This specification section outlines requirements for underground electrical construction including ducts, raceways, manholes, pull boxes and related hardware and installation. Products specified include precast concrete manholes and accessories such as ladders, ground rod sleeves, sumps and covers. Pull boxes are also specified with requirements for covers, lettering and pulling irons. Acceptable duct types include plastic and rigid metal conduit suitable for use with conductors rated 600°C and 750°C. Installation requirements cover assembly, trenching including depth of burial and separation from other utilities, concrete encasement with reinforcement and connections to manholes. Testing includes mandrel pulls to check for obstructions or out-of-round conditions.

The related federal contract opportunity is a solicitation for design-bid-build infrastructure upgrades at the Iowa City VA Medical Center. The solicitation number is 36C77622R0094 and is for upgrades to the facility's EHRM systems. The opportunity was issued by the VA Technology Acquisition Center in Austin, Texas.

View the file

Other files

File Type Posted
Amendment 0005 Attachment 2 - Brand Name Items - Johnson Control_Redacted.pdf PDF
36C77622R0094 0005.docx DOCX document
36C77622R0094 0004.docx DOCX document
36C77622R0094 0004 - Attachment 1 - Additional RFI Responses.docx DOCX document
IMG_0087.jpg JPG image
IMG_0102.jpg JPG image
IMG_0088.jpg JPG image
IMG_0090.jpg JPG image
IMG_0092.jpg JPG image
IMG_0097.jpg JPG image
IMG_0086.jpg JPG image
IMG_0095.jpg JPG image
IMG_0099.jpg JPG image
IMG_0100.jpg JPG image
IMG_0089.jpg JPG image
IMG_0094.jpg JPG image
IMG_0091.jpg JPG image
IMG_0096.jpg JPG image
IMG_0101.jpg JPG image
36C77622R0094 0003.docx DOCX document
IMG_0085.jpg JPG image
IMG_0093.jpg JPG image
IMG_0098.jpg JPG image
Attachment 1 - RFI Answered.docx DOCX document
Attachment 2 - ICRA forms EHRM project.pdf PDF
36C77622R0094 0002.docx DOCX document
BUILDING WRAP PRODUCT DATA FOR SPEC.docx DOCX document
RackHat_V1-1.pdf PDF
HDPE LUMBER PRODUCT DATA FOR SPEC.docx DOCX document
VINYL RACK HAT PRODUCT DATA FOR SPEC.docx DOCX document
RFIs FROM GCs Resp All Disciplines 07 06 22.docx DOCX document
North American Fiberboard Association.pdf PDF
GEOFOAM PRODUCT DATA FOR SPEC.docx DOCX document
STRUCTURAL FIBERBOARD SHEATHING PRODUCT DATA FOR SPEC.docx DOCX document
Attachment 2 - Site Visit Sign in Sheet 6.9.22.pdf PDF
Attachment 7 - 231_01-A409 ADD 1.pdf PDF
Attachment 3 - Bandcroft addendum 1.docx DOCX document
Attachment 5 - 105 - 01-ET409EP ADD 1.pdf PDF
Attachment 8 - 246_01-FX409 ADD 1.pdf PDF
Attachment 4 - 88 - 01-ET109RP ADD 1.pdf PDF
Attachment 6 - 159 - 01-409-RSP ADD 1.pdf PDF
Attachment 10 - 282_01-E409 ADD 1.pdf PDF
36C77622R0094 0001.docx DOCX document
Attachment 9 - 264_01-M415 ADD 1.pdf PDF
Attachment 1 - Geotechnical Engineering Report.pdf PDF
Attachment 8 - 636A821700_BID 20220408 Dwgs_Part6.pdf PDF
Attachment 9 - 636A821700_BID 20220408 Dwgs_Part7.pdf PDF
Attachment 16 - VA 6500.6 Appendix C.pdf PDF
Attachment 15 - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Attachment 2 - 636A821700_BID 20220408 Spec V2.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-01-17

SECTION 26 05 41

UNDERGROUND ELECTRICAL CONSTRUCTION

PART 1 GENERAL

1.1 DESCRIPTION

A.This section specifies the furnishing, installation, and connection of underground ducts and raceways, and precast manholes and pullboxes to form a complete underground electrical raceway system.
B.The terms “duct” and “conduit” are used interchangeably in this section.

1.2 RELATED WORK

A.Section 07 92 00, JOINT SEALANTS: Sealing of conduit penetrations.
B.Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26.
C.Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.
D.Section 31 20 00, EARTH MOVING

1.3 qualITY ASSURANCE

A.Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
B.Coordinate layout and installation of ducts, manholes, and pullboxes with final arrangement of other utilities, site grading, and surface features.

1.4 SUBMITTALS

A.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:
1.Shop Drawings:
a.Submit sufficient information to demonstrate compliance with drawings and specifications.
b.Submit information on manholes, pullboxes, ducts, and hardware. Submit manhole plan and elevation drawings, showing openings, pulling irons, cable supports, cover, ladder, sump, and other accessories.
c.Proposed deviations from the drawings shall be clearly marked on the submittals. If it is necessary to locate manholes, pullboxes, or duct banks at locations other than shown on the drawings, show the proposed locations accurately on scaled site drawings, and submit to the COR for approval prior to construction.
2.Certifications: Two weeks prior to the final inspection, submit the following.
a.Certification by the manufacturer that the materials conform to the requirements of the drawings and specifications.
b.Certification by the Contractor that the materials have been properly installed, connected, and tested.

1.5 APPLICABLE PUBLICATIONS

A.Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B.American Concrete Institute (ACI):
Building Code Requirements for Structural Concrete
318-14/318M-14Building Code Requirements for Structural Concrete & Commentary
SP-66-04ACI Detailing Manual
C.American National Standards Institute (ANSI):
77-14Underground Enclosure Integrity
D.American Society for Testing and Materials (ASTM):
C478 REV A-15Standard Specification for Precast Reinforced Concrete Manhole Sections
C858-10Underground Precast Concrete Utility Structures
C990-09Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants.
E.National Electrical Manufacturers Association (NEMA):
TC 2-13Electrical Polyvinyl Chloride (PVC) Conduit
TC 3-15Polyvinyl Chloride (PVC) Fittings for Use With Rigid PVC Conduit And Tubing
TC 6 & 8-13Polyvinyl Chloride (PVC) Plastic Utilities Duct For Underground Installations
TC 9-04Fittings For Polyvinyl Chloride (PVC) Plastic Utilities Duct For Underground Installation
F.National Fire Protection Association (NFPA):
70-17National Electrical Code (NEC)
70E-15National Electrical Safety Code
G.Underwriters Laboratories, Inc. (UL):
6-07Electrical Rigid Metal Conduit-Steel
467-13Grounding and Bonding Equipment
651-11Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings
651A-11Schedule 40 and 80 High Density Polyethylene (HDPE) Conduit

PART 2 PRODUCTS

2.1 pre-cast concrete manholes and hardware

A.Structure: Factory-fabricated, reinforced-concrete, monolithically-poured walls and bottom. Frame and cover shall form top of manhole.
B.Cable Supports:
1.Cable stanchions shall be hot-rolled, heavy duty, hotdipped galvanized "T" section steel, 56 mm (2.25 inches) x 6 mm (0.25 inch) in size, and punched with 14 holes on 38 mm (1.5 inches) centers for attaching cable arms.
2.Cable arms shall be 5 mm (0.1875 inch) gauge, hot-rolled, hotdipped galvanized sheet steel, pressed to channel shape. Arms shall be approximately 63 mm (2.5 inches) wide x 350 mm (14 inches) long.
3.Insulators for cable supports shall be porcelain, and shall be saddle type or type that completely encircles the cable.
4.Equip each cable stanchion with one spare cable arm, with three spare insulators for future use.
C.Ladder Aluminum with 400 mm (16 inches) rung spacing. Provide securely-mounted ladder for every manhole over 1.2 M (4 feet) deep.
D.Ground Rod Sleeve: Provide a 75 mm (3 inches) PVC sleeve in manhole floors so that a driven ground rod may be installed.
E.Sump: Provide 305 mm x 305 mm (12 inches x 12 inches) covered sump frame and grated cover.

2.2 pullboxes A. General: Size as indicated on the drawings. Provide pullboxes with weatherproof, non-skid covers with recessed hook eyes, secured with corrosion- and tamper-resistant hardware. Cover material shall be identical to pullbox material. Covers shall have molded lettering, ELECTRIC or SIGNAL as applicable. Pullboxes shall comply with the requirements of ANSI 77 Tier 15 loading. Provide pulling irons, 22 mm (0.875 inch) diameter galvanized steel bar with exposed triangular-shaped opening.

2.3 Ducts

A.Number and sizes shall be as shown on the drawings.
B.Ducts (concrete-encased):
1.Plastic Duct:
a.NEMA TC6 & 8 and TC9 plastic utilities duct.
b.Duct shall be suitable for use with 90˚ C (194˚ F) rated conductors.
2.Conduit Spacers: Prefabricated plastic.
C.Ducts (direct-burial):
1.Plastic duct:
a.NEMA TC2 and TC3.
b.Duct shall be suitable for use with 75˚ C (167˚ F) rated conductors.
2.Rigid metal conduit: UL 6 and NEMA RN1 galvanized rigid metal, half-lap wrapped with 10 mil PVC tape.

2.4 Grounding

A. Ground Rods and Ground Wire: Per Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.

2.5 WARNING Tape

A. 4-mil polyethylene 75 mm (3 inches) wide detectable tape, red with black letters, imprinted with “CAUTION - BURIED ELECTRIC CABLE BELOW” or similar.

2.6 PULL Rope for spare ducts

A. Plastic with 890 N (200 lb) minimum tensile strength.

PART 3 EXECUTION

3.1 MANHOLE AND pullbox INSTALLATION

A.Assembly and installation shall be per the requirements of the manufacturer.
1.Install manholes and pullboxes level and plumb.
2.Units shall be installed on a 300 mm (12 inches) thick level bed of 90% compacted granular fill, wellgraded from the 25 mm (1 inch) sieve to the No. 4 sieve. Granular fill shall be compacted with a minimum of four passes with a plate compactor.
B.Access: Ensure the top of frames and covers are flush with finished grade.
C.Grounding in Manholes:
1.Ground Rods in Manholes: Drive a ground rod into the earth, through the floor sleeve, after the manhole is set in place. Fill the sleeve with sealant to make a watertight seal. Rods shall protrude approximately 100 mm (4 inches) above the manhole floor.
2.Install a No. 3/0 AWG bare copper ring grounding conductor around the inside perimeter of the manhole and anchor to the walls with metallic cable clips.
3.Connect the ring grounding conductor to the ground rod by an exothermic welding process.
4.Bond the ring grounding conductor to the duct bank equipment grounding conductors, the exposed noncurrent carrying metal parts of racks, sump covers, and like items in the manholes with a minimum No. 6 AWG bare copper jumper using an exothermic welding process.

3.2 TRENCHING

A.Refer to Section 31 20 00, EARTH MOVING for trenching, backfilling, and compaction.
B.Before performing trenching work at existing facilities, a Ground Penetrating Radar Survey shall be carefully performed by a certified technician to reveal all existing underground ducts, conduits, cables, and other utility systems.
C.Work with extreme care near existing ducts, conduits, and other utilities to avoid damaging them.
D.Cut the trenches neatly and uniformly.
E.For Concrete-Encased Ducts:
1.After excavation of the trench, stakes shall be driven in the bottom of the trench at 1.2 M (4 feet) intervals to establish the grade and route of the duct bank.
2.Pitch the trenches uniformly toward manholes or both ways from high points between manholes for the required duct line drainage. Avoid pitching the ducts toward buildings wherever possible.
3.The walls of the trench may be used to form the side walls of the duct bank, provided that the soil is selfsupporting and that the concrete envelope can be poured without soil inclusions. Forms are required where the soil is not selfsupporting.
4.After the concrete-encased duct has sufficiently cured, the trench shall be backfilled to grade with earth, and appropriate warning tape installed.
F.Individual conduits to be installed under existing paved areas and roads that cannot be disturbed shall be jacked into place using rigid metal conduit, or bored using plastic utilities duct or PVC conduit, as approved by the COR.

3.3 DUCT INSTALLATION

A.General Requirements:
1.Ducts shall be in accordance with the NEC, as shown on the drawings, and as specified.
2.Join and terminate ducts with fittings recommended by the manufacturer.
3.Slope ducts to drain towards manholes and pullboxes, and away from building and equipment entrances. Pitch not less than 100 mm (4 inches) in 30 M (100 feet).
4.Underground conduit stubups and sweeps to equipment inside of buildings shall be galvanized rigid metal conduit half-lap wrapped with PVC tape, and shall extend a minimum of 1.5 M (5 feet) outside the building foundation. Tops of conduits below building slab shall be minimum 610 mm (24 inches) below bottom of slab.
5.Stubups and sweeps to equipment mounted on outdoor concrete slabs shall be galvanized rigid metal conduit half-lap wrapped with PVC tape, and shall extend a minimum of 1.5 M (5 feet) away from the edge of slab.
6.Install insulated grounding bushings on the conduit terminations.
7.Radius for sweeps shall be sufficient to accomplish pulls without damage. Minimum radius shall be six times conduit diameter.
8.All multiple conduit runs shall have conduit spacers. Spacers shall securely support and maintain uniform spacing of the duct assembly a minimum of 75 mm (3 inches) above the bottom of the trench during the concrete pour. Spacer spacing shall not exceed 1.5 M (5 feet). Secure spacers to ducts and earth to prevent floating during concrete pour. Provide nonferrous tie wires to prevent displacement of the ducts during concrete pour. Tie wires shall not act as substitute for spacers.
9.Duct lines shall be installed no less than 300 mm (12 inches) from other utility systems, such as water, sewer, chilled water.
10.Clearances between individual ducts:
a.For similar services, not less than 75 mm (3 inches).
b.For power and signal services, not less than 150 mm (6 inches).
11.Duct lines shall terminate at window openings in manhole walls as shown on the drawings. All ducts shall be fitted with end bells.
12.Couple the ducts with proper couplings. Stagger couplings in rows and layers to ensure maximum strength and rigidity of the duct bank.
13.Keep ducts clean of earth, sand, or gravel, and seal with tapered plugs upon completion of each portion of the work.
14.Spare Ducts: Where spare ducts are shown, they shall have a nylon pull rope installed. They shall be capped at each end and labeled as to location of the other end.
15.Duct Identification: Place continuous strip of warning tape approximately 300 mm (12 inches) above ducts before backfilling trenches. Warning tape shall be preprinted with proper identification.
16.Duct Sealing: Seal ducts, including spare ducts, at building entrances and at outdoor terminations for equipment, with a suitable non-hardening compound to prevent the entrance of foreign objects and material, moisture, and gases.
17.Use plastic ties to secure cables to insulators on cable arms. Use minimum two ties per cable per insulator.
B.Concrete-Encased Ducts:
1.Install concrete-encased ducts for medium-voltage systems, low-voltage systems, and signal systems, unless otherwise shown on the drawings.
2.Duct banks shall be single or multiple duct assemblies encased in concrete. Ducts shall be uniform in size and material throughout the installation.
3.Tops of concrete-encased ducts shall be:
a.Not less than 600 mm (24 inches) and not less than shown on the drawings, below finished grade.
b.Not less than 750 mm (30 inches) and not less than shown on the drawings, below roads and other paved surfaces.
c.Additional burial depth shall be required in order to accomplish NEC-required minimum bend radius of ducts.
d.Conduits crossing under grade slab construction joints shall be installed a minimum of 1.2 M (4 feet) below slab.
4.Extend the concrete envelope encasing the ducts not less than 75 mm (3 inches) beyond the outside walls of the outer ducts.
5.Within 3 M (10 feet} of building and manhole wall penetrations, install reinforcing steel bars at the top and bottom of each concrete envelope to provide protection against vertical shearing.
6.Install reinforcing steel bars at the top and bottom of each concrete envelope of all ducts underneath roadways and parking areas.
7.Where new ducts and concrete envelopes are to be joined to existing manholes, pullboxes, ducts, and concrete envelopes, make the joints with the proper fittings and fabricate the concrete envelopes to ensure smooth durable transitions.
8.Duct joints in concrete may be placed side by side horizontally, but shall be staggered at least 150 mm (6 inches) vertically.
9.Pour each run of concrete envelope between manholes or other terminations in one continuous pour. If more than one pour is necessary, terminate each pour in a vertical plane and install 19 mm (0.75 inch) reinforcing rod dowels extending 450 mm (18 inches) into concrete on both sides of joint near corners of envelope.
10.Pour concrete so that open spaces are uniformly filled. Do not agitate with power equipment unless approved by COR.
D.Connections to Manholes: Ducts connecting to manholes shall be flared to have an enlarged cross-section to provide additional shear strength. Dimensions of the flared cross-section shall be larger than the corresponding manhole opening dimensions by no less than 300 mm (12 inches) in each direction. Perimeter of the duct bank opening in the manhole shall be flared toward the inside or keyed to provide a positive interlock between the duct and the wall of the manhole. Use vibrators when this portion of the encasement is poured to ensure a seal between the envelope and the wall of the structure.
E.Connections to Existing Manholes: For duct connections to existing manholes, break the structure wall out to the dimensions required and preserve the steel in the structure wall. Cut steel and extend into the duct bank envelope. Chip the perimeter surface of the duct bank opening to form a key or flared surface, providing a positive connection with the duct bank envelope.
F.Connections to Existing Ducts: Where connections to existing ducts are indicated, excavate around the ducts as necessary. Cut off the ducts and remove loose concrete from inside before installing new ducts. Provide a reinforced-concrete collar, poured monolithically with the new ducts, to take the shear at the joint of the duct banks.
G.Partially-Completed Ducts: During construction, wherever a construction joint is necessary in a duct bank, prevent debris such as mud and dirt from entering ducts by providing suitable plugs. Fit concrete envelope of a partially completed ducts with reinforcing steel extending a minimum of 600 mm (2 feet) back into the envelope and a minimum of 600 mm (2 feet) beyond the end of the envelope. Provide one No. 4 bar in each corner, 75 mm (3 inches) from the edge of the envelope. Secure corner bars with two No. 3 ties, spaced approximately 300 mm (12 inches) apart. Restrain reinforcing assembly from moving during pouring of concrete.

3.4 acceptance checks and tests

A.Duct Testing and Cleaning:
1.Upon completion of the duct installation, a standard flexible mandrel shall be pulled through each duct to loosen particles of earth, sand, or foreign material left in the duct, and to test for out-of-round conditions.
2.The mandrel shall be not less than 300 mm (12 inches) long, and shall have a diameter not less than 13 mm (0.5 inch) less than the inside diameter of the duct. A brush with stiff bristles shall then be pulled through each duct to remove the loosened particles. The diameter of the brush shall be the same as, or slightly larger than, the diameter of the duct.
3.If testing reveals obstructions or out-of-round conditions, the Contractor shall replace affected section(s) of duct and retest to the satisfaction of the COR.
4.Mandrel pulls shall be witnessed by the COR.

---END---