S-10-0296 914_switchback.doc

DOC document 26 KB Posted

Attached to
RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
Solicitation number
AG-82B1-S-10-0296
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Specifications and Drawings (S D)

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION, newest first.
File Type Posted
A-001 S-10-0296.pdf PDF
S-10-0296 915_reconstruction_.doc DOC document
S-10-0296 921_culvert.doc DOC document
S-10-0296 B - M OHV RFQ.zip ZIP file
S-10-0296 908_staking.doc DOC document
S-10-0296 922_waterbar_std.doc DOC document
S-10-0296 907_quality_control.doc DOC document
S-10-0296 904_traffic_blasting.doc DOC document
S-10-0296 Logs Maps 36 Pages.pdf PDF
S-10-0296 food_order.doc DOC document
S-10-0296 954_obliteration.doc DOC document
S-10-0296906_measure_pay.doc DOC document
S-10-0296 905_materials.doc DOC document
S-10-0296 951_mobilization.doc DOC document
S-10-0296 913_turnpike_std.doc DOC document
S-10-0296 912_excavation_std.doc DOC document
903_intent.doc DOC document
S-10-0296 911_clear_grub_std.doc DOC document
961_materials_std.doc DOC document
S-10-0296 901 Spec..doc DOC document
S-10-0296 934 Log Retaining Wall.doc DOC document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 914 -- Switchbacks

Description

914.01 Work. Work consists of construction of switchbacks, including clearing and grubbing (on reconstruction sections), excavation, associated barriers, ditches, retaining walls, and approach sections.

Materials

914.02 Requirements. Use materials meeting the requirements of Section 961.

Construction

914.03 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912.

Construct upper leg of switchback wide enough to allow for ditch and constructed rock barrier where required.

914.05 Barriers. Random rocks and logs shall be placed between the upper and lower approach sections to act as barriers if natural barriers do not exist. In addition, where NOTED ON THE TRAIL LOG, construct a rock barrier along the upper approach section and into the turn section.

914.06 Ditches. Where NOTED ON THE TRAIL LOG, construct a ditch along the upper approach section and into the turn section.

914.07 Limits of Switchback. Beginning and ending of switchback will be as SHOWN ON THE DRAWING.

Measurement

914.08 Method. Measure the quantities in accordance with Section 906.

Payment

914.09 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.

The following will be considered incidental to the PAY ITEMS SHOWN IN THE SCHEDULE OF ITEMS and extra payment will not be given:

(a) Barriers, retaining walls, and ditches constructed as part of the switchback.

(b) Any clearing or grubbing necessary in the reconstruction segments.

Make payment under:

PAY ITEM

PAY UNIT

914(01) Switchbacks

EA

914-1 (12/12/2009)

File details come from the government source that posted it. Updated .