Att6i_GRCA_190083_Geotech_Field_Work_Photo_Album_4-17-18.pdf

PDF 17 MB Posted

Attached to
GRCA 190083 - Improve Potable Water Supply to Inne
Solicitation number
140P2022R0100
Issued by

About this file

This document contains information related to a federal contract opportunity for geotechnical field work. The solicitation number is 140P2022R0100 for GRCA 190083 - Improve Potable Water Supply to Inne. The opportunity type is a solicitation from the Department of the Interior National Park Service National Office to replace the Transcanyon Waterline and improve potable water systems at Grand Canyon National Park. The attached file is a photo album documenting previous geotechnical field work for the project dated April 17, 2018.

View the file

Other files

File Type Posted
Amendment_8_40_91_10_Primary_Meters_and_Transmitters_(IG_Phase_3)_08.pdf PDF
Amendment_8_Questions_and_Answers_9-8-22_08.docx DOCX document
Amendment_8_SF_30_9-8-22_08.pdf PDF
Sol_140P2022R0100_Amd_08.pdf PDF
Amendment_7_Questions_and_Answers_9-2-22_07.docx DOCX document
Sol_140P2022R0100_Amd_07.pdf PDF
Amendment_7_SF_30_9-2-22_07.pdf PDF
Amendment_6_Wage_Determination_AZ20220007_Heavy_06.pdf PDF
Sol_140P2022R0100_Amd_06.pdf PDF
Amendment_6_Questions_and_Answers_8-26-22_06.docx DOCX document
Amendment_6_06_82_00_-_FIBERGLASS_REIN_PLASTIC_FABS_Rev_2022-08-25_06.pdf PDF
Amendment_6_Wage_Determination_AZ20220016_Heavy_06.pdf PDF
Amendment_6_43_23_04_Horizontal_Multistage_Pumps_GRCA_261633_Pump_3_06.pdf PDF
Amendment_6_Wage_Determination_AZ20220030_Building_06.pdf PDF
Amendment_6_SF_30_8-26-22_06.pdf PDF
Amendment_5_Questions_and_Answers_8-19-22_05.docx DOCX document
Sol_140P2022R0100_Amd_05.pdf PDF
Amendment_5_SF_30_8-19-22_05.pdf PDF
Amendment_4_SF_30_8-12-22_04.pdf PDF
Sol_140P2022R0100_Amd_04.pdf PDF
Amendment_4_Att12b_CSF_Drawings_Rev_8-12-22_04.pdf PDF
Amendment_4_Questions_and_Answers_8-12-22_04.docx DOCX document
Amendment_3_03-E504_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-C405_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-E503_REV1_2022-08-02_03.pdf PDF
Sol_140P2022R0100_Amd_03.pdf PDF
Amendment_3_SF_30_8-5-22_03.pdf PDF
Amendment_3_Questions_and_Answers_8-5-22_03.docx DOCX document
Amendment_3_03-C137_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-C131_REV1_2022-08-22_03.pdf PDF
Amendment_2_Questions_and_Answers_7-29-22_02.docx DOCX document
Sol_140P2022R0100_Amd_02.pdf PDF
Amendment_2_SF_30_7-29-22_02.pdf PDF
Sol_140P2022R0100_Amd_01.pdf PDF
Amendment_1_01-E601_REV_1_7-22-22_01.pdf PDF
Amendment_1_01-E104_REV_1_7-22-22_01.pdf PDF
Amendment_1_Questions_and_Answers_7-22-22_01.docx DOCX document
Amendment_1_SF_30_7-22-22_01.pdf PDF
Amendment_1_01-E100_REV1_7-22-22_01.pdf PDF
Amendment_1_01-E631_REV_1_7-22-22_01.pdf PDF
Att4b_GRCA 190083 Basis of Design Report_Appendices only.pdf PDF
Att1f_GRCA 190083 Vol 04_Drawings_Pg 497to698_4-22-22.pdf PDF
Att7d_TransCanyon Waterline Drone Footage - End Plateau.mp4 MP4 file
Att6f_Innercanyon_Single-Phase_Transformer_Short_Circuit.pdf PDF
Att7e_Phantom_Rnch_Headworks_Excav_Photos.pdf PDF
Att1i_Revised_Drawings_1_7-5-22.pdf PDF
Att7b_TransCanyon_Waterline_Drone_Footage.mp4 MP4 file
Att2a_GRCA_190083_Final_CD_Specifications_Vol_1_Division_1.pdf PDF
Att6c_Suez_Proposal_for_GRCA_190083_MF-UF_Equip_9-2-20.pdf PDF
Att5b_Addendum_to_the_Geotechnical_Investigation_Report_12-23-20.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRCA 190083

Geotechnical Field Work

Photo Album April 17 – 19, 2018

IMG_7060 IMG_7061

IMG_7064 IMG_7065

IMG_7066

IMG_7067

IMG_7068 IMG_7069

IMG_7070 IMG_7071

IMG_7072 IMG_7073

IMG_7074

IMG_7075

IMG_7076

IMG_7077

IMG_7078 IMG_7079

IMG_6758 IMG_7080

IMG_6760 IMG_7081

IMG_7082 IMG_6762

IMG_6750 IMG_7083

IMG_7084 IMG_6754

IMG_6755 IMG_6756

IMG_6757

IMG_6763 IMG_6764

IMG_6766 IMG_6767

IMG_6768 IMG_6769

IMG_6770 IMG_6771

IMG_6772 IMG_6778

IMG_6779 IMG_6780

IMG_6781 IMG_6782

IMG_6783 IMG_6784

IMG_6786 IMG_6787

IMG_6788 IMG_6789

IMG_6790 IMG_6791

IMG_6793 IMG_6794

IMG_6795 IMG_6797

IMG_6799

IMG_6800

IMG_6801 IMG_6802

IMG_6803 IMG_6804

IMG_6805 IMG_6806

IMG_6807 IMG_6808

IMG_6810 IMG_6811

IMG_6812 IMG_6813

IMG_6814 IMG_6815

IMG_6817 IMG_6818

IMG_6819 IMG_6820

IMG_6821 IMG_6822

IMG_6823 IMG_6824

IMG_6827 IMG_6828

IMG_6829 IMG_6830

IMG_6831

IMG_6832

IMG_6834

IMG_6835

IMG_6839 IMG_6840

IMG_6841

IMG_6842

IMG_6843 IMG_6844

IMG_6845 IMG_6847

IMG_6849 IMG_6850

IMG_6851 IMG_6852

IMG_6853 IMG_6854

IMG_6903 IMG_6904

IMG_6905 IMG_6906

IMG_6913 IMG_6914

IMG_6915

IMG_6917

IMG_6918 IMG_6919

IMG_6921 IMG_6922

IMG_6923 IMG_6924

IMG_6925 IMG_6926

IMG_6927 IMG_6930

IMG_6931 IMG_6932

IMG_6933 IMG_6934

IMG_6935 IMG_6936

IMG_6937 IMG_6938

IMG_6939 IMG_6940

IMG_6941 IMG_6942

IMG_6943 IMG_6944

IMG_6945 IMG_6946

IMG_6947 IMG_6948

IMG_6949 IMG_6950

IMG_6951 IMG_6952

IMG_6953 IMG_6954

IMG_6955 IMG_6956

IMG_6957 IMG_6958

IMG_6959 IMG_6960

IMG_6961 IMG_6962

IMG_6963 IMG_6964

IMG_6965 IMG_6966

IMG_6968 IMG_6969

IMG_6971 IMG_6972

IMG_6973 IMG_6974

IMG_6975 IMG_6976

IMG_6977 IMG_6978

IMG_6863 IMG_6864

IMG_6865 IMG_6867

IMG_6868 IMG_6869

IMG_6870 IMG_6871

IMG_6872 IMG_6873

IMG_6874 IMG_6875

IMG_6876 IMG_6877

IMG_6878 IMG_6879

IMG_6880 IMG_6881

IMG_6882 IMG_6883

IMG_6884 IMG_6885

IMG_6886 IMG_6887

IMG_6888 IMG_6890

IMG_6891 IMG_6892

IMG_6980

IMG_6982

IMG_6983 IMG_6984

IMG_6985 IMG_6986

+R3Q [Ú

+R

[p [p

[p [p

6 6 6 6

6 6 IMG_7077.JPGIMG_7076.JPG

IMG_7075.JPG

IMG_7074.JPG

IMG_7073.JPG

IMG_7072.JPG

IMG_7071.JPGIMG_7070.JPG

IMG_7069.JPG

IMG_7068.JPG

IMG_7067.JPG

IMG_7066.JPG

IMG_7065.JPG

IMG_7061.JPG IMG_7060.JPG

North Kaibab

Silver Bridge

Phantom Ranch Area

Cle ar

Cr ee k

River

Ü

0 200100 Feet

Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log

1 inch = 200 feet

Date: 6/6/2018

Figure 1Geotechnical Field Work Photo Locations 6 April 17-19, 2019

Proposed Water Facilities [p New Intake/Well

3Q New Water Treatment Plant

[Ú New Pump Station

+R New Storage Tank Proposed TCWL Replacement

Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)

Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)

Existing Distribution System ! ! ! Trails

Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd

66666

6IMG_7084.JPG

IMG_7083.JPG

IMG_7082.JPG

IMG_7081.JPG IMG_7080.JPG

IMG_7079.JPG

IMG_7078.JPG

IMG_6769.JPG

IMG_6767.JPG

IMG_6766.JPG IMG_6764.JPG IMG_6763.JPG

IMG_6762.JPG

IMG_6758.JPG

IMG_6757.JPG

IMG_6756.JPG

IMG_6755.JPG

IMG_6754.JPG

IMG_6750.JPG

River

Sil ve r B rid ge

Ü 0 200100

Feet

Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log

1 inch = 200 feet

Date: 6/6/2018

Figure 2Geotechnical Field Work Photo Locations 6 April 17-19, 2019

Proposed Water Facilities [p New Intake/Well

3Q New Water Treatment Plant

[Ú New Pump Station

+R New Storage Tank Proposed TCWL Replacement

Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)

Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)

Existing Distribution System

Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd

66666

66666666666666

IMG_6823.JPG

IMG_6822.JPG

IMG_6821.JPG

IMG_6820.JPG IMG_6819.JPG

IMG_6818.JPG IMG_6817.JPG

IMG_6815.JPG IMG_6814.JPG

IMG_6813.JPG

IMG_6812.JPG

IMG_6811.JPG

IMG_6810.JPG

IMG_6808.JPG

IMG_6804.JPG

IMG_6801.JPG

IMG_6799.JPG IMG_6797.JPG

IMG_6795.JPG

IMG_6794.JPG IMG_6793.JPG

IMG_6791.JPG IMG_6790.JPG

IMG_6789.JPG

IMG_6788.JPG

IMG_6787.JPG

IMG_6786.JPG

IMG_6784.JPG

IMG_6783.JPG

IMG_6782.JPG IMG_6781.JPG

IMG_6780.JPG

IMG_6779.JPG

IMG_6778.JPG

IMG_6772.JPG

IMG_6769.JPG

IMG_6768.JPG

Rive r

Bright Angel

Ü 0 200100

Feet

Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log

1 inch = 200 feet

Date: 6/6/2018

Figure 3Geotechnical Field Work Photo Locations 6 April 17-19, 2019

Proposed Water Facilities [p New Intake/Well

3Q New Water Treatment Plant

[Ú New Pump Station

+R New Storage Tank Proposed TCWL Replacement

Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)

Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)

Existing Distribution System

Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd

6 6 6

6 6

6666666666666

666 IMG_6941.JPG

IMG_6940.JPG

IMG_6939.JPG

IMG_6938.JPG

IMG_6937.JPG

IMG_6936.JPG

IMG_6935.JPG

IMG_6934.JPG

IMG_6933.JPG

IMG_6932.JPG

IMG_6930.JPG IMG_6927.JPG

IMG_6926.JPG

IMG_6925.JPG

IMG_6923.JPG IMG_6922.JPG

IMG_6921.JPG

IMG_6918.JPG

IMG_6917.JPG

IMG_6915.JPGIMG_6914.JPG

IMG_6913.JPG

IMG_6906.JPG

IMG_6905.JPG

IMG_6854.JPGIMG_6853.JPG

IMG_6852.JPG

IMG_6850.JPG

IMG_6849.JPG

IMG_6847.JPG

IMG_6845.JPG

IMG_6844.JPG

IMG_6843.JPG

IMG_6842.JPG

IMG_6841.JPG

IMG_6840.JPG

IMG_6839.JPG

IMG_6835.JPGIMG_6834.JPG

IMG_6832.JPGIMG_6831.JPG

IMG_6830.JPG

IMG_6829.JPG

IMG_6828.JPG

IMG_6827.JPG

IMG_6824.JPG

IMG_6823.JPG

Plateau Point

Ü

0 200100 Feet

Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log

1 inch = 200 feet

Date: 6/6/2018

Figure 4Geotechnical Field Work Photo Locations 6 April 17-19, 2019

Proposed Water Facilities [p New Intake/Well

3Q New Water Treatment Plant

[Ú New Pump Station

+R New Storage Tank Proposed TCWL Replacement

Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)

Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)

Existing Distribution System

Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd

66666

6 IMG_6978.JPG

IMG_6977.JPG

IMG_6976.JPG

IMG_6975.JPG

IMG_6974.JPG

IMG_6973.JPG

IMG_6972.JPG

IMG_6971.JPG

IMG_6968.JPG

IMG_6966.JPG

IMG_6965.JPG

IMG_6964.JPG

IMG_6963.JPG

IMG_6962.JPG

IMG_6961.JPG

IMG_6960.JPG

IMG_6959.JPG

IMG_6958.JPG

IMG_6957.JPG

IMG_6956.JPG

IMG_6955.JPG IMG_6954.JPG

IMG_6953.JPG

IMG_6952.JPG

IMG_6951.JPG

IMG_6950.JPG

IMG_6949.JPG

IMG_6948.JPG

IMG_6947.JPG

IMG_6946.JPG

IMG_6945.JPG

IMG_6944.JPG

IMG_6943.JPG

IMG_6942.JPG

IMG_6941.JPG

IMG_6871.JPG

IMG_6870.JPG

IMG_6869.JPG

IMG_6868.JPG

IMG_6867.JPG

IMG_6865.JPG

IMG_6864.JPG

IMG_6863.JPG

Plateau Point

Bright Angel

East Tonto

We st

To nto

Ü

0 200100 Feet

Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log

1 inch = 200 feet

Date: 6/6/2018

Figure 5Geotechnical Field Work Photo Locations 6 April 17-19, 2019

Proposed Water Facilities [p New Intake/Well

3Q New Water Treatment Plant

[Ú New Pump Station

+R New Storage Tank Proposed TCWL Replacement

Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)

Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)

Existing Distribution System

Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd

3Q

+R

666666

66666 IMG_6986.JPGIMG_6985.JPG

IMG_6984.JPG

IMG_6983.JPGIMG_6982.JPG

IMG_6980.JPG

IMG_6892.JPG

IMG_6891.JPG

IMG_6890.JPG

IMG_6888.JPG

IMG_6887.JPG

IMG_6886.JPG

IMG_6885.JPG

IMG_6884.JPG

IMG_6883.JPG

IMG_6882.JPG

IMG_6881.JPG

IMG_6880.JPG

IMG_6879.JPG

IMG_6878.JPG

IMG_6877.JPG

IMG_6876.JPG IMG_6875.JPG

IMG_6874.JPG

IMG_6873.JPG

IMG_6872.JPG

Plateau Point

Ü

0 200100 Feet

Trans-canyon Waterline Replacement Geotechnical Field Work Photo Log

1 inch = 200 feet

Date: 6/6/2018

Figure 6Geotechnical Field Work Photo Locations 6 April 17-19, 2019

Proposed Water Facilities [p New Intake/Well

3Q New Water Treatment Plant

[Ú New Pump Station

+R New Storage Tank Proposed TCWL Replacement

Existing to remain Abandon in place Above Grade (Pipe Saddle / Ground Supported)

Aerial Crossing (Bridge or Truss) At Grade (Covered with Rock/Scree) Buried in Trail Buried (not in trail) Clff Face (Vertical)

Existing Distribution System

Document Path: D:\PROJECTS\215945_NPS_GRCA_Waterline\map_docs\mxd\Geotechnical Eval\Alt 3B TCWL Replacement Mapbook_REV - Photo Log.mxd

GRCA 190083 Geotechnical Field Work Photo Album
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22
Slide Number 23
Slide Number 24
Slide Number 25
Slide Number 26
Slide Number 27
Slide Number 28
Slide Number 29
Slide Number 30
Slide Number 31
Slide Number 32
Slide Number 33
Slide Number 34
Slide Number 35
Slide Number 36
Slide Number 37
Slide Number 38
Slide Number 39
Slide Number 40
Slide Number 41
Slide Number 42
Slide Number 43
Slide Number 44
Slide Number 45
Slide Number 46
Slide Number 47
Slide Number 48
Slide Number 49
Slide Number 50
Slide Number 51
Slide Number 52

File details come from the government source that posted it. Updated .