S-10-0296 921_culvert.doc
DOC document 28 KB Posted
- Attached to
- RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0296
About this file
Specs. Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-001 S-10-0296.pdf | ||
| S-10-0296 915_reconstruction_.doc | DOC document | |
| S-10-0296 B - M OHV RFQ.zip | ZIP file | |
| S-10-0296 908_staking.doc | DOC document | |
| S-10-0296 922_waterbar_std.doc | DOC document | |
| S-10-0296 907_quality_control.doc | DOC document | |
| S-10-0296 904_traffic_blasting.doc | DOC document | |
| S-10-0296 Logs Maps 36 Pages.pdf | ||
| S-10-0296 food_order.doc | DOC document | |
| S-10-0296 954_obliteration.doc | DOC document | |
| S-10-0296906_measure_pay.doc | DOC document | |
| S-10-0296 905_materials.doc | DOC document | |
| S-10-0296 951_mobilization.doc | DOC document | |
| S-10-0296 913_turnpike_std.doc | DOC document | |
| S-10-0296 912_excavation_std.doc | DOC document | |
| 903_intent.doc | DOC document | |
| S-10-0296 914_switchback.doc | DOC document | |
| S-10-0296 911_clear_grub_std.doc | DOC document | |
| 961_materials_std.doc | DOC document | |
| S-10-0296 901 Spec..doc | DOC document | |
| S-10-0296 934 Log Retaining Wall.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C
Page
Section 921 -- Culverts
Description
921.01 Work. Work consists of furnishing and installing culverts, including excavation and backfill, selecting and hauling of rock materials, and constructing catch basins, headwalls, and outlet ditches.
Materials
921.02 Requirements. Use materials meeting the requirements of Section 961.
Construction
921.03 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912.
921.04 Placement. Place culverts to provide for unobstructed inlet and outlet flow. Remove logs, debris, soil, rock, and other obstructions above and below the culvert that would impede flow into the culvert or away from the trailway. Minimize disturbance to streambeds.
Construct an inlet catch basin where NOTED ON THE TRAIL LOG or as necessary to facilitate flow into the culvert. Construct the catch basin with an 18-inch diameter flat bottom.
Construct outlet ditches where NOTED ON THE TRAIL LOG or as necessary to provide drainage. Where NOTED ON THE TRAIL LOG or where outlet ditches will not drain within 20 feet, construct an 18-inch diameter drain sump to a minimum depth of 24 inches and located at least 5 feet from culvert outlet. Fill sump with coarse rock.
921.05 Pipe Culverts. Install pipe culverts at the locations NOTED ON THE TRAIL LOG or as DESIGNATED ON THE GROUND.
(a) Placing. Skew culverts as needed to provide for free flow under the trailbed. Place culverts at stream crossings in the natural streambed on stream grade.
(b) Bedding. Excavate and remove all unsuitable material and rocks over 3 inches to a minimum depth of 6 inches below the pipe invert and to a minimum width of 1.5 pipe diameters. Bed pipe with compacted suitable material free of rocks larger than 3 inches and in a stable foundation of undisturbed or compacted soil. Shape the bed to fit the lower quadrant of the pipe exterior and provide uniform continuous support along the entire length of the pipe.
921.06 Backfilling Culverts. Backfill and compact around culverts with suitable material that is free of rocks over 3 inches. Provide for the cover height as SHOWN ON THE DRAWINGS.
921.07 Headwalls. Construct headwall at both culvert inlet and outlet. In all locations except in a turnpike section or on ditch relief culverts, the headwall shall extend from stream bank to stream bank. On turnpike and ditch relief culverts the headwall shall extend a minimum of 12 inches on both sides of the culvert.
Provide a compacted bench as a foundation for the wall.
Select rocks that have a general rectangular shape with flat top and bottom faces. Place the largest rocks on the bottom. Lay each rock stable on the course that supports it, interlocking with surrounding rocks. Do not break, jar, or displace rocks already set. Place the exposed face of each rock parallel to the face of the wall. Stagger vertical joints a minimum of 4 inches horizontally from vertical joints in adjoining courses.
Measurement
921.08 Method. Measure the quantities in accordance with Section 906.
Payment
921.09 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
The following will be considered incidental to the PAY ITEMS SHOWN IN THE SCHEDULE OF ITEMS and extra payment will not be given:
Outlet ditches, drain sumps, bedding material, catch basins, and headwalls.
Make payment under:
PAY ITEM
PAY UNIT
921(02) 12-Inch Corrugated Double Wall
PE Culvert
LF
912(03) 18- inch Corrugated Double Wall
PE Culvert . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LF 921-1 (12/13/2009)