Attachment_2_-_Bid_Schedule.pdf
PDF 186 KB Posted
- Attached to
- Preventative Maintenance Services for Alcatraz Isl Federal contract opportunity
- Solicitation number
- 140P8623Q0106
About this file
This document contains a bid schedule for preventative maintenance services for Alcatraz Island under solicitation number 140P8623Q0106 issued by the National Park Service Pacific West Region of the Department of the Interior. The bid schedule outlines pricing requirements for base and option years of electrical systems and equipment maintenance, utility chase inspections, waste handling, drinking water, pressure washing, restrooms, vehicle and equipment maintenance, and fuel storage and delivery systems. Offerors must provide pricing for all base line items and option line items on a lump sum or unit price basis as specified. The bid schedule also includes a breakdown table requiring pricing for each task area by base and option years. Offerors must provide total pricing for the base year, option years, and overall total for the base and option years.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
SOLICITATION NUMBER: 140P8623Q0106
PARK - PMIS: GOGA ‐ 311973A
DEVELOPED AREA: Golden Gate National Recreation Area, San Francisco County, California PROJECT TITLE: Preventative Maintenance Services Alcatraz Island Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for all Base line items and all Option line items (if any). Failure to do so may render the proposal unacceptable. On lump-sum (LS) line items, provide the total price only. On any unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of summation error, the total corrected amounts govern. Round totals and extended prices to whole dollars.
CONTRACT
LINE ITEM
NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE
UNIT
QTY
UNIT
OF
MEAS
UNIT PRICE TOTAL PRICE
1 Base Year: Electrical Systems and Equipment, Miscellaneous Electrical, Utility Chase Inspections, Waste Handling System, Drinking Water System, Pressure Washing, Restrooms, Vehicle and Equipment Maintenance, and Fuel Storage & Delivery Systems
1 LS $ $
2 Option Year One: Electrical Systems and Equipment, Miscellaneous Electrical, Utility Chase Inspections, Waste Handling System, Drinking Water System, Pressure Washing, Restrooms, Vehicle and Equipment Maintenance, and Fuel Storage & Delivery Systems
1 LS $ $
3 Option Year Two: Electrical Systems and Equipment, Miscellaneous Electrical, Utility Chase Inspections, Waste Handling System, Drinking Water System, Pressure Washing, Restrooms, Vehicle and Equipment Maintenance, and Fuel Storage & Delivery Systems
1 LS $ $
4 Option Year Three: Electrical Systems and Equipment, Miscellaneous Electrical, Utility Chase Inspections, Waste Handling System, Drinking Water System, Pressure Washing, Restrooms, Vehicle and Equipment Maintenance, and Fuel Storage & Delivery Systems
1 LS $ $
5 Option Year Four: Electrical Systems and Equipment, Miscellaneous Electrical, Utility Chase Inspections, Waste Handling System, Drinking Water System, Pressure Washing, Restrooms, Vehicle and Equipment Maintenance, and Fuel Storage & Delivery Systems
1 LS $ $
BID SCHEDULE BREAKDOWN BY TASK AND OPTION YEAR
Task
Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4
(11/11/2023- 11/10/2024)
(11/11/2024- 11/10/2025)
(11/11/2025- 11/10/2026)
(11/11/2026- 11/10/2027)
(11/11/2027- 11/10/2028)
Electrical Systems and Equipment $ $ $ $ $
Utility Chase Inspections $ $ $ $ $
Waste Handling System $ $ $ $ $
Drinking Water System $ $ $ $ $
Pressure Washing $ $ $ $ $
Restrooms $ $ $ $ $
Vehicle and Equipment
Maintenance $ $ $ $ $
Fuel Storage & Delivery Systems $ $ $ $ $
Total $ $ $ $ $
TOTAL BASE YEAR 11/11/2023-11/10/2024 = $
TOTAL OPTION YEAR 1 – 4 (11/11/2024-11/10/2028) = $
TOTAL BASE + OPTION YEARS = $
| BID SCHEDULE BREAKDOWN BY TASK AND OPTION YEAR |
| TOTAL BASE YEAR 11/11/2023-11/10/2024 = $ |
| TOTAL OPTION YEAR 1 – 4 (11/11/2024-11/10/2028) = $ |
| TOTAL BASE + OPTION YEARS = $ |
File details come from the government source that posted it. Updated .