Attachment (7) III Corps MTCCS II QASP.docx
DOCX document 86 KB Posted
- Attached to
- Mission Training Complex Capabilities Support (MTCCS) II Solicitation Federal contract opportunity
- Solicitation number
- W900KK23R0006
View the file
Other files for this federal contract opportunity
Show all 50
Mission Training Complex Capabilities Support (MTCCS) II Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) III Corps Mission Training Complex Capabilities Support (MTCCS II)
Controlled by: US Army ACC Orlando Controlled by: MTC HOOD AMIM-HDO-T CUI Category: General Procurement and Acquisition Distribution/Limited Dissemination Control: FEDCON POC: Michael Hilliard 254-288-6715
Table of Contents
1 Vision 3
1.1 Mission 3
3 Purpose 3
4 Authority 4
5 Roles and Responsibilities 4
5.1 Program / Project Manager 4
5.2 Contracting Office (PCO) 4
5.3 Contracting Officer's Representative (COR) 5
5.4 Other Key Government Personnel 5
5.5 Contractor Representatives 5
6 Performance Requirements and Method of Surveillance 5
6.1 Contract Surveillance 5
6.2 Surveillance Matrix 7
Appendix 1 - Surveillance Matrix 10
Appendix 2 - Corrective Action Report (CAR) 20
Appendix 3 - Customer Complaint Record 21
Appendix 4 - Performance Assessment Report (PAR) 22
Appendix 5 - Contractor Observation Report (COR) 24
CUI/FEDCON
CUI/FEDCON
Quality Assurance Surveillance Plan (QASP)
III Corps
1. Vision. The Mission Training Complex Capability Support contract provides top-tier training for US military service members and partners at Forts Hood, Carson, Riley, Bliss, and Sill.
2. Mission. The III Corps MTCs provide high-quality simulation-driven training tools for Commanders to conduct individual, leader and collective mission command training.
3. Purpose. This Quality Assurance Surveillance Plan (QASP) is a government-developed draft document used to determine if the contractor's performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
· What will be monitored?
· How monitoring will take place?
· Who will be conduct the monitoring?
· How monitoring efforts and results will be documented?
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government's surveillance of the contractor's performance to assure that it meets contract standards. It is the government's responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor's quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
4. Authority. Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
5. Roles and Responsibilities The following personnel shall oversee and coordinate surveillance activities.
5.1 Procurement Contracting Office (PCO)
The PCO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The PCO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine and document the final assessment of the contractor's performance in the governments past performance tracking system.
Assigned PCO: Phillip B. Davis Organization or Agency: Army Contracting Command, Army Telephone: Office: (407) 384-5335; Mobile: (407) 244-4971 Email: Email: Phillip.b.davis16.civ@mail.mil
5.2 Contracting Officer's Representative (COR)
The COR is responsible for providing continuous technical oversight of the contractor's performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor's actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the PCO. The COR is required to upload monthly Quality Assurance Reports (QAR) into the Army’s Procurement Integrated Enterprise Environment (PIEE) website within the Surveillance and Performance Monitoring (SPM) window, documenting the contractors performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government's behalf.
5.3 Fort Hood MTC Chief
The Fort Hood MTC Chief provides primary program oversight, nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR's performance assessment activities. MTC Chiefs are not empowered to make any contractual commitments or any contract changes on the government's behalf.
Assigned Fort Hood MTC Chief: Michael D. Hilliard Organization or Agency: III Corps and Fort Hood MTC Telephone: 254-288-6715 Email: michael.d.hilliard4.civ@mail.mil
5.4 Other Key Government Personnel
Each of the III Corps Spoke MTCs have a Quality Assurance Evaluator (QAE) whose duties include performance monitoring, training and technical inspections, and provide additional information that helps the COR monitor contractor performance.
5.5 Contractor Representatives
The following employees of the contractor serve as the contractor's Program Manager and Task Manager for this contract. (Complete this section after the contract award)
Program Manager (PM) - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Task Order Manager (TOM) - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Key Contract Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address> 6 Performance Requirements and Method of Surveillance This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
6.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR's contribution is their professional, non-adversarial relationships with the PCO, TOM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor's performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
6.2. Surveillance Method. This plan provides the government with an effective and systematic surveillance process to assess the performance of critical tasks associated with the required service. The plan outlines the method by which a complete audit trail will be established to ensure compliance with the Performance Work Statement This plan may be modified without the contractor's approval when necessary; e.g., changes in requirements, changes in contractor performance or changes in QA resources.
6.2.1. Surveillance for this requirement will begin with daily observations, scheduled, and unscheduled inspections, valid customer complaints, monthly meetings between the COR and the contractor’s on-site representative, and formal quarterly contract management reviews. However, government surveillance will remain flexible enough to adjust to the contractor’s performance as necessary. Generally, excellent performance requires less monitoring and actual performance verification, while poor performance requires more frequent monitoring and verification. The Government’s QA methods is designed to check the effectiveness of the contractor’s Quality Control Plan. QA will be conducted under the terms of the Inspection of Services and Inspection of Supplies clauses in the contract.
6.2.2. Documentation and Reporting Procedures. Various evaluation methods are suitable for monitoring contractor performance. The frequency of surveillance of contractor performance will be established based on the number of underlying factors to include: the frequency with which specific tasks are performed; the relative importance of specific tasks; and the type of task to be monitored.
6.2.3. The COR will prepare an Inspection Report for the services provided under this contract. These records will be used to summarize the findings of daily observations. Daily reports will be use to summarize and validate the COR’s monthly reports that will be provided to the Contracting Officer. Input will be required from the QAE at the Spoke sites.
6.2.4. When performance is unsatisfactory, the COR will initiate a Deficiency Report. The Contractor’s Primary Point of Contact (on-site representative) will be briefed on the deficiency by the COR. The COR may request corrective actions in writing by the Contractor. The Contractor has the option to reply in writing to the deficiency in question. Deficiency reports will be retained in the COR’s file. The COR will provide the PCO a copy of all Deficiency issued to the contractor in the monthly report in the PIEE/SPM government website.
6.2.4.1. Contract Discrepancy Report (CDR). A CDR will be used whenever necessary during administration of the contract to formally document unacceptable performance. The CDR serves as supporting documentation for contract payment deductions actions deemed necessary by the PCO. The COR will initiate a CDR (complete the form and attach the supporting documentation), then forward all documentation to the PCO. The COR will initiate a CDR, as a minimum, whenever; 1) anytime unacceptable performance is determined critical in nature and requires immediate correction; 2) trends develop in unacceptable performance (repetitive deficiencies) are recorded and require correction.
6.2.5. Contract Compliance: The Government’s role in the day-to-day administration of this contract is to ensure that requirements of the contract are met IAW the stated standards. This may require enforcement of the contract when the contractor fails to correct a deficiency or a defect in service, or take corrective action to prevent a reoccurring problem. The COR should notify the PCO whenever corrective action is needed. The decision as to the type of the enforcement remedy will be determined by the PCO.
6.2.6. Any discrepancies noted during the course of surveillance, even if they are not sufficient to render the service unsatisfactory, will require corrective action by the contractor. These discrepancies will be recorded and used in determining the overall rating for the service regardless of the time of correction. All overall ratings of unsatisfactory for services recorded may count as defects when determining the contractor’s performance. All discrepancies will be documented in the Army’s PIEE/SPS government website.
6.2.7. During the course of the month, the COR or QAE may receive customer complaints concerning the quality of service. Spoke QAE will forward those complaints to the COR, documenting any corrective action. Each complaint received must be validated by the COR, to the extent necessary, to ensure that the service was required and not performed to standard.
6.2.8. Unscheduled evaluations inspections are the prerogative of the COR and QAE; they may be conducted whenever there may be a need. This method is used to facilitate the constant change in requirements that may occur. This type of evaluation is used to support other surveillance methods and to ensure services are being performed in a timely manner.
6.2.9. The COR will, in addition to providing documentation to the PCO, maintain a complete COR file. The file will contain copies of all reports, evaluations, surveillance, recommendations, and any actions related to the Government’s performance of QA functions. All such records will be retained for the life of this contract, and forwarded to the PCO at termination or completion of the contract or as specified by the PCO.
6.3 Surveillance Matrix
The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor's performance as it relates to the performance element standards.
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance Rating Criteria
| Excellent / Outstanding |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Appendix 1 - Surveillance Matrix
| PWS Task/Performance Objective |
| Standards |
| Performance Threshold (Acceptable Quality Level) |
| Method of Surveillance |
| 2.1.3. The Contractor shall ensure flexible and cross-trained workforce that is capable of supporting the training and exercise requirements without the regular use of additional workload requests. |
| Each training and technical personnel must be cross-trained on at least two different systems or task areas. Information shall be included in Personal Qualification List identified in 2.4 below. |
| 98% cross-training complete within 120 days of contract award and maintained thereafter. |
| Random inspection amounting to 100% inspection quarterly |
| 2.2.4.4. Information Assurance (IA) Training. The Contractor employees and associated Sub-Contractor employees shall meet all information assurance training and reporting requirements |
| IAW AR 25-2 and DoD 8570.01-M, Information Assurance Workforce Improvement Program (includes IAT and IAM/ISSM Level Certification). Information shall be included in Personal Qualification List identified in 2.4 below. |
| 100% compliance |
| Monthly Inspection |
| 2.3.3. Meetings, Conferences, and Briefings: At the request of the COR, the Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. |
| Attend and participate in all directed meetings. Conferences and briefings and submit a meeting report to the COR within 2 business days of completion. |
| 100% meeting attendance, no more than 1 business day deviation from submittal standard. |
| 100% Inspection; included in Monthly Report |
| 2.3.4. Reports. The Contractor shall submit timely and accurate reports IAW Technical Exhibit 2, Deliverables Schedule, this PWS, to keep the Government informed on TO services and invoices for payment. |
| Within 5 working days after month end. |
| No more than 1 business day deviation from submittal standard. |
| Monthly Inspection |
| 2.3.5. Invoices. The Contractor shall submit monthly invoices through the Wide Area Workflow (WAWF) system. |
| Invoices shall contain no more than one minor error per invoice posted in WAWF. A minor error is an error that doesn't change the total amount due. |
| 100% compliance |
| 100% inspection by COR; documented in Monthly Report |
| 2.4. Personnel Qualifications. The Contractor shall maintain records of employees’ qualifications, certifications and licenses and ensure they remain current. |
| The Contractor shall submit to the Contracting Officer’s Representative (COR) two weeks prior to full performance, and the first working day of each month thereafter a listing of qualifications, licenses, certifications, qualifications, and experience possessed by the Contractor’s workforce. This list shall include expiration dates, and planned recertification dates. The list shall be complete IAW the TO requirements and the MTC systems to be operated. |
| List is 100% complete and no more than 1 day deviation from submittal standard. |
| Quarterly Inspection; filed in Contract File. |
| 2.4.7. Certifications. The Contractor personnel shall be appropriately certified at Contractors expense. |
| Contractor personnel shall be appropriately certified prior to beginning work on this task order or with Government approval a ninety (90) days waiver in which training must be completed at Contractors expense. At a minimum, Contractor personnel shall meet required DoD Approved Baseline Certifications as described in the Army Best Business Practices (BBP) 05-PR-M-0002, "Information Assurance (IA) Training and Certification v2.0", and DoD 8570.01-M for the IA Technical (IAT), IA Management (IAM), or Information Systems Security manager (ISSM) level and category designated on the TO, and must be completed prior to full performance. In addition to the baseline IA certification requirement for their level, IAT level individuals (IAT-I/II/III), Contractor personnel must also be certified in their computing environment (CE). IATs with privileged access must obtain appropriate computing environment (CE) certifications for the components, devices and operating system(s) they support as required by the task order. |
| 100% compliance |
| Quarterly Inspection; reported in PIEE/SPS government |
website
| 2.4.7.1.4. The Contractor shall ensure instructors are certified and current with Army training doctrine. |
| · The Contractor shall ensure that each instructor has at least two years MCIS teaching experience; have previously served as a primary instructor for the same courseware on which the instructor will teach; Have completed a course of study leading to a minimum of experience with Army MCSs and software systems AND completed a formal course of study in the subject(s) to be taught; Be a subject matter expert who has operated the system under instruction; Have experience of not less than four (4) years’ service in or support to the Army or other national defense service; have a Secret Clearance; Be qualified to serve as a primary instructor on the JLCCTC Battle Simulation Work Station (BSWS); Information shall be included in Personal Qualification List identified in 2.4 above. |
| 100% compliance |
| Random inspection amounting to 100% inspection quarterly |
3.1.1. TASK ORDER MANAGEMENT. The Contractor shall provide the overall management and administrative effort necessary to ensure that the requirements of this TO are accomplished IAW the task order PWS.
| Task Order Manager and Site Leads are present and providing PWS task management IAW Government requirements contained in the PWS. |
| 98% total PWS compliant |
| 100% Inspection |
| 3.1.1.3. Program Management Support. The Contractor shall assist the MTC Government staff in planning, scheduling, and controlling the resources allocated to meet the requirements of the TO. |
| The Contractor shall prepare and submit to the COR a monthly Contract Funds Status Report (CFSR) no later than five working days after the end of each month. |
| 100% Compliance |
| 100% Inspection |
| 3.1.1.4. Annual Training. The Contractor shall develop (and submit to the COR no later than 30 working days after TO start date) a Contractor Training and Certification Plan and maintain the program to conduct annual refresher training for all MTC Contractor personnel to maintain doctrinal and operational proficiency and to maintain technical and training certifications. |
| Monthly updates to this plan will be submitted as part of the monthly report |
| 100% Compliance |
| 100% Quarterly Inspection |
| 3.1.1.5. Monthly Report. The Contractor shall develop a format for a monthly report and submit it to the Government for approval. |
| The Contractor shall submit a monthly report to the COR by the fifth working day of the following month. |
| 100% Compliance |
| 100% Monthly Inspection |
| 3.1.1.6. Training Utilization and Reporting. The contractor shall record all usage data on a weekly basis and consolidate it into quarterly reports. |
| This data is initially consolidated into an IMCOM (Technical Exhibit 7.10) Spreadsheet and then transferred into the Army’s tracking system (TS-MATS). |
| 100% Compliance |
| 100% Quarterly Inspection |
| 3.1.2. Knowledge Management. Establish and maintain MTC section web pages and SharePoint site and provide content management. |
| Contractor will ensure content is current and relevant. This includes, but not limited to, SharePoint web part development meant to improve KM processes and procedures. |
| No more than one revision found per submission. |
| Random Inspection |
| 3.1.3. Operational Support. The Contractor shall provide operational and administrative support necessary to meet the needs of the task order. |
| The Contractor shall maintain and support the maintenance of accurate files of documentation, records, and reports required under the terms of this contract IAW AR 25-1, Army Knowledge Management and Information Technology Management, AR 25-400-2, Army Record Information Management System. |
| No more than two revisions per document or action. |
| 100% Quarterly Inspection; Reported in CORT Tool |
| 3.1.4. Property Accountability. The Contractor shall maintain inventories of equipment to ensure tracking property down to the user level, submit lists of supplies and equipment required to execute the mission, assist in the ordering process, and properly account for and store items upon receipt, including physical disposition of materials and supplies. |
| 100% accountability. Applicable U.S. Army property accountability regulations and FAR part 45 and FAR Clause 52.245-5. |
| 100% compliance |
| Monthly 10% Inventories and Monthly 100% Sensitive Item Inventories. |
| 3.1.4.2. Inventories. |
| The Contractor shall account for GOCO IAW AR 710-2-1 and at a minimum, account for 10% percent of the total GOCO issued to the Contractor per month IAW installation Property Book Officer (PBO) guidance. |
| 100% compliance |
| Random inspection amounting to 100% inspection quarterly; reported in PIEE/SPS government website |
| 3.1.6. Security Management. The Contractor shall Conduct Physical and Operational Security and access control. |
| IAW DoDD 5200.1-R (Information Security Program), AR 25-2 (Chapter 2), AR 25-1, AR25-2, DoD 8570-1, and BBP05-PR-M-0002and AR 350-53 (System Security Monitoring). |
| 100% regulation compliant |
| Random inspection amounting to 100% inspection quarterly; reported in the PIEE/SPS government website |
| 3.1.6.1. Information Systems Security Compliance. The Contractor shall provide sufficient trained and certified Network and Systems Administrators (NA/SA), ISSM/ISSO to ensure that all systems are compliant with local and Army regulations and policies, and comply with all accreditation requiring routine and periodic training, testing, and reviews |
| The Contractor shall comply with all DoD, DA, Command, and local IAW/ISSM instructions and regulations. These include, but are not limited to: DoDD 5200.1-R (Information Security Program), AR 25-2 (Chapter 2), AR 25-1, AR25-2, DoD 8570-1, and BBP05-PR-M-0002and AR 350-53 (System Security Monitoring). The Contractor shall ensure compliance with Risk Management Framework (RMF), data security regulations, and subsequent framework accreditation methods as progressively implemented by the Government to achieve continued compliance. |
| 100% regulation compliant |
| Random inspection amounting to 100% inspection quarterly; reported in the PIEE/SPS government website |
| 3.1.6.1.2.2. Network Operation. The Contractor shall ensure all requirements are met to allow Government accreditation and certification of all networks. |
| Contractor shall ensure that networks are certified and that all internal and external communications are operated and maintained IAW approved standards and regulations (AR 25-2 and local installation Network Enterprise Center (NEC) policies). |
| 100% regulation compliant |
| Random inspection amounting to 100% inspection quarterly; reported in the PIEE/SPS government website |
| 3.1.6.1.4. Data Security. The Contractor shall ensure that data security on Government networks, including data retrieval, transmission, and storage is conducted |
| IAW applicable Government standards to ensure that data transmission and storage are secure and free from unauthorized access IAW AR 380-5 and AR 25-2. |
| 100% regulation compliant |
| Random inspection amounting to 100% inspection quarterly; reported in the PIEE/SPS government website |
| 3.1.6.1.5. Security Plan. The Contractor shall ensure accreditation and connectivity of all networks are maintained. |
| The Contractor shall ensure that all standard and non-standard systems have a security plan/accreditation as identified in DoDI 8500.01 and DoDI 8510.0. The plan shall display that the proper “Designated Approving Authority” (DAA) has approved and accepted any risks identified in the plan. No network connectivity will be granted until this task is completed. |
| 100% regulation compliant |
| Random inspection amounting to 100% inspection quarterly; reported in the PIEE/SPS government website |
| 3.1.6.1.6. COMSEC Handling. The Contractor shall pick up, handle, transport, install, inventory, store, and destroy COMSEC equipment, devices, and keying material IAW all DA and National Security Agency (NSA) procedures and regulations, when and as required |
| The Contractor shall maintain COMSEC safes for the Government as needed at each installation. |
| 100% regulation compliant |
| Random inspection amounting to 100% inspection quarterly; reported in the PIEE/SPS government website |
| 3.1.8. Scenario Development. Provide scenario development and related support at Forts Hood, Carson, Riley, Sill, and Bliss. |
| Scenarios are doctrinally and operationally relevant. |
| No more than two revisions per submission. |
| Random inspection amounting to 100% inspection quarterly; documented in the PIEE/SPS government website |
| 2.4.6. Exercise Planning. The Contractor shall provide exercise planning support at Forts Hood, Carson, Riley and Bliss. |
| The Contractor shall plan exercises and meet all requirements following the tenants in TC 7-101, Exercise Design |
| 100% compliance |
| Random inspection amounting to 100% inspection quarterly; documented in the PIEE/SPS government website |
| 3.2. Individual MCIS Training. The Contractor shall perform classroom setup, networking of systems and supporting simulations, and instruction on applicable mission command systems. |
| The Contractor shall complete training to standard and on time. |
| 90% of the students successfully completing the course of instruction and receiving system certification |
| Quarterly inspection amounting to 100% inspection quarterly |
| 3.3. Gaming-Based Training. The Contractor shall provide gaming-based small event training that is doctrinally current, proficient, and operationally relevant to the user. |
| Contractor operated and maintained training enablers, simulations and mission command systems must be operational > 96% of their available time. The Contractor shall gather written feedback from each customer (Soldier/Leader) and provide that feedback to the Government within 7 days of the training event. Customer feedback will be used to improve products, services and facilities supporting training. |
| No more than 1% (95%) decrement from standard (96%) operational rate |
| 100% Quarterly Inspection; documented in the PIEE/SPS government website |
| 3.4. Medium Event Training. The Contractor shall provide mission command staff training events that are focused on current operations (CUOPS) training, Military Decision Making (MDMP) or on specific Warfighting Functions (WFF) such as but not limited to Fires or Intelligence. |
| The commander's stated outcome is the evaluation metric rather than a checklist of disconnected skills. The Contractor shall provide instruction to unit staffs, facilitate training events as observer/trainers or role play subordinate, peer and higher headquarters. |
| 100% compliance |
| Random inspection amounting to 100% inspection quarterly; documented in the PIEE/SPS government website |
| 3.5. Large Event Training. The Contractor shall support Large Multi-Echelon Exercises designed to train and stress the interactions between echelons. |
| The commander's stated outcome is the evaluation metric rather than a checklist of disconnected skills. The Contractor shall provide training and technical support following the JELC planning process. |
| 100% compliance |
| 100% Inspection; documented in the PIEE/SPS government website |
| 3.6. Surge Support. The Contractor shall be prepared to support training events/exercises and classes that exceed the planned numbers of events listed above. |
| Contractor has conducted a detailed analysis of training requirements and has recommended the most cost effective way to meet the requirement. |
| 100% compliance |
| 100% Monthly Inspection; documented in the PIEE/SPS government website |
| 3.7. Technical Support. The Contractor shall employ and incorporate models and simulations into exercises to provide realistic and in depth training environments to the training audience. |
| 100% of Contract technical employees have attained required technical certifications and the simulation is maintained for at least 98% of the required exercise time. |
| 100% compliance |
| 100% Quarterly Inspection; included in Quarterly Report |
| 3.6.2. Travel. Contractor employees will be required to travel on official business to support related Government training events, planning events or exercises. |
| All travel shall conform to section H.3.7.2 of the master contract;. |
| 100% compliance of most cost effective means |
| 100% Monthly Inspection; documented in the PIEE/SPS government website |
Appendix 2 - Corrective Action Report (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Appendix 3 - Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 - Performance Assessment Report (PAR)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 5 – Contractor Observation Report (COR) image1.emf image2.emf