Attachment_6_-_Exhibit_D_-_PV_Inspection_List.pdf

PDF 121 KB Posted

Attached to
Preventative Maintenance Services for Alcatraz Isl Federal contract opportunity
Solicitation number
140P8623Q0106
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This exhibit outlines inspection requirements for photovoltaic systems and batteries at Alcatraz Island. The inspection list details items to monitor and document for the solar panels in arrays A through D, including cell voltages, ohms readings, and component statuses. For the batteries, requirements include reporting on cleanliness, charging capacity, voltages, and operational condition for each bank. Inspections must also be performed for the battery inverters, battery room equipment such as dehumidifiers and monitoring systems, and documentation submitted per the contract terms. The related federal opportunity is a solicitation from the National Park Service seeking preventative maintenance services for these renewable energy assets at Alcatraz Island, as identified by solicitation number 140P8623Q0106.

View the file

Other files for this federal contract opportunity

Other files attached to Preventative Maintenance Services for Alcatraz Isl, newest first.
File Type Posted
Attachment_13_-_Exhibit_E_Alcatraz_Guano_CleanUp_Zones_edit_0003.pdf PDF
Attachment_8_-_Exhibit_B_AZ_PV_System_Training_Manual_0003.pdf PDF
Questions_and_Answers_from_Contractors_0003.pdf PDF
Sol_140P8623Q0106_Amd_0003.pdf PDF
Site_Visit_Sign_In_Sheet_0002.pdf PDF
Questions_and_Answers_from_Site_Visit_on_Alactraz_0002.pdf PDF
Attachment_1_-_Performance_Work_Statement_0002.pdf PDF
Sol_140P8623Q0106_Amd_0002.pdf PDF
Sol_140P8623Q0106_Amd_0001.pdf PDF
Attachment_19_-_52_209-7.pdf PDF
Attachment_2_-_Bid_Schedule.pdf PDF
Attachment_11_-_Exhibit_H2_eONE_2014_drawings.pdf PDF
Attachment_10_-_Exhibit_H1_eone-dh152-grinder-pump-installation-instructions.pdf PDF
Sol_140P8623Q0106.pdf PDF
Attachment_15_-_Exhibit_L_BAAQMD_AZ_AIR_PERMIT.pdf PDF
Attachment_1_-_Performance_Work_Statement.pdf PDF
Attachment_20_-_Limitation_on_Subcontracting_Report_Template.xlsx XLSX spreadsheet
Attachment_12_-_Exhibit_I_-_Directors_Order__83_B4.pdf PDF
Attachment_8_-_Exhibit_F_AZ_PV_System_Training_Manual.pdf PDF
Attachment_7_-_Exhibit_E_Alcatraz_PV_System_Warranty_Management_Plan.pdf PDF
Attachment_4_-_Exhibit_B_Alcatraz_Equipment_Lists.pdf PDF
Attachment_3_-_Exhibit_A_Alcatraz_General_Map.pdf PDF
Attachment_21_-_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_18_-_Past_Performance_Questionnaire.pdf PDF
Attachment_17_-_SCA_Wage_Detrmination.pdf PDF
Attachment_16_-_Exhibit_M_General_Requirements_for_Contractors_on_Alcatraz.pdf PDF
Attachment_14_-_Exhibit_K_-_CFR-2020-title40-vol24-part112.pdf PDF
Attachment_13_-_Exhibit_J_Alcatraz_Guano_CleanUp_Zones_edit.pdf PDF
Attachment_9_-_Exhibit_G_Cleaning_of_Historic_Concrete.pdf PDF
Attachment_5_-_Exhibit_C_Alcatraz_Maintenance_Manuals.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT D – PV INSPECTION LIST

Provide reports per Section 9 of the contract.

1. Inspect all photovoltaic panels (Arrays A, B, C, and D). Report on cleanliness, condition of glass, operational status, and voltage and current per string. Items to be monitored and documented shall include at a minimum:

a. Intertier Connections

b. Lowest Cell Voltage

c. Highest Cell Voltage

d. Average Cell Voltage

e. Low Ohms

f. High Ohms

g. Average Ohms

h. Knife Switches

i. Current Sensors

j. Racks

k. Solar Sensor

l. PVA Conduit

m. PVB Conduit

n. PVC Conduit

o. PVD Conduit

p. All Disconnects

q. All Combiner Boxes

r. All Array Mounts

s. All Array Racks

2. Inspect all batteries. Report on cleanliness, condition of batteries, charging capacity, operational status, and voltage and current per bank.

3. Inspect Battery Inverters. Report on cleanliness, and operational status.

4. Inspect all equipment associated with Battery Room, items to be monitored and documented shall include at a minimum:

a. Dehumidifier

b. Temperature Sensors

c. Fire System

d. Bus Cables

e. Spill Kit

f. Eye Wash

g. Alber Battery Monitoring System for String A

h. Alber Battery Monitoring System for String B

i. Spare Cells

j. Overhead Fan