN - BUILDING 40 - THIRD FLOOR
350 - 40-E401
40-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 40 - THIRD FLOOR
351_41-A10B
41-A10B ARCHITECTURAL - FLOOR PLAN - BUILDING 41 - BASEMENT
352_41-A401
41-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 41 - BASEMENT
353_41-FX401
41-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 41 - BASEMENT
354_41-M401
41-M401 MECHANICAL - ENLARGED PLAN - BUILDING 41 - BASEMENT
355 - 41-E401
41-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 41 - BASEMENT
356_42-A101
42-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 42 - THIRD FLOOR
357_42-A401
42-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 42 - THIRD FLOOR
358_42-FX401
42-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 42 - FIRST FLOOR
359_42-M401
42-M401 MECHANICAL - ENLARGED PLAN - BUILDING 42 - THIRD FLOOR
360 - 42-E401
42-E401 ELECTRICAL- ENLARGED PLAN - BUILDING 42 - FIRST FLOOR
361_49-A10G
49-A10G
362_49-A401
49-A40G
363_49-FX401
49-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 49 - GROUND FLOOR
364_49-M401
49-M401 MECHANICAL - ENLARGED PLAN - BUILDING 49 - GROUND FLOOR
365 - 49-E401
49-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 49 - GROUND FLOOR
366_50-A101
50-A101
367_50-A102
50-A102 ARCHITECTURAL - FLOOR PLAN - BUILDING 50 - SECOND FLOOR
368_50-A401
50-A401
369_50-FX401
50-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 50
370_50-P401
50-P401
371_50-M401
50-M401 MECHANICAL - ENLARGED PLAN - BUILDING 50
372_50-M402
50-M402 MECHANICAL - ENLARGED PLAN - BUILDING 50
373 - 50-E401
50-E401 ELECTRICAL - ENLARGED FLOOR PLAN - BUILDING 50 - FIRST FLOOR
374_51-A101
51-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 51- FIRST FLOOR
375_51-A401
51-A401
376_51-FX401
51-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 51 - FIRST FLOOR
377_51-P401
51-P401
378_51-A401
51-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 51 - FIRST FLOOR
378_51-M401
51-M401 MECHANICAL - ENLARGED PLAN - BUILDING 51 - FIRST FLOOR
379 - 51-E401
51-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 51 - FIRST FLOOR