30Boulder Placement Rip Rap-Layout1.pdf

PDF 90 KB Posted

Attached to
ROCEOVRY: Little Tesuque Improvements Project
Solicitation number
AG-9702-S-10-0147
Issued by

About this file

Boulder Placement Rip Rap Layout

View the file

Other files

File Type Posted
16Toilet_Building_Details-Layout1.pdf PDF
31Split-faced Retaining wall-Layout1.pdf PDF
05_ARRA_Little_Tesuque_PG_Toilet_Removal.pdf PDF
02_Site Plan.pdf PDF
22Kiosk-Message Board-Kiosk Message Board Elevations.pdf PDF
11_Toilet Building Section Floor Plan.pdf PDF
13_Toilet Building oof_framing_plan-Layout1.pdf PDF
01_Title Sheet index.pdf PDF
18toi_bldg_hardware_schedule-Layout1.pdf PDF
27Trail Clearing-Layout1.pdf PDF
10_Toilet Building Section Slab Plan.pdf PDF
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
09_Toilet Building Section Foundation.pdf PDF
06_Toilet Building Section AA.pdf PDF
19Trashpad-Layout1.pdf PDF
32Shrub Planting-Planting Det..pdf PDF
Attachment 5_Standard Form 24.pdf PDF
03_Demolition Plan.pdf PDF
Attachment 4_Wage DeterminationNM1.pdf PDF
04_Toilet Building Site.pdf PDF
23Kiosk-Message Board-Kiosk - Roof Framing Support Post.pdf PDF
AG-9702-S-10-0147 RFP.doc DOC document
15toilet_1-_roof_details-Layout1.pdf PDF
12_Toilet Building Section Walkway.pdf PDF
21ARRASignDetails-Sign Details.pdf PDF
05_Shelter Site.pdf PDF
26hardened_trail_typs-Layout1.pdf PDF
20Picnic_table-Layout1.pdf PDF
14roof_plan-Layout1.pdf PDF
08_Toilet Building Section Elevation.pdf PDF
28Master_Plan-Picnic Unit.pdf PDF
Attachment 1_Little Tesuque_ Specs.doc DOC document
07_Toilet Building Section BB.pdf PDF
17toilet_2_-_door_stuff-Layout1.pdf PDF
24draindip-Layout1.pdf PDF
25RegulatorySign-Layout1.pdf PDF
29FireRing GroupFireRing-Layout1.pdf PDF
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
Attachment 4_Wage DeterminationNM1.pdf PDF
Attachment 2 File.zip ZIP file
Attachment 1_Little Tesuque_ Specs.doc DOC document
AG-9702-S-10-0147 RFP.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Boulder

Road Edge

2'-5' From

1' From Trail Edge

Trail

Vary Spacing Between Boulders--

2'-5' and Group Different Sizes

PLAN VIEW--

SECTION

NOTES:

Hardened

3' R

TYP.5'

TYP.

boulders and vary spacing between boulders,

1. Do not place boulders in straight lines. Stagger

Road Edge

3' min.

3' min.

Bury 1/3-1/2

2. Contractor to stake boulders for COR approval.

BOULDER PLACEMENT

(Or Compacted

HAND-PLACED RIPRAP

Backfill--See

Site Plan)

Backfill--See

Site Plan)

(Or Compacted

Existing Grade

Hand-Placed Rip-Rap

Largest Stones at Base

Existing Grade

H.3

3 H.4 and vary size of boulders.

BOULDER PLACEMENT

SECTION

H.5

3. Riprapped slope to be 1-1/2:1 (run:rise)

U.S. DEPARTMENT OF AGRICULTURE

GAT FON

SOUTHWESTERN REGION

FOREST SERVICE

A P

E D

EMT

R

E R

U

TLUCIR

R-3 Item No.Project Name

Forest

Sheet

Scale

Sheet Title

H.3 Boulder Placement & Rip Rap

Little Tesuque Improvements

Santa Fe National Forest

No Scale 30 of 32

02276, 02279, 02455

H.4

H.5

B o u l d e r

P l a c e m e n t

R i p

R a p

Layout1

File details come from the government source that posted it. Updated .