Attachment_5_Fritz Bothun.pdf
PDF 821 KB Posted
- Attached to
- Wetland Restoration Projects Federal contract opportunity
- Solicitation number
- AG-7335-S-10-0014
About this file
Attachment 5
View the file
Other files for this federal contract opportunity
Show all 50
Wetland Restoration Projects has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM SCHEDULE OF ITEMS SPEC.
NO. SUPPLIES/SERVICES NO. QUANTITY UNIT
1 Mobilization 200 1 LS $ XXXXX $
2 251 60 FT $ $
3 Bermudagrass Sprigging 270 15 AC $ $
4 Hay Mulch 276 15 AC $ $
5 Wetland Embankment Extension 723 209 CY $ $
6 Wetland Embankment Repair 723 1 LS $ XXXXX $
Total $
• Offeror________________Date________
• TAX ID#_______
• DUN#_________
Fritz & Bothun – WRP Repair & Vegetation Bid Schedule
SCHEDULE OF ITEMS
Corrugated Metal Pipe (Aluminized Type 2) - 18-inch Barrel w/ flap gate
AMOUNT
UNIT
PRICE
Fritz – Bothun – WRP Vegetation & Repair – CREEK COUNTY January, 2010
SPECIFICATIONS INDEX
Construction Specifications
200 Mobilization / Demobilization
224a Water Control Structure - Prefabricated Control Valves and Flap Gates
251 Corrugated Metal Pipe Conduit
270 Bermudagrass Sprigging
273 Fertilizer
276 Hay Mulch
723 Embankment (Wetland)
CONSTRUCTION SPECIFICATION
200. MOBILIZATION/DEMOBILIZATION
1. SCOPE
The work shall consist of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract.
2. WORK ITEMS
Mobilization/demobilization shall consist of the following:
a. Premiums paid for performance and payment bonds, including coinsurance and reinsurance agreements.
b. Transportation of personnel and equipment to and from the site.
c. Establishment and disassembly/removal of offices, buildings, storage facilities, sanitary facilities, utility service, and other necessary facilities at the site not covered in specific bid items.
d. Establishment of ingress-egress routes not covered in specific bid items.
e. Other items as specified in Section 4 of this specification.
3. MEASUREMENT AND PAYMENT
For items of work for which specific lump sum prices are established in the contract, the quantity of mobilization will not be measured for payment.
Progress payments will be made only to the extent supported by invoice. If the total of such payments is less than the contract lump sum for mobilization, the unpaid balance will be included in the final contract payment. Total payment will be the lump sum contract price for mobilization, regardless of actual cost to the contractor.
Payment will not be made under this item for the purchase costs of materials having a residual value.
Payment of the lump sum contract price for mobilization will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to completion of the work.
Compensation for any item of work described in the contract but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in Section 4 of this specification
NRCS-1/06 200-1
OKLAHOMA
NRCS-12/2009 200-2
OK – Fritz Bothun – WRP – Creek County
4. ITEMS OF WORK AND CONSTRUCTION DETAILS
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item 1, Mobilization
(1) This item consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under this contract.
(2) This item also consists of stabilizing, maintaining, and restoring the ingress-egress road. The ingress-egress road shall be restored back to a condition “as-good-as” or better than it was prior to the start of construction. Before any equipment, supplies, personnel, or any other items required for the execution of work is moved on the project area, there will be a mutual agreement between the Contracting Officer’s Technical Representative and the contractor pertaining to ingress-egress, parking area, and headquarters of the contractor on the site.
(3) The contractor shall be responsible for identifying the location of utilities prior to construction activities and shall notify the Oklahoma One-Call System at least 48 hours prior to starting work at the project site. If any unidentified utilities are encountered after work is initiated, the contractor shall discontinue work and notify the contracting officer immediately.
(4) This item shall also include the securing of any bonds or payment protection, and payment for such, as required by the Contracting Officer under the terms of this contract.
(5) Payment will be made as the work proceeds, after presentation of paid invoices and/or documentation of direct costs by the Contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for the completion of the work.
(6) Due to the Oklahoma Administrative Rule OAC 35: 30-13-3 and the Federal
Regulation 7 CFR 301.81 quarantine for imported fire ants, Solenopsis invicta, all soil moving equipment shall be properly washed and/or otherwise sanitized to remove any and all soil material from the equipment, before mobilizing to the job site(s) and demobilizing from the job site(s).
NRCS-OKLA 224a-1 Fritz – Bothun WRP Creek County 12/2009
224A WATER CONTROL STRUCTURE
PREFABRICATED CONTROL VALVES AND FLAP GATES
The work shall consist of site preparation and installation of the specified prefabricated control valves and/or flap gates for the purpose of regulating the water level in shallow water impoundments for wetlands. Prefabricated structures shall conform to the requirements herein specified.
2. MATERIALS
Flap Gates
The frame shall be cast iron of flatback or spigotback design with seating surface inclined from vertical at a minimum of 2 ½ degrees to assure positive closure. The cast iron cover, with domed construction to withstand maximum seating head, shall have machined seats, and be attached to the frame in such a manner as to allow proper seating and full opening of cover.
Built in stops shall be provided to prevent the cover from rotating sufficiently to become wedged in the open position.
The linkage system shall be of the double pivoted type, attached to fixed, bronze bushed, pivot points on cover and frame. Hinge links shall be structural steel, which along with assembly hardware shall be galvanized.
Gate Valves
The gates shall be self-contained with yoke mounted bench stand operators with rising stem, or self-contained with either non-rising stem extension (NRE) or rising stem extension (RSE), or with separate stem guides and operators, in accordance with the requirements of these specifications. Specific gate design and configuration shall be as noted in gate schedule or shown on plans.
The frame and cover (slide) shall be cast iron with machined seating faces. Seating surfaces of both frame and cover shall be assembled so that maximum clearance between seating faces shall be 0.004 when in fully closed and wedged position. The frame shall be flatback or spigotback, or other special mounting configuration as specified herein or shown on the plans.
Grooves shall be cast on the vertical sides of the cover to match guide angles. The cover shall be of domed design to withstand maximum seating head as specified following:
Gate Size Max. Seating Head (Ft.)
6" - 24" 23 30" - 36" 11 42" - 48" 9 54" - 72" 6
NRCS-OKLA 224a-2 Fritz – Bothun - WRP
12/2009
The guide rails and head rails shall be minimum 1/4-inch thick structural steel, designed and built to withstand the total thrust of the gate slide due to water pressure and wedge action.
There shall be one adjustable cast iron wedge per side, located on the horizontal centerline of the gate. The cover wedge shall be integrally cast with the cover, while the other half of the wedging system shall be attached to the guide rail with two bolts. The wedges shall have smooth bearing surfaces and shall be adjustable to insure effective contact between gate seating surfaces.
The stem shall be cold finished steel of suitable length and ample strength for the intended service. The stem diameter shall be capable of withstanding twice the rated output of the operator at 40-pound pull, and shall be supported such that the L/r ratio for the unsupported part of the stem shall not exceed 200.
When rising stem extension is used the stem extension shall be supported such that a rigid installation shall be provided. Stem guides shall be spaced that the L/r ratio of the stem does not exceed 200.
Manual operated lifting mechanisms shall be as indicated on the plan drawings or in the gate schedule. Handwheel type lifts shall have threaded bronze lift nut to match stem. Threads shall be machine cut, acme type, and right hand unless otherwise specified.
An arrow shall be cast on the handwheel to indicate the direction of rotation to open the gate. A maximum effort of 40 pounds shall be required to operate the gate after it is unseated, based on the maximum specified head.
Combination control valve and flap gate structures
The frame ring and cover slide shall be cast iron with machined seating faces. A cast iron flap cover shall be domed construction and have machined seating faces, or have a resilient rubber seal permanently bonded in a groove and be flush with the surrounding cast iron seat face. The flap cover shall be attached to the cover slide in such a manner as to allow full opening of the cover and prevent jamming of the cover in the open waterway. Flap seat shall be inclined from the vertical a minimum of 2 ½ degrees. Flap cover hinge linkage shall be galvanized structural steel. Pivot points in flap cover and cover slide shall be bronze bushed. Hinge bolts shall be stainless steel. Assembly hardware and structural steel shall be galvanized.
There shall be one adjustable cast iron wedge per side located on the horizontal centerline attached to the structural guides with a minimum of two bolts per wedge, which will provide a practical degree of water tightness between the frame ring and cover slide seating face.
The stem and lift operating mechanism shall consist of a solid round lifting stem, supported so that the slenderness ratio will not exceed 200 (l/r=200) and shall be operated by a lifting device mounted on the head rail or other separate structure. The handwheel or crank type lift will be sized to allow operation of the gate with a 40-pound pull under the maximum operating head.
The lift nut shall be bronze, threaded to match the stem. Threads shall be of the single lead, stub acme type.
Stainless steel shall be used on the rails, links, yoke, stem, and all assembly hardware and fasteners.
NRCS-OKLA 224a-3 Fritz – Bothun WRP
12/2009
3. MEASUREMENT AND PAYMENT
For items of work for which specific unit prices are established in the contract, the number of each size of satisfactorily installed structures will be counted. Payment for the structures will be made at the contract unit price for each size structure satisfactorily installed. Such payment will constitute full compensation for all labor, materials, and equipment including site preparation and incidental earthwork required for installation.
4. ITEMS OF WORK AND CONSTRUCTION DETAILS
Items of work to be performed in conformance with this specification and the construction detail
a. Subsidiary Item, Flap Gate
(1) This item consists of furnishing, assembling, and installing the prefabricated flap gate as specified in the drawings.
(2) Links and bolts shall be stainless steel. The seating face will be bronze.
(3) No separate payment will be made for Flap Gate. Compensation will be included in the payment for Bid Item 2, Corrugated Metal Pipe.
251. CORRUGATED METAL PIPE CONDUITS
The work shall consist of furnishing and placing circular, arched or elliptical corrugated metal pipe and the necessary fittings.
2. MATERIALS
Pipe shall be metallic zinc-coated, aluminum-coated, or aluminum-zinc alloy-coated corrugated steel pipe and fittings conforming to the requirements of ASTM A 742, A 760, A 761, A 762, A 849, A 875, A 885, and A 929 for the specified type, class, fabrication of pipe and coating or as otherwise specified in Section 9 of this specification.
Any special coating in addition to metallic coatings shall be described in Section 9 of this specification. When specified, special coating requirements shall refer equally to both the inside and outside pipe surfaces.
3. COUPLING BANDS AND HARDWARE
Pipe joint coupling bands shall be provided meeting the requirements shown on the drawings or as otherwise specified in Section 9 of this specification.
Hardware consisting of coupling bands and band-fastening devices such as connecting bolts, rods, lugs and angles used in conjunction with zinc-coated iron or steel pipe shall be galvanized by the hot-dip method. Hardware used in conjunction with aluminum pipe and aluminum or aluminum-zinc alloy-coated iron and steel pipe shall be of the same material as the pipe except that hot-dip galvanized or cadmium-plated fasteners may be used. The surface of all band-fastening devices for pipe specified with bituminous or polymer coating shall be coated with asphalt-mastic materials meeting the requirements of ASTM A 849. The coupling band shall be coated similar to that specified for the pipe unless otherwise specified in Section 9 of this specification.
Coupling bands shall be installed to provide straight alignment of the connecting pipe ends. Unless otherwise specified in Section 9 of this specification, the band width shall be as specified in ASTM A 760 and A 762. The bands shall be positioned to overlap adjacent pipe ends equally. The coupling bands shall be corrugated to match the corrugations of the pipe section ends being connected.
4. LAYING AND BEDDING THE PIPE
Unless otherwise specified, the pipe shall be installed in accordance with the manufacturer’s recommendations. Field welding of corrugated galvanized steel pipe will not be permitted. Unless otherwise specified, the pipe sections shall be joined with standard coupling bands.
Perforated pipe shall be laid with the perforations down and oriented symmetrically about a vertical center line. Perforations shall be clear of any obstructions at the time the pipe is laid.
NRCS-1/06 251- 1
5. HANDLING THE PIPE
The contractor shall furnish such equipment as is necessary to place the pipe without damaging the pipe or coatings. The pipe shall be transported and handled in such a manner as to prevent damage to the pipe or coating.
6. REPAIR OF DAMAGED COATINGS
Any damage to the zinc coating shall be repaired by thoroughly wire brushing the damaged area, removing all loose and cracked coating, removing all dirt and greasy material with solvent and painting with two coats of one of the following paint options.
Painting options shall be selected based upon installed exposure of the pipe as determined by the engineer.
Normal exterior or interior atmospheric exposure:
a. Zinc dust - zinc oxide primer, ASTM D 790 and D 520.
b. Singles package, moisture cured urethane prime in silver metallic color.
c. Zinc-rich cold galvanized compound, brush, or aerosol application.
Submergence in water exposure:
a. Zinc dust-zinc oxide primer, ASTM D 790 and D 520.
b. Zinc dust paint, ASTM D 4146.
If the metallic coating is damaged in any individual area larger than 12 square inches, or if more than 0.2 percent of a total surface area of a length of pipe is damaged, the length will be rejected.
Breaks or scuffs in bituminous coatings that are less than 36 square inches in area shall be repaired by the application of two coats of hot asphaltic paint or a coating of cold-applied bituminous mastic. The repair coating shall be at least 0.05 inches thick after hardening and shall bond securely and permanently to the pipe. The material shall meet the physical requirements for bituminous coatings contained in ASTM A 849 and A 885. Whenever individual breaks exceed 36 square inches in area or when the total area of breaks exceeds 0.5 percent of the total surface area of the pipe, the pipe will be rejected.
Bituminous coating damaged by welding of coated pipe or pipe fittings shall be repaired as specified in this section for breaks and scuffs in bituminous coatings.
NRCS-1/06 251- 2
7. EMBEDMENT IN CONCRETE
Special treatment shall be provided to pipe surfaces when embedded or attached to concrete and the pipe material is aluminum or aluminum-coated and aluminum-zinc alloy-coated. Potential contact surfaces in contact with concrete and masonry surfaces shall be coated with two (2) coats of a bituminous paint of the cut-back type. Placement of the pipe shall be such that direct metal-to-metal contact with other metallic materials, such as embedded steel reinforcement or water control gates, is prevented.
8. MEASUREMENT AND PAYMENT
Method 1: For items of work for which specific unit prices are established in the contract, the quantity of each type, class, size and gauge of pipe will be determined to the nearest foot by measurement of the laid length of pipe along the crown of the pipe. Payment for each type, class, size and gauge of pipe will be made at the contract unit price for that type, class, size and gauge of pipe. Such payment will constitute full compensation for furnishing, transporting, and installing the pipe and fittings and all other items necessary and incidental to the completion of the work except items designated as “special fittings”. Payment for special fittings will be made at the contract lump sum price for special fittings (CMP).
Method 2: For items of work for which specific unit prices are established in the contract, the total length of each pipe diameter size will be determined to the nearest foot by measurement of the laid length of pipe along the crown of the pipe and the quantity determined as the product of diameter times length. Payment for each type of pipe will be made at the contract unit price for the diameter-inch-feet of pipe installed. Such payment will constitute full compensation for furnishing, transporting, and installing the pipe, including coupling bands, and all other items necessary and incidental to the completion of the work except items designated as “special fittings”. Payment for special fittings will be made at the contract lump sum price for the special fittings (CMP).
Compensation for any item of work described in the contract but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 9 of this specification.
NRCS-1/06 251- 3
NRCS-12/2009 251- 4
OK – Fritz & Bothun – WRP – Creek County
9. ITEMS OF WORK AND CONSTRUCTION DETAILS
a. Bid Item 2, Corrugated Metal Pipe, 18” ID, Barrel, with flap gate
(1) This item consists of furnishing and installing the pipe, flap gate, and appurtenances to the limits identified on the drawings.
(2) CM Pipe shall meet material specification 551, Type 1 helical corrugations, Aluminized, Type 2 (ASTM 910).
(3) Field joints shall be watertight flanged connections for pipe diameters up to 30”.
Larger pipe diameters shall have watertight coupling bands with annular corrugations and gaskets.
(4) Pipe bedding shall conform to Earthfill Requirements around Metal Conduits –
Construction Specification 723.
(5) Measurement and Payment will be by Method 1. The pipe will be measured along its entire length to the nearest foot.
(6) Items of work subsidiary to this bid item are:
(a) Flap Gate – Construction Specification 224a.
VEGETATIVE SPECIFICATION
270. BERMUDAGRASS SPRIGGING
The work shall consist of furnishing and planting bermudagrass sprigs in designated areas.
2. MATERIALS
Sprigs shall consist of healthy uninjured live stems, runners (stolons), and root divisions (rhizomes) of common or selected bermudagrass. The contractor shall notify the contracting officer representative of the sources of bermudagrass sprigs and secure approval of the sources before any roots are harvested and delivered to the job site. The contractor shall provide the contracting officer representative free access to the source for the purpose of inspection.
Fertilizer shall be a 1-1-1 ratio in a pelleted form and uniformly mixed. Labeling or analysis records shall be in accordance with the Oklahoma Fertilizer Law. Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight.
3. HARVESTING AND STORAGE REQUIREMENTS
Top growth greater than two inches shall be removed from the area from which the sprigs are harvested. Harvested sprigs shall be protected from direct sunlight and wind within 30 minutes of being harvested.
During periods of transportation and storage, the sprigs shall be kept moist and protected from the sun and wind.
4. SITE PREPARATION
Prior to sprigging, the area shall be tilled to a minimum depth as specified in Section 7 of this specification to prepare a smooth firm seedbed of good tilth, free of clods that will be limiting to seeding equipment and free of any competing weedy vegetation.
Fertilizer shall be uniformly applied at a rate not less than 40 pounds of nitrogen, 40 pounds of phosphate (P205), and 40 pounds of potash (K20) per acre.
Fertilizer shall be incorporated into the soil prior to planting or by the planting equipment provided the fertilizer is not applied in such a manner as to be in direct contact with the sprigs.
5. PLANTING
Planting the sprigs shall be between the dates of December 1 and May 31 for that area south of
Interstate Highway 40 with February 15 to May 15 being the optimum. For that area north of Interstate Highway 40, the planting dates shall be between March 1 and June 30 with March 15 to June 1 being the optimum.
NRCS-1/06 270-1
The sprigs shall be planted at the depth specified by the contracting officer representative at the time of planting. The specified depth will be between one and three inches.
Sprigs shall be planted within 24 hours of site preparation. The soil at the time of planting shall be moist and not frozen.
Planting shall be on the approximate contour. The distance between rows shall not exceed 24 inches. Sprigs shall be uniformly distributed at a minimum rate of 30 bushels of sprigs per acre.
In areas accessible to equipment, the sprigs shall be planted with equipment designed for the specific purpose of planting bermudagrass sprigs.
Cover soil shall be firmly packed over the planted sprigs, and the seedbed left in a reasonably smooth condition.
6. MEASUREMENT AND PAYMENT
For items of work for which specific unit prices are established in the contract, bermudagrass sprigging will be measured to the nearest 0.1 acre. Payment for bermudagrass sprigging will be made at the contract unit price. Such payment will constitute full compensation for furnishing all labor, materials, equipment, and all other items necessary and incidental to the performance of the work.
items to which they are made subsidiary are identified in Section 7 of this specification.
NRCS-1/06 270-2
NRCS-12/2009 270-3
OK – Fritz-Bothun WRP – Creek County
7. ITEMS OF WORK AND CONSTRUCTION DETAILS
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item 3, Bermudagrass Sprigging
(1) This item consists of furnishing, fertilizing, and planting bermudagrass (Cynodon) sprigs on finished earthfill slopes and tops of the new and existing wetland embankments, and other disturbed areas as directed by the Contracting Officer’s Representative.
(2) Sprigs shall consist of healthy uninjured live stems, runners (stolons), and root divisions
(rhizomes) of adapted bermudagrass. The contractor shall notify the engineer of the sources of bermudagrass sprigs and secure approval of the sources before any roots are harvested and delivered to the job site. The contractor shall provide the engineer free access to the source for the purpose of inspection.
(a) Prior to harvest, top growth greater than two inches shall be removed from the area where the sprigs are obtained. Harvested sprigs shall be protected from direct sunlight and wind within 30 minutes of being harvested.
(b) During periods of transportation and/or storage, the sprigs shall be kept moist and protected from wind and sunlight.
(c) When day time temperatures exceed 80oF, the sprigs shall be inspected every 2 hours during the day to assure the sprigs are not overheating. If the internal temperature of the pile of sprigs feels hot to the touch, then the sprigs shall be stirred to cool down the sprigs.
(d) Sprigs shall be planted within 30 hours of harvest.
(3) Planting times shall be between March 15 and June 1.
(4) Prior to sprigging, a smooth firm seedbed of good tilth shall be prepared.
(5) Sprigs shall be planted in the following manner:
(a) Within 24 hours of site preparation. The soil at the time of planting shall be moist and not frozen.
(b) Planted at a depth between one and four inches.
(c) Planted on the approximate contour, with a distance between rows not to exceed 24 inches.
(d) Uniformly distributed at a minimum rate of 80 bushels of sprigs per acre.
(e) Manually planted in areas inaccessible to equipment.
NRCS-12/2009 270-4
OK – Fritz-Bothun WRP – Creek County
(6) After planting, the area shall be compacted with a flexible rolling-type soil packer or cultipacker, and left in a smooth condition.
(7) Measurement and Payment will be as specified in Section 6.
(8) Items of work subsidiary to this bid item are:
(a) Fertilizer, Construction Specification 273.
273. FERTILIZING
This work consists of furnishing labor, equipment, and materials for fertilizing on designated areas.
2. MATERIALS
Fertilizer shall be pelleted.
Acceptable sources of nitrogen include:
a. ammonium sulfate - 21% nitrogen
b. ammonium nitrate - 33% nitrogen
c. urea - 45% nitrogen
Complete fertilizer shall be a 1-1-1 ratio in pelleted form and uniformly mixed. This will be 40 pounds nitrogen, 40 pounds of phosphate (P2O5), and 40 pounds of potash (K2O) per acre.
The contractor shall furnish a supplier's certification of analysis and weight.
3. APPLICATION
Fertilizer shall be applied as stated in Section 5, Construction Details. It shall be uniformly applied on the surface.
4. MEASUREMENT AND PAYMENT
For items of work for which specific unit prices are established in the contract, fertilizing will be measured to the nearest one-tenth acre. Payment for fertilizing will be made at the contract unit price. Such payment will constitute full compensation for all labor, materials, equipment and all other items necessary and incidental to the performance of the work.
items to which they are made subsidiary are identified in Section 5 of this specification.
NRCS-1/06 273-1
NRCS-08/2008 273-2
5. ITEMS OF WORK AND CONSTRUCTION DETAILS
a. Subsidiary Item, Fertilizer
(1) This item consists of furnishing and fertilizing the finished earthfill slopes and tops of the new and existing wetland embankments, and other disturbed areas as directed by the Contracting Officer’s Representative. The fertilizer will be placed on the areas to be seeded as described in the Specification 270, Bermudagrass Sprigging.
(2) Labeling or analysis records shall be in accordance with the Oklahoma Fertilizer Law.
Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight.
(3) The fertilizer shall be incorporated into the soil prior to planting or by the planting equipment, provided the fertilizer is not applied in such a manner as to be in direct contact with the sprigs.
(4) No separate payment will be made for Fertilizer. Compensation for this item will be included in the payment for Bid Item 3, Bermudagrass Sprigging.
276. HAY MULCH
The work shall consist of furnishing and placing hay mulch as specified on the designated areas.
2. MATERIALS
Native prairie, weeping lovegrass, small grain or introduced bluestem hay are choices that shall be used as mulch material. The hay must be of such quality that it can be well anchored to the soil.
Brittle or rotted hay, johnsongrass hay, or hay with more than a trace of annual brome and threeawn are not acceptable. Weight tickets shall be furnished at the time of delivery.
3. APPLICATION
The hay mulch shall be uniformly applied at the rate of 1 pound per square yard (4,840 pounds per acre). The mulch shall be anchored a minimum of 2 inches into the soil on the approximate contour. Disc spacing should not exceed 10 inches. A minimum of forty percent of the hay mulch shall remain on the surface after anchoring. Spreading and anchoring shall be done by hand on areas where other equipment cannot operate. Spreading and anchoring shall be done the same day as spreading.
4. MEASUREMENT AND PAYMENT
For items of work for which specific unit prices are established in the contract, hay mulch will be measured to the nearest one-tenth acre. Payment for hay mulch will be made at the contract unit price. Such payment will constitute full compensation for all labor, materials, equipment and all other items necessary and incidental to the performance of the work.
items to which they are made subsidiary are identified in Section 5 of this specification.
NRCS-1/06 276-1
NRCS-12/2009 276-2
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item 4, Hay Mulch
(1) This item consists of furnishing and placing hay mulch on finished earthfill slopes and tops of the new and existing wetland embankments, and other disturbed areas as directed by the Contracting Officer’s Representative.
(2) Hay Mulch shall be placed after application of vegetative materials and fertilizer have been properly applied.
(3) Measurement and payment will be as specified in Section 4 for this specification.
NRCS-OKLA 723 - 1 Fritz & Bothun - WRP
7/2009
723. EMBANKMENT (WETLAND)
The work shall consist of site preparation and construction of earth embankments for restoration or creation of wetland areas. Work area shall be limited to areas required for borrow material and embankment construction.
2. MATERIALS
All fill materials shall be obtained from designated borrow areas.
Fill materials shall be reasonably free of sod, brush, roots, frozen material, or other perishable materials. Rocks larger than 6" will not be placed in the fill.
Topsoil shall consist of friable surface soil reasonably free of grass, roots, weeds, sticks, stones, or other foreign materials which inhibit operation of equipment used in revegetation activities.
The moisture content of the fill material shall be adequate for obtaining the required compaction. Material that is too wet shall be dried to meet this requirement, and material that is too dry shall be wetted and mixed until the requirement is met.
As a minimum, the fill material shall contain enough moisture to be able to form a ball when squeezed in the hand and will not separate when tapped with a pencil. Dry foundation materials shall have moisture applied to the top six inches to meet that required for fill material prior to placement of the first layer of fill. Uniform moisture distribution shall be obtained by disking.
3. EMBANKMENT
The foundation area shall be cleared of trees, logs, stumps, roots, brush, boulders, sod, and rubbish. Topsoil and sod shall be stripped to a depth of six inches, and stockpiled. Sod of acceptable quality will be spread on the completed embankment.
Sod found to be unsuitable for spreading on the completed embankment may remain in piles in the pool area or be uniformly spread over other disturbed areas away from the embankment. If the borrow and embankment area have standing vegetation such as crop residue or woody vegetation, that area will be prepared by removing this material. This may be accomplished by several acceptable methods. This material may be removed with a dozer and bunched or piled in an approved location for wildlife cover. The material may be removed by burning. The burning must comply with all applicable regulations and be performed with sufficient trained personnel to be accomplished safely. The material may be removed by "brush-hogging". The "brush-hogging" will be at a height not to exceed 4" and at a speed that will insure pulverizing the materials.
NRCS-OKLA 723 - 2 Fritz & Bothun - WRP
The placing and spreading of fill material shall be started at the lowest point of the foundation and the fill brought up in layers not to exceed 10 inches in thickness prior to compaction. Construction equipment shall be operated over each layer of fill to insure that the required compaction is obtained.
Fill within 2 feet and adjacent to structures, pipe conduits, and drainfill or antiseep collars shall be compacted to a density equivalent to that of the surrounding fill by hand tamping or by using manually directed power tampers or plate vibrators. Fill compacted manually shall be placed in lifts not to exceed 4 inches in thickness.
Manual compaction shall continue to a level 2 feet above the structure at which point equipment compaction may resume unless prohibited by the particular structure specification. Fill adjacent to concrete structures shall not be compacted within 24 hours of form removal.
Fill material shall be placed in uniform layers approximately 10 inches thick with the equipment routed to give the best compaction practical. Where dozer equipment is used, the material in the downstream portion of the fill shall be compacted by running the equipment lengthwise of the embankment at regular intervals. This should be done (in addition to ordinary equipment routing over the 10-inch lifts) at least once for each 20 to 30 inch lift. Other methods that will give equivalent compaction will be satisfactory. Both faces of the dam must be compacted and smooth.
Settlement Allowance - Allowance for settlement will be based on type of equipment placing the majority of the fill.
Type of Equipment Percent Fill Height Scraper-Carry All 5 Dozer 10 Terracing Machine & Motor Grader 15 Dragline-Trackhoe 20
Where practical, embankments will be curved or serpentine. Embankments shall be staked by locating centerline, toes, or reference stakes or any combination. Fills shall be written on stakes with sufficient frequency to insure understanding by the contractor. Staking will be performed by the government. The completed work shall conform to the lines, grades, and elevations shown on the drawings or as staked in the field.
4. MEASUREMENT AND PAYMENT
Method 1: For items of work for which specific unit prices are established in the contract, the volume of earth fill placed within the embankment will be measured and computed to the nearest cubic yard by the method of average cross sectional end areas. Unless otherwise specified, no deduction in volume will be made for embedded conduits and appurtenances. Payment for this item will be to the nearest cubic yard.
Method 2: For items of work for which specific lump sum prices are established in the contract, quantities of earthfill will not be measured. Payment will be made at the contract lump sum prices.
NRCS-OKLA 723 - 3 Fritz & Bothun - WRP
Payment for embankments will be made at the contract unit price using the quantities determined in method 1or 2 as specified in the contract. Such payment will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to the performance of the work.
Items of work to be performed in conformance with this specification and construction details are:
a. Bid Item 5, Wetland Embankment Extension
(1) This item consists of performing work necessary to construct the embankment extension to the lines and grades as shown on the drawings or as staked in the field.
(2) Measurement and payment will be by Method 1.
b. Bid Item 6, Wetland Embankment Repair
(1) This item consists of performing work necessary to repair the flood damage to the embankments back to the lines and grades as shown on the drawings or as staked in the field.
(2) Measurement and payment will be by Method 2.
Ingress-Egress Road
§̈¦44
§̈¦44
OP48
OP66
Depew
Creek
21 19
23 24
20 2219
31363432 3531 33 32
26 25
3030 29
Fritz-Bothun WRP Vicinity Map
³
8,000 0 8,0004,000 Feet
Ingress - Egress off County Road
6 5
7 8
5 26 4 3
33 34
2829 27 2630 2525
Fritz - Bothun WRP Ingress - Egress Route
| Fritz & Bothun Bid Schedule |
| Bid Schedule |
| Specification page |
| 200 |
| 200-w |
| Flap gate 224a |
| 251 |
| 251-w |
| 270 |
| 270-w |
| 273 |
| 273-w |
| 276 |
| 276-w |
| 723_cs |
| Fritz & Bothun 723 |
| Fritz Bothun Vicinity Map |
| Fritz Bothun Ingress Egress |
| Fritz & Bothun -Sheet 1 |
| Fritz & Bothun -Sheet 2 |
File details come from the government source that posted it. Updated .