Attachment 0013g - D-IBCS-0471_Delta2_Suppl_PE_redacted.pdf

PDF 781 KB Posted

Attached to
RFP for Integrated Battle Command System (IBCS) LRIP/FRP Federal contract opportunity
Solicitation number
W31P4Q-20-R-0015
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This document is an attachment to a Request for Proposal (RFP) for the Integrated Battle Command System (IBCS) Low Rate Initial Production/Full Rate Production hardware segment. The RFP seeks production of IBCS hardware end items in accordance with supplied Technical Data Packages and the Critical Item Development Specification. Engineering changes may be required for obsolescence, new capabilities, and export considerations. Questions regarding the RFP are due by December 10, 2020 at 4pm Central Standard Time. The RFP is only open to contractors that met entrance criteria on SAM.gov and were approved by the Integrated Fires Mission Command Project Office within the Department of the Army Materiel Command Contracting Command at Redstone Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to RFP for Integrated Battle Command System (IBCS) LRIP/FRP, newest first.
File Type Posted
EXHIBIT A - CONTRACT DATA ITEM REQUIREMENTS LIST (CDRL) - 24NOV2020.pdf PDF
Exhibit C- IBCS DSL - 24NOV2020.docx DOCX document
Attachment 0002 - AIAMD System of Systems (SoS)(MIS-PRF-56500).pdf PDF
Attachment 0004b - Relay Acceptance Test Procedures_FINAL.docx DOCX document
Attachment 0004d - Operator Procedures For IFMC GSIL.docx DOCX document
Attachment 0005 - Software Installation Instructions.docx DOCX document
Attachment 0008 - AIAMD IUID Plan Appendix A - IUID Candidates List Data Items.pdf PDF
Attachment 0009 - R and M Prediction Report.docx DOCX document
Attachment 0010a.3 – R003 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.7 – R007 Relay Network Switch-Parvus Switch-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.9 – R015 PDU Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.13 – R031 Black Router--FMECA.xlsx XLSX spreadsheet
Attachment 0010c.3 – E048 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.8 – E053 Shelter Time Server-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.9 – E059 Shelter Switch – 01-FMECA.xlsx XLSX spreadsheet
Attachment 0010d.7 – E153 RS112 Server -06 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 0010d.8 – E153 RS112 Server -07 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 0010e.9 – E147 – Table 3 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0012 - Risk Management Plan.pdf PDF
Attachment 0013c - IBCS-A301-003 Vol II Instructor Guide_redacted.pdf PDF
Attachment 0013f - D-IBCS-0428-001_Delta_Software_SG_redacted.pdf PDF
Attachment 0014 RevC - Technical Library.docx DOCX document
Attachment 0016 - Example Cage Code and Cognizant DCMA DCAA Information.xlsx XLSX spreadsheet
Attachment 0022a - CASS to PDRS.docx DOCX document
Attachment 0022a.1.e - ALH-215333 00 S-280 CASS INSTALLA.pdf PDF
Attachment 0022a.1.h - PL-ALH-211130 00 CABLE ASSEMBLY C.pdf PDF
Attachment 0022a.4 - CASS Task Purpose.v2.pptx PPTX presentation
Attachment 0025 - DD254.pdf PDF
Attachment 0010b.6 – E030 KVM Console-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.5 – R005 SCIM-FMECA.xlsx XLSX spreadsheet
Attachment 0013i - D-IBCS-0473_Adv_NetMgr.pdf PDF
Attachment 0018 - IBCS LRIP FRP IDIQ Pricing Template_29Oct2020 v.3.xlsx XLSX spreadsheet
Attachment 0004 - Acceptance Test Plan.docx DOCX document
Attachment 0004c - ECT Acceptance Test Procedures_FINAL.DOCX DOCX document
Attachment 0006 - Obsolete Parts List.pdf PDF
Attachment 0010a.4 – R004 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.8 – R008 Media Converter Chassis-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.11 – R029 PFPU SSHD-1—FMECA.xlsx XLSX spreadsheet
Attachment 0010a.15 – R033 Media Converter Module 12-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.2 – E002 Power Inverter Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.4 – E013 ADSI Shelter – Misc Equip-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.5 – E029 KVM Switch 1 Shelter Stack-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.7 – E031 R112 Shelter – Server Stack – 01-FEMCA.xlsx XLSX spreadsheet
Attachment 0010c.2 – E044 Firewall Black-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.5 – E050 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.10 – E060 Shelter Switch – 02-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.13 – E063 Isolation Router Black-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.15 – E068 Media Converter 02 – FMECA.xlsx XLSX spreadsheet
Attachment 0010d.3 – E150 S-280 PEV-FMECA.xlsx XLSX spreadsheet
Attachment 0010e.1 – E067 – EtherNet Switch-FMECA.xlsx XLSX spreadsheet
Show all 50

RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Copyright 2020 Northrop Grumman Systems Corporation.

UNCLASSIFIED

IBCS.DM.025.25 (Jan20)

Integrated Air and Missile Defense (IAMD)

Battle Command System (IBCS)

Operator/Maintainer Course

Delta 2 Training

Supplemental Practical Exercises

DOCUMENT NUMBER: RELEASE: DOCUMENT DATE:

D-IBCS-0471 001 06 May 2020

CDRL NUMBER: CONTRACT: CONTRACT NUMBER:

N/A IBCS W31P4Q-08-C-0418

EXPORT CONTROL WARNING DISTRIBUTION STATEMENT D

WARNING -This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751,

et. seq.) or the Export Administration Act of 1979, as amended, Title

50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Distribution authorized to DoD and U.S. DoD contractors only;

Administrative and operational Use; 26 July 2017. Other requests for this document shall be referred to the IAMD Project Office, Bldg.

5250 Martin Road, Redstone Arsenal, AL 35898.

DISCLAIMER STATEMENT AND DISTRIBUTION

RESTRICTION

The views, opinions, and/or findings contained in this report are those of the author(s) and should not be construed as an official

Department of Defense position, policy, or decision, unless so designated by other official documentation.

This document contains information EXEMPT FROM MANDATORY DISCLOSURE under the FOIA. Exemption 3 (e) apply. (Reference: Army Regulation 25-55)

This material is based upon work supported by the U.S. Army Aviation and Missile Command under Contract No. W31P4Q-08-C-0418.

Prepared for: Prepared by:

Integrated Air and Missile Defense (IAMD)

Battle Command System (IBCS)

Northrop Grumman Defense Systems Sector

Combat Systems and Mission Readiness (CSMR)

Division

213 Wynn Drive

Huntsville, AL 35805-1928

CAGE Code 9F909

W31P4Q-20-R-0015 ATTACHMENT 0013g

D-IBCS-0471, Rel. 001

06 May 2020 iii

Northrop Grumman Defense Systems

Combat Systems and Mission Readiness (CSMR) Division

IAMD Battle Command System (IBCS)

213 Wynn Drive

Huntsville, Alabama 35805-1928

CHANGE RECORD

Release

Number Date Authority

Pages

Affected Remarks

001 06 May 2020 SOW 3.2.10.9.1 All Initial Release, DCR-6593, PCCB #587

D-IBCS-0471, Rel. 001

06 May 2020 iv

This page intentionally blank

UNCLASSIFIED D-IBCS-0471, Rel. 001

Delta 2 Training Supplemental Practical Exercises 06 May 2020

Integrated Air and Missile Defense (IAMD)

Battle Command System (IBCS)

Operator/Maintainer Course

Delta 2 Training

Supplemental Practical Exercises

UNCLASSIFIED

TABLE OF CONTENTS

Delta 2 Training Supplemental Practical Exercises

PE 01: Set Up the EOC Mast

PE 02: Perform TOCNET and Spark Procedures

PE 03: Perform IDD Procedures – Integrated Defense Design

PE 04: Perform IDD Procedures – Communications

PE 05: Perform IDD Procedures – Task Force Configuration

PE 06: Perform Neighbor Management and Network Pruning

PE 07: Perform Gateway Transition

UNCLASSIFIED

DELTA 2 TRAINING SUPPLEMENTAL PRACTICAL EXERCISES

WARNING: Adhere to all safety Warnings and Cautions during the exercises.

PRACTICAL EXERCISE (PE) OVERVIEW

1. Directions to Students

a. Perform the following mission: Enable and perform simulated engagement operations and real-time surveillance operations using the IBCS and CWMI.

b. Perform assigned tasks and procedures given by the instructor.

c. Use TMs, Student Guide materials, and notes when performing exercises.

d. Safety Precautions:

(1) Remove all jewelry—including neck chains.

(2) Remove power from equipment during assembly and disassembly procedures.

(3) Obey all applicable cautions and warnings.

(4) Use the proper tools for the task.

(5) Use the Buddy System when working on energized equipment.

e. Student References

(1) Student Guide for the IBCS Operator/Maintainer Course.

(2) SUM

(3) IETM: DRAFT TM-11-5895-567-13&P

2. Practical Exercise Execution

a. By performing the exercises, students learn the following tasks:

(1) Set up the EOC Mast

(2) Perform TOCNET and SPARK procedures

(3) Perform IDD procedures

(4) Perform Neighbor Management and Network Pruning

(5) Perform Gateway Transition

b. Evaluations are conducted on individual and team participation when performing exercises.

UNCLASSIFIED

PE 01: SET UP THE EOC MAST

Evaluation

The PE validates the ability of the student to set up the EOC Mast.

The instructor performs a progress check on each student to ensure that proper actions are taken during the practical exercise (PE). At the end of the exercise, the instructor marks the PE

“GO” or “NO-GO.” A NO-GO assessment results in retraining and re-evaluation.

Directions

● Follow the instructions given in the Student Guide.

● Perform proper procedures indicated by the instructor.

● Follow procedures exactly, unless the instructor states otherwise.

a. Start up the Generator

b. Start up the PDISE

c. Set up the EOC Mast

(1) Install Payload Adapter Crossbeam

(2) Install Lightning Rod

(3) Install the Beacon

(4) Connect the HRFU cables

(5) Install HRFU radio to adapter

(6) Install adapter to mast

(7) Guy the mast

d. Raise the EOC Mast

(1) Perform Cable Management

(2) Extend the Mast

(3) Tighten the Guy Ropes

Instructor Check: GO_____ NO-GO_____

UNCLASSIFIED

PE 02: PERFORM TOCNET AND SPARK PROCEDURES

Evaluation

The PE validates the ability of the student to operate the TOCNET and Spark.

The instructor performs a progress check on each student to ensure that proper actions are taken during the practical exercise (PE). At the end of the exercise, the instructor marks the PE

“GO” or “NO-GO.” A NO-GO assessment results in retraining and re-evaluation.

Directions

● Follow the instructions given in the Student Guide.

a. Perform TOCNET Procedures.

(1) Log in to the SoftCAU.

(2) Add an asset to the main screen.

(3) Remove an asset.

(4) Place a call.

(a) Use TOCNET to call a VoIP.

(5) Answer an incoming call.

(a) Receive a call from a VoIP.

(6) Coordinate with other EOCs via voice.

(7) Transmit and monitor on a channel.

b. Perform Spark Procedures.

(1) Log into Spark.

(2) Establish communication with other EOCs.

c. Using either TOCNET or Spark, acquire all Hardware IDs for all equipment assigned to the battalion.

UNCLASSIFIED

PE 03: PERFORM IDD PROCEDURES – INTEGRATED DEFENSE DESIGN

Evaluation

The PE validates the ability of the student to perform IDD procedures. During this practical exercise, the student produces an IDD plan with the indicated resource laydown.

The instructor performs a progress check on each student to ensure that proper actions are taken during the Practical Exercise (PE). At the end of the exercise, the instructor marks the PE “GO” or “NO-GO.” A NO-GO assessment results in retraining and re-evaluation.

Directions

● Follow the instructions given in the Student Guide.

a. Using New Plan, create a new plan with the following parameters.

(1) Name: <Last Name>_2020

(2) Destination: Save to Delta2 Folder

(3) COCOM: NORTHCOM

(4) Zoom to region: Yes

(5) No threat countries selected

b. Create an Area of Interest.

(1) Point 1: Lat. 34.656, Long. -108.575

(2) Point 2: Lat. 34.790, Long. -104.220

(3) Point 3: Lat. 30.523, Long. -104.285

(4) Point 4: Lat. 30.603, Long. -108.411

c. Create a Task Force Area.

(1) Point 1: Lat. 33.106, Long. -106.490

(2) Point 2: Lat. 33.107, Long. -106.026

(3) Point 3: Lat. 32.449, Long. -106.005

(4) Point 4: Lat. 32.391, Long. -106.377

(5) Point 5: Lat. 32.589, Long. -106.647

d. Create an Exclusion zone around the mountain range to the west.

UNCLASSIFIED

e. Create the following Assets:

(1) 90133

(a) Circle

(b) DAL 1

(c) Radius 1000

(2) Dog

(a) Circle

(b) DAL 2

(c) Radius 1000

(3) LC37

(a) Circle

(b) DAL 2

(c) Radius 1000

(4) Tac2

(a) Circle

(b) DAL 2

(c) Radius 1000

(5) Tula

(a) Circle

(b) DAL 2

(c) Radius 1000

f. Create the following TAOs.

(1) 1 BMOA

(a) Assign all Assets in the Target List

(2) 1 Airstrip

(a) Assign all Assets in the Target List

(3) 1 CMOA

(a) Assign all Assets in the Target List

g. Using the Threat Pallet assign the following:

(1) 5 TBMs

(2) 5 ABTs

(3) 5 CMs

h. Using the Flight Path Manager, assign 1 threat from each TAO to an asset.

UNCLASSIFIED

i. Emplace the following equipment inside each asset following the fiber limitation 1 km from EOC or Relay.

● The minimum distance equipment can be emplaced 120 meters in front of the sensor.

● A relay must be emplaced no less than 1500 m and within 180 degrees of RS coverage.

(1) Alpha battery at asset Tac2 with 1 EOC, 1 Sensor, 6 Launchers

(2) Bravo battery at asset Dog with 1 EOC, 1 Sensor, 6 Launchers

(3) Charlie Battery at asset LC37 with 1 EOC, 1 Sensor, 6 Launchers

(4) Delta Battery at asset Tula with 1 EOC, 1 Sensor, 6 Launchers

(5) HHB at asset 90133 with two EOCs

j. Apply proper naming convention to equipment based upon unit.

k. Assign five “tbmthreatset" to each Sensor.

l. Assign an appropriate PTL that targets the threats.

m. Using the comms manager and resource connectivity, ensure sensors and launchers are connected to the appropriate EOC.

n. Using the communication manager and tools available to establish an effective network using a maximum of 10 relays.

o. Use the bearing search to discover a valid location to emplace equipment.

p. Use the placement tool to discover possible locations between two points.

q. Verify connectivity using the Network Evaluation Tool.

r. Complete the Authority Tab with the appropriate information for your battalion.

s. Complete the Task Force Configuration Tab with the appropriate information for your battalion.

t. Complete the Hardware ID tab with the information for your battalion.

(1) Input Link 16 information for each EOC and Relay.

UNCLASSIFIED

PE 04: PERFORM IDD PROCEDURES – COMMUNICATIONS

Evaluation

The PE validates the ability of the student to perform Communications, IDD procedures.

The instructor performs a progress check on each student to ensure that proper actions are taken during the practical exercise (PE). At the end of the exercise, the instructor marks the PE

“GO” or “NO-GO.” A NO-GO assessment results in retraining and re-evaluation.

Directions

● Follow the instructions given in the Student Guide.

a. Using the communication manager and tools available, establish an effective network using a maximum of 10 relays.

b. Use the bearing search to discover a valid location to emplace equipment.

c. Use the placement tool to discover possible locations between two points.

d. Verify connectivity using the Network Evaluation Tool.

UNCLASSIFIED

PE 05: PERFORM IDD PROCEDURES – TASK FORCE CONFIGURATION

Evaluation

The PE validates the ability of the student to perform Task Force Configuration, IDD procedures.

The instructor performs a progress check on each student to ensure that proper actions are taken during the practical exercise (PE). At the end of the exercise, the instructor marks the PE

“GO” or “NO-GO.” A NO-GO assessment results in retraining and re-evaluation.

Directions

● Follow the instructions given in the Student Guide.

a. Complete the Authority Tab with the appropriate information for your battalion.

b. Complete the Task Force Configuration Tab with the appropriate information for your battalion.

c. Complete the Hardware ID tab with the information for your battalion.

a. Input Link 16 information for each EOC and Relay.

UNCLASSIFIED

PE 06: PERFORM NEIGHBOR MANAGEMENT AND NETWORK PRUNING

Evaluation

The PE validates the ability of the student to perform Neighbor Management and Network

Pruning tasks.

The instructor performs a progress check on each student to ensure that proper actions are taken during the practical exercise (PE). At the end of the exercise, the instructor marks the PE

“GO” or “NO-GO.” A NO-GO assessment results in retraining and re-evaluation.

Directions

● Follow the instructions given in the Student Guide.

a. With guidance from the instructor perform Network Pruning.

b. Select Roles as S6.

c. Click the Network manager.

d. Click the Network Control.

e. Select the Appropriate EOC.

(1) Using the battalion layout, modify the neighbor list so the two closest neighbors are the highest priority.

(2) Set all other neighbors to the lowest priority. Do not use -2.

UNCLASSIFIED

PE 07: PERFORM GATEWAY TRANSITION

Evaluation

The PE validates the ability of the student to perform Connectivity between the ADSI and the

IBCS system.

The instructor performs a progress check on each student to ensure that proper actions are taken during the practical exercise (PE). At the end of the exercise, the instructor marks the PE

“GO” or “NO-GO.” A NO-GO assessment results in retraining and re-evaluation.

Directions

● Follow the instructions given in the Student Guide.

a. Go to the plan settings in the Home Tab.

b. Verify Task Force JU matches the information assigned to the ADSI.

c. Perform a Gateway transition following the steps listed in the Student Guide for Delta.

d. Perform the steps needed to relinquish Gateway control.