S-10-0296 954_obliteration.doc

DOC document 26 KB Posted

Attached to
RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
Solicitation number
AG-82B1-S-10-0296
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

S D

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION, newest first.
File Type Posted
A-001 S-10-0296.pdf PDF
S-10-0296906_measure_pay.doc DOC document
S-10-0296 905_materials.doc DOC document
S-10-0296 951_mobilization.doc DOC document
S-10-0296 913_turnpike_std.doc DOC document
S-10-0296 912_excavation_std.doc DOC document
S-10-0296 915_reconstruction_.doc DOC document
S-10-0296 921_culvert.doc DOC document
S-10-0296 B - M OHV RFQ.zip ZIP file
S-10-0296 908_staking.doc DOC document
903_intent.doc DOC document
S-10-0296 914_switchback.doc DOC document
S-10-0296 911_clear_grub_std.doc DOC document
961_materials_std.doc DOC document
S-10-0296 901 Spec..doc DOC document
S-10-0296 934 Log Retaining Wall.doc DOC document
S-10-0296 922_waterbar_std.doc DOC document
S-10-0296 907_quality_control.doc DOC document
S-10-0296 904_traffic_blasting.doc DOC document
S-10-0296 Logs Maps 36 Pages.pdf PDF
S-10-0296 food_order.doc DOC document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 954 – Obliteration of Abandoned Trailways

Description

954.01 Work. This work consists of obliteration of trailways, construction of drainage structures, and reestablishment of natural drainage patterns and vegetation.

Construction

954.02 General. Obliterate trailways at the locations NOTED ON THE TRAIL LOG or DESIGNATED ON THE GROUND.

954.03 Trail Closure. Block trailway entrances to traffic by placing rocks, logs, branches, and duff across the trailway. Place rocks, logs, branches, and duff to conceal the abandoned trailway and discourage future use. Use materials that are available in the areas to be obliterated. Live trees under 5 inches in diameter may be cut if no other material is available.

954.04 Drainage Structures. Leave existing drainage structures on the abandoned trail segments in place unless designated for removal.

Construct drainage structures at locations NOTED ON THE TRAIL LOG.

Construct check dams of rock where suitable rocks are available within 200 feet either direction along the trail, within 100 feet uphill, or within 50 feet downhill, of the check dam location. Where suitable rocks are not available, use native timber unless otherwise NOTED ON THE TRAIL LOG. Do not backfill behind check dams unless otherwise NOTED ON THE TRAIL LOG.

Measurement

954.05 Method. Measure the quantities in accordance with Section 906.

Payment

954.06 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

Make payment under:

PAY ITEM

PAY UNIT

954(01) Trail Obliteration

LF

954(02) Check Dams

EA