Amendment_2_Questions_and_Answers_7-29-22_02.docx

DOCX document 24 KB Posted

Attached to
GRCA 190083 - Improve Potable Water Supply to Inne
Solicitation number
140P2022R0100
Issued by

About this file

This document provides questions and answers related to solicitation number 140P2022R0100 for GRCA 190083 - Replace Transcanyon Waterline and Improve Potable Water Systems at Grand Canyon National Park. The National Park Service is seeking to replace the existing transcanyon water pipeline and improve potable water systems at Roaring Springs and Indian Gardens pumping stations. Site visits for non-public areas can be arranged by request. No comprehensive as-built drawings exist but requests for available relevant drawings will not be provided during the solicitation phase. MS Project or Primavera P6 Gantt charts are acceptable scheduling software formats for project schedules to be submitted with proposals. Expanded drone footage of the project area can be accessed with the provided link and password.

View the file

Other files

File Type Posted
Amendment_8_40_91_10_Primary_Meters_and_Transmitters_(IG_Phase_3)_08.pdf PDF
Amendment_8_Questions_and_Answers_9-8-22_08.docx DOCX document
Amendment_8_SF_30_9-8-22_08.pdf PDF
Sol_140P2022R0100_Amd_08.pdf PDF
Amendment_7_Questions_and_Answers_9-2-22_07.docx DOCX document
Sol_140P2022R0100_Amd_07.pdf PDF
Amendment_7_SF_30_9-2-22_07.pdf PDF
Amendment_6_Wage_Determination_AZ20220007_Heavy_06.pdf PDF
Sol_140P2022R0100_Amd_06.pdf PDF
Amendment_6_Questions_and_Answers_8-26-22_06.docx DOCX document
Amendment_6_06_82_00_-_FIBERGLASS_REIN_PLASTIC_FABS_Rev_2022-08-25_06.pdf PDF
Amendment_6_Wage_Determination_AZ20220016_Heavy_06.pdf PDF
Amendment_6_43_23_04_Horizontal_Multistage_Pumps_GRCA_261633_Pump_3_06.pdf PDF
Amendment_6_Wage_Determination_AZ20220030_Building_06.pdf PDF
Amendment_6_SF_30_8-26-22_06.pdf PDF
Amendment_5_Questions_and_Answers_8-19-22_05.docx DOCX document
Sol_140P2022R0100_Amd_05.pdf PDF
Amendment_5_SF_30_8-19-22_05.pdf PDF
Amendment_4_SF_30_8-12-22_04.pdf PDF
Sol_140P2022R0100_Amd_04.pdf PDF
Amendment_4_Att12b_CSF_Drawings_Rev_8-12-22_04.pdf PDF
Amendment_4_Questions_and_Answers_8-12-22_04.docx DOCX document
Amendment_3_03-E504_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-C405_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-E503_REV1_2022-08-02_03.pdf PDF
Sol_140P2022R0100_Amd_03.pdf PDF
Amendment_3_SF_30_8-5-22_03.pdf PDF
Amendment_3_Questions_and_Answers_8-5-22_03.docx DOCX document
Amendment_3_03-C137_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-C131_REV1_2022-08-22_03.pdf PDF
Sol_140P2022R0100_Amd_02.pdf PDF
Amendment_2_SF_30_7-29-22_02.pdf PDF
Sol_140P2022R0100_Amd_01.pdf PDF
Amendment_1_01-E601_REV_1_7-22-22_01.pdf PDF
Amendment_1_01-E104_REV_1_7-22-22_01.pdf PDF
Amendment_1_Questions_and_Answers_7-22-22_01.docx DOCX document
Amendment_1_SF_30_7-22-22_01.pdf PDF
Amendment_1_01-E100_REV1_7-22-22_01.pdf PDF
Amendment_1_01-E631_REV_1_7-22-22_01.pdf PDF
Att4b_GRCA 190083 Basis of Design Report_Appendices only.pdf PDF
Att1f_GRCA 190083 Vol 04_Drawings_Pg 497to698_4-22-22.pdf PDF
Att7d_TransCanyon Waterline Drone Footage - End Plateau.mp4 MP4 file
Att6f_Innercanyon_Single-Phase_Transformer_Short_Circuit.pdf PDF
Att7e_Phantom_Rnch_Headworks_Excav_Photos.pdf PDF
Att1i_Revised_Drawings_1_7-5-22.pdf PDF
Att6i_GRCA_190083_Geotech_Field_Work_Photo_Album_4-17-18.pdf PDF
Att7b_TransCanyon_Waterline_Drone_Footage.mp4 MP4 file
Att2a_GRCA_190083_Final_CD_Specifications_Vol_1_Division_1.pdf PDF
Att6c_Suez_Proposal_for_GRCA_190083_MF-UF_Equip_9-2-20.pdf PDF
Att5b_Addendum_to_the_Geotechnical_Investigation_Report_12-23-20.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRCA 190083

Replace Transcanyon Waterline and Improve Potable Water Systems Grand Canyon National Park

Solicitation 140P2022R0100 – Questions and Answers

Amendment 1, issued 7/22/22:

1. Question: Can you post the as‐built drawings for the existing transcanyon pipeline and pumping stations at roaring springs and Indian Gardens?

Answer: No set of comprehensive as-builts exist. The solicitation documents are the most current basis of existing system information available.

2. Question: Is AIR-SHIELD LMP an acceptable approved equal material?

Answer: The prime contractor will make all material submittals to the NPS for approval after award. Any substitution requests should be submitted to the eventual awardee of this contract.

3. Question: Do you have a list of contractors who are looking at this project?

Answer: The Presolicitation Attendees list was issued with a Special Notice on sam.gov under this solicitation number on June 21, 2022.

Amendment 2, issued 7/29/22:

4. Question: The Special Notice posted on May 26 gave on information on a Virtual Pre-Proposal Conference to be held on June 17, and an escorted Site Visit to occur on June 21 - 24. Will there be a second escorted Site Visit before proposals are due?

Answer: Site visits for areas not open to the public will be considered by appointments on an as-requested basis. Please email your requests to timothy_burger@nps.gov and edwin_berry@contractor.nps.gov and identify the specific area of the project you would like to see. Areas closed to the public include: South Rim Heliport, Havasupai/Indian Gardens Pump Station, Cottonwood and Manzanita NPS Buildings; There is limited access around Phantom Ranch WWTP because of active construction.

5. Question: Even though a single comprehensive as-built set does not exist, there are a few relevant as-built drawing sets. Can you post those for reference? #1 Transcanyon Water Line # 3608, #2 Transcanyon Water Transmission System Improvements- Phase 1 # 113-41126 A, #3 Transcanyon Water Transmission System Improvements- Phase 2 # 113-41127, #4 New Roaring Springs Pumphouse 1977 ( no drawing number known).

Answer: No as-builts will be provided during the solicitation phase of this project.

6. Question: Solicitation for this project requires the Project Schedule submitted in our proposal to be in MS Project Gantt Chart format. See Solicitation page 50 of 56 Factor 4. Our company uses P6 as our scheduling software. Can a P6 Gantt Chart format be used in our submission in lieu of the MS Project format?

Answer: MS Project or Equal - P6 is acceptable software.

7. Contracting Officer’s Note: Expanded drone footage of the project can be accessed following the link and Password provided below:

https://player.vimeo.com/video/730467912 Password: HDRNPS

File details come from the government source that posted it. Updated .