Hardened Trail Layout
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3'
SLOPE ROUNDING
0'-6" Max. Depth
2'
No Scale
C.2
1. See Site Plan for location of hardened trail construction and unit locations.
2. See Unit Details for dimensions. Clearing limits extend 1' beyond cut & fill slopes unless approved otherwise by COR.
3. Seed and mulch all cut and fill slopes and other disturbed/obliterated areas.
4. Trees to remain within clearing limits will be marked on the ground by COR.
NOTES
3% Max.
2" Compacted Asphalt
HARDENED TRAIL & CAMP UNIT CONSTRUCTION
(typ) Existing Slope
3:1
Slope Rounding
4" Compacted
3:1
Width varies
(Width Varies depending on
Base Course; Grading A
Typical Cross Section
S e e d
S e e d
Geotextile Depth varies. See grades on Camp Spur Chart.
per unit or trail as shown on plans
Excavation/Borrow Placement
C.3
C.2
Clearing Limit
1' 1'
Scale: 3/8" = 1' - 0"
Camp Unit or Trail)
@ 12"O.C. (Typ.)
3/8 " x 10" Spiral steel spike
Edge Treatment C.1
Surface restraint edging (Typ.)
for proper support (Typ.)
Fill all voids under restraint
Geotextile
Excavation/embankment placement
Depth varies
4" Compacted base course (fill) or compacted native material (cut)
4" Compacted, crusher fines
E R
U
TLUCIRGAT FONEMT
R
A P
E D
Scale
SOUTHWESTERN REGION
FOREST SERVICE
Sheet
Item No.
Sheet TitleForest
Project Name
R-3
U.S. DEPARTMENT OF AGRICULTURE
Santa Fe National Forest
Little Tesuque Improvements
Hardened Trail & Camp Unit Typicals
As Shown
02213, 02465
C.1 C.2
C.3
Layout1