32Shrub Planting-Planting Det..pdf

PDF 74 KB Posted

Attached to
ROCEOVRY: Little Tesuque Improvements Project
Solicitation number
AG-9702-S-10-0147
Issued by

About this file

Shrub Planting Detail

View the file

Other files

File Type Posted
16Toilet_Building_Details-Layout1.pdf PDF
31Split-faced Retaining wall-Layout1.pdf PDF
05_ARRA_Little_Tesuque_PG_Toilet_Removal.pdf PDF
02_Site Plan.pdf PDF
22Kiosk-Message Board-Kiosk Message Board Elevations.pdf PDF
11_Toilet Building Section Floor Plan.pdf PDF
30Boulder Placement Rip Rap-Layout1.pdf PDF
13_Toilet Building oof_framing_plan-Layout1.pdf PDF
01_Title Sheet index.pdf PDF
18toi_bldg_hardware_schedule-Layout1.pdf PDF
27Trail Clearing-Layout1.pdf PDF
10_Toilet Building Section Slab Plan.pdf PDF
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
09_Toilet Building Section Foundation.pdf PDF
06_Toilet Building Section AA.pdf PDF
19Trashpad-Layout1.pdf PDF
Attachment 5_Standard Form 24.pdf PDF
03_Demolition Plan.pdf PDF
Attachment 4_Wage DeterminationNM1.pdf PDF
04_Toilet Building Site.pdf PDF
23Kiosk-Message Board-Kiosk - Roof Framing Support Post.pdf PDF
AG-9702-S-10-0147 RFP.doc DOC document
15toilet_1-_roof_details-Layout1.pdf PDF
12_Toilet Building Section Walkway.pdf PDF
21ARRASignDetails-Sign Details.pdf PDF
05_Shelter Site.pdf PDF
26hardened_trail_typs-Layout1.pdf PDF
20Picnic_table-Layout1.pdf PDF
14roof_plan-Layout1.pdf PDF
08_Toilet Building Section Elevation.pdf PDF
28Master_Plan-Picnic Unit.pdf PDF
Attachment 1_Little Tesuque_ Specs.doc DOC document
07_Toilet Building Section BB.pdf PDF
17toilet_2_-_door_stuff-Layout1.pdf PDF
24draindip-Layout1.pdf PDF
25RegulatorySign-Layout1.pdf PDF
29FireRing GroupFireRing-Layout1.pdf PDF
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
Attachment 4_Wage DeterminationNM1.pdf PDF
Attachment 2 File.zip ZIP file
Attachment 1_Little Tesuque_ Specs.doc DOC document
AG-9702-S-10-0147 RFP.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOT TO SCALE

SHRUB PLANTING DETAIL

Construct 4" continuous earthen berm

Undisturbed Soil

3 X width of rootball

NOTES

Root collar at or slightly above grade

Bark mulch

1. Approximate locations for shrubs are shown on site plan.

2. Planting and watering shall be done within one working day.

3. Planting shall occur before ground freezes.

ADD1

around plants

Finish grade

Compact planting mixture beneath rootball.

Soil mixture to be mixed and tamped to remove air pockets

Plant fertilizer tablet

(Typ)

E R

U

TLUCIRGAT FONEMT

R

A P

E D

Scale

SOUTHWESTERN REGION

FOREST SERVICE

Sheet

Item No.

Sheet TitleForest

Project Name

R-3

U.S. DEPARTMENT OF AGRICULTURE

Santa Fe National Forest

Little Tesuque Improvements

Shrub Planting Detail

No Scale

02490

S.1

S h r u b

P l a n t i n g d w g

Planting Det.

File details come from the government source that posted it. Updated .