Attachment_11_Baker West.pdf

PDF 4 MB Posted

Attached to
Wetland Restoration Projects Federal contract opportunity
Solicitation number
AG-7335-S-10-0014
Issued by
Department of Agriculture National Resources Conservation Service

About this file

Attachment 11

View the file

Other files for this federal contract opportunity

Other files attached to Wetland Restoration Projects, newest first.
File Type Posted
AG-7335-10-S-0014 bid abstract.xlsx XLSX spreadsheet
Attachment_39_Q A.docx DOCX document
SF_30_continuation_page.docx DOCX document
S_30.pdf PDF
Attachment_36_supplemental_pages_for_Attachment_10.pdf PDF
SF_30_continuation_page.docx DOCX document
Attachment_37_supplement_to_Attachment_12.docx DOCX document
SF30.pdf PDF
Attachment_35_Change_page_59_for_Attachment_12.docx DOCX document
Attachment_38_Tom_Way_Site_Visit_Sign-in.pdf PDF
Attachment_33_Baker_Site_Visit_Sign-in.pdf PDF
SF30_Block_14_Continuation.docx DOCX document
SF1442 - conformed copy of sol.pdf PDF
AG-7335-S-10-0014-0004_SF_30.pdf PDF
Attachment_32_Page_1_Fritz_Bothun.pdf PDF
Attachment_31_Roten_Site_Visit_Sign-in.pdf PDF
Attachment_27_Fritz-Bothun_Sign-in.pdf PDF
SF30.pdf PDF
Attachment_29_Page_251-4_Vigeant_ Hayes.pdf PDF
Attachment_30_Page_68of68_Attachment_12.pdf PDF
Attachment_28_April_29_Sign-in.pdf PDF
Attachment_17_Roberts_Sign-in.pdf PDF
SF_30_Block_14_Continuation.docx DOCX document
Attachment_25_Amend_0002_Fritz Bothun.pdf PDF
Attachment_18_Newsom_Sign-in.pdf PDF
Attachment_26_Stout_Sign-in.pdf PDF
Attachment_21_Replace_P58of_Attachment_0012.pdf PDF
Attachment_23_Replace_P723-4_Attach_11.pdf PDF
Attachment_20_Replace P1of_Attachment_0012.pdf PDF
Attachment_22_Page_045-8of_Attachment_0011.pdf PDF
SF30_Amendment_0002.pdf PDF
Attachment_24_Tom_Way_Sign-in.pdf PDF
Attachment_16_April_22_Brixey-Hicks_Sign-in.pdf PDF
Attachment_13_Tom_Way.pdf PDF
AG-7335-S-10-0014-0001.pdf PDF
SF30_Continuation.rtf RTF text file
Attachment_14_April_19_Pre-Bid_Sign-in.pdf PDF
Attachment_15_April_20_Pre-Bid_Sign-in.pdf PDF
Attachment_6_Brixey Hicks.pdf PDF
Attachment_12_Vigeant Hayes.pdf PDF
Attachment_5_Fritz Bothun.pdf PDF
Attachment_8_Roberts.pdf PDF
Attachment_9_Newsome.pdf PDF
Attachment_4_Stout.pdf PDF
Attachment_7_Roten.pdf PDF
AG-7335-S-10-0014.rtf RTF text file
Attachment_1_Local Instructions.docx DOCX document
SF1442.pdf PDF
Attachment_10_Hoogendoorn.pdf PDF
Attachment_3_WD_Creek_Rogers_Counties.docx DOCX document
Show all 50

Wetland Restoration Projects has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

BAKER WRP AND WEST WRP

OTTAWA COUNTY AND ROGERS COUNTY, OKLAHOMA

Item Description Spec. Unit No. No. Quantity Unit Price Amount

1 Mobilization 200 1 LS $ XXXXXX $__________

2. Water Control Structure 045 5 EA $ ________ $__________ Barrel and Riser - PVC

3. Embankment 723 3050 FT $ ________ $__________

4. Structure Removal 202 1 LS $ XXXXXX $__________

5. Vegetation Treatment 275 1 LS $ XXXXXX $__________

6 Mobilization 200 1 LS $ XXXXXX $__________

7 Excavated Swale 729 5 EA $ ________ $__________

8 Island 728 1 EA $ ________ $__________

9 Circular Pond 729 2 EA $ ________ $__________

10 Vegetation Treatment 275 1 LS $ XXXXXX $__________

TOTAL: $_____________

OFFEROR

TAX ID

DUNS #

AWARD RESTRICTION (AUG 1987 NRCS, AMB)

One aware for the aggregated of all Items will be made under this solicitation.

W E

S T

W R

P B

A K

E R

W R

P

SUB-TOTAL:

SUB-TOTAL:

CONSTRUCTION SPECIFICATION

200. MOBILIZATION/DEMOBILIZATION

1. SCOPE

The work shall consist of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract.

2. WORK ITEMS

Mobilization/demobilization shall consist of the following:

a. Premiums paid for performance and payment bonds, including coinsurance and reinsurance agreements.

b. Transportation of personnel and equipment to and from the site.

c. Establishment and disassembly/removal of offices, buildings, storage facilities, sanitary facilities, utility service, and other necessary facilities at the site not covered in specific bid items.

d. Establishment of ingress-egress routes not covered in specific bid items.

e. Other items as specified in Section 4 of this specification.

3. MEASUREMENT AND PAYMENT

For items of work for which specific lump sum prices are established in the contract, the quantity of mobilization will not be measured for payment.

Progress payments will be made only to the extent supported by invoice. If the total of such payments is less than the contract lump sum for mobilization, the unpaid balance will be included in the final contract payment. Total payment will be the lump sum contract price for mobilization, regardless of actual cost to the contractor.

Payment will not be made under this item for the purchase costs of materials having a residual value.

Payment of the lump sum contract price for mobilization will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to completion of the work.

Compensation for any item of work described in the contract but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in Section 4 of this specification

NRCS-1/06 200-1

OKLAHOMA

NRCS- 12/06 200-2

OK – Baker/West WRP, Miami FO/Claremore FO

4. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details are:

a. Bid Item 1 & 6, Mobilization

(1) This item consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under this contract including stabilization and maintenance of the ingress-egress road.

NRCS-1/06 202-1

202. DEBRIS AND/OR STRUCTURE REMOVAL

The work consists of the removal, salvage and disposal of debris and structures

(including fences) from the designated areas.

2. REMOVAL

All structures designated in the contract for removal shall be removed to the specified extent and depth.

3. SALVAGE

Structures that are designated to be salvaged shall be carefully removed and neatly placed in the specified storage areas. Salvaged structures that are capable of being disassembled shall be dismantled into individual members or sections. Such structures shall be neatly match-marked with paint prior to disassembly. All pins, nuts, bolts, washers, plates, and other loose parts shall be marked or tagged to indicate their proper locations in the structure and shall be fastened to the appropriate structural member or packed in suitable containers. Materials from fences designated to be salvaged shall be placed outside the work area on the property from which they were removed. Wire shall be rolled into uniform rolls of convenient size. Posts and rails shall be neatly piled.

4. DISPOSAL OF REFUSE MATERIALS

Unless otherwise specified, refuse materials resulting from debris and structure removal shall be burned or buried at locations shown on the drawings or as specified in Section 6 of the specification.

Buried material shall have a minimum earthfill cover of not less than 2 feet. The cover shall be placed in two lifts with each lift compacted by traversing the entire surface with one tread track of the material placement equipment. The top lift shall be mounded at least 6 inches higher than the surrounding undisturbed area to prevent unsightly depressions after settlement. The finished surface of the disposal area shall be uniformly graded to prevent ponding of water.

NRCS-1/06 202-2

5. MEASUREMENT AND PAYMENT

For items of work for which specific lump sum prices are established in the contract, payment for debris or structure removal will be made at the contract lump sum price.

Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.

Compensation for any item of work described in the contract but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in Section 6 of this specification.

NRCS-12/06 202-3

OK – Baker/West WRP, Miami FO/Claremore FO.

6. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details are:

a. Bid Item 4, Structure Removal

(1) This item consists of the removal of existing WCS as designated in the drawings.

(2) Material may be buried within Unit 1, no closer than 100 ft. of the toe of the embankment, and/or salvaged and removed from site.

(3) WCS No.1 will be installed at this location.

(210-VI-NEH, May 2001) 45–1

Construction Specification 45—Plastic Pipe

1. Scope The work consists of furnishing and installing plastic pipe (except corrugated polyethylene tubing) and the necessary fittings and appurtenances as shown on the drawings or as specified herein.

2. Material Pipe, fittings, and gaskets shall conform to the requirements of Material Specification 547, Plastic Pipe, and as specified in section 14 of this specification or as shown on the drawings.

Perforated pipe shall conform to the requirements of Material Specification 547, Plastic Pipe, and as specified in section 14 of this specification or as shown on the drawings.

Unless otherwise specified, concrete shall conform to the requirements of Construction Specification 32, Structure Concrete, and section 8 of this specification.

Unless otherwise specified, earth backfill shall conform to the requirements of Construction Specifica-tion 23, Earthfill.

Unless otherwise specified, drainfill shall conform to the requirements of Construction Specification 24, Drainfill.

3. Handling and storage Pipe shall be delivered to the job site and handled by means that provide adequate support to the pipe and do not subject it to undue stresses or damage. When handling and placing plastic pipe, care shall be taken to prevent impact blows, abrasion damage, and gouging or cutting (by metal edges and/or surface or rocks). The manufacturer's special handling requirements shall be strictly observed. Special care shall be taken to avoid impact when the pipe must be handled at a temperature of 40 degrees Fahrenheit or less.

Pipe shall be stored on a relatively flat surface so that the barrels are evenly supported. Unless the pipe is specifically manufactured to withstand exposure to ultraviolet radiation, it shall be covered with an opaque material when stored outdoors for 15 days or longer.

4. Excavation Excavation shall be in accordance with Construction Specification 21, Excavation, and section 14 of this specification or as shown on the drawings.

The pipe foundation shall be excavated a minimum of 4 inches lower than the pipe grade shown on the drawings or staked in the field whenever bedrock, boulders, cobbles, or other material that may cause pipe damage is encountered at planned pipe grade.

5. Laying the pipe Plastic pipe conduits complete with fittings and other related appurtenances shall be installed to the lines and grades shown on the drawings or specified in section 14 of this specification. The pipe shall be installed so that there is no reversal of grade between joints unless otherwise shown on the drawings.

The pipe shall not be dropped or dumped on the bedding or into the pipe trench. The ground surface near the pipe trench shall be free of loose rocks and stones greater than 1 inch in diameter. This ensures that rock will not be displaced and impact the pipe.

(210-VI-NEH, May 2001)45–2

Just before placement, each pipe section shall be inspected to ensure that all foreign material is removed from inside the pipe. The pipe ends and the couplings shall be free of foreign material when assembled.

At the completion of a work shift, all open ends of the pipeline shall be temporarily closed off using a suitable cover or plug.

Care shall be taken to prevent distortion and damage during hot or cold weather. During unusually hot weather (daytime high temperature of more than 90 °F), the pipe assembled in the trench shall be lightly backfilled or shaded to keep it as near to ground temperature as possible until final backfill is placed.

Backfill operations should be performed during daily construction periods when the ground temperature and the temperature of the pipe do not vary more than 40 degrees Fahrenheit.

Perforated pipe shall be installed with the perforations down and oriented symmetrically about the vertical centerline. Perforations shall be clear of any obstructions on the inside and outside of the pipe when the pipe is approved by the engineer for backfill.

During installation, the pipe shall be firmly and uniformly bedded throughout its entire length, to the depth and in the manner specified in section 14 of this specification or as shown on the drawings. Bell-holes shall be placed in bedding material under bells, couplings, and other fittings to assure the pipe is uniformly supported throughout its entire length. Blocking or mounding beneath the pipe to bring the pipe to final grade is not permitted.

6. Pipe embedment Earth bedding—The pipe shall be firmly and uniformly placed on compacted earthfill bedding or an inplace earth material bedding of ample bearing strength to support the pipe without noticeable settle-ment. The earth material on which the pipe is placed shall be of uniform density to prevent differential settlement.

Unless otherwise specified, a groove that closely conforms to the outside surface of the pipe shall be formed in the bedding. The depth of the groove shall be equal to or greater than 0.3 of the pipe diameter.

Earth bedding shall be compacted to a density not less than adjacent undisturbed inplace earth material or be compacted earth backfill. Earthfill material used for compacted earth bedding shall be free of rocks or stones greater than 1 inch in diameter and earth clods greater than 2 inches in diameter. The pipe shall be loaded sufficiently during the compaction of bedding under the haunches and around the sides of the pipe to prevent displacement from its final approved placement.

Sand, gravel, or crushed rock bedding—When sand, gravel, or crushed rock bedding is specified, the pipe shall be firmly and uniformly placed on the bedding material. Material for bedding shall not exceed 1 inch in diameter. Unless otherwise specified in section 14 of this specification or shown on the draw-ings, the coarse-grained bedding material shall be carefully placed and compacted to a depth equal to or greater than 0.3 of the diameter of the pipe above the bottom of the pipe. The pipe shall be loaded suffi-ciently during backfilling and compaction around the sides to prevent displacement of the pipe from its final approved placement.

Pipe encased in drainfill—The pipe shall be firmly and uniformly placed on bedding of specified drainfill. Drainfill shall be placed and compacted as specified in section 14 of this specification or as shown on the drawings to form a continuous uniform support around the entire circumference of the pipe. The pipe shall be loaded sufficiently during backfilling around the sides and during compaction to prevent displacement of the pipe.

(210-VI-NEH, May 2001) 45–3

7. Backfill Initial backfill—Unless otherwise specified, initial backfill to 6 inches above the top of the conduit is required. Earth haunching and initial backfill material shall consist of soil material that is free of rocks, stones, or hard clods more than 1 inch in diameter. Coarse backfill material shall be the specified sand, gravel, crushed rock, or drainfill material.

Initial backfill shall be placed in two stages. In the first stage (haunching), backfill is placed to the pipe spring line (center of pipe). In the second stage, it is placed to 6 inches above the top of the pipe.

The first stage material shall be worked carefully under the haunches of the pipe to provide continuous support throughout the entire pipe length. The haunching backfill material shall be placed in layers that have a maximum thickness of about 6 inches and are compacted as specified in section 14 of this specifi-cation or as shown on the drawings. During compaction operations, care shall be taken to ensure that the tamping or vibratory equipment does not come in contact with the pipe and the pipe is not deformed or displaced.

When pressure testing is not specified, the pipe shall be covered with a minimum of 6 inches of backfill material as soon as possible following assembling of the pipe in the trench, but not later than within the same day that placement has occurred. When pressure testing is specified, sufficient backfill material shall be placed over the pipe to anchor the conduit against movement during pressure testing activities.

Final backfill—Final backfill shall consist of placing the remaining material required to complete the backfill from the top of the initial backfill to the ground surface, including mounding at the top of the trench. Final backfill material within 2 feet of the top of the pipe shall be free of debris or rocks larger than 3 inches nominal diameter. Coarse backfill material shall be the specified sand, gravel, crushed rock, or drainfill. Final backfill shall be placed in approximately uniform, compacted layers. Final back-fill compaction requirements shall be as specified in section 14 of this specification or as shown on the drawings.

Vehicles or construction equipment shall not be allowed to cross the pipe until the minimum earth cover and required density as specified in section 14 of this specification has been obtained.

8. Pipe encasement in concrete Concrete encasement shall be carefully placed to form a continuous uniform support around the entire circumference of the pipe as specified in section 14 of this specification or as shown on the drawings.

Pipes encased in concrete shall be securely anchored to prevent movement of the pipe during concrete placement. A clear distance of 1.5 inch shall be maintained between the pipe and the reinforcing steel.

The concrete for the encasement shall conform to the requirements of Construction Specification 32, Structure Concrete, for Class 3000M concrete unless otherwise specified.

9. Joints Unless otherwise specified in section 14 of this specification or shown on the drawings, joints shall be either bell and spigot type with elastomeric gaskets, coupling type, solvent cement bell and spigot, or jointed by butt heat fusion. When a lubricant is required to facilitate joint assembly, it shall be a type having no deleterious affect on the gasket or pipe material.

Pipe joints shall be watertight at the pressures specified except where unsealed joints are indicated.

Pipe shall be installed and joined in accordance with the manufacturer's recommendations. Laying de-flections and joint fitting or stab depths shall be within the manufacturer's recommended tolerances.

(210-VI-NEH, May 2001)45–4

When solvent cement joints are specified for PVC or ABS pipe and fittings, they shall be made in accor-dance with the following ASTMs and the related appendix of each ASTM; D 2855 for PVC pipe and fit-tings and D 2235 for ABS pipe and fittings.

Flanged, banded, heat-fusion, or elastomeric-sealed mechanical joints shall be used when joining poly-ethylene (PE) and high density polyethylene (HDPE) pipe and fittings unless otherwise specified in section 14 of this specification or as shown on the drawings.

Pipe ends shall be cut square and be deburred to provide a uniform, smooth surface for the jointing process. Reference marks shall be placed on the spigot ends to assist in determining when proper seat-ing depth has been achieved within the joint.

10. Fittings Unless otherwise specified, steel fittings, valves, and bolted connections shall be painted or coated as recommended by the manufacturer.

Fittings for nonpressure pipe shall be of the same or similar material as the pipe and shall provide the same durability, watertightness, and strength as the pipe unless otherwise specified.

11. Thrust blocks and anchors When specified, concrete thrust blocks and anchors shall be installed as shown on the drawings or speci-fied in section 14 of this specification.

The concrete for the thrust blocks and anchors shall conform to the requirements of Construction Speci-fication 32, Structure Concrete, for Class 3000M concrete unless otherwise specified in section 14 of this specification.

The thrust block cavity shall be hand dug into undisturbed soil or previously placed compacted backfill.

The cavity shall be formed with soil or wood to hold the freshly placed concrete without displacement until an initial set has occurred.

When excavation beyond the designated trench widths and depths as shown on the drawings or speci-fied in section 14 of this specification occurs at locations where installation of concrete thrust blocks is required, the contractor shall install an alternative thrust block provision. The concrete thrust block shall have a thickness of one pipe diameter and a contact face area that shall be formed against the pipe as shown on the drawings or specified in section 14 of this specification. Backfill shall be placed on all sides of the thrust block and to the sides of the excavation. It shall be compacted as specified for initial backfill.

12.Pressure testing Method 1—Pressure testing of the completed conduit is not required.

Method 2—The conduit shall be tested for leaks in the following manner:

a. Before pressure testing:

(1) Joints of the assembled pipeline shall be allowed to cure as recommended by the manufacturer.

(2) Pipeline shall be flushed and cleaned.

(3) All concrete anchors and thrust blocks shall be in place and allowed to cure for a minimum of 3 days.

(4) Earth backfill shall be sufficient to anchor the conduit against movement during the pressure testing and shall be compacted as specified in Section 14 of this specification or as shown on the drawings.

(210-VI-NEH, May 2001)

(5) The conduit shall be braced, anchored, or both, at each end to restrict all potential pipe move-ment.

(6) The ends of the conduit shall be plugged. The upstream plug shall have a standpipe installed vertically having a minimum diameter of 2 inches and shall be equipped with a shutoff valve.

All high points in the line shall be vented to evacuate air pockets. The conduit and the standpipe shall be slowly filled with water such that no air is entrapped during the filling op-eration. After filling is complete, all vents shall be closed.

b. During pressure testing, the water level in the standpipe shall be continuously maintained at a minimum of 10 feet above the highest invert elevation of the conduit for no less than 2 hours un-less otherwise specified in section 14 of this specification or as shown on the drawings.

The volume of water leakage in the 2-hour test period shall be recorded. The maximum allowable leakage (L) in gallons per hour shall not exceed 0.02 times the nominal pipe diameter (D) in inches for each 1,000 feet of pipe line, which is about 50 pipe joints (L = 0.02 x D).

c. When observed leakage exceeds the allowable, leaks shall be sealed by replacement of pipe and fittings as necessary. The conduit shall be retested as described above. This procedure shall be repeated until the conduit leakage does not exceed the allowable specified above.

The contractor shall be fully responsible for any and all work required to correct leakage exceed-ing the amount specified.

Method 3—The conduit shall be tested for leaks in the following manner:

a. Before pressure testing:

(1) Joints of the assembled pipeline shall be allowed to cure as recommended by the manufac-turer.

(2) Pipeline shall be flushed and cleaned.

(3) All concrete anchor and thrust blocks shall be in place and allowed to cure for at least 3 days.

(4) Earth backfill shall be sufficient to anchor the conduit against movement during the pressure testing and compacted as specified in section 14 of this specification or as shown on the draw-ings.

(5) The conduit shall be braced and/or anchored at each end to prevent all potential pipe move-ment.

(6) The ends of the conduit shall be plugged, and a pressure gauge shall be attached to the up-stream and downstream ends. All high points along the pipeline shall be vented to permit the complete removal of all air within the pipeline. The conduit shall be slowly filled with water such that no air is entrapped during the filling operations.

b. The testing pressure specified in section 14 of this specification shall be continuously maintained at the upstream gauge for a minimum of 2 hours. The pressure at the downstream gauge shall not exceed the pressure rating of the pipe.

c. The volume of water leakage for the 2-hour test period shall be recorded. Maximum allowable leakage shall be in accordance with the following:

45–5

Allowable leakage for plastic pipe (gal/hr/1,000 feet, or 50 pipe joints) 1/

Nominal Test pressure in the pipeline (lb/in2) pipe size 50 100 150 200

(in) - - - - - - - - Allowable leakage - - - - - - -

4 .19 .27 .33 .38 6 .29 .41 .50 .57 8 .38 .54 .66 .76 10 .48 .68 .83 .96 12 .57 .81 .99 1.15 14 .67 .95 1.16 1.34 15 .72 1.02 1.25 1.44 16 .76 1.07 1.32 1.52 18 .86 1.22 1.49 1.72

1/ Computation basis L

ND P=

7 400, where:

L = allowable leakage in gallons per hour N = number of joints (pipe and fittings) D = nominal diameter of pipe in inches P = test pressure in pounds per square inch

d. When observed leakage exceeds the allowable, leaks shall be sealed by replacement of pipe and fittings as necessary. The conduit shall be retested as described in this section. The procedure shall be repeated until the conduit leakage does not exceed the allowable specified above.

The contractor shall be fully responsible for any and all work required to correct leakage exceed-ing the amount specified.

13. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the quantity of each kind, size, and class of pipe is determined to the nearest foot by measurement of the laid length along the crown centerline of the conduit. Payment for each kind, size, and class of pipe is made at the contract unit price for that kind, size, and class. Such payment constitutes full compensation for furnish-ing, transporting, and installing the pipe including excavation, shoring, backfill, bedding, thrust blocks, and all fittings, appurtenances, and other items necessary and incidental to the completion of the work.

Payment for appurtenances listed separately in the bid schedule is made at the contract prices for those items.

Method 2—For items of work for which specific unit prices are established in the contract, the quantity of each kind, size, and class of pipe is determined as the sum of the nominal laying lengths of the sec-tions used. Payment for each kind, size, and class of pipe is made at the contract unit price for the kind, size, and class. Such payment constitutes full compensation for furnishing, transporting, and installing the pipe including excavation, shoring, backfill, bedding, thrust blocks, and all fittings, appurtenances, and other items necessary and incidental to the completion of the work. Payment for appurtenances listed separately in the bid schedule is made at the contract prices for those items.

45–6

Method 3—For items of work for which specific unit prices are established in the contract, the quantity of each kind, size, and class of pipe is determined to the nearest foot by measurement of the laid length along the crown centerline of the conduit. Payment for each kind, size, and class of pipe is made at the contract unit price for the kind, size, and class. Such payment constitutes full compensation for furnish-ing, transporting, and installing the pipe including shoring, all fittings, thrust blocks, appurtenances, and other items necessary and incidental to the completion of the work. Payment for appurtenances listed separately in the bid schedule is made at the contract prices for those items.

Method 4—For items of work for which specific unit prices are established in the contract, the quantity of each kind, size, and class of pipe is determined as the sum of the nominal laying lengths of the pipe sections used. Payment for each kind, size, and class of pipe is made at the contract unit price for that kind, size, and class. Such payment constitutes full compensation for furnishing, transporting, and in-stalling the pipe including shoring, all fittings, thrust blocks, appurtenances, and other items necessary and incidental to the completion of the work. Payment for appurtenances listed separately in the bid schedule is made at the contract prices for those items.

Methods 3 and 4—Excavation, backfill, and bedding is paid separately under their respective bid items.

All measurement and payment methods—Compensation for any items of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 14 of this specification.

14. Items of work and construction details

45–7

NRCS- 12/06 045- 8

OK-Baker/West WRP, Miami FO/Claremore FO.

14. ITEMS OF WORK AND CONSTRUCTION DETAILS

a. Bid Item 2, Water Control Structure, Barrel and Riser - PVC

(1) This item consists of furnishing and installing the plastic PVC pipe and riser including the anti-seep collars and the guards to the limits identified on the

(2) Plastic Pipe shall meet Material Specification 547, Schedule 40 PVC (ASTM D 2122)

(3) Risers will be Inline AgriDrain – 1@3’x12’’, 2@4’x12” and 2@2’x12”, PVC or equivalent.

(4) Field joints shall be watertight connections for pipe. Pressure Testing Method 1.

(5) Pipe bedding shall conform to Embankment Requirements around Plastic Pipe – Construction Specification 723.

(6) Measurement and Payment will be for items of work for which specific unit prices are established in the contract, the quantity of each Water Control Structure and its pipe along with the connections. Such payment constitutes full compensation for furnishing, transporting, and installing the pipe including shoring, all fittings, thrust blocks, appurtenances, and other items necessary and incidental to the completion of the work.

(7) The exposed ends (6 feet) of the PVC pipe shall be protected from UV radiation.

Use latex (water based) paint. Preparation of the surface area before painting is critical and follows: Pipe should be cleaned to remove dirt and moisture, oil. The pipe should be wiped with a clean dry cloth. Petroleum-based paints are not acceptable since the presence of petroleum will prevent proper bonding of pipe.

b. Items of work subsidiary to this bid item are:

(1) Installation of the Antiseep Collars and installation of Trash Guards and Outlet Rat Guards on each Water Control Structure, 5 required, as specified in the drawings

Part 642

National Engineering Handbook

National Standard Material

Specifications

Chapter 3

(210-VI-NEH, November 2005)

1. Scope

This specification covers the quality of Poly Vinyl Chloride (PVC), Polyethylene (PE), High Density Polyethylene (HDPE), and Acrylonitrile-Butadi-ene-Styrene (ABS) plastic pipe, fittings, and joint materials.

2. Material

Pipe—The pipe shall be as uniform as commer-cially practicable in color, opaqueness, density, and other specified physical properties. It shall be free from visible cracks, holes, foreign inclusions, or other defects. The dimensions of the pipe shall be measured as prescribed in ASTM D 2122.

Unless otherwise specified, the pipe shall con-form to the requirements listed in this specifica-tion and the applicable reference specifications in table 547–2, the requirements specified in Con-struction Specification 45, Plastic Pipe, and the requirements shown on the drawings.

Fittings and joints—Fittings and joints shall be of a schedule, SDR or DR, pressure class, exter-nal load carrying capacity, or pipe stiffness that equals or exceeds that of the plastic pipe. The dimensions of fittings and joints shall be compat-ible with the pipe and measured in accordance with ASTM D 2122. Joint and fitting material shall be compatible with the pipe material. The joints and fittings shall be as uniform as commercially practicable in color, opaqueness, density, and other specified physical properties. It shall be free from visible cracks, holes, foreign inclusions, or other defects.

Fittings and joints shall conform to the require-ments listed in this specification, the require-ments of the applicable specification referenced in the ASTM or AWWA specification for the pipe, the requirements specified in Construction Specification 45, and the requirements shown on the drawings.

Solvents—Solvents for solvent welded pipe joints shall be compatible with the plastic pipe used and shall conform to the requirements of the appli-cable specification referenced in the ASTM or AWWA specification for the pipe, fitting, or joint.

Gaskets—Rubber gaskets for pipe joints shall conform to the requirements of ASTM F 477, Elastomeric Seals (Gaskets) for Jointing Plastic Pipe.

3. Perforations

When perforated pipe is specified, perforations shall conform to the following requirements unless otherwise specified in Construction Speci-fication 45 or shown on the drawings:

a. Perforations shall be either circular or slots.

b. Circular perforations shall be 1/4 ± 1/16-inch diameter holes arranged in rows parallel to the axis of the pipe. Perforations shall be evenly spaced along each row such that the center-to-center distance between perfora-tions is not less than eight times the perfora-tion diameter. Perforations may appear at the ends of short and random lengths. The minimum perforation opening per foot of pipe shall be as shown in table 547–1.

Material Specification 547—Plastic Pipe

Table 547–1 Perforations

Nominal Minimum number of rows Minimum pipe size circular slot opening/foot (inches) (square inches)

4 2 2 0.22

6 4 2 0.44

8 4 2 0.44

10 4 2 0.44

12 6 2 0.66

547–1

National Standard Material

Specifications

Chapter 3

(210-VI-NEH, November 2005)

Rows shall be arranged in two equal groups at equal distance from the bottom on each side of the vertical centerline of the pipe.

The lowermost rows of perforations shall be separated by an arc of not less than 60 de-grees or more than 125 degrees. The upper-most rows of perforations shall be sepa-rated by an arc not to exceed 166 degrees.

The spacing of rows between these limits shall be uniform. The minimum number of rows shall be as shown in table 547–1.

c. Slot perforations shall be symmetrically located in two rows, one on each side of the pipe centerline. Slot perforations shall be located within the lower quadrants of the pipe with slots no wider than 1/8 inch and spaced not to exceed 11 times the perfora-tion width. Minimum perforation opening per lineal foot of pipe shall be as shown in table 547–1.

d. On both the inside and outside of the pipe, perforations shall be free of cuttings or frayed edges and of any material that would reduce the effective opening.

547–2

National Standard Material

Specifications

Chapter 3

(210-VI-NEH, November 2005)

Table 547–2 Pipe specification

Pipe Specification

Poly vinyl chloride (PVC) pipe

Plastic pipe - Schedules 40, 80, 120 .................................................................................. ASTM D 1785

ASTM D 2466

Pressure rated pipe - SDR Series...................................................................................... AWWA C 900

ASTM D 2241

Plastic drain, waste, and vent pipe and fittings .............................................................. ASTM D 2665 Joints for IPS PVC pipe using solvent weld cement ...................................................... ASTM D 2672 Composite sewer pipe ....................................................................................................... ASTM D 2680 Type PSM PVC sewer pipe and fittings ........................................................................... ASTM D 3034 Large-diameter gravity sewer pipe and fittings .............................................................. ASTM F 679 Smooth-Wall Underdrain Systems for Highway, Airport, and Similar Drainage ........ ASTM F 758 Type PS-46 gravity flow sewer pipe and fittings ............................................................ ASTM F 789 Profile gravity sewer pipe and fittings based on controlled inside diameter ............. ASTM F 794 Corrugated sewer pipe with a smooth interior and fittings ......................................... ASTM F 949 Pressure pipe, 4-inch through 12-inch for water distribution ...................................... AWWA C 900 Water transmission pipe, nominal diameters 14-inch through 36-inch ....................... AWWA C 905

Polyethylene (PE) plastic pipe

Schedule 40 ......................................................................................................................... ASTM D 2104 SIDR-PR based on controlled inside diameter ............................................................... ASTM D 2239 Schedules 40 and 80 Based on outside diameter ........................................................... ASTM D 2447 SDR-PR based on controlled outside diameter .............................................................. ASTM D 3035

High density polyethylene (HDPE) plastic pipe

Plastic pipe and fittings ..................................................................................................... ASTM D 3350 SDR-PR based on controlled outside diameter .............................................................. ASTM F 714 Plastic moldings and extrusion compounds ................................................................... ASTM D 1248 Heat joining polyolefin pipe and fittings ......................................................................... ASTM D 2657

Acrylonitrile-butadiene-styrene (ABS) pipe

Plastic pipe, schedules 40 and 80 ..................................................................................... ASTM D 1527 Plastic pipe, SDR-PR .......................................................................................................... ASTM D 2282 Schedule 40 plastic drain, waste, and vent pipe ............................................................. ASTM D 2661 Composite sewer pipe ....................................................................................................... ASTM D 2680 Sewer pipe and fittings ...................................................................................................... ASTM D 2751

547–3

VEGETATIVE SPECIFICATION

275. SEEDING

This work consists of furnishing seed, labor, equipment, and planting seed on designated areas.

2. MATERIALS

All seed shall meet the requirements of the specifications found in the Oklahoma Seed Law which specifies the kind and amount of weed seed permitted, the requirements for a current analysis report, labeling of all seed to show its purity, germination, date of last germination test, and weed seed content.

For seed shipped across state lines, the germination test is valid for 5 months after the end of the month the test was made.

For seed purchased during the valid period of the germination test, the analysis report may be considered current for the full seeding period in effect at the time of purchase. If the seed is to be planted during a later seeding season, a new germination test should be obtained.

All seed shall have a Pure Live Seed (PLS) determination. PLS is computed by adding the percent germination to the percent hard seed, multiplying by the percent purity and dividing by 100.

The seed shall be uniformly applied at the rate and dates specified in Section 6, Construction

Details.

Inoculants shall be the appropriate commercial culture of nitrogen-fixing bacteria prepared specifically for the legume to be inoculated. The inoculants shall be used prior to the expiration date stamped on the package and stored in a cool place until used.

3. SITE PREPARATION

Unless otherwise specified in Section 6, Construction Details, a smooth, firm seedbed, free of competing vegetation, shall be prepared to a minimum depth of 4 inches, deeper if needed to break up a restrictive compacted layer of soil. The site shall be suitable for maintenance with farm equipment. A tractor or truck shall be used to hold equipment on 3:1 slopes or steeper.

4. PLANTING

The seed shall be drilled and firmly anchored into mineral soil. Seed shall be planted 1/4 to 3/4 inch deep and drilled on the approximate contour. Packing shall not be required where hay mulch is to be applied and anchored immediately following seeding. Small areas not accessible to the grass drill can be seeded by hand or other suitable equipment as long as the soil is firmed over the seed.

NRCS-1/06 275-1

5. MEASUREMENT AND PAYMENT

For items of work for which specific unit prices are established in the contract, seeding will be measured to the nearest one-tenth acre. Payment for seeding will be made at the contract unit price.

Such payment will constitute full compensation for all labor, materials, equipment and all other items necessary and incidental to the performance of the work.

Compensation for any item of work described in the contract but not listed in the bid schedule will be included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in Section 6 of this specification.

NRCS-1/06 275-2

NRCS-10/2006 275- 3

OK – Baker/West – WRP – Miami FO/Claremore FO

a. Bid Item 5 and 10, Vegetative Treatment

(1) This item consists of furnishing all labor, equipment and products to adequately cover the borrow areas designated on the drawings.

(2) Seeding dates, locations and species are defined in the chart below.

Depending on the time of year and location, vegetative treatment will vary and may involve hay mulching or soil treatment (PAM), or a temporary cover in addition to permanent vegetation.

(3) If a temporary cover crop is planted, the crop shall be mowed and lightly disked to provide an adequate seedbed prior to final seeding/sprigging.

(4) The seed shall be uniformly mixed where two or more species are used.

(5) Payment as described in Section 5 shall be by lump sum and not per acre.

(6) Subsidiary items to this bid item may include Fertilization, Hay Mulch, Planting Temporary Cover and/or PAM Application.

(7) No vegetation will be needed for borrow areas. Areas to be vegetated are:

a. Newly constructed embankments

b. Newly constructed auxiliary spillways

c. Areas disturbed by the contractor, outside of Units 1, 2, or 3

(8) West WRP Site:

a. Mow vegetation to a height of 3-6 inches, including grass, trees, and brush which have a diameter of 1.5 inches or less.

b. Mow entire WRP site, including existing embankments, drainage ways, and pastures. Approximately 58 acres.

NRCS-10/2006 275- 4

OK – Baker/West – WRP – Miami FO/Claremore FO

Species or Treatment 1/ Jan Feb Mar Apr May June July Aug Sept Oct Nov

De c

Statewide

Natives 2/

Regional Bermuda Grass

Sprigging

SW

SE

NW

NE

Seeding

SW 15 15

SE 15 15

NW 15

NE 15

Fescue

SW

SE

Smooth Brome

Select Counties 3/ 15

Temporary Cover 4/

SW

SE

Other

1/ Hay mulch or other protective cover approved by the COTR shall be used when construction ends outside of seeding dates shown above.

2/ Non-structural, islands and swales only

3/ Adair, Cherokee, Delaware, Ottawa, Mayes, Craig, Rogers, Nowata, Washington and the north ½ of Grant, Kay, and Osage counties

4/ Temporary cover may include cool season or warm season species depending on time of year and location. Cover crops include but are not limited to small grains or forage sorghums.

Type of cover will be specified below.

Varieties and Rates

Bermuda Grass 4-8 lbs. PLS per acre for Common and 2-4 lbs. PLS per acre for Guymon or Wrangler

Fescue 10-20 lbs. PLS per Acre

Natives

Indian Grass (Cheyenne) 0.90 lbs. PLS per Acre Switchgrass (Blackwell) 1.65 lbs. PLS per Acre Eastern Gamagrass (Luka) 2.00 lbs. PLS per Acre Total – 4.55 lbs PLS per Acre

NRCS-1/06 273-1

273. FERTILIZING

This work consists of furnishing labor, equipment, and materials for fertilizing on designated areas.

2. MATERIALS

Fertilizer shall be pelleted.

Acceptable sources of nitrogen include:

a. ammonium sulfate - 21% nitrogen

b. ammonium nitrate - 33% nitrogen

c. urea - 45% nitrogen

Complete fertilizer shall be a 1-1-1 ratio in pelleted form and uniformly mixed. This will be 40 pounds nitrogen, 40 pounds of phosphate (P2O5), and 40 pounds of potash (K2O) per acre.

The contractor shall furnish a supplier's certification of analysis and weight.

3. APPLICATION

Fertilizer shall be applied as stated in Section 5, Construction Details. It shall be uniformly applied on the surface.

4. MEASUREMENT AND PAYMENT

For items of work for which specific unit prices are established in the contract, fertilizing will be measured to the nearest one-tenth acre. Payment for fertilizing will be made at the contract unit price. Such payment will constitute full compensation for all labor, materials, equipment and all other items necessary and incidental to the performance of the work.

items to which they are made subsidiary are identified in Section 5 of this specification.

5. ITEMS OF WORK AND CONSTRUCTION DETAILS

a. Subsidiary Item, Fertilizer

(1) This item consists of furnishing and fertilizing the area identified in the drawings.

(2) No separate payment will be made for Fertilizer. Compensation will be included in the payment for Bid Items 5 & 10, Vegetative Treatment.

NRCS-12/06 273-2

NRCS-1/06 276-1

276. HAY MULCH

The work shall consist of furnishing and placing hay mulch as specified on the designated areas.

2. MATERIALS

Native prairie, weeping lovegrass, small grain or introduced bluestem hay are choices that shall be used as mulch material. The hay must be of such quality that it can be well anchored to the soil.

Brittle or rotted hay, johnsongrass hay, or hay with more than a trace of annual brome and threeawn are not acceptable. Weight tickets shall be furnished at the time of delivery.

3. APPLICATION

The hay mulch shall be uniformly applied at the rate of 1 pound per square yard (4,840 pounds per acre). The mulch shall be anchored a minimum of 2 inches into the soil on the approximate contour. Disc spacing should not exceed 10 inches. A minimum of forty percent of the hay mulch shall remain on the surface after anchoring. Spreading and anchoring shall be done by hand on areas where other equipment cannot operate. Spreading and anchoring shall be done the same day as spreading.

4. MEASUREMENT AND PAYMENT

For items of work for which specific unit prices are established in the contract, hay mulch will be measured to the nearest one-tenth acre. Payment for hay mulch will be made at the contract unit price. Such payment will constitute full compensation for all labor, materials, equipment and all other items necessary and incidental to the performance of the work.

Items of work to be performed in conformance with this specification and the construction details are:

a. Subsidiary Item, Hay Mulch

(1) This item consists of furnishing and placing hay mulch on all disturbed or newly constructed areas following seeding (either temporary or permanent vegetation) or other disturbed areas as directed by the Contracting Officer’s Representative. This item is subsidiary to Bid Items 5 & 10, Vegetative Treatment and is to be used after planting of the permanent vegetation.

NRCS-12/06 276-2

280. PLANTING TEMPORARY COVER CROP

This item shall consist of furnishing labor, equipment and materials, and furnishing and placing seed and fertilizer for planting a temporary cover crop on the designated area.

2. MATERIALS

Seed. All seed shall conform to the current labeling in accordance with the Oklahoma Seed Law.

Crop Seeding Rate Seeding Date

Small grain 40 - 60 lbs/ac 8/20 - 10/15 Forage Sorghum 6 - 12 lbs/ac 4/15 - 6/15

Seedbed preparation. A smooth, firm seedbed shall be prepared without obstructions and free of competing vegetation. Seedbed preparation shall require tillage to a depth of six inches.

Fertilizer. Unless otherwise specified in Section 5, Construction Details, fertilizer shall be applied according to a current soils test based on needed production. The fertilizer shall be a 1-1-1 ratio and uniformly applied at the rate of not less than 40 pounds of nitrogen, 40 pounds of phosphate (P2O5), and 40 pounds of potash (K2O) per acre. The fertilizer shall be a commercial grade fertilizer. Labeling or analysis record shall be in accordance with the Oklahoma Fertilizer Law.

Where fertilizer is furnished from bulk storage, the contractor shall furnish a supplier's certification of analysis and weight.

Seeding operation. All seeding shall be applied uniformly to the designated area. Seed shall be firmed into the soil and be done when the soil is moist.

3. MANAGEMENT OF TEMPORARY COVER CROP

The temporary cover crop shall be managed to prevent the production of viable seed either by shredding or chemical means. Maintain a 12" stubble height. Follow label guidance on chemicals.

Weeds will be controlled during the fallow period.

NRCS-1/06 280-1

For items of work for which specific unit prices are established in the contract, the area planted in temporary cover crop will be measured to the nearest one-tenth acre. Payment for temporary cover crop will be made at the contract unit price. Such payment will constitute full compensation for all labor, materials, equipment and all other items necessary and incidental to the performance of the work.

Compensation for any item of work described in the contract but not listed in the bid schedule, will

NRCS-1/06 280-2

NRCS-12/06 280-3

a. Subsidiary Item, Temporary Cover

(1) This item consists of furnishing and placing seed and fertilizer for a temporary cover crop at the locations identified on the drawings or staked by the Contracting Officer’s Representative. This item is subsidiary to Bid Items 5 & 10, Vegetative Treatment and is only to be used if outside of vegetation dates as per specification 275.

Construction Specification 205 PAM Application

1. Scope

The work consists of furnishing and applying anionic Polyacrylamide (PAM) on the surface of disturbed soils to minimize the production of sediment and control water erosion. PAM is to be an anionic, high molecular weight (>15 mega grams / mole) polymer.

2. Material

Granular PAM shall consist of a dry granular recycled paper cellulose impregnated with Linear Polyacrylamide (Active ingredient, PAM) with an active PAM content of no less than 1.2%. Granular PAM shall be free of foreign materials or substances that may be toxic to plant germination or growth. Granular PAM shall be placed on the soil surface with either a cyclone type broadcast seeding mechanism or pneumatic blower machine.

3. Areas to which Granular PAM is applied

PAM shall be applied to haul roads, stockpile areas, embankments, cut slopes and any other areas that have had vegetation removed. PAM shall also be applied to all areas that have been previously treated and are disturbed by construction activity.

A disturbing construction activity shall be defined as any activity that breaks the crust of the soil surface after a rainfall event that has activated the PAM.

4. Measurement and payment

Method 1

For item s of work f or which specif ic unit pr ices are established in the contract, the number of tons of PAM applie d shall be m easured to the nearest 0.1 Ton. Paym ent for PAM will be m ade at the contract unit pr ice. Such paym ent will constitute f ull compensation for furnishing, transporting, and placing the PAM, including all labor, material, equipment, and other item s necessary and incidental to the com pletion of the work.

Method 2 For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.

NRCS – 1/06 205-1

Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary.

Such items, and the items to which they are made subsidiary, are…