Attachment 9 - 636A821700_BID 20220408 Dwgs_Part7.pdf
PDF 4 MB Posted
- Attached to
- Y1DA--Iowa City | EHRM Infrastructure Upgrades
- Solicitation number
- 36C77622R0094
About this file
This document package contains architectural, mechanical, electrical, fire protection, and plumbing drawings for infrastructure upgrades at the Iowa City VA Medical Center. The drawings depict proposed demolition and construction work for multiple buildings on the medical center campus. They include floor plans, enlarged plans, elevations, sections, schedules and details. Proposed upgrades include renovations to data centers, electrical rooms, mechanical rooms and other clinical areas. The solicitation seeks a design-build contractor to complete the infrastructure upgrades according to the specifications and drawings provided.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRAC
CRAC-209
CRAC-210
C
D
C.9
B.9
9 109.2 9.8
G.1
H.9
A
G.2
H.8
UP
UP
UPUP
UP
UP
UP
BUS A2
BUS B2 C
R
AC
C R
AC
VESTIBULE
1S38
HVAC RETURN OPENING
HVAC RETURN OPENING
J J
TYP. FOR 27
J
PNL 'C2HB'
PNL 'C2HA'
PNL 'EQ2H'
BUS A1
BUS B1
T
PNL '2LA'
45KVA TRANSFORMER.
TRANSFORMER SHALL BE CEILING MOUNTED.
PROVIDE CHANNEL MOUNTING HARDWARE AS
REQUIRED.
100A ENCLOSED CIRCUIT
BREAKER
2LA-10
2LA-4
2LA-8
2LA-7
2LA-6
C2LA-1,3,5
2LA-5
2LA-5 2LA-4 2LA-4
2LA-22LA-2
2LA-4
2LA-2
2LA-6
2LA-6
2LA-8
2LA-8
2LA-8EQ2H-25,27,29 EQ2H-31,33,35
GFCI/WP
PNL 'C2LA'
PNL 'C2LB'
2LA-5
2LA-5
2LA-102LA-10 2LA-10
2LA-12,14,16
C2LA-2,4,6
C2LB-1,3,5
C2LA-7,9,11
C2LB-7,9,11 2LA-11,13,15C2LA-13,15,17
PWR
CABINET
1087LBS
I/O CABINET
463LBS
TRANSFORMER
CABINET
2640LBS
VRLA
BATTERY
3643LBS
VRLA
BATTERY
3643LBS
PW
R
CA
BIN
ET
LB
S
I/O
CA
BIN
ET
3L
BS
TR
AN
SF
OR
ME
R
CA
BIN
ET
LB
S
VR
LA
BA
TT
ER
Y
LB
S
VR
LA
BA
TT
ER
Y
LB
S
EQ2H-20,22,24
EQ2H-26,28,30
EQ2H-32,32,34
J J
JJ
7 8 9 10 11 12
A
11.19.99.18.17.1
HVAC RETURN OPENING C
D
C.9
B.9
9 109.2 9.8
G.1
H.9
A
G.2
H.8
UP
UP
UPUP
UP
UP
UP
C R
AC
BC
R
AC
A
PLATFORM
LIFT
VESTIBULE
1S38
S
X1
X1
A1
A1
A1
A1
A1
A2
A2
A1
A1
A2A2
A1A1A1A1
A2
HVAC RETURN OPENING
P M
P
S
S
S
B1
OS
OS
OS OS
OS
OS
OS
OS
SD
SD SDC2HA-1
C2HA-1 C2HA-1
C2HA-1C2HA-1
C2HA-1C2HA-1
C2HA-1
C2HA-1
C2HA-1
C2HA-1
C2HA-1
C2HA-1
C2HA-1
SD
SD
SD
SD
M
MM
M
S
S
S S
S S
B
B B
B B
TYP.
TYP.
BLDG FIRE ALARM
SPEAKER STROBE
(TYP.)
CP
A1
A1
C2HA-1
C2HA-1
A2
C2HA-1
A2
C2HA-1
A2
C2HA-1
A2
C2HA-1
A2
C2HA-1
A2
C2HA-1
A2
C2HA-1
C2HA-1C2HA-1C2HA-1
A1A1A1A1A1
C2HA-1 C2HA-1C2HA-1C2HA-1C2HA-1
A1A1A1A1A1
C2HA-1 C2HA-1C2HA-1C2HA-1C2HA-1
7 8 9 10 11 12
A
11.19.99.18.17.1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A k:
\c cg _p ro je ct s\
\1 8-c2 d0 vi sn id iq (n or th d ak ot a io w a)
\3 6c
1r eh rm io w a ci ty
, i a\
0-d es do cs
\4
- d ra w in gs \W
O R
KI
N
G \A
C
AD
\3 6C
-1 8-
1-
-E
1.
2.
dw g 4/
7/
:0 0:
P
M
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
ELECTRICAL - BUILDING 02 - DATA
CENTER
CC FK 02-E401.2
SD
SD
A A A A A A
A
AA A A A A
A
A C.9
B.9
9.2 9.8
G.1
H.9
G.2
H.8
UP
UP
UP
UP
UP
UP
UP
UP
UP
ACCU-210
5 TONS
ACCU-209
5 TONS
ACCU-208
ACCU-2 ACCU-1
RTU-1
1000 CFM
EQ2H-2,4,6 EQ2H-7,9,11 EQ2H-1,3,5
EQ2H-14,16,18
EQ2H-8,10,12
EQ2H-19,21,23
2LA-1
PROVIDE STEEL CHANNEL
AS REQUIRED. (TYPICAL
FOR ALL RECEPTACLE ON
ROOF.)
GFCI/WP
GFCI/WP GFCI/WP
GFCI/WP
GFCI/WPGFCI/WP
2LA-1
2LA-1 2LA-3
2LA-3
2LA-3
A
A
A
A
TYP
TYP
7 8 9 10 11 12
A
11.19.99.18.17.1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A k:
\c cg _p ro je ct s\
\1 8-c2 d0 vi sn id iq (n or th d ak ot a io w a)
\3 6c
1r eh rm io w a ci ty
, i a\
0-d es do cs
\4
- d ra w in gs \W
O R
KI
N
G \A
C
AD
\3 6C
-1 8-
1-
-E
1.
3.
dw g 3/
/2
4:
:1
PM
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
ELECTRICAL - BUILDING 02 - DATA
CENTER - ROOF PLAN
CC FK 02-E401.3
07-A401
07-E401
07-FX401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
C
D
V
I S
N
I D
I Q
N o r t h
D a k o t a o w a C
R
E
H R
M
I o w a
C i t y
I A
D e s D o c s
D r a w i n g s W
O R
K I N
G A
C A
D C
A d w g
A
M
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
ARCHITECTURAL - FLOOR PLAN -
BUILDING 07 - FIRST FLOOR
XX XX 07- A101
AutoCAD SHX Text 01-7
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 03-7
AutoCAD SHX Text 02-7
AutoCAD SHX Text 05-7
AutoCAD SHX Text 04-7
AutoCAD SHX Text 06-7
AutoCAD SHX Text
OPEN AIR COVERED AREA WITH CHAIN LINK FENCE
AutoCAD SHX Text 07-7
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
TO MEZZANINE
AutoCAD SHX Text
BLDG 11
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text
BLDG 33
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
ARCHITECTURAL - BUILDING 7 - FIRST FLOOR
AutoCAD SHX Text
NORTH
ldikova Snapshot
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
C
D
V
I S
N
I D o r t h
D a k o t w a C
R
E
H R
M
I o w a
C i t y
I A
D e s D o c s
D r a w i n g s W
O R
K I N
G A
C A
D C
A d w g
A
M
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
ARCHITECTURAL - ENLARGED FLOOR
PLAN - BUILDING 07 - FIRST FLOOR
XX XX 07-A401
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text B
AutoCAD SHX Text
SCALE: 1"=16'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 0'
AutoCAD SHX Text 32'
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING PARTITION
AutoCAD SHX Text
EXISTING DOOR
AutoCAD SHX Text
AREA OF DEMOLITION WORK, SEE KEYNOTES
AutoCAD SHX Text
NEW PARTITION SURFACE MATERIAL
AutoCAD SHX Text
FLOOR PLAN LEGEND
AutoCAD SHX Text
ROOM NAME ROOM NUMBER
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. A. SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW IN EACH TR CLOSET. B. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. C. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. D. SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA CENTER. E. PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS DURING CONSTRUCTION. F. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. G. INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM FINISH SCHEDULE SHEET 512. H. PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS I. FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN INCLUDED ON 75% SUBMITTAL. J. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE INVESTIGATION ALL DIMENSIONS, EXISTING COMPONENTS OF NEW AND EXISTING COLUMN LOCATIONS MUST BE VERIFIED IN FIELD.
AutoCAD SHX Text
DEMOLITION PLAN LEGEND
AutoCAD SHX Text EXISTING CONSTRUCTION TO BE REMOVED IN ITS ENTIRETY, INCLUDING WALL SWITCHES, OUTLETS, THERMOSTATS, ETC. PATCH ABUTTING WALLS, FLOORS AND CEILINGS AS REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE DEMOLITION IS COMPLETED.
AutoCAD SHX Text
EXISTING CONSTRUCTION TO REMAIN
AutoCAD SHX Text
FLOOR PLAN KEY NOTES
AutoCAD SHX Text X
AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 2. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH COATS OVER PATCHED/REPAIRED WALL SURFACES. 3. EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO MEET VA PSRDM REQUIREMENTS - 1/2" SILICONE SEALANT AT ALL (4) SIDES. 4. REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE AT ALL (4) EDGES. 5. FUTURE USE OF UTILITY CLOSET TO BE DETERMINED BY VA OR CURRENTLY UNDER CONSTRUCTION. SEE MEP & IT DRAWINGS FOR ADDITIONAL SOW IN THIS AREA. 6. EXISTING RAISED COMPUTER FLOORING TO REMAIN.
AutoCAD SHX Text
EXISTING DOOR TO BE REMOVED
AutoCAD SHX Text
DEMOLITION KEY NOTES
AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE 2. REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING AND SUPPORTS. 3. REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED MOLDINGS , TRIM, WIRESUPPORTS, AND/OR BRACING THROUGHOUT THE AREA. 4. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS 5. REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS 6. REMOVE EXISTING GYPSUM BOARD CEILING. REMOVE EXISTING GYPSUM BOARD CEILING. 7. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. 8. REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM DISPLACEMENT WITH THE VA. 9. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. 10. REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE. PREP AND LEVEL EXISTING CONCRETE FLOOR TO RECEIVE NEW FINISH. 11. REMOVE VINYL BASE ALONG EXISTING WALL. REMOVE VINYL BASE ALONG EXISTING WALL. 12. G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED EQUIPMENT AND TURN OVER TO V.A. 13. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA. 14. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. #####. . 15. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING FOR ACCESS. 16. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER AND SHALL EXTEND TO UNDERSIDE OF STRUCTURE. 17. FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.
AutoCAD SHX Text X
AutoCAD SHX Text
DEMO CEILING KEYNOTES
AutoCAD SHX Text
17. REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING GRID, TILE , RELATED MOLDINGS, TRIM, WIRESUPPORTS AND/OR BRACING. G.C. SHALL TEMPORARY SUPPORT REMAINING EXISTING ACT CEILING SYSTEM UNTIL NEW WALL IS CONSTRUCTED. NEW ACT CEILING SYSTEM AND TILES SHALL BE INSTALLED TO MATCH EXISTING.
AutoCAD SHX Text NEW FULLY RECESSED FIRE EXTINGUISHER CABINET TO BE INSTALLED. PATCH AND MATCH EXISTING CONDITIONS
AutoCAD SHX Text
BUILDING 7 - FIRST FLOOR KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'
AutoCAD SHX Text 6'
AutoCAD SHX Text 3/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
RM 04-7 - DEMOLITION PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'
AutoCAD SHX Text 6'
AutoCAD SHX Text 3/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
RM 7 - NEW WORK PLAN
AutoCAD SHX Text
NORTH
EQUIP RM
GENERAL FIRE PROTECTION NOTES
FIRE PROTECTION KEY NOTES
NOT ALL KEYNOTES APPLICABLE TO THIS DRAWING.
1. EXISTING AUTOMATIC SPRINKLER HEAD - TO REMAIN
2. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED.
3. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW
UPRIGHT SPRINKLER TO BE INSTALLED IN SAME LOCATION.
4. EXISTING AUTOMATIC SPRINKLER HEAD LOCATION - TO BE RELOCATED AS INDICATED WITH NEW
UPRIGHT AUTOMATIC SPRINKLER HEAD.
5. INSTALL NEW SEMI-RECESSED AUTOMATIC SPRINKLER HEAD.
6. INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD..
7. EXISTING LAY-IN TILE CEILING TO REMAIN, OR BE ADJUSTED BY GENERAL CONTRACTOR PER
ARCHITECTURAL DRAWING.
8. EXISTING LAY IN CEILING TO BE REMOVED BY GENERAL CONTRACTOR
9. EXISTING PLASTER CEILING TO BE REMOVED BY GENERAL CONTRACTOR.
10. ROOM SHALL HAVE NO CEILING.
11. NEW ROOM CONFIGURATION WILL REQUIRE FIELD ADJUSTMENT TO EXISTING SPRINKLER LAYOUT.
12. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW SEMI
RECESSED SPRINKLER HEAD TO BE INSTALLED IN SAME LOCATION.
13. SEE ARCHITECTURAL DRAWING FOR WORK IN ROOM(S) BELOW THIS AREA. ARCHITECTURAL AND
STRUCTURAL WORK MAY INCLUDE FIRE PROTECTION ADJUSTMENT DUE TO FIELD CONDITIONS.
A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND
SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER
DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE
PROTECTION CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS, BRANCH
PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN. REFER TO SPECIFICATION FOR DESIGN
CRITERIA.
B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, DATED JUNE 1, 2021.
C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.
D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND FEED MAINS, SERVING NEW
SPRINKLER LOCATIONS WITH MODIFIED ARM-OVER CONNECTIONS FED FROM EXISTING OUTLET.
SHOW ALL PIPING ON SHOP DRAWING SUBMITTAL.
E. CONTRACTOR TO TURN VERTICAL POSITION OF BRANCH 90 DEGREE FITTING FROM FACING
DOWNWARD TO UPWARD AND INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD TO MAINTAIN
FIRE SUPPRESSION PIPING ACTIVE DURING THE CONSTRUCTION. AT THE CONCLUSION OF THE
CONSTRUCTION, REVERSE THE 90 DEGREE FITTING TO ITS ORIGINAL CONFIGURATION, AND
PENDENT AUTOMATIC SPRINKLER HEADS WILL BE INSTALLED, WHERE REQUIRE.
F. AT LOCATIONS WHERE THE EXISTING AUTOMATIC SPRINKLERS ARE REMOVED, RELOCATED, OR
RE-INSTALLED, ONLY NEW AUTOMATIC SPRINKLER HEADS SHALL BE USED. NO AUTOMATIC
SPRINKLER HEADS SHALL BE RE-USED, IN ACCORDANCE WITH THE NFPA #13 REQUIREMENTS.
G. SEE ARCHITECTURAL DRAWINGS GENERAL NOTES AND KEY NOTING TO COORDINATE WORK.
H. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION
OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING
CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO
RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE
INVESTIGATION. ALL DIMENSIONS EXISTING COMPONENTS OF NEW AND EXISTING COLUMN
LOCATIONS MUST BE VERIFIED IN FIELD.
I. COORDINATE FINAL LOCATION OF AUTOMATIC SPRINKLER HEAD IN FIELD. ADJUST SO HEAD AND
FITTINGS ARE NOT DIRECTLY ABOVE DATA RACKS.
J. FIRE PROTECTION CONTRACTOR SHALL REVIEW WORK OF ALL TRADES TO VERIFY THE EXTENT OF
WORK IN ROOM AND COORDINATE.
K. REFER TO OVERALL ARCHITECTURAL FLOOR PLAN, OF THIS FLOOR, SHOWING EXTENT OR CABLE
AND CABLE TRAY MODIFICATIONS OF CEILING. COORDINATE FIRE PROTECTION WORK WITH
CEILING WORK. WHEREVER REQUIRED REMOVE EXISTING AUTOMATIC SPRINKLER HEAD
ASSEMBLY AND INSTALL A NEW A/S HEAD ASSEMBLY OF SAME TYPE IN REPAIRED CEILING.
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
8\
-1
6C
9D
V
IS
N
ID
IQ
(N or th D ak ot a
Io w
a) \3
6C
1R
EH
R M
Io w a
C ity
, I A\
0-
D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A C
AD
\3
6C -1
8-
1-
-F X4
.d w g
/7
/2
1:
:0
PM
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
FIRE PROTECTION - ENLARGED
PLAN - BUILDING 07 - FIRST FLOOR
JPK RRR 07-FX401
KEY PLAN
N
HAZARDOUS
NON-RATED SMOKE PARTITION
1 HOUR SMOKE PARTITION
2 HOUR SMOKE PARTITION
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
HEALTHCARE OCCUPANCY
1 BUILDING 7 - FIRST FLOOR RM 7 ENLARGED PLAN
APPROXIMATE LOCATION OF IT RACK. COORDINATE WITH IT
DRAWINGS AND VA FOR EXACT LOCATION PRIOR TO ROUGH IN
AND INSTALLATION.
IT RACK
CONTRACTOR SHALL CONNECT CIRCUIT TO
NEAREST NORMAL PANEL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A k:
\c cg _p ro je ct s\
\1 8-c2 d0 vi sn id iq (n or th d ak ot a io w a)
\3 6c
1r eh rm io w a ci ty
, i a\
0-d es do cs
\4
- d ra w in gs \W
O R
KI
N
G \A
C
AD
\3 6C
-1 8-
1-
-E
1.
dw g
4/ 7/
2:
:2
PM
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
ELECTRICAL - ENLARGED PLAN -
BUILDING 07 - FIRST FLOOR
CC FK 07-E401
16-A401
16-M401
07-E401
07-FX401
07-E401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
C
D
V
I S
N
I D o r t h
D a k o t w a C
R
E
H R
M
I o w a
C i t y
I A
D e s D o c s
D r a w i n g s W
O R
K I N
G A
C A
D C
A d w g
A
M
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
ARCHITECTURAL - FLOOR PLAN -
BUILDING 16 - FIRST FLOOR
XX XX 16- A101
AutoCAD SHX Text 08-16
AutoCAD SHX Text 02-16
AutoCAD SHX Text 03-16
AutoCAD SHX Text 04-16
AutoCAD SHX Text 06-16
AutoCAD SHX Text 05-16
AutoCAD SHX Text
01ST-16
AutoCAD SHX Text 01-16
AutoCAD SHX Text
01ST-16
AutoCAD SHX Text 02A-16
AutoCAD SHX Text Mezzanine
AutoCAD SHX Text 07-16
AutoCAD SHX Text
01ST-16
AutoCAD SHX Text 07-16A
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
ARCHITECTURAL - BUILDING 16 - MEZZANINE
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
ARCHITECTURAL - BUILDING 16 - FIRST FLOOR
AutoCAD SHX Text
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
C
D
V
I S
N
I D o r t h
D a k o t w a C
R
E
H R
M
I o w a
C i t y
I A
D e s D o c s
D r a w i n g s W
O R
K I N
G A
C A
D C
A d w g
A
M
CONSTRUCTION BID
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
IOWA CITY, IA
636A8-21-700
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 18-121
3300 Dundee Rd. Suite D Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21
75% DESIGN DEVELOPMENT SUBMISSION 08-19-21
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21
100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21
CONSTRUCTION BID DOCUMENTS 04-08-2022
04/08/2022
ARCHITECTURAL - ENLARGED FLOOR PLAN -
BUILDING 16 - MEZZANINE
XX XX 16- A401
AutoCAD SHX Text 07-16
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
ROOM 1B01
AutoCAD SHX Text
XXXXX
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING PARTITION
AutoCAD SHX Text
EXISTING DOOR
AutoCAD SHX Text
AREA OF DEMOLITION WORK, SEE KEYNOTES
AutoCAD SHX Text
NEW PARTITION SURFACE MATERIAL
AutoCAD SHX Text
FLOOR PLAN LEGEND
AutoCAD SHX Text
ROOM NAME ROOM NUMBER
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. A. SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW SEE LIMITED ASBESTOS AND LEAD-CONTAINING PAINT SURVEY REPORT FOR SOW IN EACH TR CLOSET. B. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. SEE ELECTRICAL DRAWINGS FOR TYPICAL TR CLOSET ELECTRICAL DEMOLITION. C. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. SEE DATA CENTER ELECTRICAL DRAWINGS FOR NEW SOW. D. SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA SEE FIRE PROTECTION DRAWINGS FOR TYPICAL SOW ON TR CLOSETS AND DATA CENTER. E. PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS PROVIDE TEMPORARY PROTECTION AT EXISTING AND NEW TR . CLOSET DOORS DURING CONSTRUCTION. F. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. NO CEILING GRID AND ACOUSTICAL CEILING TILE AT TR CLOSETS. G. INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM INSTALL STATIC DISSIPATIVE TILE (SDT) FLOORING AT TR CLOSETS - SEE ROOM FINISH SCHEDULE SHEET 512. H. PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS PATCH EXISTING WALLS TO MATCH NEW TR CLOSET FINISHED WALLS I. FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN FOR IT INFORMATION AND SOW SEE DESIGN NARRATIVE/BASIS OF DESIGN INCLUDED ON 75% SUBMITTAL. J. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE DISCOVER EXISTING CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE INVESTIGATION ALL DIMENSIONS, EXISTING COMPONENTS OF NEW AND EXISTING COLUMN LOCATIONS MUST BE VERIFIED IN FIELD.
AutoCAD SHX Text
DEMOLITION PLAN LEGEND
AutoCAD SHX Text EXISTING CONSTRUCTION TO BE REMOVED IN ITS ENTIRETY, INCLUDING WALL SWITCHES, OUTLETS, THERMOSTATS, ETC. PATCH ABUTTING WALLS, FLOORS AND CEILINGS AS REQUIRED. REMOVE EXISTING ITEMS SCHEDULED TO REMAIN AS NECESSARY TO ALLOW THE COMPLETE DEMOLITION OF SELECTED ITEMS. REPAIR/REPLACE EXISTING ITEMS ONCE DEMOLITION IS COMPLETED.
AutoCAD SHX Text
EXISTING CONSTRUCTION TO REMAIN
AutoCAD SHX Text
FLOOR PLAN KEY NOTES
AutoCAD SHX Text X
AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 42"x84" SOLID CORE WOOD DOOR WITH HOLLOW METAL FRAME. SEE DR SCHEDULE. 2. FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE FINISH WALL CORNER TO CORNER AND FLOOR TO CEILING. PRIOR TO PAINTING THE ENTIRE WALL SURFACE WITH (1) FINISH COAT OF PAINT, PROVIDE (1) PRIME COAT AND (2) FINISH COATS OVER PATCHED/REPAIRED WALL SURFACES. 3. EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO EXISTING WINDOW GLAZING WILL REQUIRE RETROFIT (8 MIL ANTI SHATTER FILM) TO MEET VA PSRDM REQUIREMENTS - 1/2" SILICONE SEALANT AT ALL (4) SIDES. 4. REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE REPLACE EXISTING WINDOW GLAZING WITH 1.125 LAMINATED IGU - 3/8" SILICONE AT ALL (4) EDGES. 5. FUTURE USE OF UTILITY CLOSET TO BE DETERMINED BY VA OR CURRENTLY UNDER CONSTRUCTION. SEE MEP & IT DRAWINGS FOR ADDITIONAL SOW IN THIS AREA. 6. EXISTING RAISED COMPUTER FLOORING TO REMAIN.
AutoCAD SHX Text
EXISTING DOOR TO BE REMOVED
AutoCAD SHX Text
DEMOLITION KEY NOTES
AutoCAD SHX Text NOTE: NOT ALL NOTES APPLY TO EVERY DRAWING. NOT ALL NOTES APPLY TO EVERY DRAWING. 1. REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE REMOVE EXISTING DOOR, FRAME AND ALL ASSOCIATED HARDWARE 2. REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING REMOVE EXISTING PARTITION IN ITS ENTIRETY INCLUDING ALL FRAMING, BRACING AND SUPPORTS. 3. REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED REMOVE EXISTING CEILING, GRID, AND ACOUSTICAL TILE, INCLUDING ALL RELATED MOLDINGS , TRIM, WIRESUPPORTS, AND/OR BRACING THROUGHOUT THE AREA. 4. REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS REMOVE EXISTING LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS 5. REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS REMOVE EXISTING DIFFUSER. REFER TO MECHANICAL DRAWINGS 6. REMOVE EXISTING GYPSUM BOARD CEILING. REMOVE EXISTING GYPSUM BOARD CEILING. 7. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. REMOVE EXISTING GYPSUM BOARD SOFFIT AND BULKHEAD. 8. REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM REMOVE IN THEIR ENTIRETY ALL EXISTING WALL-MOUNTED ITEMS. COORDINATE ITEM DISPLACEMENT WITH THE VA. 9. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. REMOVE EXISTING WINDOW IN ITS ENTIRETY INCLUDING GLAZING, FRAME AND SILL. 10. REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING REMOVE EXISTING FLOORING (I.E. CARPET, LAMINATE FLOORING, VCT) TO EXISTING CONCRETE. SCRAPE CLEAN AND REMOVE ALL ASSOCIATED ADHESIVE. PREP AND LEVEL EXISTING CONCRETE FLOOR TO RECEIVE NEW FINISH. 11. REMOVE VINYL BASE ALONG EXISTING WALL. REMOVE VINYL BASE ALONG EXISTING WALL. 12. G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED G.C. TO CAREFULLY REMOVE SYSTEMS FURNITURE AND ALL WALL MOUNTED EQUIPMENT AND TURN OVER TO V.A. 13. G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO G.C. TO CAREFULLY REMOVE EXISTING WINDOW TREATMENT AND TURN OVER TO VA. 14. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. SUPPLY AND INSTALL WALK OFF MAT(S). SEE DETAILS ON SHEET #####. #####. . 15. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER. PROVIDE ZIPPER OPENING FOR ACCESS. 16. SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SUPPLY AND INSTALL 6 MIL HEAVY DUTY, REINFORCED, FIRE-RETARDANT, POLY SHEETING. PLASTIC SHEET SHALL BE FULLY SEALED AT PERIMETER AND SHALL EXTEND TO UNDERSIDE OF STRUCTURE. 17. FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER FOR REFERENCE ONLY. NO ARCHITECTURAL WORK ON THESE ROOMS. SEE OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.
AutoCAD SHX Text X
AutoCAD SHX Text
DEMO CEILING KEYNOTES
AutoCAD SHX Text
17. REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING REMOVE EXISTING ACT CEILING ASSEMBLE TO NEXT FULL TILE, INCLUDING GRID, TILE , RELATED MOLDINGS, TRIM, WIRESUPPORTS AND/OR BRACING. G.C. SHALL TEMPORARY SUPPORT REMAINING EXISTING ACT CEILING SYSTEM UNTIL NEW WALL IS CONSTRUCTED. NEW ACT CEILING SYSTEM AND TILES SHALL BE INSTALLED TO MATCH EXISTING.
AutoCAD SHX Text NEW FULLY RECESSED FIRE EXTINGUISHER CABINET TO BE INSTALLED. PATCH AND MATCH EXISTING CONDITIONS
AutoCAD SHX Text
BUILDING 16 - FIRST FLOOR KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'
AutoCAD SHX Text 6'
AutoCAD SHX Text 3/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
RM 07-16 - DEMOLITION PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'
AutoCAD SHX Text 6'
AutoCAD SHX Text 3/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
RM 07-16 - NEW WORK PLAN
AutoCAD SHX Text
NORTH
| 001_G001 |
| G001 COVER SHEET |
| 004_G004 |
| G004 DRAWING INDEX |
| 002_G002 |
| G002 DRAWING INDEX |
| 003_G003 |
| G003 DRAWING INDEX |
| 005_G005 |
| G005 CODE ANALYSIS |
| 006_GI001 |
| GI001 GENERAL - CONTRACTOR & BASIS-OF-DESIGN PROTOCOL NOTES |
| 007_GI002 |
| GI002 GENERAL - PROTECTION PROTOCOL, SCOPE OF WORK AND MISC. NOTES |
| 008_GI003 |
| GI003 GENERAL - DEMOLITION NOTES |
| 009_GI100SB |
| GI100SB GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SUB BASEMENT |
| 010_GI100 |
| GI100 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - BASEMENT |
| 011_GI101 |
| GI101 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - FIRST FLOOR |
| 012_GI102 |
| GI102 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SECOND FLOOR |
| 013_GI103 |
| GI103 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - THIRD FLOOR |
| 014_GI104 |
| GI104 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - FOURTH FLOOR |
| 015_GI105 |
| GI105 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - FIFTH FLOOR |
| 016_GI106 |
| GI106 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SIXTH FLOOR |
| 017_GI107 |
| GI107 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - SEVENTH FLOOR |
| 018_GI108 |
| GI108 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - EIGHTH FLOOR |
| 019_GI109 |
| GI109 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - NINTH FLOOR |
| 020_GI110 |
| GI110 GENERAL - OVERALL ORIENTATION PLAN - BLDG 1 - TENTH FLOOR |
| 021_02-GI302 |
| 02-GI302 GENERAL - LIFE SAFETY - BLDG 2 - SECOND FLOOR |
| 022_GI403 |
| GI403 GENERAL - INFECTION CONTROL - CLASS III DETAILS |
| 023_GI404 |
| GI404 GENERAL - INFECTION CONTROL - CLASS IV DETAILS |
| 024_GTM100 |
| GTM100 GENERAL - TRAFFIC MANAGEMENT - OVERALL SITE PLAN |
| 025_GTM101 |
| GTM101 GENERAL - TRAFFIC MANAGEMENT |
| 026_GTM102 |
| GTM102 GENERAL - TRAFFIC MANAGEMENT |
| 027_GTM103 |
| GTM103 GENERAL - TRAFFIC MANAGEMENT |
| 028_GTM104 |
| GTM104 GENERAL - TRAFFIC MANAGEMENT |
| 029_GTM105 |
| GTM105 GENERAL - TRAFFIC MANAGEMENT |
| 042_A001 |
| A001 ABBREVIATIONS, SYMBOLS, & STANDARD MOUNTING HEIGHTS |
| 043_A511 |
| A511 ARCHITECTURAL - PARTITION TYPES |
| 1 |
| 044_A512 |
| A512 ARCHITECTURAL - FINISHES AND SIGNAGE |
| 045_A601 |
| A601 ARCHITECTURAL - DOOR SCHEDULE & DETAILS |
| DOOR TYPES |
| 46_FX001 |
| FX001 FIRE PROTECTION - GENERAL NOTES, ABBREVIATIONS, & SYMBOLS |
| 47_FX501 |
| FX501 FIRE PROTECTIONS - DETAILS |
| 48_P001 |
| P001 PLUMBING - GENERAL NOTES, ABBREVIATIONS, & SYMBOLS |
| 49_P501 |
| P501 PLUMBING - DETAILS |
| 50_M001 |
| M001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND NOTES |
| 51_M501 |
| M501 MECHANICAL DETAILS |
| 52_M502 |
| M502 MECHANICAL DETAILS |
| 53_M503 |
| M503 MECHANICAL DETAILS |
| 54_M601 |
| M601 MECHANICAL EQUIPMENT SCHEDULES |
| 55_M602 |
| M602 MECHANICAL EQUIPMENT SCHEDULES |
| 56_M603 |
| M603 MECHANICAL EQUIPMENT SCHEDULES |
| 57_M701 |
| M701 MECHANICAL - TEMPERATURE CONTROLS & SEQUENCE OF OPERATION |
| 58_M702 |
| M702 MECHANICAL - TEMPERATURE CONTROLS & SEQUENCE OF OPERATION |
| 59_M703 |
| M703 MECHANICAL - TEMPERATURE CONTROLS & SEQUENCE OF OPERATION |
| 60 - E001 |
| E001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTES |
| 61 - E501 |
| E501 ELECTRICAL - DETAILS |
| 62 - E502 |
| E502 ELECTRICAL - DETAILS |
| 63 - E503 |
| E503 ELECTRICAL - DETAILS |
| 64 - E601 |
| E601 ELECTRICAL - ONELINE |
| 65 - E701 |
| E701 ELECTRICAL - PANEL AND LIGHT FIXTURE SCHEDULES |
| 177_01-A100SB.1 |
| 01-A100SB.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SUBBASEMENT |
| 178_01-A100SB.2 |
| 01-A100SB.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SUBBASEMENT |
| 179_01-A100.1 |
| 01-A100.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT |
| 180_01-A100.2 |
| 01-A100.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT |
| 181_01-A100.3 |
| 01-A100.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT |
| 182_01-A100.4 |
| 01-A100.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - BASEMENT |
| 183_01-A101.1 |
| 01-A101.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR |
| 184_01-A101.2 |
| 01-A101.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR |
| 185_01-A101.3 |
| 01-A101.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR |
| 186_01-A101.4 |
| 01-A101.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR |
| 187_01-A101.5 |
| 01-A101.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIRST FLOOR |
| 188_01-A102.1 |
| 01-A102.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR |
| 189_01-A102.2 |
| 01-A102.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR |
| 190_01-A102.3 |
| 01-A102.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR |
| 191_01-A102.4 |
| 01-A102.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR |
| 192_01-A102.5 |
| 01-A102.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SECOND FLOOR |
| 193_01-A103.1 |
| 01-A103.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 194_01-A103.2 |
| 01-A103.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 195_01-A103.3 |
| 01-A103.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 196_01-A103.4 |
| 01-A103.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 197_01-A103.5 |
| 01-A103.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 198_01-A104.1 |
| 01-A104.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR |
| 199_01-A104.2 |
| 01-A104.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR |
| 200_01-A104.3 |
| 01-A104.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR |
| 201_01-A104.4 |
| 01-A104.4 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR |
| 202_01-A104.5 |
| 01-A104.5 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FOURTH FLOOR |
| 203_01-A105.1 |
| 01-A105.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIFTH FLOOR |
| 204_01-A105.2 |
| 01-A105.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIFTH FLOOR |
| 205_01-A105.3 |
| 01-A105.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - FIFTH FLOOR |
| 206_01-A106.1 |
| 01-A106.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SIXTH FLOOR |
| 207_01-A106.2 |
| 01-A106.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SIXTH FLOOR |
| 208_01-A106.3 |
| 01-A106.3 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SIXTH FLOOR |
| 209_01-A107.1 |
| 01-A107.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SEVENTH FLOOR |
| 210_01-A107.2 |
| 01-A107.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - SEVENTH FLOOR |
| 211_01-A108.1 |
| 01-A108.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - EIGHTH FLOOR |
| 212_01-A108.2 |
| 01-A108.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - EIGHTH FLOOR |
| 213_01-A109.1 |
| 01-A109.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - NINTH FLOOR |
| 214_01-A109.2 |
| 01-A109.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - NINTH FLOOR |
| 215_01-A110.1 |
| 01-A110.1 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - TENTH FLOOR |
| 216_01-A110.2 |
| 01-A110.2 ARCHITECTURAL - FLOOR PLAN - BUILDING 01 - TENTH FLOOR |
| 217_01-A400SB |
| 01-A400SB ARCHITECTURAL- ENLARGED FLOOR PLAN - BUILDING 01 - SUB BASEMENT |
| 218_01-A400 |
| 01-A400 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - BASEMENT |
| 219_01-A401 |
| 01-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - FIRST FLOOR |
| 220_01-A401.A |
| 01 A401.A ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILIDNG 01 - FIRST FLOOR |
| 221_01-A402 |
| 01-A402 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - SECOND FLOOR |
| 222_01-A402.A |
| 01-A402.A ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - SECOND FLOOR |
| 223_01-A403 |
| 01-A403 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 224_01-A403.A |
| 01-A403.A ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 225_01-A404 |
| 01-A404 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - FOURTH FLOOR |
| 226_01-A404.A |
| 01-A404.A ARCHITECTURAL- ENLARGED FLOOR PLAN - BUILDING 01 - FOURTH FLOOR |
| 227_01-A405 |
| 01-A405 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - FIFTH FLOOR |
| 228_01-A406 |
| 01-A406 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - SIXTH FLOOR |
| 229_01-A407 |
| 01-A407 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 -SEVENTH FLOOR |
| 230_01-A408 |
| 01-A408 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - EIGHTH FLOOR |
| 231_01-A409 |
| 01-A409 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - NINTH FLOOR |
| 232_01-A410 |
| 01-A410 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - TENTH FLOOR |
| 233_01-A411 |
| 01-A411 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - BASEMENT |
| 234_01-A412 |
| 01-A412 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - THIRD FLOOR |
| 235_01-A413 |
| 01-A413 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 01 - 7TH, 8TH |
| 236_01-FX400SB |
| 01-FX400SB FIRE PROTECTION - ENLARGED PLAN-BUILDING 1 - SUB-BASEMENT |
| 237_01-FX400 |
| 01-FX400 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - BASEMENT |
| 238_01-FX401 |
| 01-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - FIRST FLOOR |
| 239_01-FX402 |
| 01-FX402 FIRE PROTECTION - ENLARGED PLAN- BUILDING 1 - SECOND FLOOR |
| 240_01-FX403 |
| 01-FX403 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - THIRD FLOOR |
| 241_01-FX404 |
| 01-FX404 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - FOURTH FLOOR |
| 242_01-FX405 |
| 01-FX405 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - FIFTH FLOOR |
| 243_01-FX406 |
| 01-FX406 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - SIXTH FLOOR |
| 244_01-FX407 |
| 01-FX407 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - SEVENTH FLOOR |
| 245_01-FX408 |
| 01-FX408 FIRE PROTECTION - ENLARGED PLAN- BUILDING 1 - EIGHTH FLOOR |
| 246_01-FX409 |
| 01-FX409 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - NINTH FLOOR |
| 247_01-FX410 |
| 01-FX410 FIRE PROTECTION - ENLARGED PLAN - BUILDING 1 - TENTH FLOOR |
| 248_01-P408 |
| 01-P408 PLUMBING - ENLARGED PLAN - BUILDING 01 - EIGTH FLOOR |
| 249_01-M400 |
| 01-M400 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SUB BASEMENT |
| 250_01-M401 |
| 01-M401 MECHANICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT |
| 251_01-M402 |
| 01-M402 MECHANICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT |
| 252_01-M403 |
| 01-M403 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR |
| 253_01-M404 |
| 01-M404 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR |
| 254_01-M405 |
| 01-M405 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR |
| 255_01-M406 |
| 01-M406 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SECOND FLOOR |
| 256_01-M407 |
| 01-M407 MECHANICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR |
| 257_01-M408 |
| 01-M408 MECHANICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR |
| 258_01-M409 |
| 01-M409 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FOURTH FLOOR |
| 259_01-M410 |
| 01-M410 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FOURTH FLOOR |
| 260_01-M411 |
| 01-M411 MECHANICAL - ENLARGED PLAN - BUILDING 01 - FIFTH FLOOR |
| 261_01-M412 |
| 01-M412 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SIXTH FLOOR |
| 262_01-M413 |
| 01-M413 MECHANICAL - ENLARGED PLAN - BUILDING 01 - SEVENTH FLOOR |
| 263_01-M414 |
| 01-M414 MECHANICAL - ENLARGED PLAN - BUILDING 01 - EIGHTH FLOOR |
| 264_01-M415 |
| 01-M415 MECHANICAL - ENLARGED PLAN - BUILDING 01 - NINTH FLOOR |
| 265_01-M416 |
| 01-M416 MECHANICAL - ENLARGED PLAN - BUILDING 01 - TENTH FLOOR |
| 266_01-M417 |
| 01-M417 MECHANICAL - TR REINFORCEMENT |
| 267_01-M418 |
| 01-M418 MECHANICAL - TR REINFORCEMENT |
| 268_01-M419 |
| 01-M419 MECHANICAL - TR REINFORCEMENT |
| 269 - 01-E100 |
| 01-E100 ELECTRICAL - SITE PLAN |
| 270 - 01-E400SB |
| 01-E400SB ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SUB BASEMENT |
| 271 - 01-E400 |
| 01-E400 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT |
| 272 - 01-E401A |
| 01-E401A ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR |
| 273 - 01-E401B |
| 01-E401B ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FIRST FLOOR |
| 274 - 01-E401.1 |
| 01-E401.1_void |
| 275 - 01-E402 |
| 01-E402 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SECOND FLOOR |
| 276 - 01-E403 |
| 01-E403 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR |
| 277 - 01-E404 |
| 01-E404 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FOURTH FLOOR |
| 278 - 01-E405 |
| 01-E405 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - FIFTH FLOOR |
| 279 - 01-E406 |
| 01-E406 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SIXTH FLOOR |
| 280 - 01-E407 |
| 01-E407 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - SEVENTH FLOOR |
| 281 - 01-E408 |
| 01-E408 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - EIGHTH FLOOR |
| 282 - 01-E409 |
| 01-E409 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - NINTH FLOOR |
| 283 - 01-E410 |
| 01-E410 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - TENTH FLOOR |
| 284 - 01-E411 |
| 01-E411 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - BASEMENT |
| 285 - 01-E412 |
| 01-E412 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - THIRD FLOOR |
| 286 - 01-E413 |
| 01-E413 ELECTRICAL - ENLARGED PLAN - BUILDING 01 - 7TH, 8TH |
| 301_02-A001 |
| 02-A001 ARCHITECTURAL - ORIENTATION & ICRA PLAN - BLDG 02 - 1ST FLOOR |
| 302_02-A002 |
| 02-A002 ARCHITECTURAL - ORIENTATION & ICRA PLAN - BLDG 02 - 2ND FLOOR |
| 303_02-AD101.1 |
| 02-AD101.1 ARCHITECTURAL - DEMOLITION PLAN - BLDG 02 - 1ST FLOOR |
| 304_02-AD102.1 |
| 02-AD102.1 |
| 305_02-AD301 |
| 02-AD301 ARCHITECTURAL - DEMOLITION SECTIONS & DETAILS - BLDG 02 |
| 306_02-A101.1 |
| 02-A101.1 ARCHITECTURAL - ENLARGED FLOOR PLAN - BLDG 02 - 1ST FLOOR |
| 307_02-A102.1 |
| 02-A102.1 ARCHITECTURAL - ENLARGED FLOOR PLAN - BLDG 02 - 2ND FLOOR |
| 308_02-A103.1 |
| 02-A103.1 ARCHITECTURAL - ENLARGED ROOF PLAN - BLDG 02 - DATA CENTER |
| 309_02-AC102.1 |
| 02-AC102.1 |
| 310_02-A201 |
| 02-A201 ARCHITECTURAL - EXTERIOR ELEVATIONS-SECTIONS - BLDG 02 |
| 311_02-A202 |
| 02-A202 |
| 312_02-A301 |
| 02-A301 |
| 313_02-A401 |
| 02-A401 ARCHITECTURAL - INTERIOR ELEVATIONS, FFE SCHEDULE AND DETAILS |
| 314_02-A501 |
| 02-A501 ARCHITECTURAL - WALL TYPES AND WALL SECTIONS - BLDG 02 |
| 315_02-A502 |
| 02-A502 ARCHITECTURAL - WALL SECTIONS AND DETAILS - BLDG 02 |
| 316_02-A503 |
| 02-A503 ARCHITECTURAL - PLAN DETAILS - BLDG 02 |
| 317_02-A504 |
| 02-A504 ARCHITECTURAL - DETAILS - BLDG 02 |
| 318_02-FX101 |
| 02-FX101 FIRE PROTECTION - BUILDING 02 - FIRST FLOOR |
| 319_02-FX102 |
| 02-FX102 FIRE PROTECTION - BUILDING 02 - SECOND FLOOR DATA CENTER |
| 320_02-P101 |
| 02-P101 |
| 321_02-P102 |
| 02-P102 PLUMBING - BUILDING 2 - SECOND FLOOR DATA CENTER |
| 323_02-P401 |
| 02-P401 |
| 324_02-MD102 |
| 02-MD102 MECHANICAL - BUILDING 02 - DATA CENTER - DEMOLITION PLAN |
| 325_02-M102 |
| 02-M102 MECHANICAL - BUILDING 02 - DATA CENTER |
| 326_02-M103 |
| 02-M103 MECHANICAL - BUILDING 02 - DATA CENTER ROOF |
| 327_02-M401 |
| 02-M401 MECHANICAL - ENLARGED PLAN - BUILDING 02 - WAREHOUSE |
| 328 - 02-E401.1 |
| 02-E401.1 ELECTRICAL - BUILDING 02 - MAIN ELECTRICAL ROOM |
| 329 - 02-E401.2 |
| 02-E401.2 ELECTRICAL - BUILDING 02 - DATA CENTER |
| 330 - 02-E401.3 |
| 02-E401.3 ELECTRICAL - BUILDING 02 - DATA CENTER - ROOF PLAN |
| 332_07-A101 |
| 07-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 07 - FIRST FLOOR |
| 333_07-A401 |
| 07-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 07 - FIRST FLOOR |
| 334_07-FX401 |
| 07-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 07 - FIRST FLOOR |
| 335 - 07-E401 |
| 07-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 07 - FIRST FLOOR |
| 336_16-A101 |
| 16-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 16 - FIRST FLOOR |
| 337_16-A401 |
| 16-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 16 - MEZZANINE |
| 338_16-FX401 |
| 16-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 16 - FIRST FLOOR |
| 339_16-M401 |
| 16-M401 MECHANICAL - ENLARGED PLAN - BUILDING 16 |
| 340 - 16-E401 |
| 16-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 16 - FIRST FLOOR |
| 341_20-A101 |
| 20-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 20 - FIRST FLOOR |
| 342_20-A401 |
| 20-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 20 - FIRST FLOOR |
| 343_20-FX401 |
| 20-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 20 - FIRST FLOOR |
| 344_20-M401 |
| 20-M401 MECHANICAL - ENLARGED PLAN - BUILDING 20 - FIRST FLOOR |
| 345 - 20-E401 |
| 20-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 20 - FIRST FLOOR |
| 346_40-A103 |
| 40-A103 ARCHITECTURAL - FLOOR PLAN - BUILDING 40 - THIRD FLOOR |
| 347_40-A401 |
| 40-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN BUILDING 40 - THIRD FLOOR |
| 348_40-FX401 |
| 40-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 40 - THIRD FLOOR |
| 349_40-M401 |
| 40-M401 MECHANICAL - ENLARGED PLAN - BUILDING 40 - THIRD FLOOR |
| 350 - 40-E401 |
| 40-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 40 - THIRD FLOOR |
| 351_41-A10B |
| 41-A10B ARCHITECTURAL - FLOOR PLAN - BUILDING 41 - BASEMENT |
| 352_41-A401 |
| 41-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 41 - BASEMENT |
| 353_41-FX401 |
| 41-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 41 - BASEMENT |
| 354_41-M401 |
| 41-M401 MECHANICAL - ENLARGED PLAN - BUILDING 41 - BASEMENT |
| 355 - 41-E401 |
| 41-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 41 - BASEMENT |
| 356_42-A101 |
| 42-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 42 - THIRD FLOOR |
| 357_42-A401 |
| 42-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 42 - THIRD FLOOR |
| 358_42-FX401 |
| 42-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 42 - FIRST FLOOR |
| 359_42-M401 |
| 42-M401 MECHANICAL - ENLARGED PLAN - BUILDING 42 - THIRD FLOOR |
| 360 - 42-E401 |
| 42-E401 ELECTRICAL- ENLARGED PLAN - BUILDING 42 - FIRST FLOOR |
| 361_49-A10G |
| 49-A10G |
| 362_49-A401 |
| 49-A40G |
| 363_49-FX401 |
| 49-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 49 - GROUND FLOOR |
| 364_49-M401 |
| 49-M401 MECHANICAL - ENLARGED PLAN - BUILDING 49 - GROUND FLOOR |
| 365 - 49-E401 |
| 49-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 49 - GROUND FLOOR |
| 366_50-A101 |
| 50-A101 |
| 367_50-A102 |
| 50-A102 ARCHITECTURAL - FLOOR PLAN - BUILDING 50 - SECOND FLOOR |
| 368_50-A401 |
| 50-A401 |
| 369_50-FX401 |
| 50-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 50 |
| 370_50-P401 |
| 50-P401 |
| 371_50-M401 |
| 50-M401 MECHANICAL - ENLARGED PLAN - BUILDING 50 |
| 372_50-M402 |
| 50-M402 MECHANICAL - ENLARGED PLAN - BUILDING 50 |
| 373 - 50-E401 |
| 50-E401 ELECTRICAL - ENLARGED FLOOR PLAN - BUILDING 50 - FIRST FLOOR |
| 374_51-A101 |
| 51-A101 ARCHITECTURAL - FLOOR PLAN - BUILDING 51- FIRST FLOOR |
| 375_51-A401 |
| 51-A401 |
| 376_51-FX401 |
| 51-FX401 FIRE PROTECTION - ENLARGED PLAN - BUILDING 51 - FIRST FLOOR |
| 377_51-P401 |
| 51-P401 |
| 378_51-A401 |
| 51-A401 ARCHITECTURAL - ENLARGED FLOOR PLAN - BUILDING 51 - FIRST FLOOR |
| 378_51-M401 |
| 51-M401 MECHANICAL - ENLARGED PLAN - BUILDING 51 - FIRST FLOOR |
| 379 - 51-E401 |
| 51-E401 ELECTRICAL - ENLARGED PLAN - BUILDING 51 - FIRST FLOOR |
File details come from the government source that posted it. Updated .