27Trail Clearing-Layout1.pdf
PDF 170 KB Posted
- Attached to
- ROCEOVRY: Little Tesuque Improvements Project Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0147
About this file
Trail Clearing Layout
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
unless noted otherwise
7' min.
Clearing limits or approved by COR a fork main stem is nonexistent.
stem at branch fork or at ground level if diameter shall be cut flush with the main is over 12 inches in height and 1/2 inch Brush extending into the clearing limits that
Cut flush with trunk
Cut branches
Clearing limits centerline (both sides).
be cut if they are within 3 feet from the
All trees 8 inches or less in diameter shall trailway (both sides).
if they are outside of
10 inches in diameter
Do not cut trees over clearing limit
Trailway
Vertical limit uphill
Clearing
80" limit downhill--
Clearing
Clearing limits extend 1' beyond cut & fill slopes unless approved by COR.
NOTE:
U.S. DEPARTMENT OF AGRICULTURE
GAT FON
SOUTHWESTERN REGION
FOREST SERVICE
A P
E D
EMT
R
E R
U
TLUCIR
R-3 Item No.Project Name
Forest
Sheet
Scale
Sheet Title
C.3 Trail Clearing Limits
Little Tesuque Improvements
Santa Fe National Forest
No Scale 27 of 32
02213 revised 07/14/04
T r a i l
C l e a r i n g d w g
Layout1
File details come from the government source that posted it. Updated .