Att6i_GRCA_190083_Geotech_Field_Work_Photo_Album_4-17-18.pdf
PDF 17 MB Posted
- Solicitation number
- 140P2022R0100
About this file
This document contains information related to a federal contract opportunity for geotechnical field work. The solicitation number is 140P2022R0100 for GRCA 190083 - Improve Potable Water Supply to Inne. The opportunity type is a solicitation from the Department of the Interior National Park Service National Office to replace the Transcanyon Waterline and improve potable water systems at Grand Canyon National Park. The attached file is a photo album documenting previous geotechnical field work for the project dated April 17, 2018.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRCA 190083
Geotechnical Field Work
Photo Album April 17 – 19, 2018
IMG_7060 IMG_7061
IMG_7064 IMG_7065
IMG_7066
IMG_7067
IMG_7068 IMG_7069
IMG_7070 IMG_7071
IMG_7072 IMG_7073
IMG_7074
IMG_7075
IMG_7076
IMG_7077
IMG_7078 IMG_7079
IMG_6758 IMG_7080
IMG_6760 IMG_7081
IMG_7082 IMG_6762
IMG_6750 IMG_7083
IMG_7084 IMG_6754
IMG_6755 IMG_6756
IMG_6757
IMG_6763 IMG_6764
IMG_6766 IMG_6767
IMG_6768 IMG_6769
IMG_6770 IMG_6771
IMG_6772 IMG_6778
IMG_6779 IMG_6780
IMG_6781 IMG_6782
IMG_6783 IMG_6784
IMG_6786 IMG_6787
IMG_6788 IMG_6789
IMG_6790 IMG_6791
IMG_6793 IMG_6794
IMG_6795 IMG_6797
IMG_6799
IMG_6800
IMG_6801 IMG_6802
IMG_6803 IMG_6804
IMG_6805 IMG_6806
IMG_6807 IMG_6808
IMG_6810 IMG_6811
IMG_6812 IMG_6813
IMG_6814 IMG_6815
IMG_6817 IMG_6818
IMG_6819 IMG_6820
IMG_6821 IMG_6822
IMG_6823 IMG_6824
IMG_6827 IMG_6828
IMG_6829 IMG_6830
IMG_6831
IMG_6832
IMG_6834
IMG_6835
IMG_6839 IMG_6840
IMG_6841
IMG_6842
IMG_6843 IMG_6844
IMG_6845 IMG_6847
IMG_6849 IMG_6850
IMG_6851 IMG_6852
IMG_6853 IMG_6854
IMG_6903 IMG_6904
IMG_6905 IMG_6906
IMG_6913 IMG_6914
IMG_6915
IMG_6917
IMG_6918 IMG_6919
IMG_6921 IMG_6922
IMG_6923 IMG_6924
IMG_6925 IMG_6926
IMG_6927 IMG_6930
IMG_6931 IMG_6932
IMG_6933 IMG_6934
IMG_6935 IMG_6936
IMG_6937 IMG_6938
IMG_6939 IMG_6940
IMG_6941 IMG_6942
IMG_6943 IMG_6944
IMG_6945 IMG_6946
IMG_6947 IMG_6948
IMG_6949 IMG_6950
IMG_6951 IMG_6952
IMG_6953 IMG_6954
IMG_6955 IMG_6956
IMG_6957 IMG_6958
IMG_6959 IMG_6960
IMG_6961 IMG_6962
IMG_6963 IMG_6964
IMG_6965 IMG_6966
IMG_6968 IMG_6969
IMG_6971 IMG_6972
IMG_6973 IMG_6974
IMG_6975 IMG_6976
IMG_6977 IMG_6978
IMG_6863 IMG_6864
IMG_6865 IMG_6867
IMG_6868 IMG_6869
IMG_6870 IMG_6871
IMG_6872 IMG_6873
IMG_6874 IMG_6875
IMG_6876 IMG_6877
IMG_6878 IMG_6879
IMG_6880 IMG_6881
IMG_6882 IMG_6883
IMG_6884 IMG_6885
IMG_6886 IMG_6887
IMG_6888 IMG_6890
IMG_6891 IMG_6892
IMG_6980
IMG_6982
IMG_6983 IMG_6984
IMG_6985 IMG_6986
+R3Q [Ú
+R
[p [p
[p [p
6 6 6 6
6 6 IMG_7077.JPGIMG_7076.JPG
IMG_7075.JPG
IMG_7074.JPG
IMG_7073.JPG
IMG_7072.JPG
IMG_7071.JPGIMG_7070.JPG
IMG_7069.JPG
IMG_7068.JPG
IMG_7067.JPG
IMG_7066.JPG
IMG_7065.JPG
IMG_7061.JPG IMG_7060.JPG
North Kaibab
Silver Bridge
Phantom Ranch Area
Cle ar
Cr ee k
River
Ü
0 200100 Feet
Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log
1 inch = 200 feet
Date: 6/6/2018
Figure 1Geotechnical Field Work Photo Locations 6 April 17-19, 2019
Proposed Water Facilities [p New Intake/Well
3Q New Water Treatment Plant
[Ú New Pump Station
+R New Storage Tank Proposed TCWL Replacement
Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)
Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)
Existing Distribution System ! ! ! Trails
Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd
66666
6IMG_7084.JPG
IMG_7083.JPG
IMG_7082.JPG
IMG_7081.JPG IMG_7080.JPG
IMG_7079.JPG
IMG_7078.JPG
IMG_6769.JPG
IMG_6767.JPG
IMG_6766.JPG IMG_6764.JPG IMG_6763.JPG
IMG_6762.JPG
IMG_6758.JPG
IMG_6757.JPG
IMG_6756.JPG
IMG_6755.JPG
IMG_6754.JPG
IMG_6750.JPG
River
Sil ve r B rid ge
Ü 0 200100
Feet
Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log
1 inch = 200 feet
Date: 6/6/2018
Figure 2Geotechnical Field Work Photo Locations 6 April 17-19, 2019
Proposed Water Facilities [p New Intake/Well
3Q New Water Treatment Plant
[Ú New Pump Station
+R New Storage Tank Proposed TCWL Replacement
Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)
Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)
Existing Distribution System
Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd
66666
66666666666666
IMG_6823.JPG
IMG_6822.JPG
IMG_6821.JPG
IMG_6820.JPG IMG_6819.JPG
IMG_6818.JPG IMG_6817.JPG
IMG_6815.JPG IMG_6814.JPG
IMG_6813.JPG
IMG_6812.JPG
IMG_6811.JPG
IMG_6810.JPG
IMG_6808.JPG
IMG_6804.JPG
IMG_6801.JPG
IMG_6799.JPG IMG_6797.JPG
IMG_6795.JPG
IMG_6794.JPG IMG_6793.JPG
IMG_6791.JPG IMG_6790.JPG
IMG_6789.JPG
IMG_6788.JPG
IMG_6787.JPG
IMG_6786.JPG
IMG_6784.JPG
IMG_6783.JPG
IMG_6782.JPG IMG_6781.JPG
IMG_6780.JPG
IMG_6779.JPG
IMG_6778.JPG
IMG_6772.JPG
IMG_6769.JPG
IMG_6768.JPG
Rive r
Bright Angel
Ü 0 200100
Feet
Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log
1 inch = 200 feet
Date: 6/6/2018
Figure 3Geotechnical Field Work Photo Locations 6 April 17-19, 2019
Proposed Water Facilities [p New Intake/Well
3Q New Water Treatment Plant
[Ú New Pump Station
+R New Storage Tank Proposed TCWL Replacement
Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)
Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)
Existing Distribution System
Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd
6 6 6
6 6
6666666666666
666 IMG_6941.JPG
IMG_6940.JPG
IMG_6939.JPG
IMG_6938.JPG
IMG_6937.JPG
IMG_6936.JPG
IMG_6935.JPG
IMG_6934.JPG
IMG_6933.JPG
IMG_6932.JPG
IMG_6930.JPG IMG_6927.JPG
IMG_6926.JPG
IMG_6925.JPG
IMG_6923.JPG IMG_6922.JPG
IMG_6921.JPG
IMG_6918.JPG
IMG_6917.JPG
IMG_6915.JPGIMG_6914.JPG
IMG_6913.JPG
IMG_6906.JPG
IMG_6905.JPG
IMG_6854.JPGIMG_6853.JPG
IMG_6852.JPG
IMG_6850.JPG
IMG_6849.JPG
IMG_6847.JPG
IMG_6845.JPG
IMG_6844.JPG
IMG_6843.JPG
IMG_6842.JPG
IMG_6841.JPG
IMG_6840.JPG
IMG_6839.JPG
IMG_6835.JPGIMG_6834.JPG
IMG_6832.JPGIMG_6831.JPG
IMG_6830.JPG
IMG_6829.JPG
IMG_6828.JPG
IMG_6827.JPG
IMG_6824.JPG
IMG_6823.JPG
Plateau Point
Ü
0 200100 Feet
Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log
1 inch = 200 feet
Date: 6/6/2018
Figure 4Geotechnical Field Work Photo Locations 6 April 17-19, 2019
Proposed Water Facilities [p New Intake/Well
3Q New Water Treatment Plant
[Ú New Pump Station
+R New Storage Tank Proposed TCWL Replacement
Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)
Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)
Existing Distribution System
Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd
66666
6 IMG_6978.JPG
IMG_6977.JPG
IMG_6976.JPG
IMG_6975.JPG
IMG_6974.JPG
IMG_6973.JPG
IMG_6972.JPG
IMG_6971.JPG
IMG_6968.JPG
IMG_6966.JPG
IMG_6965.JPG
IMG_6964.JPG
IMG_6963.JPG
IMG_6962.JPG
IMG_6961.JPG
IMG_6960.JPG
IMG_6959.JPG
IMG_6958.JPG
IMG_6957.JPG
IMG_6956.JPG
IMG_6955.JPG IMG_6954.JPG
IMG_6953.JPG
IMG_6952.JPG
IMG_6951.JPG
IMG_6950.JPG
IMG_6949.JPG
IMG_6948.JPG
IMG_6947.JPG
IMG_6946.JPG
IMG_6945.JPG
IMG_6944.JPG
IMG_6943.JPG
IMG_6942.JPG
IMG_6941.JPG
IMG_6871.JPG
IMG_6870.JPG
IMG_6869.JPG
IMG_6868.JPG
IMG_6867.JPG
IMG_6865.JPG
IMG_6864.JPG
IMG_6863.JPG
Plateau Point
Bright Angel
East Tonto
We st
To nto
Ü
0 200100 Feet
Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log
1 inch = 200 feet
Date: 6/6/2018
Figure 5Geotechnical Field Work Photo Locations 6 April 17-19, 2019
Proposed Water Facilities [p New Intake/Well
3Q New Water Treatment Plant
[Ú New Pump Station
+R New Storage Tank Proposed TCWL Replacement
Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)
Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)
Existing Distribution System
Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd
3Q
+R
666666
66666 IMG_6986.JPGIMG_6985.JPG
IMG_6984.JPG
IMG_6983.JPGIMG_6982.JPG
IMG_6980.JPG
IMG_6892.JPG
IMG_6891.JPG
IMG_6890.JPG
IMG_6888.JPG
IMG_6887.JPG
IMG_6886.JPG
IMG_6885.JPG
IMG_6884.JPG
IMG_6883.JPG
IMG_6882.JPG
IMG_6881.JPG
IMG_6880.JPG
IMG_6879.JPG
IMG_6878.JPG
IMG_6877.JPG
IMG_6876.JPG IMG_6875.JPG
IMG_6874.JPG
IMG_6873.JPG
IMG_6872.JPG
Plateau Point
Ü
0 200100 Feet
Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log
1 inch = 200 feet
Date: 6/6/2018
Figure 6Geotechnical Field Work Photo Locations 6 April 17-19, 2019
Proposed Water Facilities [p New Intake/Well
3Q New Water Treatment Plant
[Ú New Pump Station
+R New Storage Tank Proposed TCWL Replacement
Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)
Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)
Existing Distribution System
Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd
| GRCA 190083 Geotechnical Field Work Photo Album |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
| Slide Number 40 |
| Slide Number 41 |
| Slide Number 42 |
| Slide Number 43 |
| Slide Number 44 |
| Slide Number 45 |
| Slide Number 46 |
| Slide Number 47 |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |