This document package includes construction drawings and notes for fire protection system upgrades at the Iowa City VA Medical Center. The drawings show existing and proposed sprinkler locations throughout the ninth floor of Building 1, with keynotes providing instructions for contractors. Notes indicate the drawings are conceptual and final design and installation will be the responsibility of the design-build fire protection contractor. The contractor must utilize existing piping where possible, protect existing sprinklers, and only use new sprinkler heads where existing ones are removed or relocated. The project involves infrastructure upgrades to electrical, mechanical and healthcare facilities.

View the file

Other files

File Type Posted
Amendment 0005 Attachment 2 - Brand Name Items - Johnson Control_Redacted.pdf PDF
Amendment 0005 Attachment 1 - Spec Section 260541.docx DOCX document
36C77622R0094 0005.docx DOCX document
36C77622R0094 0004.docx DOCX document
36C77622R0094 0004 - Attachment 1 - Additional RFI Responses.docx DOCX document
IMG_0087.jpg JPG image
IMG_0102.jpg JPG image
IMG_0088.jpg JPG image
IMG_0090.jpg JPG image
IMG_0092.jpg JPG image
IMG_0097.jpg JPG image
IMG_0086.jpg JPG image
IMG_0095.jpg JPG image
IMG_0099.jpg JPG image
IMG_0100.jpg JPG image
IMG_0089.jpg JPG image
IMG_0094.jpg JPG image
IMG_0091.jpg JPG image
IMG_0096.jpg JPG image
IMG_0101.jpg JPG image
36C77622R0094 0003.docx DOCX document
IMG_0085.jpg JPG image
IMG_0093.jpg JPG image
IMG_0098.jpg JPG image
Attachment 1 - RFI Answered.docx DOCX document
Attachment 2 - ICRA forms EHRM project.pdf PDF
36C77622R0094 0002.docx DOCX document
BUILDING WRAP PRODUCT DATA FOR SPEC.docx DOCX document
RackHat_V1-1.pdf PDF
HDPE LUMBER PRODUCT DATA FOR SPEC.docx DOCX document
VINYL RACK HAT PRODUCT DATA FOR SPEC.docx DOCX document
RFIs FROM GCs Resp All Disciplines 07 06 22.docx DOCX document
North American Fiberboard Association.pdf PDF
GEOFOAM PRODUCT DATA FOR SPEC.docx DOCX document
STRUCTURAL FIBERBOARD SHEATHING PRODUCT DATA FOR SPEC.docx DOCX document
Attachment 2 - Site Visit Sign in Sheet 6.9.22.pdf PDF
Attachment 7 - 231_01-A409 ADD 1.pdf PDF
Attachment 3 - Bandcroft addendum 1.docx DOCX document
Attachment 5 - 105 - 01-ET409EP ADD 1.pdf PDF
Attachment 4 - 88 - 01-ET109RP ADD 1.pdf PDF
Attachment 6 - 159 - 01-409-RSP ADD 1.pdf PDF
Attachment 10 - 282_01-E409 ADD 1.pdf PDF
36C77622R0094 0001.docx DOCX document
Attachment 9 - 264_01-M415 ADD 1.pdf PDF
Attachment 1 - Geotechnical Engineering Report.pdf PDF
Attachment 8 - 636A821700_BID 20220408 Dwgs_Part6.pdf PDF
Attachment 9 - 636A821700_BID 20220408 Dwgs_Part7.pdf PDF
Attachment 16 - VA 6500.6 Appendix C.pdf PDF
Attachment 15 - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Attachment 2 - 636A821700_BID 20220408 Spec V2.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT ALL KEYNOTES APPLICABLE TO THIS DRAWING.

1. EXISTING AUTOMATIC SPRINKLER HEAD - TO REMAIN

2. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED.

3. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW

UPRIGHT SPRINKLER TO BE INSTALLED IN SAME LOCATION.

4. EXISTING AUTOMATIC SPRINKLER HEAD LOCATION - TO BE RELOCATED AS INDICATED WITH NEW

UPRIGHT AUTOMATIC SPRINKLER HEAD.

5. INSTALL NEW SEMI-RECESSED AUTOMATIC SPRINKLER HEAD.

6. INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD..

7. EXISTING LAY-IN TILE CEILING TO REMAIN, OR BE ADJUSTED BY GENERAL CONTRACTOR PER

ARCHITECTURAL DRAWING.

8. EXISTING LAY IN CEILING TO BE REMOVED BY GENERAL CONTRACTOR

9. EXISTING PLASTER CEILING TO BE REMOVED BY GENERAL CONTRACTOR.

10. ROOM SHALL HAVE NO CEILING.

11. NEW ROOM CONFIGURATION WILL REQUIRE FIELD ADJUSTMENT TO EXISTING SPRINKLER LAYOUT.

12. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW SEMI

RECESSED SPRINKLER HEAD TO BE INSTALLED IN SAME LOCATION.

13. SEE ARCHITECTURAL DRAWING FOR WORK IN ROOM(S) BELOW THIS AREA. ARCHITECTURAL AND

STRUCTURAL WORK MAY INCLUDE FIRE PROTECTION ADJUSTMENT DUE TO FIELD CONDITIONS.

A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND

SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER

DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE

PROTECTION CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS, BRANCH

PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN. REFER TO SPECIFICATION FOR DESIGN

CRITERIA.

B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, DATED JUNE 1, 2021.

C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.

D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND FEED MAINS, SERVING NEW

SPRINKLER LOCATIONS WITH MODIFIED ARM-OVER CONNECTIONS FED FROM EXISTING OUTLET.

SHOW ALL PIPING ON SHOP DRAWING SUBMITTAL.

E. CONTRACTOR TO TURN VERTICAL POSITION OF BRANCH 90 DEGREE FITTING FROM FACING

DOWNWARD TO UPWARD AND INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD TO MAINTAIN

FIRE SUPPRESSION PIPING ACTIVE DURING THE CONSTRUCTION. AT THE CONCLUSION OF THE

CONSTRUCTION, REVERSE THE 90 DEGREE FITTING TO ITS ORIGINAL CONFIGURATION, AND

PENDENT AUTOMATIC SPRINKLER HEADS WILL BE INSTALLED, WHERE REQUIRE.

F. AT LOCATIONS WHERE THE EXISTING AUTOMATIC SPRINKLERS ARE REMOVED, RELOCATED, OR

RE-INSTALLED, ONLY NEW AUTOMATIC SPRINKLER HEADS SHALL BE USED. NO AUTOMATIC

SPRINKLER HEADS SHALL BE RE-USED, IN ACCORDANCE WITH THE NFPA #13 REQUIREMENTS.

G. SEE ARCHITECTURAL DRAWINGS GENERAL NOTES AND KEY NOTING TO COORDINATE WORK.

H. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION

OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING

CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO

RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE

INVESTIGATION. ALL DIMENSIONS EXISTING COMPONENTS OF NEW AND EXISTING COLUMN

LOCATIONS MUST BE VERIFIED IN FIELD.

I. COORDINATE FINAL LOCATION OF AUTOMATIC SPRINKLER HEAD IN FIELD. ADJUST SO HEAD AND

FITTINGS ARE NOT DIRECTLY ABOVE DATA RACKS.

J. FIRE PROTECTION CONTRACTOR SHALL REVIEW WORK OF ALL TRADES TO VERIFY THE EXTENT OF

WORK IN ROOM AND COORDINATE.

K. REFER TO OVERALL ARCHITECTURAL FLOOR PLAN, OF THIS FLOOR, SHOWING EXTENT OR CABLE

AND CABLE TRAY MODIFICATIONS OF CEILING. COORDINATE FIRE PROTECTION WORK WITH

CEILING WORK. WHEREVER REQUIRED REMOVE EXISTING AUTOMATIC SPRINKLER HEAD

ASSEMBLY AND INSTALL A NEW A/S HEAD ASSEMBLY OF SAME TYPE IN REPAIRED CEILING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

8\

-1

6C

9D

V

IS

N

ID

IQ

(N or th D ak ot a

Io w

a) \3

6C

1R

EH

R M

Io w a

C ity

, I A\

0-

D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A C

AD

\3

6C -1

8-

1-

-F X4

.d w g

5/

/2

3:

:5

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

FIRE PROTECTION - ENLARGED

PLAN - BUILDING 1 - NINTH FLOOR

JPK RRR 01-FX409

HAZARDOUS

NON-RATED SMOKE PARTITION

1 HOUR SMOKE PARTITION

2 HOUR SMOKE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

HEALTHCARE OCCUPANCY

ADDENDUM #1 05-27-2022

NOT ALL KEYNOTES APPLICABLE TO THIS DRAWING.

1. EXISTING AUTOMATIC SPRINKLER HEAD - TO REMAIN

2. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED.

3. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW

UPRIGHT SPRINKLER TO BE INSTALLED IN SAME LOCATION.

4. EXISTING AUTOMATIC SPRINKLER HEAD LOCATION - TO BE RELOCATED AS INDICATED WITH NEW

UPRIGHT AUTOMATIC SPRINKLER HEAD.

5. INSTALL NEW SEMI-RECESSED AUTOMATIC SPRINKLER HEAD.

6. INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD..

7. EXISTING LAY-IN TILE CEILING TO REMAIN, OR BE ADJUSTED BY GENERAL CONTRACTOR PER

ARCHITECTURAL DRAWING.

8. EXISTING LAY IN CEILING TO BE REMOVED BY GENERAL CONTRACTOR

9. EXISTING PLASTER CEILING TO BE REMOVED BY GENERAL CONTRACTOR.

10. ROOM SHALL HAVE NO CEILING.

11. NEW ROOM CONFIGURATION WILL REQUIRE FIELD ADJUSTMENT TO EXISTING SPRINKLER LAYOUT.

12. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW SEMI

RECESSED SPRINKLER HEAD TO BE INSTALLED IN SAME LOCATION.

13. SEE ARCHITECTURAL DRAWING FOR WORK IN ROOM(S) BELOW THIS AREA. ARCHITECTURAL AND

STRUCTURAL WORK MAY INCLUDE FIRE PROTECTION ADJUSTMENT DUE TO FIELD CONDITIONS.

A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND

SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER

DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE

PROTECTION CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS, BRANCH

PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN. REFER TO SPECIFICATION FOR DESIGN

CRITERIA.

B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, DATED JUNE 1, 2021.

C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.

D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND FEED MAINS, SERVING NEW

SPRINKLER LOCATIONS WITH MODIFIED ARM-OVER CONNECTIONS FED FROM EXISTING OUTLET.

SHOW ALL PIPING ON SHOP DRAWING SUBMITTAL.

E. CONTRACTOR TO TURN VERTICAL POSITION OF BRANCH 90 DEGREE FITTING FROM FACING

DOWNWARD TO UPWARD AND INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD TO MAINTAIN

FIRE SUPPRESSION PIPING ACTIVE DURING THE CONSTRUCTION. AT THE CONCLUSION OF THE

CONSTRUCTION, REVERSE THE 90 DEGREE FITTING TO ITS ORIGINAL CONFIGURATION, AND

PENDENT AUTOMATIC SPRINKLER HEADS WILL BE INSTALLED, WHERE REQUIRE.

F. AT LOCATIONS WHERE THE EXISTING AUTOMATIC SPRINKLERS ARE REMOVED, RELOCATED, OR

RE-INSTALLED, ONLY NEW AUTOMATIC SPRINKLER HEADS SHALL BE USED. NO AUTOMATIC

SPRINKLER HEADS SHALL BE RE-USED, IN ACCORDANCE WITH THE NFPA #13 REQUIREMENTS.

G. SEE ARCHITECTURAL DRAWINGS GENERAL NOTES AND KEY NOTING TO COORDINATE WORK.

H. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION

OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING

CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO

RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE

INVESTIGATION. ALL DIMENSIONS EXISTING COMPONENTS OF NEW AND EXISTING COLUMN

LOCATIONS MUST BE VERIFIED IN FIELD.

I. COORDINATE FINAL LOCATION OF AUTOMATIC SPRINKLER HEAD IN FIELD. ADJUST SO HEAD AND

FITTINGS ARE NOT DIRECTLY ABOVE DATA RACKS.

J. FIRE PROTECTION CONTRACTOR SHALL REVIEW WORK OF ALL TRADES TO VERIFY THE EXTENT OF

WORK IN ROOM AND COORDINATE.

K. REFER TO OVERALL ARCHITECTURAL FLOOR PLAN, OF THIS FLOOR, SHOWING EXTENT OR CABLE

AND CABLE TRAY MODIFICATIONS OF CEILING. COORDINATE FIRE PROTECTION WORK WITH

CEILING WORK. WHEREVER REQUIRED REMOVE EXISTING AUTOMATIC SPRINKLER HEAD

ASSEMBLY AND INSTALL A NEW A/S HEAD ASSEMBLY OF SAME TYPE IN REPAIRED CEILING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

8\

-1

6C

9D

V

IS

N

ID

IQ

(N or th D ak ot a

Io w

a) \3

6C

1R

EH

R M

Io w a

C ity

, I A\

0-

D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A C

AD

\3

6C -1

8-

1-

-F X4

.d w g

5/

/2

3:

:5

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

FIRE PROTECTION - ENLARGED

PLAN - BUILDING 1 - NINTH FLOOR

JPK RRR 01-FX409

HAZARDOUS

NON-RATED SMOKE PARTITION

1 HOUR SMOKE PARTITION

2 HOUR SMOKE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

HEALTHCARE OCCUPANCY

ADDENDUM #1 05-27-2022

NOT ALL KEYNOTES APPLICABLE TO THIS DRAWING.

1. EXISTING AUTOMATIC SPRINKLER HEAD - TO REMAIN

2. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED.

3. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW

UPRIGHT SPRINKLER TO BE INSTALLED IN SAME LOCATION.

4. EXISTING AUTOMATIC SPRINKLER HEAD LOCATION - TO BE RELOCATED AS INDICATED WITH NEW

UPRIGHT AUTOMATIC SPRINKLER HEAD.

5. INSTALL NEW SEMI-RECESSED AUTOMATIC SPRINKLER HEAD.

6. INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD..

7. EXISTING LAY-IN TILE CEILING TO REMAIN, OR BE ADJUSTED BY GENERAL CONTRACTOR PER

ARCHITECTURAL DRAWING.

8. EXISTING LAY IN CEILING TO BE REMOVED BY GENERAL CONTRACTOR

9. EXISTING PLASTER CEILING TO BE REMOVED BY GENERAL CONTRACTOR.

10. ROOM SHALL HAVE NO CEILING.

11. NEW ROOM CONFIGURATION WILL REQUIRE FIELD ADJUSTMENT TO EXISTING SPRINKLER LAYOUT.

12. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW SEMI

RECESSED SPRINKLER HEAD TO BE INSTALLED IN SAME LOCATION.

13. SEE ARCHITECTURAL DRAWING FOR WORK IN ROOM(S) BELOW THIS AREA. ARCHITECTURAL AND

STRUCTURAL WORK MAY INCLUDE FIRE PROTECTION ADJUSTMENT DUE TO FIELD CONDITIONS.

A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND

SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER

DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE

PROTECTION CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS, BRANCH

PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN. REFER TO SPECIFICATION FOR DESIGN

CRITERIA.

B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, DATED JUNE 1, 2021.

C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.

D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND FEED MAINS, SERVING NEW

SPRINKLER LOCATIONS WITH MODIFIED ARM-OVER CONNECTIONS FED FROM EXISTING OUTLET.

SHOW ALL PIPING ON SHOP DRAWING SUBMITTAL.

E. CONTRACTOR TO TURN VERTICAL POSITION OF BRANCH 90 DEGREE FITTING FROM FACING

DOWNWARD TO UPWARD AND INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD TO MAINTAIN

FIRE SUPPRESSION PIPING ACTIVE DURING THE CONSTRUCTION. AT THE CONCLUSION OF THE

CONSTRUCTION, REVERSE THE 90 DEGREE FITTING TO ITS ORIGINAL CONFIGURATION, AND

PENDENT AUTOMATIC SPRINKLER HEADS WILL BE INSTALLED, WHERE REQUIRE.

F. AT LOCATIONS WHERE THE EXISTING AUTOMATIC SPRINKLERS ARE REMOVED, RELOCATED, OR

RE-INSTALLED, ONLY NEW AUTOMATIC SPRINKLER HEADS SHALL BE USED. NO AUTOMATIC

SPRINKLER HEADS SHALL BE RE-USED, IN ACCORDANCE WITH THE NFPA #13 REQUIREMENTS.

G. SEE ARCHITECTURAL DRAWINGS GENERAL NOTES AND KEY NOTING TO COORDINATE WORK.

H. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION

OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING

CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO

RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE

INVESTIGATION. ALL DIMENSIONS EXISTING COMPONENTS OF NEW AND EXISTING COLUMN

LOCATIONS MUST BE VERIFIED IN FIELD.

I. COORDINATE FINAL LOCATION OF AUTOMATIC SPRINKLER HEAD IN FIELD. ADJUST SO HEAD AND

FITTINGS ARE NOT DIRECTLY ABOVE DATA RACKS.

J. FIRE PROTECTION CONTRACTOR SHALL REVIEW WORK OF ALL TRADES TO VERIFY THE EXTENT OF

WORK IN ROOM AND COORDINATE.

K. REFER TO OVERALL ARCHITECTURAL FLOOR PLAN, OF THIS FLOOR, SHOWING EXTENT OR CABLE

AND CABLE TRAY MODIFICATIONS OF CEILING. COORDINATE FIRE PROTECTION WORK WITH

CEILING WORK. WHEREVER REQUIRED REMOVE EXISTING AUTOMATIC SPRINKLER HEAD

ASSEMBLY AND INSTALL A NEW A/S HEAD ASSEMBLY OF SAME TYPE IN REPAIRED CEILING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

8\

-1

6C

9D

V

IS

N

ID

IQ

(N or th D ak ot a

Io w

a) \3

6C

1R

EH

R M

Io w a

C ity

, I A\

0-

D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A C

AD

\3

6C -1

8-

1-

-F X4

.d w g

5/

/2

3:

:5

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

FIRE PROTECTION - ENLARGED

PLAN - BUILDING 1 - NINTH FLOOR

JPK RRR 01-FX409

HAZARDOUS

NON-RATED SMOKE PARTITION

1 HOUR SMOKE PARTITION

2 HOUR SMOKE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

HEALTHCARE OCCUPANCY

ADDENDUM #1 05-27-2022

NOT ALL KEYNOTES APPLICABLE TO THIS DRAWING.

1. EXISTING AUTOMATIC SPRINKLER HEAD - TO REMAIN

2. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED.

3. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW

UPRIGHT SPRINKLER TO BE INSTALLED IN SAME LOCATION.

4. EXISTING AUTOMATIC SPRINKLER HEAD LOCATION - TO BE RELOCATED AS INDICATED WITH NEW

UPRIGHT AUTOMATIC SPRINKLER HEAD.

5. INSTALL NEW SEMI-RECESSED AUTOMATIC SPRINKLER HEAD.

6. INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD..

7. EXISTING LAY-IN TILE CEILING TO REMAIN, OR BE ADJUSTED BY GENERAL CONTRACTOR PER

ARCHITECTURAL DRAWING.

8. EXISTING LAY IN CEILING TO BE REMOVED BY GENERAL CONTRACTOR

9. EXISTING PLASTER CEILING TO BE REMOVED BY GENERAL CONTRACTOR.

10. ROOM SHALL HAVE NO CEILING.

11. NEW ROOM CONFIGURATION WILL REQUIRE FIELD ADJUSTMENT TO EXISTING SPRINKLER LAYOUT.

12. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW SEMI

RECESSED SPRINKLER HEAD TO BE INSTALLED IN SAME LOCATION.

13. SEE ARCHITECTURAL DRAWING FOR WORK IN ROOM(S) BELOW THIS AREA. ARCHITECTURAL AND

STRUCTURAL WORK MAY INCLUDE FIRE PROTECTION ADJUSTMENT DUE TO FIELD CONDITIONS.

A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND

SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER

DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE

PROTECTION CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS, BRANCH

PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN. REFER TO SPECIFICATION FOR DESIGN

CRITERIA.

B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, DATED JUNE 1, 2021.

C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.

D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND FEED MAINS, SERVING NEW

SPRINKLER LOCATIONS WITH MODIFIED ARM-OVER CONNECTIONS FED FROM EXISTING OUTLET.

SHOW ALL PIPING ON SHOP DRAWING SUBMITTAL.

E. CONTRACTOR TO TURN VERTICAL POSITION OF BRANCH 90 DEGREE FITTING FROM FACING

DOWNWARD TO UPWARD AND INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD TO MAINTAIN

FIRE SUPPRESSION PIPING ACTIVE DURING THE CONSTRUCTION. AT THE CONCLUSION OF THE

CONSTRUCTION, REVERSE THE 90 DEGREE FITTING TO ITS ORIGINAL CONFIGURATION, AND

PENDENT AUTOMATIC SPRINKLER HEADS WILL BE INSTALLED, WHERE REQUIRE.

F. AT LOCATIONS WHERE THE EXISTING AUTOMATIC SPRINKLERS ARE REMOVED, RELOCATED, OR

RE-INSTALLED, ONLY NEW AUTOMATIC SPRINKLER HEADS SHALL BE USED. NO AUTOMATIC

SPRINKLER HEADS SHALL BE RE-USED, IN ACCORDANCE WITH THE NFPA #13 REQUIREMENTS.

G. SEE ARCHITECTURAL DRAWINGS GENERAL NOTES AND KEY NOTING TO COORDINATE WORK.

H. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION

OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING

CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO

RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE

INVESTIGATION. ALL DIMENSIONS EXISTING COMPONENTS OF NEW AND EXISTING COLUMN

LOCATIONS MUST BE VERIFIED IN FIELD.

I. COORDINATE FINAL LOCATION OF AUTOMATIC SPRINKLER HEAD IN FIELD. ADJUST SO HEAD AND

FITTINGS ARE NOT DIRECTLY ABOVE DATA RACKS.

J. FIRE PROTECTION CONTRACTOR SHALL REVIEW WORK OF ALL TRADES TO VERIFY THE EXTENT OF

WORK IN ROOM AND COORDINATE.

K. REFER TO OVERALL ARCHITECTURAL FLOOR PLAN, OF THIS FLOOR, SHOWING EXTENT OR CABLE

AND CABLE TRAY MODIFICATIONS OF CEILING. COORDINATE FIRE PROTECTION WORK WITH

CEILING WORK. WHEREVER REQUIRED REMOVE EXISTING AUTOMATIC SPRINKLER HEAD

ASSEMBLY AND INSTALL A NEW A/S HEAD ASSEMBLY OF SAME TYPE IN REPAIRED CEILING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

8\

-1

6C

9D

V

IS

N

ID

IQ

(N or th D ak ot a

Io w

a) \3

6C

1R

EH

R M

Io w a

C ity

, I A\

0-

D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A C

AD

\3

6C -1

8-

1-

-F X4

.d w g

5/

/2

3:

:5

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

FIRE PROTECTION - ENLARGED

PLAN - BUILDING 1 - NINTH FLOOR

JPK RRR 01-FX409

HAZARDOUS

NON-RATED SMOKE PARTITION

1 HOUR SMOKE PARTITION

2 HOUR SMOKE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

HEALTHCARE OCCUPANCY

ADDENDUM #1 05-27-2022

NOT ALL KEYNOTES APPLICABLE TO THIS DRAWING.

1. EXISTING AUTOMATIC SPRINKLER HEAD - TO REMAIN

2. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED.

3. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW

UPRIGHT SPRINKLER TO BE INSTALLED IN SAME LOCATION.

4. EXISTING AUTOMATIC SPRINKLER HEAD LOCATION - TO BE RELOCATED AS INDICATED WITH NEW

UPRIGHT AUTOMATIC SPRINKLER HEAD.

5. INSTALL NEW SEMI-RECESSED AUTOMATIC SPRINKLER HEAD.

6. INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD..

7. EXISTING LAY-IN TILE CEILING TO REMAIN, OR BE ADJUSTED BY GENERAL CONTRACTOR PER

ARCHITECTURAL DRAWING.

8. EXISTING LAY IN CEILING TO BE REMOVED BY GENERAL CONTRACTOR

9. EXISTING PLASTER CEILING TO BE REMOVED BY GENERAL CONTRACTOR.

10. ROOM SHALL HAVE NO CEILING.

11. NEW ROOM CONFIGURATION WILL REQUIRE FIELD ADJUSTMENT TO EXISTING SPRINKLER LAYOUT.

12. EXISTING AUTOMATIC SPRINKLER HEAD - TO BE REMOVED DURING CONSTRUCTION AND NEW SEMI

RECESSED SPRINKLER HEAD TO BE INSTALLED IN SAME LOCATION.

13. SEE ARCHITECTURAL DRAWING FOR WORK IN ROOM(S) BELOW THIS AREA. ARCHITECTURAL AND

STRUCTURAL WORK MAY INCLUDE FIRE PROTECTION ADJUSTMENT DUE TO FIELD CONDITIONS.

A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL INFORMATION ONLY AND

SHALL NOT BE CONSTRUED AS FINAL DESIGN OR INSTALLATION DOCUMENTS. THE SPRINKLER

DESIGN AND INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE

PROTECTION CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS, BRANCH

PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN. REFER TO SPECIFICATION FOR DESIGN

CRITERIA.

B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN MANUAL, DATED JUNE 1, 2021.

C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING CONSTRUCTION ACTIVITIES.

D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND FEED MAINS, SERVING NEW

SPRINKLER LOCATIONS WITH MODIFIED ARM-OVER CONNECTIONS FED FROM EXISTING OUTLET.

SHOW ALL PIPING ON SHOP DRAWING SUBMITTAL.

E. CONTRACTOR TO TURN VERTICAL POSITION OF BRANCH 90 DEGREE FITTING FROM FACING

DOWNWARD TO UPWARD AND INSTALL NEW UPRIGHT AUTOMATIC SPRINKLER HEAD TO MAINTAIN

FIRE SUPPRESSION PIPING ACTIVE DURING THE CONSTRUCTION. AT THE CONCLUSION OF THE

CONSTRUCTION, REVERSE THE 90 DEGREE FITTING TO ITS ORIGINAL CONFIGURATION, AND

PENDENT AUTOMATIC SPRINKLER HEADS WILL BE INSTALLED, WHERE REQUIRE.

F. AT LOCATIONS WHERE THE EXISTING AUTOMATIC SPRINKLERS ARE REMOVED, RELOCATED, OR

RE-INSTALLED, ONLY NEW AUTOMATIC SPRINKLER HEADS SHALL BE USED. NO AUTOMATIC

SPRINKLER HEADS SHALL BE RE-USED, IN ACCORDANCE WITH THE NFPA #13 REQUIREMENTS.

G. SEE ARCHITECTURAL DRAWINGS GENERAL NOTES AND KEY NOTING TO COORDINATE WORK.

H. VERIFY IN FIELD ALL EXISTING CONDITIONS ILLUSTRATED ON THESE DRAWINGS. CONSTRUCTION DRAWINGS HAVE BEEN DEVELOPED REFERENCING AS-BUILT DRAWINGS PROVIDED BY THE VA. AND FIELD VERIFICATION CONDUCTED THROUGH VISUAL INVESTIGATION. NO SELECTIVE DEMOLITION

OR EXPLORATORY INVESTIGATION WAS ABLE TO BE PERFORMED TO DISCOVER EXISTING

CONDITIONS HAS BEEN EXECUTED DURING THE CREATION OF THESE DRAWINGS. THIS ALSO

RESULTED IN LIMITED ACCESS TO HIDDEN WORK AREAS AND THEIR CONDITIONS DURING SITE

INVESTIGATION. ALL DIMENSIONS EXISTING COMPONENTS OF NEW AND EXISTING COLUMN

LOCATIONS MUST BE VERIFIED IN FIELD.

I. COORDINATE FINAL LOCATION OF AUTOMATIC SPRINKLER HEAD IN FIELD. ADJUST SO HEAD AND

FITTINGS ARE NOT DIRECTLY ABOVE DATA RACKS.

J. FIRE PROTECTION CONTRACTOR SHALL REVIEW WORK OF ALL TRADES TO VERIFY THE EXTENT OF

WORK IN ROOM AND COORDINATE.

K. REFER TO OVERALL ARCHITECTURAL FLOOR PLAN, OF THIS FLOOR, SHOWING EXTENT OR CABLE

AND CABLE TRAY MODIFICATIONS OF CEILING. COORDINATE FIRE PROTECTION WORK WITH

CEILING WORK. WHEREVER REQUIRED REMOVE EXISTING AUTOMATIC SPRINKLER HEAD

ASSEMBLY AND INSTALL A NEW A/S HEAD ASSEMBLY OF SAME TYPE IN REPAIRED CEILING.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

8\

-1

6C

9D

V

IS

N

ID

IQ

(N or th D ak ot a

Io w

a) \3

6C

1R

EH

R M

Io w a

C ity

, I A\

0-

D es

D oc s\

2- D ra w in gs

\W O

R

KI

N G

\A C

AD

\3

6C -1

8-

1-

-F X4

.d w g

5/

/2

3:

:5

PM

CONSTRUCTION BID

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

IOWA CITY, IA

636A8-21-700

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 18-121

3300 Dundee Rd. Suite D Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C77621N281535% SCHEMATIC DESIGN SUBMISSION 07-15-21

75% DESIGN DEVELOPMENT SUBMISSION 08-19-21

95% CONSTRUCTION DOCUMENTS SUBMISSION 10-21-21

100% CONSTRUCTION DOCUMENTS SUBMISSION 11-09-21

CONSTRUCTION BID DOCUMENTS 04-08-2022

04/08/2022

FIRE PROTECTION - ENLARGED

PLAN - BUILDING 1 - NINTH FLOOR

JPK RRR 01-FX409

HAZARDOUS

NON-RATED SMOKE PARTITION

1 HOUR SMOKE PARTITION

2 HOUR SMOKE PARTITION

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

HEALTHCARE OCCUPANCY

ADDENDUM #1 05-27-2022