Appendix 10 - ROME Specifications.pdf

PDF 5 MB Posted

Attached to
DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP Federal contract opportunity
Solicitation number
80GSFC22R0011-DRFP
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This is a draft request for proposal for facilities operations and maintenance, architect-engineering, construction, and information resources services at the Goddard Space Flight Center and Wallops Flight Facility. The contractor shall provide facilities support services including facilities operations and maintenance, architect-engineering, construction, and facilities information resources services. Facilities include office buildings, technical facilities, laboratories, launch facilities, an airfield, and warehouses supported by utilities including electrical power, water, wastewater, storm water, steam, chilled water, gas, fire alarm, and utility control systems. The contractor must have the capability to perform repairs, operations, maintenance, and engineering services for facilities and associated infrastructure at both locations.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP, newest first.
File Type Posted
M.1 WD CBA 2022-99 Maryland.pdf r1.pdf PDF
ROME E-Library Documents.zip ZIP file
Exhibit 14 ROME Past Perf Questionaire.pdf PDF
Enclosure 3 ROME RTO3 Navy OM IR.pdf PDF
Attachment C1 - GB List of IAGP.pdf PDF
Attachment C2 - Wallops List of IAGP.pdf PDF
Attachment H IT Security Management Plan.pdf PDF
Attachment K Safety and Health Plan.pdf PDF
Attachment N Wage Determinations Building.pdf PDF
N.2 Davis Bacon Wage Determination VA 20220007.txt TXT text file
Appendix 17 Snow Removal Area 100 GB.pdf PDF
Appendix 20 Snow Maps WFF.pdf PDF
Appendix 13 - ROME Position Qualifications.pdf PDF
Appendix 9-SUBMITTAL REGISTER.pdf PDF
Appendix 11 - Application Systems List (Admin and OT).pdf PDF
Appendix 15 Snow Removal Roads Parking GB.pdf PDF
Appendix 19 Snow Removal Area 300 and 400 GB.pdf PDF
80GSFC22R0011 Cover Letter.pdf PDF
Exhibits 15-15E A-E Const IDIQ Pricing.pdf PDF
Enclosure 1 ROME RTO1 Greenbelt OM IR.pdf PDF
Enclosure 2 ROME RTO2 WFF OM IR.pdf PDF
Enclosure 4 ROME QA Surveillance Plan.pdf PDF
Enclosure 5 IT Security Management Plan Template.pdf PDF
Attachment I OCI Avoidance Plan Outline.pdf PDF
Attachment L ROME FINANCIAL REPORTING 533.pdf PDF
Attachment M Collective Bargaining Agreement.pdf PDF
M.2 WD CBA 2022-134 Virginia.pdf PDF
Attachment O Wage Determinations SCA.pdf PDF
Appendix 8 - RESERVED.pdf PDF
Appendix 16 Snow Removal Sidewalks GB.pdf PDF
Appendix 4 - List of Facilities final.pdf PDF
80GSFC22R0011 SF33 ROME DRFP.pdf PDF
Appendix 4 - List of Facilities.pdf PDF
Appendix 7 - Navy SCSC Assets.pdf PDF
Exhibits 1-13A ROME COST.pdf PDF
Attachment A - ROME Contract SOW.pdf PDF
Attachment B IDIQ Cost-Fixed Price Rate Matrix All IDIQ Contract.pdf PDF
Attachment C - List of IAGP.pdf PDF
Attachment D DD254.pdf PDF
Attachment E A-E Const IDIQ Pricing.pdf PDF
Attachment G IT Security Applicable Documents List.pdf PDF
M.1 WD CBA 2022-99 Maryland.pdf PDF
N.1 Davis Bacon Wage Determination MD 20220044.txt TXT text file
O.1 Wage Determination SCA MD 2015-4281.txt TXT text file
Appendix 2 - ROME A-E Specifications.pdf PDF
Appendix 3 - FMD CADD Manual 2021.pdf PDF
Appendix 6 - WFF Asset List and Count.pdf PDF
Appendix 5 - GB Asset Listing and count.pdf PDF
Attachment D DD254-ROME.pdf PDF
Attachment F Quality Control Plan.pdf PDF
Show all 50

DRAFT RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - DRAFT RFP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROME Contract Construction Specifications Appendix 10 FINAL

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 9/21 SUMMARY OF WORK

01 31 00 9/21 PROJECT COORDINATION

01 33 00 9/21 SUBMITTAL PROCEDURES

01 35 26 9/21 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 43 9/21 ENVIRONMENTAL PROCEDURES

01 41 00 9/21 SPECIAL INSPECTIONS

01 45 10 9/21 CONTRACTOR QUALITY CONTROL I

01 45 20 9/21 CONTRACTOR QUALITY CONTROL II

01 50 00 9/21 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 56 39 9/21 TEMPORARY TREE AND PLANT PROTECTION

01 58 00 9/21 PROJECT IDENTIFICATION

01 65 00 9/21 PRODUCT DELIVERY AND GOMAR TAGS

01 73 00 9/21 SELECTIVE DEMOLITION

01 78 00 9/21 TASK ORDER CLOSEOUT

01 78 23 9/21 OPERATION AND MAINTENANCE DATA

01 78 24 9/21 ELECTRONIC FACILITY DATA REQUIREMENTS

01 86 12 9/21 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS

01 91 13 9/21 GENERAL COMMISSIONING REQUIREMENTS

DIVISION 02 - EXISTING CONDITIONS

02 82 14 9/21 ASBESTOS HAZARD CONTROL ACTIVITIES

DIVISION 03 - CONCRETE

03 30 00 9/21 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 9/21 MASONRY

DIVISION 05 - METALS

05 12 00 9/21 STRUCTURAL STEEL

05 21 23 9/21 STEEL JOIST FRAMING

05 30 00 9/21 STEEL DECKS

05 40 00 9/21 COLD-FORMED METAL FRAMING

05 50 13 9/21 MISCELLANEOUS METAL FABRICATIONS

05 51 00 9/21 METAL STAIRS

05 51 33 9/21 METAL LADDERS

05 72 00 9/21 DECORATIVE METAL SPECIALTIES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 9/21 ROUGH CARPENTRY

06 20 00 9/21 FINISH CARPENTRY

06 41 16 9/21 LAMINATE CLAD ARCHITECTURAL MILLWORK

06 61 16 9/21 SOLID SURFACE FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50 9/21 PREPARATION FOR RE-ROOFING

07 11 13 9/21 BITUMINOUS DAMPPROOFING

07 14 00 9/21 FLUID-APPLIED WATERPROOFING

07 21 13 9/21 RIGID FOAM BOARD INSULATION

07 21 16 9/21 BLANKET INSULATION

07 22 00 9/21 ROOF AND DECK INSULATION

07 26 16 9/21 BELOW-GRADE VAPOR BARRIERS AND RETARDERS

07 52 00 9/21 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 60 00 9/21 FLASHING AND SHEET METAL

07 84 00 9/21 FIRESTOPPING

07 92 00 9/21 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 9/21 STEEL DOORS AND FRAMES

08 14 00 9/21 WOOD DOORS

08 33 23 9/21 OVERHEAD COILING DOORS

08 41 13 9/21 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 51 13 9/21 ALUMINUM WINDOWS

08 71 00 9/21 DOOR HARDWARE

08 71 13 9/21 AUTOMATIC DOOR OPERATORS

08 81 00 9/21 GLAZING

08 91 00 9/21 METAL LOUVERS

DIVISION 09 - FINISHES

09 22 00 9/21 SUPPORTS FOR GYPSUM BOARD

09 29 00 9/21 GYPSUM BOARD

09 30 13 9/21 CERAMIC TILING

09 51 00 9/21 ACOUSTICAL CEILINGS

09 65 00 9/21 RESILIENT FLOORING

09 67 23 9/21 RESINOUS FLOORING

09 68 13 9/21 TILE CARPETING

09 69 13 9/21 RIGID GRID ACCESS FLOORING

09 72 00 9/21 WALLCOVERINGS

09 90 00 9/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00 9/21 INTERIOR SIGNAGE

10 14 01 9/21 EXTERIOR SIGNS

10 21 13 9/21 TOILET COMPARTMENTS

10 22 19 9/21 DEMOUNTABLE PARTITIONS

10 26 13 9/21 WALL AND CORNER GUARDS

10 28 13 9/21 TOILET ACCESSORIES

10 44 16 9/21 FIRE EXTINGUISHERS AND CABINETS

DIVISION 11 - EQUIPMENT

11 13 10 9/21 DOCK LEVELERS

DIVISION 12 - FURNISHINGS

12 93 13 9/21 BICYCLE RACKS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 9/21 STANDPIPE SYSTEMS

21 13 00 9/21 FIRE-SUPPRESSION SPRINKLER SYSTEMS

DIVISION 22 - PLUMBING

22 00 00 9/21 PLUMBING, GENERAL PURPOSE

22 15 14 9/21 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 9/21 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00 9/21 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 9/21 COMMON PIPING FOR HVAC

23 05 48 9/21 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

23 05 93 9/21 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 9/21 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00 9/21 COMMISSIONING OF HVAC SYSTEMS

23 09 13 9/21 CONTROL VALVES, SELF-CONTAINED

23 09 23 9/21 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC

23 09 43 9/21 PNEUMATIC CONTROL SYSTEMS FOR HVAC

23 09 53 9/21 SPACE TEMPERATURE CONTROL SYSTEMS

23 11 25 9/21 NATURAL GAS SYSTEMS

23 21 13 9/21 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 22 13 9/21 STEAM TRAPS

23 22 23 9/21 STEAM CONDENSATE PUMPS

23 22 25 9/21 STEAM VALVES

23 22 26 9/21 STEAM SYSTEM AND TERMINAL UNITS

23 25 00 9/21 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 64 26 9/21 CHILLED WATER PIPING SYSTEMS

23 81 00 9/21 UNITARY AIR CONDITIONING EQUIPMENT

23 81 23 9/21 COMPUTER ROOM AIR CONDITIONING UNITS

23 82 00 9/21 TERMINAL HEATING AND COOLING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 50 00 9/21 PRESSURE VESSEL SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00 9/21 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 71 9/21 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES

26 08 00 9/21 APPARATUS INSPECTION AND TESTING

26 09 23 9/21 LIGHTING CONTROL DEVICES

26 11 16 9/21 SECONDARY UNIT SUBSTATIONS

26 13 01 9/21 PAD-MOUNTED SWITCHGEAR

26 13 02 9/21 PAD-MOUNTED SECTIONALIZING CABINET

26 20 00 9/21 INTERIOR DISTRIBUTION SYSTEM

26 24 16 9/21 PANELBOARDS

26 28 01 9/21 COORDINATED POWER SYSTEM PROTECTION

26 29 23 9/21 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 9/21 INTERIOR LIGHTING

26 52 00 9/21 EMERGENCY LIGHTING

26 53 00 9/21 EXIT SIGNS

26 56 00 9/21 EXTERIOR LIGHTING

26 56 13 9/21 LIGHTING POLES

26 60 13 9/21 LOW-VOLTAGE MOTORS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 73 9/21 AIR ASPIRATING SMOKE DETECTION SYSTEMS

28 31 76 9/21 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 9/21 EARTHWORK

31 23 19 9/21 DEWATERING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 10 00 9/21 BITUMINOUS CONCRETE PAVEMENT

32 31 13 9/21 CHAIN LINK FENCES AND GATES

32 92 19 9/21 SEEDING

DIVISION 33 - UTILITIES

33 11 00 9/21 WATER DISTRIBUTION

33 30 00 9/21 SANITARY SEWERS

33 40 00 9/21 STORM DRAINAGE UTILITIES

33 60 01 9/21 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES

33 61 00 9/21 UNDERGROUND CHILLED WATER DISTRIBUTION

33 63 13 9/21 UNDERGROUND STEAM DISTRIBUTION SYSTEM

33 71 02 9/21 EXTERIOR ELECTRICAL DISTRIBUTION

SECTION 01 10 00

SUMMARY OF WORK

9/21

PART 1 GENERAL

1.1 RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and

Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

Not used.

1.3 RELATED SECTIONS

Related Sections include the following:

1. Division 01 Section "Governmental Safety and Environmental

Requirements."

1.4 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

GODDARD SPACE FLIGHT CENTER (GSFC)

GPR 1600.1A (2014) Goddard Space Flight Center (GSFC)

Protective Services Program Requirements

GPR 1700.6B (2012) Confined Space Program Requirements

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA EO 13693 (2015) Planning for Federal Sustainability in the Next Decade

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Division 01 Section "Submittal Procedures":

SD-01 Preconstruction Submittals

Mobilization Plan; G

Contractor Contact List; G

Excavation Permit; G

Hot Work Permit; G

Confined Space Entry Permit; G

Utility Outage Plan; G

Utility Outage Request; G

C&D Waste Management Plan; G

SD-11 Closeout Submittals

Delivery Report; G

Documentation substantiating the quality and condition of materials or equipment received for incorporation into the Work.

Transportation Report; G

Documentation substantiating the satisfactory disposition of salvaged materials or equipment.

C&D Waste Report; G

1.6 WORK RESTRICTIONS DUE TO GOVERNMENT OPERATIONS

Some construction activities involving work in Buildings 1, 3/13/14, 5, 7/10/15/29, 8, 23, 24, 25, 28, 29, 31, and 32; work pertaining to utilities and manholes serving those facilities; and work requiring an excavation permit will be periodically prohibited due to Government Operations.

Work prohibitions (work freeze periods) occur 8 times per year on average, for periods lasting between 7 and 21 working days, but not exceeding 120 working days per calendar year. The Contractor may submit a Freeze Exemption

Request (FER) form requesting an exception to the prohibition of work during a freeze period; the completed form shall successfully demonstrate that the

Work will not affect critical mission operations. Evaluation of the FER and final determination as to whether or not the Work may commence will be made by the Contracting Officer.

Government Operations occurring on weekends, holidays, and other days outside the range of normal duty hours shall not be included in the time periods indicated above.

The Contractor shall clearly indicate restrictions due to Government

Operations in the proposed work schedule, and shall provide sufficient detail in the work schedule to indicate exactly which work tasks will be affected by the work restrictions. The Contractor shall revise and submit updated progress schedules to reflect periodic changes in the Government

Operations Schedule.

An initial Government Operations Schedule shall be provided for each task order at the Preconstruction Conference. An updated status report of

Government Operations shall be provided by the 15th of each month, or when necessary to convey critical changes to the Government Operations schedule.

Work restrictions due to Government Operations are highly volatile and may change with little or no notice due to factors which affect critical mission activities. The Contractor shall closely coordinate schedules with the

Government in order to minimize the impact of these work restrictions to the timely and successful prosecution of the work.

1.7 WORK IN SECURE AREAS

Some work may require access to secure areas. The Contractor will be notified when work in secure areas will be required by specific task orders.

Access to the secure areas of the Building 3/13/14 complex requires a

Government-issued temporary badge, and accompaniment by a Government escort at all times.

1.8 OCCUPANCY OF PREMISES

Work areas will be located in normally occupied buildings. The Contractor's use of the premises may be limited because of Government occupancy of the buildings. Work stoppages due to excessive noise complaints from building occupants are to be expected. Work required to be performed outside of normal duty hours will be indicated on the construction documents and only with prior approval from the Government.

1.9 NORMAL DUTY HOURS

Normal duty hours are from 7:00 a.m. to 3:30 p.m., Monday through Friday, except as noted.

Normal duty hours are from 7:00 a.m. to 3:00 p.m., Monday through Friday, in

Buildings 24, 24A, 24B, 24C, and Building 31.

Normal duty hours for deliveries to GSFC's shipping and receiving facility, Building 35, are from 6:00 a.m. to 5:00 p.m, Monday through Friday.

Fire alarm testing in Building 8 shall be conducted prior to 7:00 a.m., Monday through Friday.

Work shall be performed only during normal duty hours, except as otherwise required or authorized by the Government, or where timeliness of performance is necessary to safeguard life or property.

Written requests to perform work outside of normal duty hours shall be submitted to the Government no less than 3 working days prior to the proposed work period.

1.10 CONTRACTOR MOBILIZATION

Prior to starting work on each task order, the Contractor shall submit a mobilization plan. The plan shall indicate the locations of any staging/storage/laydown areas, means of access to work areas, and any planned restrictions to the use of approaches, corridors, and stairways by building occupants.

The Contractor shall request a Preconstruction Conference through the

Government's on-site Quality Assurance Group. The meeting agenda shall consist of a review of the Contractor's mobilization plan, work sequencing, utility outages required, and applicable safety measures. Review and approval for the above shall include the Contracting Officer, the building's

Facilities Operations Manager (FOM), and the building's Building Manager.

1.10.1 Contractor Contact List

The Contractor shall submit a list of contact personnel with their cell phone numbers to be used in the event of an emergency. The list shall be routinely updated to reflect changes in employment status.

1.11 CONTRACTOR PERSONNEL BADGING

The Contractor shall adhere to GSFC's security requirements as specified in

GPR 1600.1A.

Entrance onto the GSFC campus requires a GSFC-issued picture badge, or GSFC-issued temporary badge. The Contractor shall provide an escort to accompany subcontractors working in secure areas. Only contractor personnel in possession of a GSFC-issued picture badge may serve as an escort.

The Contractor shall obtain personnel badges following the requirements listed on the GSFC protective services website located at URL http://protectiveservicesdivision.gsfc.nasa.gov/persec/badging.

1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Unless otherwise noted in the task order documents, the Contractor shall accept delivery of Government-furnished material and equipment at the GSFC's shipping and receiving facility, Building 35. The Contractor shall be responsible for all handling, rigging, and transportation necessary to transport the Government-furnished materials and equipment from the receiving facility to the point of incorporation into the Work.

The Contractor shall visually inspect Government-Furnished Property in the presence of the Government or their designated representative during and immediately after taking delivery from the Government. Crated materials and equipment shall be uncrated for inspection and shall be re-crated until incorporation into the Work.

The Contractor shall submit a delivery report documenting each item of

Government-Furnished Property received, including accessories, indicating quantity and condition. Report dents, scratches, cracks, surface rust and burns, frays and crimps in cables, obvious missing parts, and any quantities short of those specified. Report shall include the signature of the

Government or their designated representative present at delivery and inspection with exceptions noted.

1.13 ON-SITE PERMITS

The Contractor shall secure permits for excavation work, for hot work, utility outages, and for entry into confined spaces. All requests shall be made in writing to the Government, using the appropriate form. No work shall be performed until an approved permit has been obtained and posted. Permits shall be posted in a conspicuous location in the construction area.

Permits are the property of the Government and shall be returned to the

Contracting Officer, or designated representative, upon completion of the permitted work.

1.13.1 Excavation Permit

The Contractor shall submit an Excavation Request/Permit form no less than

10 working days prior to the proposed work. The Contractor shall retain the original copy of the form, and a photocopy of the request shall be routed to the Government for review and approval.

Excavation operations requiring a permit shall include surface scarifying, surface grading, driving stakes, setting post holes, trenching, general excavating and any other activity which has the potential to damage underground utilities.

1.13.2 Hot Work Permit

The Contractor shall comply with the Hot Work requirements specified in

Division 01 Section "Governmental Safety and Environmental Requirements."

The Contractor shall submit a Hot Work Permit, form GSFC 23-4, on the day of the proposed work. The Contractor shall retain the original copy of the permit request, and a photocopy of the request shall be routed to the

Government for review and approval.

The burning of trash or rubbish on Government property is prohibited.

1.13.3 Confined Space Entry Permit

The Contractor shall comply with the GSFC confined space entry requirements specified in GPR 1700.6B and as specified in Division 01 Section

"Governmental Safety and Environmental Requirements." The Contractor shall submit a Confined Space Entry Permit, form GSFC 23-52, no less than 3 working days prior to the proposed entry into a confined space. The

Contractor shall retain the original copy of the permit request, and a photocopy of the request shall be routed to the Government for review and approval.

1.13.4 Utility Outage Request

For task orders that require utility outages, the Contractor shall submit a

Utility Outage Plan. The Utility Outage Plan shall list all significant outages necessary to perform the Work. The Contractor shall utilize the

Outage Table on the construction documents as the basis for the plan. The

Contractor shall submit a Utility Outage Request, using the web-based

Utility Outage Tracking (UOTS). Requests shall be submitted no less than 7 working days prior to the proposed work.

Utility outages shall be arranged for at the convenience of the Government.

Unless otherwise noted in the task order documents, utility outages shall be scheduled outside normal duty hours, or over weekends. In addition to the time required for the Contractor to perform the Work, the utility outage times shall also include the time necessary for the Government to secure and restore the utility including related activities such as drain down and refill times, lock out/tag out, and required testing.

The Work shall be scheduled to minimize the number of required utility outages. When more than one connection to an existing utility is required, all connections to that particular utility shall be scheduled and made during a single utility outage. The Contractor shall provide sufficient work force to accomplish all scheduled work on the affected utility during the approved outage period.

The following types of utility outages will be prohibited during Scheduled

Government Operations:

1. Any type requiring an excavation permit or connection to an underground utility.

2. Any type involving work in an electrical/telecommunications manhole or distribution transformer.

3. Work in Buildings 1, 3/13/14, 5, 7/10/15/29, 8, 23, 24, 25, 28, 31, and 32.

The Government reserves the right to seek compensatory damages for Outage

Requests that are dutifully processed, approved and prepared for, and for which the Contractor fails to execute.

1.14 SALVAGED MATERIALS AND EQUIPMENT

Items designated on the construction documents to be salvaged shall remain the property of the Government.

Salvaged property shall be segregated, itemized, and delivered to the

Government's designated storage area.

Unless otherwise noted in the task order documents, the Contractor shall deliver salvaged property to the GSFC's shipping and receiving facility, Building 35. The Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition. Maintain property control records for material or equipment designated as salvage. The

Contractor shall be responsible for the handling, rigging, and transportation of Government furnished materials and equipment from the work area to the Government's designated storage area.

The Contractor shall submit a Transportation Report documenting each item of salvaged property, including accessories, indicating quantity and condition.

The Government or their designated representative shall visually inspect the salvaged property in the presence of the Contractor upon taking delivery from the Contractor. Report shall include the signature of the Contracting

Officer or their designated representative present at time of delivery and inspection with exceptions noted.

1.15 CONSTRUCTION AND DEMOLITION (C&D) WASTE

EPA EO 13693 requires federal agencies to divert a minimum of 50 percent of their Construction and Demolition (C&D) waste stream from landfills to recycling centers. C&D waste includes products of demolition or removal, excess or unusable construction materials, packaging materials for construction products, and other materials generated during the construction process but not incorporated into the Work.

The Contractor shall be required to divert at least 50 percent (by weight) of the C&D waste generated by work performed under this Contract from going to landfills. An exemption for a lower diversion rate shall be allowed if it becomes cost prohibitive to transport the waste a long distance to a recycling center. Specifically, recycling centers farther than 50 miles from GSFC will be considered cost prohibitive.

Submit a C&D Waste Management Plan after receiving the first task order.

The plan shall state whether C&D waste will be segregated on-site or transported as co-mingled waste to an off-site segregation facility. The plan shall include the name(s) of the segregation and recycling facilities the Contractor plans to use for disposal.

Submit a C&D Waste Report by November 30 each calendar year. The report shall indicate the total tonnage of C&D waste that was generated under this

Contract, the total tonnage sent to landfills, and the total tonnage of C&D waste diverted to recycling centers. The figures shall be certified (with signature) by the Contractor.

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section --

SECTION 01 31 00

PROJECT COORDINATION

This Section describes the requirements for preconstruction conferences, progress meetings, task order-specific progress schedules, task order-specific submittal schedules, and as-built documentation.

1.3 SUBMITTALS

used, a designation following the "G" designation identifies the office that

Progress Schedule; G

Submittal Register; G

As-Built Drawings; G

3.1 PRECONSTRUCTION CONFERENCE

The Contractor shall attend a Preconstruction Conference scheduled by the

Government for each individual task order. Work shall not begin prior to the meeting. For task orders where subcontractor labor is being employed, subcontractor attendance at the Preconstruction Conference is also required.

The Preconstruction Conference agenda shall minimally include a discussion of the following: project location, personnel contact, safety issues, permits, required outages, requirement for progress meetings, a review of the progress schedule, and a review of the list of proposed task-specific submittals.

3.2 PROGRESS MEETINGS

The Contractor shall attend progress meetings when scheduled by the

Government. Attendance is required by appropriate contractor staff and subcontractors as needed to satisfactorily address the meeting's scheduled agenda topics.

The meeting agenda shall include a review of the minutes of the previous meeting, a review of the work progress, field observations, problems, decisions, status of submittal reviews, status of the progress schedule, potential factors of delay, deficiencies, material delivery schedules, safety issues, and other business relating to the work.

Updates to the progress schedule shall be submitted by the 15th of each month, and distributed prior to the following month's progress meeting.

3.3 PROGRESS SCHEDULE REQUIREMENT

Within 15 days after notice to proceed, submit a progress schedule to the

Government for review and approval. Submittal shall be in electronic format. The Contractor shall update the schedule as the work progresses, and resubmit copies of the updated schedule to the Government with each revision.

The progress schedule shall be in the form of a bar (Gantt) chart, and shall illustrate the dependency relationships between primary work activities and the current schedule status. Primary work activities shall be itemized under major headings. Under each heading, subtasks shall be broken out into separate line items sufficient to track the progress of the work.

Provide separate line items for Red Zone activities, training of Government personnel, Operational Readiness Reviews (ORRs), O&M Manuals, and for each system specified in Division 01 Section "Task Order Closeout."

Provide a separate major heading for project closeout activities. Examples of subtasks listed under this heading include punch list, clean-up, and submission of the As-Built Drawings.

3.3.1 Government Operations Delays

The Contractor's progress schedule shall reflect delays in the work attributed to anticipated Government Operations as defined by Division 01

Section "Summary of Work."

3.4 SUBMITTAL REGISTER REQUIREMENT

The Contractor shall thoroughly review the specifications and construction drawings to verify a comprehensive list of submittals that will be required by each individual task order contract. The Contractor may use the

Submittal Register found at the end of Part 3 of Section 01 33 00 for reference or as a starting point for generating a project-specific Submittal

Register.

If using the Submittal Register found at the end of Part 3 of Section 01 33

00, the Contractor shall add to the Register any submittals that may be required by the task order contract but not found in the Register or on the construction drawings to generate a project-specific Submittal Register.

Within 30 days after notice to proceed, the Contractor shall submit to the

Government a preliminary project-specific Submittal Register, marked up with suggested additions, deletions, revisions, and anticipated submission dates.

Submission dates for submittals may also be indicated in the overall

Progress Schedule.

The Government shall review the project-specific Submittal Register and provide feedback to the Contractor by way of approving the register for use in tracking submittals required by the task order contract. Government approval of the Register does not relieve the Contractor of supplying submittals required by the contract documents but were omitted from the

Register.

3.5 AS-BUILT DRAWINGS

Refer to Division 01 Section "Task Order Closeout" for requirements relating to as-built drawings.

SECTION 01 33 00

SUBMITTAL PROCEDURES

The Government may request submittals in addition to those specified herein when deemed necessary to substantiate compliance with specific project requirements.

Units of weights and measures used on all submittals are to be the same as those used in the construction documents.

Each submittal shall be complete and include sufficient detail to allow ready determination of compliance with Contract requirements.

The Contractor's Quality Control (CQC) System Manager and the Designer of

Record, if applicable, shall review all submittals prior to forwarding to the Government for the Government's action. Submittals reviewed by the

Contractor and Designer of Record shall be stamped, signed, dated, and indicate the action taken. Proposed deviations from the Contract requirements are to be clearly identified.

Submittals requiring Government approval shall be submitted prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in compliance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.3 DEFINITIONS

1.3.1 Submittal Descriptions (SD)

Submittals requirements are specified in the individual specification sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:

Submittals which are required prior to issuance of Contract notice to proceed.

Certificates of insurance

Surety bonds

List of proposed Subcontractors

List of proposed products

Construction progress schedule

Network Analysis Schedule (NAS)

Submittal Register

Schedule of Values

Health and Safety plan

Work plan

Quality Control (QC) plan

Environmental protection plan

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the Contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of

Contract award for the project.

Report which includes findings of a test required to be performed by the

Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or

Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Confined space entry permits.

Hot Work permits.

Text of posted operating instructions.

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.

SD-09 Manufacturer's Field Reports

Documentation of the inspection, testing, and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.

SD-10 Operation and Maintenance Data

Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment.

This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.

This data is intended to be incorporated in an operations and maintenance manual.

Documentation to record compliance with technical or administrative

Submittals required for Guiding Principle Validation (GPV) or Third Party

Certification (TPC).

Special requirements necessary to properly close out a construction contract.

For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

Preliminary copy of Real Property Form 1046, with cost breakout for all assets, 30 days prior to facility turnover.

1.3.2 Approving Authority

Office or designated person authorized to approve submittal.

1.3.3 Work

As used in this Section, on- and off-site construction required by the construction documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.4 SUBMITTALS

used, a designation following the "G" designation identifies the office that submitted in compliance with this Section:

Submittal Register; G

1.5 SUBMITTAL REVIEWING ENTITIES

1.5.1 Government (G)

Government review and approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the

Government. Government approval is required for all deviations from the

Contract.

1.5.2 Architect-Engineer (AE)

Architect-Engineer (AE) review and recommendation to the Government on disposition is required for extensions of design, critical materials, any deviations from the solicitation, the accepted proposal, or the completed design, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government. The Contractor shall provide the number of copies designated herein. The Government will review AE-approved submittals for compliance with the Contract.

1.6 PREPARATION

1.6.1 Transmittal Coversheet

Submittals shall be in electronic format, accompanied by GSFC standard form

FMD-304 Material Approval Submittal transmittal coversheet. Each submittal item shall be listed on the transmittal coversheet form, and be identified by a submittal schedule reference number, specification and drawing reference, submittal type (SD number), and assigned a submittal name.

Transmittal form shall also include the NASA contract number.

1.6.2 Format of SD-01 Preconstruction Submittals and SD-11 Closeout

Submittals

SD-01 and SD-11 submittals shall be in electronic format.

1.6.3 Format of SD-02 Shop Drawings

SD-02 submittals shall be in electronic format. Shop drawings shall be drawn to scale, and include a graphic scale. Shop drawings shall be capable of being printed or reproduced without a reduction in quality or legibility.

Shop drawing submittals shall include the following:

a. Project name, which shall match the general title of the construction documents.

b. Name of Contractor.

c. Name of Subcontractor.

d. Date of the drawings and revisions.

e. Name of the item, material, or equipment detailed thereon.

f. Number of the submittal (e.g., first submittal, etc.) in a uniform location adjacent to the title block.

Shop drawings shall be numbered in a logical sequence. Title block shall be in a uniform location on each sheet, and include the Government's contract number.

Except for diagrams and schematic drawings, shop drawings shall be dimensioned and demonstrate interface with other trades and construction.

Use the same unit of measure for shop drawings as indicated on the construction documents. Identify materials and products for work shown.

1.6.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions

SD-03 and SD-08 submittals shall be in electronic format. Include a table of contents bookmarked to the individual submittal items.

Indicate by prominent notation each product being submitted; indicate specification section number and paragraph number to which it pertains.

Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project, with information and format as required for submission of SD-07 Certificates.

Include the manufacturer's name, trade name, place of manufacture, and catalog model or number on product data. Also include applicable federal, military, industry and technical society publication references. Should manufacturer's data require supplemental information for clarification, submit as specified for SD-07 Certificates.

Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations such as American

National Standards Institute (ANSI), ASTM International (ASTM), National

Electrical Manufacturer's Association (NEMA), Underwriters Laboratories

(UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Government. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.

Collect required data submittals for each specific material, product, unit of work, or system into a single submittal and marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will not be accepted for expedition of construction effort.

Submit manufacturer's instructions prior to installation.

1.6.5 Format of SD-04 Samples

Samples shall be physically identical to the proposed material or product to be incorporated into the Work, fully fabricated and finished in the specified manner, and full scale. Where variations in color, finish, pattern, or texture are inherent in the material or product represented by the sample, multiple units of the sample, showing the near-limits of the variations and the "average" of the whole range (not less than 3 units), shall be submitted. Each unit shall be marked to describe its relation to the range of the variation. Where samples are specified for selection of color, finish, pattern, or texture, the full set of available choices shall be submitted for the material or product specified. Sizes and quantities of samples shall represent their respective standard unit.

a. The project name, which shall be the general title of the construction documents.

b. Name of Contractor.

c. Name of Subcontractor.

d. The name of the item, material, or equipment detailed thereon.

e. Name of producer and brand.

f. Specification Section to which samples apply.

g. Submittal Register reference number.

h. Samples of finish materials shall have additional markings that will identify them under the finish schedules.

1.6.6 Format of SD-05 Design Data and SD-07 Certificates

SD-06 submittals shall be in electronic format.

1.6.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports

SD-06 and SD-09 submittals shall be in electronic format.

Indicate by prominent notation, each report in the submittal. Indicate specification number and paragraph number to which it pertains.

1.6.8 Format of SD-10 Operation and Maintenance Data (O&M)

Comply with Division 01 Section "Operation and Maintenance Data" for format

1.7 VARIATIONS

Variations from Contract requirements require both Designer of Record (DOR) and Government approval pursuant to Contract Clause FAR 52.236-21 and will be considered where advantageous to Government.

1.7.1 Considering Variations

Discussion with Government prior to submission, after consulting with the

DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value

Engineering Change Proposal (VECP).

Specifically point out variations from Contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the

Government.

1.7.2 Proposing Variations

When proposing variation, deliver written request to the Government, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

1.7.3 Warranting that Variations are Compatible

When delivering a variation for approval, Contractor, including its

Designer(s) of Record, warrants that this Contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.7.4 Review Schedule is Modified

In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.

1.8 SUBMITTAL REGISTER

Prepare and maintain a submittal register, as the work progresses. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment.

This list may not be all inclusive and additional submittals may be required. Submittal Register shall include columns with the following data:

a. Column listing the specification section in which the submittal is required.

b. Column listing the Submittal Description and type (e.g., SD-02 Shop

Drawings).

c. Column listing principal paragraph where the material or product is specified.

1.9 GOVERNMENT REVIEW

1.9.1 Review Notations

The Government will review submittals and provide pertinent notation generally within 15 working days after receipt of submission. On complex or lengthy submittals requiring extensive review efforts by the Government, and on occasions when numerous submittals are made within a 15 day period, the aforementioned 15-day review period may be exceeded by the Government.

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "APPROVED" authorize the Contractor to proceed with the work covered.

b. Submittals marked "APPROVED AS NOTED - NO RESUBMIT" authorize the

Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "APPROVED AS NOTED - RESUBMIT" require the

Contractor to make the necessary corrections and revisions and to re-submit them for approval in the same routine as before.

d. Submittals marked "REJECTED - RESUBMIT" indicate noncompliance with the Contract requirements and shall be re-submitted with appropriate changes.

e. Submittals marked "REVIEW NOT REQUIRED - NO ACTION TAKEN" indicate the Government is not required to approve the submitted work or operation. Such determination by the Government shall not relieve

Contractor of his responsibility to perform the work in a safe and workmanlike manner and to obtain all required permits and approvals.

1.10 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

b. Submittals called for by the construction documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the construction documents but which have been omitted from the register or marked "N/A."

c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

1.11 REJECTED SUBMITTALS

The Contractor shall make corrections required by the Government's review.

If the Contractor considers any correction or notation on the returned submittals to constitute a change to the Contract requirements, notice as required under the clause entitled "Changes" shall be given to the

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.12 APPROVED SUBMITTALS

Government approval or acceptance of submittals is not to be construed as a complete check, and indicates only that

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor

Quality Control (CQC) requirements of this Contract is responsible for.

After submittals have been approved or accepted by the Government, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.13 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the Contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this Contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Government for testing. Samples failing to meet contract requirements will automatically void previous approvals.

Contractor to replace such materials or equipment to meet contract

Approval of the Contractor's samples by the Government does not relieve the

Contractor of his responsibilities under the Contract.

SECTION 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS

1.1 SUMMARY

1.2 AUTHORITY HAVING JURISDICTION

At Goddard Space Flight Center (GSFC), the Medical and Environmental

Management Division, Code 250, is the authority in all matters regarding hazardous waste generation and disposal.

At GSFC, the Safety Division, Code 360, is the Authority Having Jurisdiction

(AHJ) in all matters regarding Occupational Safety, Fire Safety, and Health.

1.2.1 Reporting Emergencies

Contact the GSFC Emergency Console by dialing "911" from GSFC phones or

(301) 286-9111 from outside lines and cell phones.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The current version of each document shall be used unless otherwise noted.

GSFC references may be obtained at Goddard Directory Management System

(GDMS), http://gdms.nasa.gov/home.jsp. NASA references may be obtained at

HQ NODIS" link from within GDMS.

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)

ASSE/SAFE A10.34 (2001; R 2012) Protection of the Public on or

Adjacent to Construction Sites

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI/ASSE Z359.1 (2007) Safety Requirements for Personal Fall

Arrest Systems, Subsystems and Components

ANSI/ASSE A10.8 (2011) Scaffolding Safety Requirements

ASME INTERNATIONAL (ASME)

ASME B30.22 (2010) Articulating Boom Cranes

ASME B30.3 (2012) Tower Cranes

ASME B30.5 (2014) Mobile and Locomotive Cranes

GODDARD SPACE FLIGHT CENTER (GSFC)

GPR 1700.1 Occupational Safety Program at the Goddard

Space Flight Center

GPR 1700.5 Control of Hazardous Energy (Lockout/Tagout)

GPR 1700.6 Confined Space Program at the Goddard Space

Flight Center

GPR 1860.1 Ionizing Radiation Protection

GPR 1860.2 Laser Radiation Protection

GPR 8715.5 Fire Protection at the Goddard Space Flight

Center

GPR 8715.8 Fall Protection Requirements at Goddard Space

Flight Center

GPR 8719.1 Lifting Devices and Equipment (LDE)

Certifications and Operations

INTERNATIONAL CODE COUNCIL (ICC)

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)

NASA NPR 1800.1 (2004; R 2013) NASA Occupational Health

Program Procedures

NASA NPR 8621.1 (2006b; Change 7) NASA Procedural

Requirements for Mishap and Close Call

Reporting, Investigating, and Recordkeeping

NASA NPR 8715.3 (2008c; Change 9) NASA General Safety Program

Requirements

NASA-STD 8719.9 (2007) NASA Standard for Lifting Devices and

Equipment

NASA-STD 8719.11 (2008a) NASA Safety Standard for Fire

Protection

NASA-STD 8719.12 (2011; Change 2) Safety Standard for

Explosives, Propellants, and Pyrotechnics

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 10 (2013) Standard for Portable Fire

Extinguishers

NFPA 51B (2014) Standard for Fire Prevention During

Welding, Cutting, and Other Hot Work

NFPA 70 (2017) National Electrical Code

NFPA 70E (2015; ERTA 1 2015) Standard for Electrical

Safety in the Workplace

NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life

Safety Code

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

10 CFR 20 Standards for Protection Against Radiation

29 CFR 1910 (2013) Occupational Safety and Health

Standards

29 CFR 1910.97 (2011) Nonionizing Radiation

29 CFR 1910.146 Permit-required Confined Spaces

29 CFR 1910.1000 Air Contaminants

29 CFR 1915 Confined and Enclosed Spaces and Other

Dangerous…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .