06_Toilet Building Section AA.pdf

PDF 129 KB Posted

Attached to
ROCEOVRY: Little Tesuque Improvements Project Federal contract opportunity
Solicitation number
AG-9702-S-10-0147
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Toilet Building Section AA

View the file

Other files for this federal contract opportunity

Other files attached to ROCEOVRY: Little Tesuque Improvements Project, newest first.
File Type Posted
27Trail Clearing-Layout1.pdf PDF
18toi_bldg_hardware_schedule-Layout1.pdf PDF
01_Title Sheet index.pdf PDF
13_Toilet Building oof_framing_plan-Layout1.pdf PDF
10_Toilet Building Section Slab Plan.pdf PDF
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
03_Demolition Plan.pdf PDF
Attachment 5_Standard Form 24.pdf PDF
20Picnic_table-Layout1.pdf PDF
28Master_Plan-Picnic Unit.pdf PDF
23Kiosk-Message Board-Kiosk - Roof Framing Support Post.pdf PDF
04_Toilet Building Site.pdf PDF
12_Toilet Building Section Walkway.pdf PDF
AG-9702-S-10-0147 RFP.doc DOC document
15toilet_1-_roof_details-Layout1.pdf PDF
26hardened_trail_typs-Layout1.pdf PDF
21ARRASignDetails-Sign Details.pdf PDF
05_Shelter Site.pdf PDF
05_ARRA_Little_Tesuque_PG_Toilet_Removal.pdf PDF
Attachment 1_Little Tesuque_ Specs.doc DOC document
17toilet_2_-_door_stuff-Layout1.pdf PDF
29FireRing GroupFireRing-Layout1.pdf PDF
07_Toilet Building Section BB.pdf PDF
24draindip-Layout1.pdf PDF
25RegulatorySign-Layout1.pdf PDF
16Toilet_Building_Details-Layout1.pdf PDF
02_Site Plan.pdf PDF
11_Toilet Building Section Floor Plan.pdf PDF
30Boulder Placement Rip Rap-Layout1.pdf PDF
09_Toilet Building Section Foundation.pdf PDF
32Shrub Planting-Planting Det..pdf PDF
19Trashpad-Layout1.pdf PDF
Attachment 4_Wage DeterminationNM1.pdf PDF
14roof_plan-Layout1.pdf PDF
08_Toilet Building Section Elevation.pdf PDF
31Split-faced Retaining wall-Layout1.pdf PDF
22Kiosk-Message Board-Kiosk Message Board Elevations.pdf PDF
Attachment 4_Wage DeterminationNM1.pdf PDF
Attachment 2 File.zip ZIP file
AG-9702-S-10-0147 RFP.doc DOC document
Attachment 1_Little Tesuque_ Specs.doc DOC document
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Toilet riser

8'-8"

3'

1'-8"

#4 rebar @ 12" 0.C.

all sides

#4 rebar @ 16" O.C.

2" minimum from top of footing to bottom of vault

Compacted select backfill

Polyethylene vault

Footing to be placed on undisturbed soil

6" concrete support column per manufacturer's specifications

24" manhole for cleanout

Grab bars -- see floor plan and hardware schedule

Schedule 40 black PE pipe, 12" diameter.

Watertight rubber gasket.

Color to match vent stack.

1'-6"

(Typ.)

Toilet paper holder

#4 rebar @ 16" O.C.

NOTES:

1. Contractor to submit reinforcing plan.

2. Install riser in accordance with

ADAAG 4.16.

3. Install grab bars in accordance with

ADAAG 4.26.

4. Reinforce corners, wall intersections, and wall openings vertically down to footing.

5. Provide blocking behind grab bars and toilet paper holders as required.

8"

Finish grade

0'-0"

SECTION AA

Bond beam

6"

Lapped wood siding

U.S. DEPARTMENT OF AGRICULTURE

GAT FON

SOUTHWESTERN REGION

FOREST SERVICE

A P

E D

EMT

R

E R

U

TLUCIR

R-3 Item No.Project Name

Forest

Sheet

Scale

Sheet Title

A.5 Toilet Building Section AA

Little Tesuque Improvements

Santa Fe National Forest

3/8" = 1'-0" 6 of 32

10168 s e c t i o n A A d w g

Layout1

File details come from the government source that posted it. Updated .