S-10-0296 922_waterbar_std.doc
DOC document 28 KB Posted
- Attached to
- RECOVERY - TRAIL CONSTRUCTION/RECONSTRUCTION Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0296
About this file
Specs. Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-001 S-10-0296.pdf | ||
| 903_intent.doc | DOC document | |
| S-10-0296 914_switchback.doc | DOC document | |
| S-10-0296 911_clear_grub_std.doc | DOC document | |
| 961_materials_std.doc | DOC document | |
| S-10-0296 901 Spec..doc | DOC document | |
| S-10-0296 934 Log Retaining Wall.doc | DOC document | |
| S-10-0296 915_reconstruction_.doc | DOC document | |
| S-10-0296 921_culvert.doc | DOC document | |
| S-10-0296 B - M OHV RFQ.zip | ZIP file | |
| S-10-0296 908_staking.doc | DOC document | |
| S-10-0296 907_quality_control.doc | DOC document | |
| S-10-0296 904_traffic_blasting.doc | DOC document | |
| S-10-0296 Logs Maps 36 Pages.pdf | ||
| S-10-0296 food_order.doc | DOC document | |
| S-10-0296 954_obliteration.doc | DOC document | |
| S-10-0296906_measure_pay.doc | DOC document | |
| S-10-0296 905_materials.doc | DOC document | |
| S-10-0296 951_mobilization.doc | DOC document | |
| S-10-0296 913_turnpike_std.doc | DOC document | |
| S-10-0296 912_excavation_std.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C
Page
Section 922 -- Waterbars
Description
922.01 Work. This work consists of installing waterbars, including excavation, backfill, and outlet drainage; selecting log and rock materials; and furnishing treated timber and other materials where required.
Materials
922.02 Requirements. Use materials meeting the requirements of Section 961.
Construction
922.03 General. Install waterbars at the locations NOTED ON THE TRAIL LOG.
(a) Native Log or Rock Waterbar PAY ITEM. Where suitable rocks are available within 200 feet either direction along the trail, within 100 feet uphill, or within 50 feet downhill, of the waterbar location, the waterbar shall be constructed of rock. Where suitable rocks are not available, use native timber.
922.04 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912. Backfill and compact suitable material around waterbar. Compact material on the downgrade side flush with the top of the waterbar.
922.05 Rock Waterbar. Tightly embed selected rocks into the trailbed. Place waterbar rocks with tops relatively even, with no sharp points. Use rocks with lengths greater than or equal to 1.5 times their width.
922.06 Log Waterbar. Embed peeled native logs or into the trailbed to form a waterbar across the trail. Use anchor methods as SHOWN ON THE DRAWINGS at log or timber ends outside the trail tread. In the absence of a backslope, anchor the upgrade end of the log or timber waterbar in the same manner as the downgrade end.
922.07 Outlet Drainage. Construct outlet ditches where NOTED ON THE TRAIL LOG or as necessary to provide drainage. Where NOTED ON THE TRAIL LOG or where outlet ditches will not drain within 20 feet, construct an 18-inch diameter drain sump to a minimum depth of 24 inches and located at least 5 feet from edge of trailbed. Fill sump with coarse rock.
Measurement
922.08 Method. Measure the quantities in accordance with Section 906.
Payment
922.09 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
The following will be considered incidental to the PAY ITEMS SHOWN IN THE SCHEDULE OF ITEMS and extra payment will not be given:
Outlet ditches and drain sumps.
Make payment under:
PAY ITEM
PAY UNIT
922(01) Native Log or Rock Waterbar
EA
922(02) Waterbar, Special Diversion. . . . . . . . . . . . . . . . . . . . . . . . EA 922-1 (12/11/2009)