S-10-0296 914_switchback.doc
DOC document 26 KB Posted
- Attached to
- RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0296
About this file
Specifications and Drawings (S D)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-001 S-10-0296.pdf | ||
| S-10-0296 915_reconstruction_.doc | DOC document | |
| S-10-0296 921_culvert.doc | DOC document | |
| S-10-0296 B - M OHV RFQ.zip | ZIP file | |
| S-10-0296 908_staking.doc | DOC document | |
| S-10-0296 922_waterbar_std.doc | DOC document | |
| S-10-0296 907_quality_control.doc | DOC document | |
| S-10-0296 904_traffic_blasting.doc | DOC document | |
| S-10-0296 Logs Maps 36 Pages.pdf | ||
| S-10-0296 food_order.doc | DOC document | |
| S-10-0296 954_obliteration.doc | DOC document | |
| S-10-0296906_measure_pay.doc | DOC document | |
| S-10-0296 905_materials.doc | DOC document | |
| S-10-0296 951_mobilization.doc | DOC document | |
| S-10-0296 913_turnpike_std.doc | DOC document | |
| S-10-0296 912_excavation_std.doc | DOC document | |
| 903_intent.doc | DOC document | |
| S-10-0296 911_clear_grub_std.doc | DOC document | |
| 961_materials_std.doc | DOC document | |
| S-10-0296 901 Spec..doc | DOC document | |
| S-10-0296 934 Log Retaining Wall.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 914 -- Switchbacks
Description
914.01 Work. Work consists of construction of switchbacks, including clearing and grubbing (on reconstruction sections), excavation, associated barriers, ditches, retaining walls, and approach sections.
Materials
914.02 Requirements. Use materials meeting the requirements of Section 961.
Construction
914.03 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912.
Construct upper leg of switchback wide enough to allow for ditch and constructed rock barrier where required.
914.05 Barriers. Random rocks and logs shall be placed between the upper and lower approach sections to act as barriers if natural barriers do not exist. In addition, where NOTED ON THE TRAIL LOG, construct a rock barrier along the upper approach section and into the turn section.
914.06 Ditches. Where NOTED ON THE TRAIL LOG, construct a ditch along the upper approach section and into the turn section.
914.07 Limits of Switchback. Beginning and ending of switchback will be as SHOWN ON THE DRAWING.
Measurement
914.08 Method. Measure the quantities in accordance with Section 906.
Payment
914.09 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
The following will be considered incidental to the PAY ITEMS SHOWN IN THE SCHEDULE OF ITEMS and extra payment will not be given:
(a) Barriers, retaining walls, and ditches constructed as part of the switchback.
(b) Any clearing or grubbing necessary in the reconstruction segments.
Make payment under:
PAY ITEM
PAY UNIT
914(01) Switchbacks
EA
914-1 (12/12/2009)