S-10-0296 934 Log Retaining Wall.doc
DOC document 26 KB Posted
- Attached to
- RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0296
About this file
Specs Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-001 S-10-0296.pdf | ||
| S-10-0296 915_reconstruction_.doc | DOC document | |
| S-10-0296 921_culvert.doc | DOC document | |
| S-10-0296 B - M OHV RFQ.zip | ZIP file | |
| S-10-0296 908_staking.doc | DOC document | |
| 903_intent.doc | DOC document | |
| S-10-0296 914_switchback.doc | DOC document | |
| S-10-0296 911_clear_grub_std.doc | DOC document | |
| 961_materials_std.doc | DOC document | |
| S-10-0296 901 Spec..doc | DOC document | |
| S-10-0296 922_waterbar_std.doc | DOC document | |
| S-10-0296 907_quality_control.doc | DOC document | |
| S-10-0296 904_traffic_blasting.doc | DOC document | |
| S-10-0296 Logs Maps 36 Pages.pdf | ||
| S-10-0296 food_order.doc | DOC document | |
| S-10-0296 954_obliteration.doc | DOC document | |
| S-10-0296906_measure_pay.doc | DOC document | |
| S-10-0296 905_materials.doc | DOC document | |
| S-10-0296 951_mobilization.doc | DOC document | |
| S-10-0296 913_turnpike_std.doc | DOC document | |
| S-10-0296 912_excavation_std.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C
Page
Section 934 -- Log Retaining Walls
Description
935.01 Work. Work consists of constructing native log retaining walls for the Shallow Stream Ford- Native Log Structure, Pay Item -6, including excavating, placing borrow, and backfilling.
Materials
935.02 Requirements. Use materials meeting the requirements AS-SHOWN-ON-THE-DRAWINGS.
Construction
935.03 Excavation. Excavate in accordance with Section 912 to provide a full bench foundation.
935.04 Wall Construction. The log retaining wall shall be constructed using material to the dimensions AS- SHOWN- ON- THE- DRAWING.
Measurement
935.05 Method. Measure the quantities in accordance with Section 906.
Payment
935.06 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
The following will be considered incidental to the PAY ITEMS SHOWN IN THE SCHEDULE OF ITEMS and extra payment will not be given:
(a) Retaining walls on the lower side of the trailbed constructed in place of full-bench or for construction of Shallow-Stream- Ford, Native Log Structures.
(b) Retaining walls through talus or rubble rock sections.
(c) Retaining walls at switchbacks when needed to hold embankment on steep sideslopes.
934-1 (1/10/2010)