S-10-0296 908_staking.doc
DOC document 24 KB Posted
- Attached to
- RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0296
About this file
Specs Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-001 S-10-0296.pdf | ||
| S-10-0296 915_reconstruction_.doc | DOC document | |
| S-10-0296 921_culvert.doc | DOC document | |
| S-10-0296 B - M OHV RFQ.zip | ZIP file | |
| S-10-0296 954_obliteration.doc | DOC document | |
| S-10-0296906_measure_pay.doc | DOC document | |
| S-10-0296 905_materials.doc | DOC document | |
| S-10-0296 951_mobilization.doc | DOC document | |
| S-10-0296 913_turnpike_std.doc | DOC document | |
| S-10-0296 912_excavation_std.doc | DOC document | |
| 903_intent.doc | DOC document | |
| S-10-0296 914_switchback.doc | DOC document | |
| S-10-0296 911_clear_grub_std.doc | DOC document | |
| 961_materials_std.doc | DOC document | |
| S-10-0296 901 Spec..doc | DOC document | |
| S-10-0296 934 Log Retaining Wall.doc | DOC document | |
| S-10-0296 922_waterbar_std.doc | DOC document | |
| S-10-0296 907_quality_control.doc | DOC document | |
| S-10-0296 904_traffic_blasting.doc | DOC document | |
| S-10-0296 Logs Maps 36 Pages.pdf | ||
| S-10-0296 food_order.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 908 -- Staking, Flagging, and Cleanup
Description
908.01 Work. This work consists of protecting existing staking and establishing any control points needed in addition to existing staking and flagging, and removing and disposing of all construction stakes, tags, flagging, and plastic ribbon from the project area.
Construction
908.02 General. This project has been staked at varying intervals on the ground with reference stakes and flagging as control points. These stakes and flagging constitute the field control. Not all items of work SHOWN ON THE TRAIL LOGS are staked or flagged on the ground.
The Contractor shall protect from construction activities all stakes by resetting them immediately uphill and adjacent to their initial locations as work proceeds.
The Contractor shall furnish and maintain all additional stakes, flagging, templates, batter boards, and other equipment, materials, and supplies necessary for locating on the ground the items of work SHOWN ON THE TRAIL LOGS and for marking and maintaining points and lines established. Do not perform work in the absence of control points. If any construction control points are destroyed, displaced, or erroneous, notify the CO. Uniformly contour alignment and construct grade from control point to control point.
908.03 Project Cleanup. Remove all construction stakes, tags, flagging, and plastic ribbon from the project area within 7 days after the final inspection of all other work on the project. Dispose of all stakes, tags, flagging, and plastic ribbon off Government-administered lands unless otherwise designated.
Measurement
908.04 Method. There will be no separate measurement for this item.
Payment
908.05 Basis. All work under this section will be considered incidental to other PAY ITEMS in this contract, and additional payment will not be made.