Attachment_8_-_Exhibit_B_AZ_PV_System_Training_Manual_0003.pdf

PDF 40 MB Posted

Attached to
Preventative Maintenance Services for Alcatraz Isl Federal contract opportunity
Solicitation number
140P8623Q0106
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This file is an attachment to a federal contract solicitation for preventative maintenance services on Alcatraz Island. The solicitation was issued by the Department of the Interior National Park Service Pacific West Region seeking proposals for preventative maintenance of photovoltaic systems on Alcatraz Island. Proposals were due by January 6, 2023, with the period of performance running from April 1, 2023 through March 31, 2028. The solicitation aims to maintain the existing solar panel infrastructure on the island to support its power needs. The attachment provides a training manual on the photovoltaic systems with details on maintenance procedures, component specifications, and safety protocols for working on the solar array.

View the file

Other files for this federal contract opportunity

Other files attached to Preventative Maintenance Services for Alcatraz Isl, newest first.
File Type Posted
Attachment_13_-_Exhibit_E_Alcatraz_Guano_CleanUp_Zones_edit_0003.pdf PDF
Sol_140P8623Q0106_Amd_0003.pdf PDF
Questions_and_Answers_from_Contractors_0003.pdf PDF
Questions_and_Answers_from_Site_Visit_on_Alactraz_0002.pdf PDF
Site_Visit_Sign_In_Sheet_0002.pdf PDF
Attachment_1_-_Performance_Work_Statement_0002.pdf PDF
Sol_140P8623Q0106_Amd_0002.pdf PDF
Sol_140P8623Q0106_Amd_0001.pdf PDF
Attachment_19_-_52_209-7.pdf PDF
Attachment_2_-_Bid_Schedule.pdf PDF
Attachment_11_-_Exhibit_H2_eONE_2014_drawings.pdf PDF
Attachment_10_-_Exhibit_H1_eone-dh152-grinder-pump-installation-instructions.pdf PDF
Sol_140P8623Q0106.pdf PDF
Attachment_20_-_Limitation_on_Subcontracting_Report_Template.xlsx XLSX spreadsheet
Attachment_12_-_Exhibit_I_-_Directors_Order__83_B4.pdf PDF
Attachment_8_-_Exhibit_F_AZ_PV_System_Training_Manual.pdf PDF
Attachment_7_-_Exhibit_E_Alcatraz_PV_System_Warranty_Management_Plan.pdf PDF
Attachment_6_-_Exhibit_D_-_PV_Inspection_List.pdf PDF
Attachment_4_-_Exhibit_B_Alcatraz_Equipment_Lists.pdf PDF
Attachment_3_-_Exhibit_A_Alcatraz_General_Map.pdf PDF
Attachment_21_-_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_18_-_Past_Performance_Questionnaire.pdf PDF
Attachment_15_-_Exhibit_L_BAAQMD_AZ_AIR_PERMIT.pdf PDF
Attachment_1_-_Performance_Work_Statement.pdf PDF
Attachment_17_-_SCA_Wage_Detrmination.pdf PDF
Attachment_16_-_Exhibit_M_General_Requirements_for_Contractors_on_Alcatraz.pdf PDF
Attachment_14_-_Exhibit_K_-_CFR-2020-title40-vol24-part112.pdf PDF
Attachment_13_-_Exhibit_J_Alcatraz_Guano_CleanUp_Zones_edit.pdf PDF
Attachment_9_-_Exhibit_G_Cleaning_of_Historic_Concrete.pdf PDF
Attachment_5_-_Exhibit_C_Alcatraz_Maintenance_Manuals.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alcatraz PV-Diesel Hybid System Operations Review

Install Solar Generator Power
PV Training Manual - Cover Page_TOC
System Components Summary
System Operational Overview PPS
System ShutDown Guide - PPS
System Startup Guide - PPS
Tab 1 - General Overview
Tab 2 - PPS - Inverters and Controllers
Tab 3 - Generators
Tab 4 - Electrical Gear
Tab 5 - Fire Alarm System - Battery Room
Tab 6 - Automatic Louvers - Dampers
Tab 7 - Battery Room 2nd Scan
Tab 7 - Battery Room
Tab 8 - Pump House
Tab 9 - Main Prison Bldg - Panels - Weather Station - Energy Conservation
Tab 10 - Energy Metering

File details come from the government source that posted it. Updated .