Att10_Vaccination_Certification_Notification.pdf

PDF 150 KB Posted

Attached to
GRCA 190083 - Improve Potable Water Supply to Inne
Solicitation number
140P2022R0100
Issued by

About this file

This memorandum notifies Department of the Interior contract holders of new COVID-19 vaccination requirements for contractor employees working on-site in federal buildings or facilities. To enter such sites, employees must complete an attached Certification of Vaccination form confirming their vaccination status. Fully vaccinated individuals have fewer restrictions, while unvaccinated employees must wear masks, distance, and provide proof of a negative COVID-19 test taken within the previous three days. Costs of testing will not be reimbursed by the government. Failure to complete the attestation or testing may result in denial of entry. The memorandum applies to all employees working under Interior Department contracts who visit relevant federal sites and directs contractors to disseminate the information. It references the Centers for Disease Control and Prevention transmission guidelines that determine indoor mask requirements.

The related federal contract opportunity is a solicitation to replace the Transcanyon Waterline and improve potable water systems at Grand Canyon National Park for the Department of the Interior National Park Service National Office.

View the file

Other files

File Type Posted
Amendment_8_40_91_10_Primary_Meters_and_Transmitters_(IG_Phase_3)_08.pdf PDF
Amendment_8_Questions_and_Answers_9-8-22_08.docx DOCX document
Amendment_8_SF_30_9-8-22_08.pdf PDF
Sol_140P2022R0100_Amd_08.pdf PDF
Amendment_7_Questions_and_Answers_9-2-22_07.docx DOCX document
Sol_140P2022R0100_Amd_07.pdf PDF
Amendment_7_SF_30_9-2-22_07.pdf PDF
Amendment_6_Wage_Determination_AZ20220007_Heavy_06.pdf PDF
Sol_140P2022R0100_Amd_06.pdf PDF
Amendment_6_Questions_and_Answers_8-26-22_06.docx DOCX document
Amendment_6_06_82_00_-_FIBERGLASS_REIN_PLASTIC_FABS_Rev_2022-08-25_06.pdf PDF
Amendment_6_Wage_Determination_AZ20220016_Heavy_06.pdf PDF
Amendment_6_43_23_04_Horizontal_Multistage_Pumps_GRCA_261633_Pump_3_06.pdf PDF
Amendment_6_Wage_Determination_AZ20220030_Building_06.pdf PDF
Amendment_6_SF_30_8-26-22_06.pdf PDF
Amendment_5_Questions_and_Answers_8-19-22_05.docx DOCX document
Sol_140P2022R0100_Amd_05.pdf PDF
Amendment_5_SF_30_8-19-22_05.pdf PDF
Amendment_4_SF_30_8-12-22_04.pdf PDF
Sol_140P2022R0100_Amd_04.pdf PDF
Amendment_4_Att12b_CSF_Drawings_Rev_8-12-22_04.pdf PDF
Amendment_4_Questions_and_Answers_8-12-22_04.docx DOCX document
Amendment_3_03-E504_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-C405_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-E503_REV1_2022-08-02_03.pdf PDF
Sol_140P2022R0100_Amd_03.pdf PDF
Amendment_3_SF_30_8-5-22_03.pdf PDF
Amendment_3_Questions_and_Answers_8-5-22_03.docx DOCX document
Amendment_3_03-C137_REV1_2022-08-02_03.pdf PDF
Amendment_3_03-C131_REV1_2022-08-22_03.pdf PDF
Amendment_2_Questions_and_Answers_7-29-22_02.docx DOCX document
Sol_140P2022R0100_Amd_02.pdf PDF
Amendment_2_SF_30_7-29-22_02.pdf PDF
Sol_140P2022R0100_Amd_01.pdf PDF
Amendment_1_01-E601_REV_1_7-22-22_01.pdf PDF
Amendment_1_01-E104_REV_1_7-22-22_01.pdf PDF
Amendment_1_Questions_and_Answers_7-22-22_01.docx DOCX document
Amendment_1_SF_30_7-22-22_01.pdf PDF
Amendment_1_01-E100_REV1_7-22-22_01.pdf PDF
Amendment_1_01-E631_REV_1_7-22-22_01.pdf PDF
Att4b_GRCA 190083 Basis of Design Report_Appendices only.pdf PDF
Att1f_GRCA 190083 Vol 04_Drawings_Pg 497to698_4-22-22.pdf PDF
Att7d_TransCanyon Waterline Drone Footage - End Plateau.mp4 MP4 file
Att6f_Innercanyon_Single-Phase_Transformer_Short_Circuit.pdf PDF
Att7e_Phantom_Rnch_Headworks_Excav_Photos.pdf PDF
Att1i_Revised_Drawings_1_7-5-22.pdf PDF
Att6i_GRCA_190083_Geotech_Field_Work_Photo_Album_4-17-18.pdf PDF
Att7b_TransCanyon_Waterline_Drone_Footage.mp4 MP4 file
Att2a_GRCA_190083_Final_CD_Specifications_Vol_1_Division_1.pdf PDF
Att6c_Suez_Proposal_for_GRCA_190083_MF-UF_Equip_9-2-20.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum

To:

From:

Re:

Department of the Interior Contract Holder

Contracting Officer

Certification of vaccination for contractor employees working in any Federal building or Federally controlled indoor worksite

In order to take steps to prevent the spread of COVID-19 and to protect the health and safety of all Federal employees, onsite contractors, visitors to Federal buildings or Federally controlled indoor workspaces, and other individuals interacting with the Federal workforce, employees under the subject contract who are required to work on site in Federal buildings or Federally controlled indoor worksites must:

• Complete the attached form, Certification of Vaccination, prior to entering any Federal building or Federally controlled indoor worksite;

• Maintain this form during their time on Federal premises;

• Show this form upon entry to a Federal building or Federally controlled indoor worksite, even if they have badged access to the facility;

• Show this form and/or information from a health screening to a Federal employee who is supervising or managing their work on Federal premises if asked;

• Not enter any Federal building or Federally controlled indoor worksite if they do not have a completed form, even if they have badged access to the facility. If a contractor employee arrives at a Federal building or Federally controlled indoor worksite without the completed form, they must obtain a blank form from this link and fill it out. They must not enter until they complete the form; and

• Fully comply with DOI policy regarding masking, social distancing, and testing while in the facility.

o In areas of high or substantial transmission, as defined by CDC, everyone— including fully vaccinated people—must wear a mask indoors when not alone in their office, consistent with federal requirements.

o In areas of low or moderate transmission, fully vaccinated people generally can safely participate in most activities, indoor or outdoor, without needing to wear a mask or maintain physical distance, and do not need to undertake regular testing.

o Individuals who are not fully vaccinated or those who decline to respond must:

Wear a mask regardless of the level of community transmission;

Physically distance; and Provide proof of having received a negative COVID-19 test from within the previous 3 days. Costs incurred as a result of testing shall not be reimbursed by the Government.

https://www.saferfederalworkforce.gov/downloads/CertificationVaccinationPRAv7.pdf

If a contractor employee fails to complete the signed attestation or obtain a required negative COVID-19 test, they may be denied entry to a Federal facility. The attestation form shall be completed under penalty of perjury, and a knowing and willful false statement on the form can be punished by fine or imprisonment or both (18 U.S.C. 1001) or could result in additional administrative action up to and including removal from the contract.

Contractors must disseminate this information and the Certification of Vaccination form to all employees who are working under a Department of the Interior contract. However, only those employees who will work in or visit Federal buildings or Federally controlled indoor worksites are required to complete the form. If you have any questions regarding this notification, please contact your Contracting Officer.

Attachment: Certification of Vaccination form

Date3_af_date:

File details come from the government source that posted it. Updated .