Attachment 0001_SOW Attachment 1.5 - QCR Submittal Form.pdf

PDF 675 KB Posted

Attached to
SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
Solicitation number
W51EW7-26-R-A002
Issued by

About this file

This document is a combined Contractor's Quality Control Report (QCR) and Government Quality Assurance Report (QAR) template used for federal construction contracts under the Army Corps of Engineers (referenced contract number W911S2). The form serves as a daily reporting mechanism for tracking construction progress, quality control activities, and government oversight on federally funded projects.

The Contractor's Quality Control Report section requires the contractor to document percent actual and scheduled construction completion, significant issues requiring immediate attention, weather classifications (Classes A through E based on work interruptions), and detailed descriptions of work performed daily by prime contractors and subcontractors. The contractor must identify all tests performed per plans and specifications with results, document verbal instructions received from government personnel regarding deficiencies or retesting, and provide comprehensive remarks covering plan conflicts, material acceptability, work progress, delays, and reasons for any work stoppages. Additional mandatory reporting includes environmental quality control verification, site visitor documentation, safety infractions and corrective actions, and any attached Requests for Information (RFIs) with assigned control numbers. The contractor's Quality Control Manager must certify report accuracy and compliance with contract requirements. The Government Quality Assurance Report section, completed by the PW Engineering Construction Representative, Project Manager, and Contracting Officer's Representative, documents observed work performance, contractor QC functions effectiveness, any identified deficiencies with notification documentation, overall contractor performance assessment including workmanship and schedule compliance, and separate comment sections for government PM and COR/ACOR personnel. Both sections require signature and date authentication.

View the file

Other files

File Type Posted
Attachment 0015 - NCR MATOC QA A0008 v2.pdf PDF
Attachment 0001 - NCR MATOC SOW 8JUN2026.pdf PDF
Attachment 0012 - Seed Project SOW Floor Plan Layout.pptx PPTX presentation
Attachment 0011 - NCR MATOC QA A0003 Rev1.pdf PDF
Attachment 0008 - NCR MATOC Section L v6.pdf PDF
Attachment 0004 - Seed Project SOW 15APR2026 v2.pdf PDF
Attachment 0003 - Past Performance Questionnaire v2.docx DOCX document
Solicitation Amendment W51EW726RA0020003 SF 30.pdf PDF
Solicitation Amendment W51EW726RA0020002 SF 30.pdf PDF
Attachment 0010 - NCR MATOC QA A0001.pdf PDF
Attachment 0009 - NCR MATOC Section M v4.pdf PDF
Attachment 0008 - NCR MATOC Section L v5.pdf PDF
Attachment 0008 - NCR MATOC Section L v4.pdf PDF
68 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SECT DETS 041810.pdf PDF
67 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ROOF FRM PLN 041805.pdf PDF
59 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DOM 041860.pdf PDF
56 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 TITLE SHT 041709.pdf PDF
51 - Attachment 0004 SEED PROJ SOW 2020 MECH PLMB ALTER 1st FLR BTH 085811.pdf PDF
44 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PROF SW MTW 041853.pdf PDF
33 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR PLN 041825.pdf PDF
37 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041837.pdf PDF
34 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 CONT DIAG 041828.pdf PDF
35 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 CONT DIAG 041835.pdf PDF
8 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 SIGNAGE 1st 041797.pdf PDF
5 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 DOOR SCHD 041786.pdf PDF
1 - Attachment 0004 SEED PROJ SOW Attach 1991 ENL BRKS PH 4 ELEV 041759 2.pdf PDF
Attachment 0004 - Seed Project SOW 25FEB2026 2.pdf PDF
Attachment 0003 - Past Performance Questionnaire.docx DOCX document
Attachment 0001_SOW APPENDIX 2.7.4 JBMHH Excavation Permit SOP June 2023.pdf PDF
Attachment 0001_SOW APPENDIX 2.1.3 APG Excavation Permit.pdf PDF
Attachment 0001 - NCR MATOC SOW 10FEB2026.pdf PDF
69 - Attachment 0004 SEED PROJ SOW 2020 Title Sheet Alter 1st Flr BTH 085806.pdf PDF
66 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 FDN PLN 041804.pdf PDF
63 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PLUMB PLN 041872.pdf PDF
60 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd FLR DRN 041856.pdf PDF
54 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR DOM WTR 041859.pdf PDF
53 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC FLR PLN 041826.pdf PDF
50 - Attachment 0004 SEED PROJ SOW 2020 MECH PLMB ALTER 1ST FLR BTH 085810.pdf PDF
47 - Attachment 0004 SEED PROJ SOW 2014 WTR BFLW DEVICE 079606.pdf PDF
46 - Attachment 0004 SEED PROJ SOW 2007 MECH PLN UPGD 054886.pdf PDF
43 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 MTW DETS 041854.pdf PDF
36 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 DETS 041836.pdf PDF
31 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 SITE PLN 041877.pdf PDF
30 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 PWR RISR SIG 041891.pdf PDF
28 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 LTG FIX SCHED 041882.pdf PDF
25 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 ATTIC SIG 041890.pdf PDF
24 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 2nd 3rd FLR SIG 041889.pdf PDF
19 - Attachment 0004 SEED PROJ SOW 1991 ENL BRKS PH 4 1st FLR LHTG 041883.pdf PDF
17 - Attachment 0004 SEED PROJ SOW 2020 Legends Alter 1st FLR BTH 085812.pdf PDF
12 - Attachment 0004 SEED PROJ SOW Attach 1991 EBK VBRJS OG 4 TLT PLNS 041784.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR’S QUALITY CONTROL REPORT (QCR) DATE: REPORT No:

NAME OF CONTRACTOR:

CONTRACT No.:

W911S2- -D-

TASK ORDER: WORK ORDER: TITLE:

PROJECT STATUS

Percent Actual Construction Complete:

Percent Scheduled Construction Completed:

(IAW Approved Progress Schedule)

(If the percent of actual construction is more than 5% less than the scheduled percent completion based on the approved task order progress schedule, explain in Block 5, Remarks, what affirmative steps will be taken in order to bring the project back into compliance with the progress schedule.)

SIGNIFICANT ISSUES: (Describe any issues that have been or need to be brought to the immediate attention of the Contracting Officer):

WEATHER CLASSIFICATION:

CLASS A: No Interruptions of any kind from weather conditions occurring this or previous shifts CLASS B: Weather occurred during a shift that caused a partial stoppage of work CLASS C: Weather occurred during a shift that caused a complete stoppage of all work CLASS D: Weather excellent or suitable during shift but partially stopped work due to previous adverse weather

CLASS E: Weather excellent or suitable during shift but complete stopped or work due to previous adverse weather

OTHER (Explain in section 5)

WEATHER CONDITIONS:

Class: (if B, C, D, or E describe below what work tasks were affected by the weather conditions)

Temperature: Min: Max:

Precipitation:

Work Tasks Affected:

CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY:

a.

b.

c.

d.

e.

f.

1. WORK PERFORMED TODAY: (Indicate location and description of work performed refer to work by prime and/or subcontractors by letter in table above)

2. TYPE AND RESULTS OF INSPECTION: (Indicate whether: P- Preparatory, I - Initial, or F - Follow-up and include satisfactory work completed or deficiencies with action to be taken.)

CONTRACTOR’S QUALITY CONTROL REPORT (QCR) DATE: REPORT No:

NAME OF CONTRACTOR:

CONTRACT No.:

W911S2- -D-

TASK ORDER: WORK ORDER: TITLE:

3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:

4. VERBAL INSTRUCTIONS RECEIVED: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with actions taken or planned)

5. REMARKS: (Cover any conflicts in plans, specifications, or instructions: acceptability of incoming materials; offsite surveillance activities;

progress of work, delays, causes, and extent thereof; days of no work with reasons for it. Note if a Preparatory or Initial Phase Meeting was held.)

5. a. ENVIRONMENTAL QUALITY CONTROL Environmental Quality Control Requirements are in place and have been checked? Yes; No; Not Applicable (Describe any Deficiencies and Corrective Actions taken):

5. b. VISITORS TO THE SITE (List the name of all official visitors to the site and who they represent i.e. State DEP, OSHA)

6. SAFETY: (Include all infractions of the accident prevention plan; COE Safety and Health Requirements Manual, EM 385-1-1; or instructions from Government QA personnel. Describe corrective actions taken.)

Safety meeting held today: Yes, No (If Yes, state the subject and report number of personnel in attendance ) Safety meeting subject:

Number of Contractor personnel attending = Number of subcontractor personnel attending =

7. REQUESTS FOR INFORMATION: (Note that there is an RFI attached to this daily report, assign a control number and attach a sheet to this report which fully describes the RFI and recommend a solution if applicable.)

RFI Attached; Control Number = (RFI’s are also to be sent directly to MICC)

CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all material and equipment used, work performed and tests conducted during this reporting period complied with the contract except as noted above

Contractor’s QC Manager Signature

Date

GOVERNMENT QUALITY ASSURANCE REPORT (QAR) DATE: REPORT No:

NAME OF CONTRACTOR:

CONTRACT No.:

W911S2- -D-

TASK ORDER: WORK ORDER: TITLE:

These section to be completed by the PW Engineering Construction Representative (ConRep), Project Manager (PM), and Contracting Officer’s Representative/Alternate Contracting Officers Representative (COR/ACOR)

1. CONTACT WORK PERFORMED TODAY: (Describe work performed by the Prime Contractor and subcontractors at any tier at the time of the surveillance inspection)

2. CONTRACTOR QC FUNCTIONS: (Describe work performed by the Prime Contractor and subcontractors at any tier at the time of the surveillance inspection)

3. DEFICIENCIES: (Describe any deficiencies in work completed. State who for the Prime Contractor was informed of the deficiencies)

4. CONTRACTOR PERFORMANCE: (Describe the overall performance of the project: workmanship; progression of the project; compliance with the approved progress schedule; effectiveness of the Contractor QC functions; etc.)

Government ConREP:

Print Name Signature/Date

GOVERNMENT QUALITY ASSURANCE REPORT (QAR) DATE: REPORT No:

NAME OF CONTRACTOR:

CONTRACT No.:

W911S2- -D-

TASK ORDER: WORK ORDER: TITLE:

These section to be completed by the PW Engineering Construction Representative (ConRep), Project Manager (PM), and Contracting Officer’s Representative/Alternate Contracting Officers Representative (COR/ACOR)

5. GOVERNMENT PM COMMENTS:

Government PM:

Print Name Signature/Date

6. GOVERNMENT COR/ACOR COMMENTS:

Government ACOR/COR:

Print Name Signature/Date

c:
d:
e:
f:
1 WORK PERFORMED TODAY Indicate location and description of work performed refer to work by prime andor subcontractors by letter in table above:
2 TYPE AND RESULTS OF INSPECTION Indicate whether PPreparatory I Initial or F Followup and include satisfactory work completed or deficiencies with action to be taken:
3 TESTS REQUIRED BY PLANS ANDOR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:
4 VERBAL INSTRUCTIONS RECEIVED List any instructions given by Government personnel on construction deficiencies retesting required etc with actions taken or planned:
5 REMARKS Cover any conflicts in plans specifications or instructions acceptability of incoming materials offsite surveillance activities progress of work delays causes and extent thereof days of no work with reasons for it Note if a Preparatory or Initial Phase Meeting was held:
5 a ENVIRONMENTAL QUALITY CONTROL Environmental Quality Control Requirements are in place and have been checked Yes No Not Applicable Describe any Deficiencies and Corrective Actions taken:
Environmental Quality Control Requirements are in place and have been checked: Off
5 b VISITORS TO THE SITE List the name of all official visitors to the site and who they represent ie State DEP OSHA:
Safety meeting held today: Off
RFI Attached Control Number: Off
1 CONTACT WORK PERFORMED TODAY Describe work performed by the Prime Contractor and subcontractors at any tier at the time of the surveillance inspection:
2 CONTRACTOR QC FUNCTIONS Describe work performed by the Prime Contractor and subcontractors at any tier at the time of the surveillance inspection:
3 DEFICIENCIES Describe any deficiencies in work completed State who for the Prime Contractor was informed of the deficiencies:
4 CONTRACTOR PERFORMANCE Describe the overall performance of the project workmanship progression of the project compliance with the approved progress schedule effectiveness of the Contractor QC functions etc:
Print Name:
5 GOVERNMENT PM COMMENTS:
Print Name_2:
6 GOVERNMENT CORACOR COMMENTS:
Print Name_3:
DATE:
REPORT No:
NAME OF CONTRACTOR:
Contract No:
TASK ORDER:
WORK ORDER:
TITLE:
Class:
Min Temp:
Max Temp:
Precip:
Tasks Affected:
b:
a:
6:
Safety:
Subcont No:
Contractor NO:
RFI No:
Significant Issues:
Text1:
Percent Contruction:
Secheduled Contruction:
No: