About this file
This is a cost proposal attachment for RFP 26-87798, issued by a state vocational rehabilitation (VR) agency, requesting Community Rehabilitation Programs (CRPs) to establish, develop, or improve non-profit community rehabilitation programs. The proposal template is designed specifically for Years 3 and 4 of the project period and requires respondents to detail newly-created full-time employment (FTE) positions, with staffing costs allocated at 60% in Year 3 and 45% in Year 4. Respondents must use only the designated green-shaded cells within the provided Excel spreadsheet to enter proposed staffing, training, and supply costs for the establishment project; proposals submitted in alternative formats will not be accepted. The template includes sections for identifying all new positions by year of hire and requires a budget narrative detailing anticipated staffing, training, and laptop costs for each allowable position.
The cost proposal structure allocates funding with a 21.3% federal/VR share and a 78.7% match requirement to be provided by the CRP for overall project costs. Training and supply costs (specifically laptop and software) are budgeted at 100% for both Year 3 and Year 4, with the same cost-sharing percentages applied. All formulas within the spreadsheet are automated and will calculate the allowable cost shares once numeric values are entered into the designated cells. As of the submission template shown, all proposed costs display $0.00, indicating this is a blank form awaiting completion by the respondent organization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Est 2027 pp.pptx | PPTX presentation | |
| Att B - Sample Contract.docx | DOCX document | |
| Att F- Technical Proposal.docx | DOCX document | |
| Att B1 - IOT-IaaS.docx | DOCX document | |
| Att B3 - IOT-SaaS.docx | DOCX document | |
| Att E - Business Proposal.docx | DOCX document | |
| Att M-Infrastructure Overview.docx | DOCX document | |
| Att J - Attestation Form.docx | DOCX document | |
| Att K - Statement of Work.docx | DOCX document | |
| Att G - Q&A Template.xlsx | XLSX spreadsheet | |
| RFP Boilerplate.docx | DOCX document | |
| Att L-Artificial Intelligence.docx | DOCX document | |
| Att H - Reference Check Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment D Cost Proposal Attachment D Cost Proposal
RFF 26-87798 - Establishment, Development or Improvement of Non-Profit Community Rehabilitation Programs
Respondent:
Instructions: In response to the RFP, the Community Rehabilitation Programs (CRP) MUST ONLY use the green shaded cells to enter the organization's proposed staffing, training, and supply costs for the Establishment Project.
Note: The formulas for staffing and training/supply are hidden and will automatically calculate the share of costs that can be charged to the project, once the green shaded cells include a numeric value. Budgets submitted in a different format (and not using this spreadsheet) will not be accepted.
Please refer to the RFP for allowable staffing, training, and supply cost components.
| Year 3 | Year 4 | Cumulative # new positions by end of Year 4 | |
| Identify all newly-created, full-time employment (FTE) positions for the project, by year of hire | 0 |
| Year 3 (60%) | Year 4 (45%) | |
| Annual Staffing cost | ||
| Portion of staffing costs available for federal and match funds | $0.00 | $0.00 |
| 21.3% Match required by CRP | $0.00 | $0.00 |
| 78.7% VR cost | $0.00 | $0.00 |
| Year 3 (100%) | Year 4 (100%) | |
| Annual Training cost | ||
| 21.3% Match required by CRP | $0.00 | $0.00 |
| 78.7% VR cost | $0.00 | $0.00 |
| Year 3 (100%) | Year 4 (100%) | |
| Annual Supply (Laptop/Software) cost | ||
| 21.3% Match required by CRP | $0.00 | $0.00 |
| 78.7% VR cost | $0.00 | $0.00 |
| Total Establishment Project cost | $0.00 | $0.00 |
| 21.3% Match required by CRP | $0.00 | $0.00 |
| 78.7% VR cost | $0.00 | $0.00 |
Total project cost $0.00
ESTABLISHMENT PROJECT COSTS
Please include a budget narrative below that details the anticipated staffing, training, and laptop costs for each allowable position.
Position #1: