S-10-0296 951_mobilization.doc

DOC document 24 KB Posted

Attached to
RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
Solicitation number
AG-82B1-S-10-0296
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Specs. Drawings

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION, newest first.
File Type Posted
A-001 S-10-0296.pdf PDF
S-10-0296 915_reconstruction_.doc DOC document
S-10-0296 921_culvert.doc DOC document
S-10-0296 B - M OHV RFQ.zip ZIP file
S-10-0296 908_staking.doc DOC document
S-10-0296 922_waterbar_std.doc DOC document
S-10-0296 907_quality_control.doc DOC document
S-10-0296 904_traffic_blasting.doc DOC document
S-10-0296 Logs Maps 36 Pages.pdf PDF
S-10-0296 food_order.doc DOC document
903_intent.doc DOC document
S-10-0296 914_switchback.doc DOC document
S-10-0296 911_clear_grub_std.doc DOC document
961_materials_std.doc DOC document
S-10-0296 901 Spec..doc DOC document
S-10-0296 934 Log Retaining Wall.doc DOC document
S-10-0296 954_obliteration.doc DOC document
S-10-0296906_measure_pay.doc DOC document
S-10-0296 905_materials.doc DOC document
S-10-0296 913_turnpike_std.doc DOC document
S-10-0296 912_excavation_std.doc DOC document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 951 -- Mobilization

Description

951.01 Work. This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.

Payment

951.02 Basis. Pay for the accepted work at the contract unit price for the PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

Make progress payments for mobilization as follows:

(a) Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.

(b) When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.

(c) When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.

(d) Pay any unpaid amount for mobilization upon final acceptance of all work items.

The total of all payments, including bonding, shall not exceed the original contract amount for this item.

Make payment under:

PAY ITEM

PAY UNIT

951(01) Mobilization

LS

951-1 (3/23/2000)