25RegulatorySign-Layout1.pdf

PDF 113 KB Posted

Attached to
ROCEOVRY: Little Tesuque Improvements Project Federal contract opportunity
Solicitation number
AG-9702-S-10-0147
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Regulatory Sign and Railing detail

View the file

Other files for this federal contract opportunity

Other files attached to ROCEOVRY: Little Tesuque Improvements Project, newest first.
File Type Posted
23Kiosk-Message Board-Kiosk - Roof Framing Support Post.pdf PDF
04_Toilet Building Site.pdf PDF
12_Toilet Building Section Walkway.pdf PDF
AG-9702-S-10-0147 RFP.doc DOC document
15toilet_1-_roof_details-Layout1.pdf PDF
26hardened_trail_typs-Layout1.pdf PDF
21ARRASignDetails-Sign Details.pdf PDF
05_Shelter Site.pdf PDF
05_ARRA_Little_Tesuque_PG_Toilet_Removal.pdf PDF
27Trail Clearing-Layout1.pdf PDF
18toi_bldg_hardware_schedule-Layout1.pdf PDF
01_Title Sheet index.pdf PDF
13_Toilet Building oof_framing_plan-Layout1.pdf PDF
10_Toilet Building Section Slab Plan.pdf PDF
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
03_Demolition Plan.pdf PDF
Attachment 5_Standard Form 24.pdf PDF
20Picnic_table-Layout1.pdf PDF
28Master_Plan-Picnic Unit.pdf PDF
06_Toilet Building Section AA.pdf PDF
09_Toilet Building Section Foundation.pdf PDF
32Shrub Planting-Planting Det..pdf PDF
19Trashpad-Layout1.pdf PDF
Attachment 4_Wage DeterminationNM1.pdf PDF
14roof_plan-Layout1.pdf PDF
08_Toilet Building Section Elevation.pdf PDF
31Split-faced Retaining wall-Layout1.pdf PDF
22Kiosk-Message Board-Kiosk Message Board Elevations.pdf PDF
Attachment 1_Little Tesuque_ Specs.doc DOC document
17toilet_2_-_door_stuff-Layout1.pdf PDF
29FireRing GroupFireRing-Layout1.pdf PDF
07_Toilet Building Section BB.pdf PDF
24draindip-Layout1.pdf PDF
16Toilet_Building_Details-Layout1.pdf PDF
02_Site Plan.pdf PDF
11_Toilet Building Section Floor Plan.pdf PDF
30Boulder Placement Rip Rap-Layout1.pdf PDF
Attachment 4_Wage DeterminationNM1.pdf PDF
Attachment 2 File.zip ZIP file
Attachment 3_Fire Plan_ LittleTesuque.doc DOC document
AG-9702-S-10-0147 RFP.doc DOC document
Attachment 1_Little Tesuque_ Specs.doc DOC document
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

1. Sign location as shown on pavement plan or as designated by COR.

2. Sign location to be approved by COR prior to installation.

3. Drill posts as necessary to meet break-away requirements.

4. Erodible Soils signs to be installed on brown metal posts. Posts to be driven into ground, not installed in concrete footing.

Drilled for break-away

5'

3" concrete footing

K.1

2"

2'-10"

2"

FRONT VIEW

1'-6"

Utility

(typ.)

Regulatory Sign

SIDE VIEW

4" x 4" treated post or metal post as required.

See Note #4.

type & location plan for sign

See pavement

3"

7-1/2" Carriage bolt Galvanized steel - Contractor to match bolt diam. to holes pre-drilled by sign manufacturer, 2 per sign; peen ends around post

Mound backfill

Installation as required

"Van Accessible"

K.2 Railing Detail

Installation

2" x 4" Rectangular section Corten rail

(Typ.)

2" x 2" Corten posts oriented diagonnaly (Typ.)

Top of retaining wall

4'

2'-1"

5'-2

K.3 Retaining wall bench

Installation

Plan

Elevation

6'-7"

Typ.

4" Cap (Typ.)

T y p

T y p

20'-9"

2'-4"

U.S. DEPARTMENT OF AGRICULTURE

GAT FON

SOUTHWESTERN REGION

FOREST SERVICE

A P

E D

EMT

R

E R

U

TLUCIR

R-3 Item No.Project Name

Forest

Sheet

Scale

Sheet Title

K.1 Regulatory Sign and Railing Detail Installation

Little Tesuque Improvements

Santa Fe National Forest

No Scale 25 of 32

02451

R e g u l a t o r y S i g n d w g

K.3

K.3

Layout1

File details come from the government source that posted it. Updated .