This document contains an electrical one-line diagram and equipment list for improvements to the potable water system at Grand Canyon National Park as part of solicitation number 140P2022R0100. The project includes replacing an existing transcanyon waterline and upgrading other potable water infrastructure. Key equipment includes a 1000kVA transformer, 800kW diesel generator, 2000A switchboard, motor control centers, automatic transfer switch, and associated distribution equipment. The National Park Service is the contracting agency seeking these upgrades to improve the reliability and capacity of the park's water supply system. Arizona Public Service will provide and install the transformer and underground primary conductors.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1000KVA
12.47kV-480Y/277V Z=5.75%
G
SPD
WH
APS
TRANSFORMER SR-T-1
KNAN
PAD-MOUNT
G
G
S R
-T -1
:P
S
E T
S
K C
M
IL
A
L
K
C M
IL
-N
A
L
"C
G
G
SR-GEN-1
800kW 1000kVA 480Y/277V
(DIESEL)
SB
TB
DMP
(TYPE C)
MCCB
225AF
60AT
3P
MCCB
800AF
3P
LSIG
100%
SR-MCC-1
(WTP)
S R
-G E
N -1
:P
S
E T
S
[3
K
C M
IL
K
C M
IL
-N
/0
G
"C
SR-SWBD-P1:1-3 #4, #8G, 1-1/4"C
S R
-S W
B D
-1 :P
S
E T
S
K C
M
IL
/0
G
"C
MCCB
800AF
3P
LSIG
100%
SR-MCC-2
(WTP)
S R
-S W
B D
-1 :P
S
E T
S
K
C M
IL
/0
G
"C
/0 G G
/0 G
SR-SWBD-1: 480/277V, 2000A, 3PH, 4W, 65000AIC
PER.
MFR
(LSIGA)
S R
-G E
N -1
:C
-1
/C
"C
SERVICE ENTRANCE
SWITCHBOARD
SR-SES-1 : 480V, 2000A, 3PH,
4W, 65000AIC
SIZED
BY
MFR
LVP
2000AF
1800AS/AT
3P
LSIGAN
DMP
(TYPE PC1)
P O
W E
R
P A
N E
L S
R -P
P -1
MCCB
225A 3P
SR-PP-1
S R
-S W
B D
-1 :P
/0
G
-1
/2 "C
MCA
S W
IT
C
H G
E
B L D
G
C K
A G
R
M
IN
A L H
E
U
M P
-P
T H
P -1
MCCB
25A 3P
S R
-S W
B D
-1 :P
G
/4
MCA
S W
IT
C
H G
E
B
G
C K
A G
R
M
IN
A L H
E
U
M P
-P
T H
P -2
MCCB
25A 3P
S R
-S W
B D
-1 :P
G
M
IN
I P
O W
Z
O N
E S
R -M
P Z
-3
10KVA
480-
120/240V
S R
-P P
-1 :2
,4
G
M
IN
I P
O W
Z
O N
-M P
Z -2
MCCB
30A 2P
10KVA
480-
120/240V
S R
-S W
B D
-1 :P
G
#4/0G
#4/0G
(3
U N
D E
R G
R O
U
F
O M
A P
S S
W
IT
C H
N
/0 G
G
/0 G
N
E-STOP
SR-GEN-1:C2 - 1-5/C#14, 3/4"C
S R
-P L C
-1 :C
S R
-P L C
-1 :N
SR-PLC-1
MCCB
250AT
3P
S R
-S W
B D
-1 :P
K C
M
IL
G
"C
200A
ACTIVE
HARMONIC
FILTER
1 2
ATS
BYPASS
AUTOMATIC TRANSFER
SWITCH 'SR-ATS-1'
2000A, 3-POLE
SOLID NEUTRAL
BYPASS-ISOLATION TYPE
G
N
G
R E
M O
N
U N
C
IA
T O
R
F U
E L L
E V
IS
P
L A
Y
SR-GEN-1:C3 - 5#16 TSP, 1-1/4"C
BRINE
BUILDING
MCCB
60A 3P
YAVAPAI
LODGE
ROAD LIFT
STATION
S R
-S W
B D
-1 :P
G
-1
-P L C
-1 :C
SR-PLC-1
S R
-P L C
-1 :N
SR-PLC-1
SR-PLC-1
SR-PLC-1:C186
ACC
POWER
SR-MCC-2
Subtotal SR-MCC-2 614.8
25% NPS Spare Capacity 341.6
Total, with +25% Spare capacity 1707.8
SR-SWBD-1 Loads (Direct Connection)
Power Panel (Brine) SR-PP-1 kVA 9 10.8
SR-SWBD-1 LOAD ANALYSIS:
SR-MCC-1 UNIT LOAD
AMPS @
480V
Subtotal SR-MCC-1 Load 608.4
Subtotal SR-SWBD-1 Connected Load 1314.3
25% of largest motor (UF Feed Pump) 52.0 Subtotal - Minumum SR-SWBD-1 Ampacity per NEC 1366.3
SWGR Bldg Heat Pump (18MCA) 01-PTHP-1 HP 10 14 SWGR Bldg Heat Pump (18MCA) 01-PTHP-2 HP 10 14 Generator Accessory Power - kVA 25 30.1 Lift Station - HP 6 21.0 Mini-Power Zone SR-MPZ-2 kVA 1 1.2 Subtotal SR-SWBD-1 Direct Connection Load 91.1
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
B
IM
/1
N P
S
G ra n d C a n y o n S o u th
R im
W T
P
/1
E
S
R W
T P
.r v t
/2
/2
:4
:0
P M
E601
GRAND CANYON NATIONAL PARK
190083
ELECTRICAL
SWITCHBOARD SR-SWBD-1
ONE-LINE DIAGRAM
T. MOORE
P. DAVILA
04/22/2022
N. LYNCH
14456601-
01-E601
1 SWITCHBOARD SR-SWBD-1 ONE-LINE DIAGRAM
(SOUTH RIM WTP YARD)
X
KEY NOTES
1 SWITCHBOARD SERVICE ENTRANCE SECTION (SES)
EQUIPMENT PER APS ELECTRIC SERVICE
REQUIREMENTS MANUAL. SERVICE ENTRANCE
SECTION EQUIPMENT TO BE REVIEWED BY APS
METER SHOP PRIOR TO ACQUIRING THE
EQUIPMENT.
2 REFER TO APS/ CONTRACTOR ELECTRIC SERVICE
SCOPE TABLE FOR ADDITIONAL INFORMATION.
3 TRANSFORMER SIZE SHOWN IS AS RECOMMENDED
BY ARIZONA PUBLIC SERVICE. TRANSFORMER
IMPEDANCE SHOWN IS NOMINAL IMPEDANCE
(ANSI-STANDARD). ARIZONA PUBLIC SERVICE
TRANSFORMER MATERIAL SPECIFICATIONS
INDICATE THAT ACTUAL TRANSFORMER IMPEDANCE
WILL BE IN THE RANGE OF 5.35%-6.15% (-/+ 7% FROM
NOMINAL IMPEDANCE). CONTRACTOR SHALL
CONFIM ACTUAL TRANSFORMER IMPEDANCE AND
PROVIDE IMPEDANCE TO CONTRACTING OFFICER.
4 MAIN BONDING JUMPER.
5 GENERATOR INCLUDES WEATHERPROOF
SOUND-ATTENUATING ENCLOSURE (60dB AVG
@7M/23FT), AND A SUB-BASE FUEL TANK PROVIDING
24-HOUR GENERATOR RUNTIME AT FULL LOAD.
6 EQUIPMENT IS BUSSED/CLOSE-COUPLED BY
MANUFACTURER.
7 BUS TRANSITION SECTION IF REQUIRED BY
MANUFACTURER.
8 TRANSFORMER SECONDARY CONDUCTORS
SUPPLIED AND INSTALLED BY ARIZONA PUBLIC
SERVICE. CONDUCTORS LISTED ARE ALUMINUM
WITH XLPE INSULATION, APS CONDUCTOR CODE
"6220.UA750DDV" PER APS CONSTRUCTION
STANDARD #6220.
9 AUTOMATIC TRANSFER SWITCH IS
OPEN-TRANSITION TYPE. ATS MUST BE REVIEWED
AND APPROVED BY ARIZONA PUBLIC SERVICE
INTERCONNECTION DEPARTMENT PRIOR TO
ACQUIRING THE EQUIPMENT.
10 SELF-CONTAINED ACCESSORY POWER
PANELBOARD AND TRANSFORMER.
1. CONTRACTOR TO TRENCH/BACKFILL (INCLUDING CONDUIT BEDDING) FOR
CIRCUITS BETWEEN APS POLES AND SWITCHING CABINETS, UNDERGROUND
PRIMARY CIRCUITS AND SECONDARY CIRCUIT FROM THE TRANSFORMER TO THE
SES. ASSOCIATED TRENCHING/BACKFILL TO COMPY WITH THE FOLLOWING APS
STANDARDS: "APS SUBSTRUCTURES TRENCHING REQUIREMENTS - FORM 8601" AND
"APS SUBSTRUCTURES EXAMPLE OF TRENCH DETAILS FOR ELECTRIC (ONLY)
WHERE ELECTRIC FACILITIES ARE INSTALLED IN CONDUIT - FORM 8620"
NOTE:
CTs/ METER X
SES/ METER PANEL X
BOLLARDS & HILL HOLDERS X
UNDERGROUND WIRE X
OVERHEAD WIRE X
GROUND ROD X
SPARE CONDUIT ELECTRONIC MARKER BALL X
CONDUIT CAPS, PLUGS, MULE TAPE X
CONDUIT - UNDERGROUND X
OVERHEAD TO UNDERGROUND... X
POLE X
ABOVE GROUND SWITCHING CABINET PAD X
ABOVE GROUND SWITCHING CABINET X
ABOVE/UNDERGROUND PRIMARY PULL BOX X
ABOVE/UNDERGROUND SERVICE JUNCTION BOX X
3Ø TRANSFORMER PAD X
3Ø TRANSFORMER - UNDERGROUND X
EQUIPMENT
APS
PROVIDES,
APS
INSTALLS
APS
PROVIDES,
CUSTOMER
INSTALLS
CUSTOMER
ACQUIRES &
INSTALLS
APS/ CONTRACTOR ELECTRIC SERVICE SCOPE...
REV 1 APS COORDINATION 07/22/2022
File details come from the government source that posted it. Updated .