S-10-0296 905_materials.doc

DOC document 25 KB Posted

Attached to
RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
Solicitation number
AG-82B1-S-10-0296
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

S D

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION, newest first.
File Type Posted
A-001 S-10-0296.pdf PDF
S-10-0296 915_reconstruction_.doc DOC document
S-10-0296 921_culvert.doc DOC document
S-10-0296 B - M OHV RFQ.zip ZIP file
S-10-0296 908_staking.doc DOC document
S-10-0296 954_obliteration.doc DOC document
S-10-0296906_measure_pay.doc DOC document
S-10-0296 951_mobilization.doc DOC document
S-10-0296 913_turnpike_std.doc DOC document
S-10-0296 912_excavation_std.doc DOC document
903_intent.doc DOC document
S-10-0296 914_switchback.doc DOC document
S-10-0296 911_clear_grub_std.doc DOC document
961_materials_std.doc DOC document
S-10-0296 901 Spec..doc DOC document
S-10-0296 934 Log Retaining Wall.doc DOC document
S-10-0296 922_waterbar_std.doc DOC document
S-10-0296 907_quality_control.doc DOC document
S-10-0296 904_traffic_blasting.doc DOC document
S-10-0296 Logs Maps 36 Pages.pdf PDF
S-10-0296 food_order.doc DOC document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 905 -- Control of Materials

905.01 Handling Materials. Transport and handle all materials to preserve their quality and fitness for the work. Stockpile, load, and transport aggregates in a manner that will preserve specified gradation and avoid contamination.

Store materials to assure the preservation of their quality and fitness for the work. Locate stored materials to facilitate their prompt inspection. Restore all storage sites in accordance with requirements SHOWN ON THE DRAWINGS or as otherwise specified. Arrangements for storage on other than designated sites are the responsibility of the Contractor.

905.02 Material Sources

(a) Designated Sources. Use select borrow sources DESIGNATED ON THE TRAIL LOGS.

Designated sources of local materials are guaranteed by the Government for the quality and quantity of material in the source. The designation of a source includes the right to use those areas for the designated purpose only. Use all needed suitable material from the source. Operations are restricted to the confines of the area(s) designated.

905.03 Restoration. Upon completion of hauling from borrow sites, shape and grade the area to blend the sides into natural ground. Scatter debris over the area. Cut off stumps to less than 6 inches above the ground as measured on the uphill side of the stump. Place debris over the first 25 feet of any access route where the access route and main trail meet.

Where temporary access routes to borrow sources have approaches into live or intermittent stream channels, temporary erosion control structures shall be utilized during use. Upon completion of hauling activities, check dams shall be constructed at 8-foot intervals and debris placed in these approaches.

Measurement

905.04 Method. For permanent check dams measure the quantities in accordance with Section 906. There will be no separate measurement for any other work for this item.

Payment

905.05 Basis. All work under this section except for permanent check dams will be considered incidental to other PAY ITEMS in this contract, and additional payment will not be made.

Pay for the accepted quantities of check dams in accordance with Section 906 at the contract unit price for the PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

905-1 (1/16/2001)