AG-7335-10-S-0014 bid abstract.xlsx
XLSX spreadsheet 52 KB Posted
- Attached to
- Wetland Restoration Projects Federal contract opportunity
- Solicitation number
- AG-7335-S-10-0014
About this file
The attached bid abstract is only the raw data. Awards may or may not be processed as a result of this information. Thank you for your interest in NRCS procurement. Marti Worlein
View the file
Other files for this federal contract opportunity
Show all 50
Wetland Restoration Projects has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tom Way
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||
| BID BOND | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | X | ||||||
| 5 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | X | ||||||
| 0013 | Tom Way | $ 15,696.48 | unit price | extended amount | |||||||||||||
| SFWC#1 | |||||||||||||||||
| 0013AA | Structural Concrete | 1.3 | cy | $ 335.20 | $ 435.76 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 750.00 | $ 975.00 |
| 0013AB | Screw Gate - 12" | 1.0 | ls | $ 1,200.00 | $ 1,200.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 1,250.00 | $ 1,250.00 |
| 0013AC | Mobilization/ Demobilization | 1.0 | ls | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 7,000.00 | $ 7,000.00 |
| 0013AD | Excavation - Core Trench | 302.0 | cy | $ 2.42 | $ 730.84 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 7.00 | $ 2,114.00 |
| 0013AE | Excavation - Channel | 414.0 | cy | $ 2.42 | $ 1,001.88 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 6.00 | $ 2,484.00 |
| 0013F | Earthfill - Wetland Embankment | 293.0 | cy | $ 2.08 | $ 609.44 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 8.00 | $ 2,344.00 |
| 0013AG | Corrugated Metal Pipe | 86.0 | lf | $ 28.90 | $ 2,485.40 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 41.00 | $ 3,526.00 |
| 0013AH | Vegitative - Bermudagrass Sprigging | 0.3 | ac | $ 560.00 | $ 168.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,000.00 | $ 600.00 |
| 0013AJ | Vegitation - Bermudagrass Mulch Sod | 0.3 | ac | $ 2,000.00 | $ 600.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 20,000.00 | $ 6,000.00 |
| 0013AK | Vegatation - Native Grass | 0.5 | ac | $ 500.00 | $ 250.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,500.00 | $ 1,250.00 |
| total | $ 9,481.32 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 27,543.00 | |||||
| SFWC#2 | |||||||||||||||||
| 0013AL | Structural Concrete | 1.2 | cy | $ 335.20 | $ 402.24 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 750.00 | $ 900.00 |
| 0013AM | Screw Gate - 8" | 1.0 | ls | $ 1,000.00 | $ 1,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 1,150.00 | $ 1,150.00 |
| 0013AN | Mobilization/ Demobilization | 1.0 | ls | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 7,000.00 | $ 7,000.00 |
| 0013AP | Excavation - Core Trench | 157.0 | cy | $ 2.42 | $ 379.94 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 7.00 | $ 1,099.00 |
| 0013AQ | Earthfill - Wetland Embankment | 262.0 | cy | $ 2.08 | $ 544.96 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 11.00 | $ 2,882.00 |
| 0013AR | Corrugated Metal Pipe | 27.0 | lf | $ 19.26 | $ 520.02 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 105.00 | $ 2,835.00 |
| 0013AS | Vegitative - Bermudagrass Sprigging | 0.3 | ac | $ 560.00 | $ 168.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,000.00 | $ 600.00 |
| 0013AT | Vegitation - Bermudagrass Mulch Sod | 0.5 | ac | $ 2,000.00 | $ 1,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 20,000.00 | $ 10,000.00 |
| 0013AU | Vegatation - Native Grass | 0.4 | ac | $ 500.00 | $ 200.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,500.00 | $ 1,000.00 |
| total | $ 6,215.16 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 27,466.00 | ||||
| GRAND TOTAL | $ 15,696.48 | $ 55,009.00 |
Vigeant-Hayes
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||||
| BID BOND | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | X | No Bid | ||||||||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | No Bid | |||||
| 0011 | Vigeant | $ 169,916.30 | X X | X X | X X | ||||||||||||||
| 0011AA | Mobilization/ Demobilization | 1.0 | LS | $ 20,000.00 | $ 20,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 3,450.00 | $ 3,450.00 | $ - 0 | $ - 0 | $ - 0 | $ 10,000.00 | $ 10,000.00 | $ 16,000.00 | $ 16,000.00 | $ - 0 |
| 0011AB | Clearing | 15.0 | AC | $ 500.00 | $ 7,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 575.00 | $ 8,625.00 | $ - 0 | $ - 0 | $ - 0 | $ 1,000.00 | $ 15,000.00 | $ 700.00 | $ 10,500.00 | $ - 0 |
| 0011AC | Structure Removal | 1.0 | LS | $ 8,000.00 | $ 8,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 3,000.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 15,000.00 | $ 15,000.00 | $ 1,500.00 | $ 1,500.00 | $ - 0 |
| 0011AD | Excavation, Excavated Swales | 4.0 | EA | $ 2,000.00 | $ 8,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 4,600.00 | $ 18,400.00 | $ - 0 | $ - 0 | $ - 0 | $ 6,500.00 | $ 26,000.00 | $ 1,950.00 | $ 7,800.00 | $ - 0 |
| 0011AE | Excavation, Circle Pit | 1.0 | EA | $ 10,000.00 | $ 10,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 23,000.00 | $ 23,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 8,000.00 | $ 8,000.00 | $ 9,200.00 | $ 9,200.00 | $ - 0 |
| 0011AF | Excavation, Leveling | 3.0 | EA | $ 4,125.00 | $ 12,375.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,300.00 | $ 6,900.00 | $ - 0 | $ - 0 | $ - 0 | $ 4,500.00 | $ 13,500.00 | $ 735.00 | $ 2,205.00 | $ - 0 |
| 0011AG | Excavation, Waterway | 1.0 | LS | $ 18,000.00 | $ 18,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 41,400.00 | $ 41,400.00 | $ - 0 | $ - 0 | $ - 0 | $ 10,000.00 | $ 10,000.00 | $ 22,000.00 | $ 22,000.00 | $ - 0 |
| 0011AH | Earthfill, Wetland Embankment Repair | 1.0 | EA | $ 500.00 | $ 500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 1,600.00 | $ 1,600.00 | $ - 0 | $ - 0 | $ - 0 | $ 8,500.00 | $ 8,500.00 | $ 700.00 | $ 700.00 | $ - 0 |
| 0011AJ | Earthfill, GSS Embankment | 4500.0 | CY | $ 4.00 | $ 18,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 9.20 | $ 41,400.00 | $ - 0 | $ - 0 | $ - 0 | $ 15.00 | $ 67,500.00 | $ 8.15 | $ 36,675.00 | $ - 0 |
| 0011AK | Earthfill, Island | 1.0 | EA | $ 4,800.00 | $ 4,800.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 11,000.00 | $ 11,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 11,500.00 | $ 11,500.00 | $ 4,500.00 | $ 4,500.00 | $ - 0 |
| 0011AL | GSS Pipe | 122.0 | LF | $ 71.65 | $ 8,741.30 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 106.00 | $ 12,932.00 | $ - 0 | $ - 0 | $ - 0 | $ 240.00 | $ 29,280.00 | $ 106.00 | $ 12,932.00 | $ - 0 |
| 0011AM | Fertilizing | 1.1 | AC | $ 200.00 | $ 220.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 230.00 | $ 253.00 | $ - 0 | $ - 0 | $ - 0 | $ 900.00 | $ 990.00 | $ 650.00 | $ 715.00 | $ - 0 |
| 0011AN | Seeding, Fescue Mixture | 1.1 | AC | $ 500.00 | $ 550.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 690.00 | $ 759.00 | $ - 0 | $ - 0 | $ - 0 | $ 500.00 | $ 550.00 | $ 500.00 | $ 550.00 | $ - 0 |
| 0011AP | Seeding, Native Grass | 4.5 | AC | $ 300.00 | $ 1,350.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 690.00 | $ 3,105.00 | $ - 0 | $ - 0 | $ - 0 | $ 500.00 | $ 2,250.00 | $ 350.00 | $ 1,575.00 | $ - 0 |
| 0011AQ | Hay Mulch | 5.6 | AC | $ 800.00 | $ 4,480.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 690.00 | $ 3,864.00 | $ - 0 | $ - 0 | $ - 0 | $ 1,000.00 | $ 5,600.00 | $ 900.00 | $ 5,040.00 | $ - 0 |
| total | $ 122,516.30 | $ 179,688.00 | $ 223,670.00 | $ 131,892.00 | $ - 0 | ||||||||||||||
| 0012 | Hayes | $ 149,132.00 | |||||||||||||||||
| 0012AA | Mobilization/ Demobilization | 1 | LS | $ 20,000.00 | $ 20,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 2,500.00 | $ 2,500.00 | $ - 0 | $ - 0 | $ - 0 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ - 0 |
| 0012AB | Clearing | 20 | AC | $ 500.00 | $ 10,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 350.00 | $ 7,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 1,000.00 | $ 20,000.00 | $ 300.00 | $ 6,000.00 | $ - 0 |
| 00012AC | Excavation, Excavated Swales | 2 | EA | $ 4,000.00 | $ 8,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 1,500.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 6,500.00 | $ 13,000.00 | $ 3,900.00 | $ 7,800.00 | $ - 0 |
| 0012AD | Excavation, Circle Pit | 1 | EA | $ 10,000.00 | $ 10,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 7,500.00 | $ 7,500.00 | $ - 0 | $ - 0 | $ - 0 | $ 8,000.00 | $ 8,000.00 | $ 9,200.00 | $ 9,200.00 | $ - 0 |
| 0012AE | Earthfill, Wetland Embankment | 17450 | CY | $ 4.00 | $ 69,800.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 3.00 | $ 52,350.00 | $ - 0 | $ - 0 | $ - 0 | $ 9.25 | $ 161,412.50 | $ 5.35 | $ 93,357.50 | $ - 0 |
| 0012AF | Earthfill, Island | 2 | EA | $ 4,800.00 | $ 9,600.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 3,600.00 | $ 7,200.00 | $ - 0 | $ - 0 | $ - 0 | $ 11,500.00 | $ 23,000.00 | $ 4,500.00 | $ 9,000.00 | $ - 0 |
| 0012AG | High Density Poly tubing | 80 | LF | $ 71.65 | $ 5,732.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 42.50 | $ 3,400.00 | $ - 0 | $ - 0 | $ - 0 | $ 150.00 | $ 12,000.00 | $ 78.00 | $ 6,240.00 | $ - 0 |
| 0012AH | Fertilizing | 7 | AC | $ 200.00 | $ 1,400.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 200.00 | $ 1,400.00 | $ - 0 | $ - 0 | $ - 0 | $ 900.00 | $ 6,300.00 | $ 600.00 | $ 4,200.00 | $ - 0 |
| 0012AJ | Seeding, Fescue Mixture | 7 | AC | $ 500.00 | $ 3,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 600.00 | $ 4,200.00 | $ - 0 | $ - 0 | $ - 0 | $ 500.00 | $ 3,500.00 | $ 490.00 | $ 3,430.00 | $ - 0 |
| 0012AK | Seeding, Native Grass | 5 | AC | $ 300.00 | $ 1,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 600.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 500.00 | $ 2,500.00 | $ 350.00 | $ 1,750.00 | $ - 0 |
| 0012AL | Hay Mulch | 12 | AC | $ 800.00 | $ 9,600.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 600.00 | $ 7,200.00 | $ - 0 | $ - 0 | $ - 0 | $ 900.00 | $ 10,800.00 | $ 900.00 | $ 10,800.00 | $ - 0 |
| total | $ 149,132.00 | $ 98,750.00 | $ 270,512.50 | $ 161,777.50 | |||||||||||||||
| GRAND TOTAL | $ 271,648.30 | $ 278,438.00 | $ 494,182.50 | $ 293,669.50 |
Baker-West
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||
| BID BOND | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | No Bid | No Bid | |||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | |||||||
| 0009 | Baker | $ 34,375.00 | |||||||||||||||
| 0009AA | Mobilization | 1 | LS | $ 1,200.00 | $ 1,200.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 7,050.00 | $ 7,050.00 | $ - | $ - | $ - | $ - |
| 0009AB | Water Control Structure Barrel and Riser - PVC | 5 | EA | $ 2,560.00 | $ 12,800.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,600.00 | $ 8,000.00 | $ - | $ - | $ - | $ - |
| 0009AC | Embankment | 3050 | FT | $ 5.50 | $ 16,775.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 4.28 | $ 13,054.00 | $ - | $ - | $ - | $ - |
| 0009AD | Structure Removal | 1 | LS | $ 1,500.00 | $ 1,500.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 500.00 | $ 500.00 | $ - | $ - | $ - | $ - |
| 0009AE | Vegitative Treatment | 1 | LS | $ 2,100.00 | $ 2,100.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,500.00 | $ 2,500.00 | $ - | $ - | $ - | $ - |
| total | $ 34,375.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 31,104.00 | $ - | $ - | $ - | $ - | |||||
| 0010 | West | $ 18,600.00 | |||||||||||||||
| 0010AA | Mobilization | 1 | LS | $ 1,200.00 | $ 1,200.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,200.00 | $ 1,200.00 | $ - | $ - | $ - | $ - |
| 0010AB | Excavated Swale | 5 | EA | $ 1,000.00 | $ 5,000.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 800.00 | $ 4,000.00 | $ - | $ - | $ - | $ - |
| 0010AC | Island | 1 | EA | $ 1,200.00 | $ 1,200.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,575.00 | $ 1,575.00 | $ - | $ - | $ - | $ - |
| 0010AD | Circular Pond | 2 | EA | $ 5,000.00 | $ 10,000.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,305.00 | $ 2,610.00 | $ - | $ - | $ - | $ - |
| 00010AE | Vegitative Treatment | 1 | LS | $ 1,200.00 | $ 1,200.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,500.00 | $ 1,500.00 | $ - | $ - | $ - | $ - |
| total | $ 18,600.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 10,885.00 | $ - | $ - | $ - | $ - | |||||
| GRAND TOTAL | $ 52,975.00 | $ 41,989.00 |
Hoogendoorn
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||||
| BID BOND | No Bid | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | No Bid | |||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | |||||||||||
| 0008 | Hoogendoorn | $ 29,537.50 | X X | X X | X X | ||||||||||||||
| 0008AA | Mobilization/ Demobilization | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 3,000.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 15,000.00 | $ 15,000.00 | $ 21,000.00 | $ 21,000.00 | $ - 0 |
| 0008AB | Clearing | 3 | LS | $ 1,500.00 | $ 1,500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 1,200.00 | $ 1,200.00 | $ - 0 | $ - 0 | $ - 0 | $ 12,500.00 | $ 37,500.00 | $ 3,800.00 | $ 11,400.00 | $ - 0 |
| 0008AC | Earthfill | 7325 | CY | $ 3.00 | $ 21,975.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 4.50 | $ 32,962.50 | $ - 0 | $ - 0 | $ - 0 | $ 15.00 | $ 109,875.00 | $ 15.00 | $ 109,875.00 | $ - 0 |
| 0008AD | Bermuda Mulch Sod | 16250 | YS | $ 0.25 | $ 4,062.50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | $ 16,250.00 | $ - 0 | $ - 0 | $ - 0 | $ 4.95 | $ 80,437.50 | $ 1.75 | $ 28,437.50 | $ - 0 |
| total | $ 29,537.50 | $ 53,412.50 | $ 242,812.50 | $ 170,712.50 |
Newsom
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||||||||
| BID BOND | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | No Bid | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | No Bid | |||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | |||||||||||||||||||
| 0007 | Newsom | $ 60,106.88 | X bond 10% | X X | X X | X X | X X | ||||||||||||||||
| 0007AA | Mobilization/ Demobilization | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ - 0 | $ - 0 | $ - 0 | $ 3,000.00 | $ 3,000.00 | $ 3,500.00 | $ 3,500.00 | $ - 0 | $ 10,175.00 | $ 10,175.00 | $ 2,943.00 | $ 2,943.00 | $ 4,000.00 | $ 4,000.00 | $ 16,000.00 | $ 16,000.00 | $ - 0 | |
| 0007AB | Earthfill Unit #1 | 7350 | CY | $ 3.50 | $ 25,725.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.95 | $ 14,332.50 | $ 3.00 | $ 22,050.00 | $ - 0 | $ 1.50 | $ 11,025.00 | $ 1.35 | $ 9,922.50 | $ 4.25 | $ 31,237.50 | $ 6.30 | $ 46,305.00 | $ - 0 | |
| 0007AC | Earthfill Unit #2 | 5825 | CY | $ 3.50 | $ 20,387.50 | $ - 0 | $ - 0 | $ - 0 | $ 1.95 | $ 11,358.75 | $ 3.00 | $ 17,475.00 | $ - 0 | $ 1.50 | $ 8,737.50 | $ 1.35 | $ 7,863.75 | $ 5.10 | $ 29,707.50 | $ 6.30 | $ 36,697.50 | $ - 0 | |
| 0007AD | Installation of Unit #1 Water Control Structure | 90 | LF | $ 38.34 | $ 3,450.60 | $ - 0 | $ - 0 | $ - 0 | $ 61.39 | $ 5,525.10 | $ 49.50 | $ 4,455.00 | $ - 0 | $ 47.50 | $ 4,275.00 | $ 43.33 | $ 3,899.70 | $ 103.00 | $ 9,270.00 | $ 80.00 | $ 7,200.00 | $ - 0 | |
| 0007AE | Installation of Unit #2 Water Control Structure | 64 | LF | $ 37.52 | $ 2,401.28 | $ - 0 | $ - 0 | $ - 0 | $ 58.99 | $ 3,775.36 | $ 45.40 | $ 2,905.60 | $ - 0 | $ 52.00 | $ 3,328.00 | $ 38.28 | $ 2,449.92 | $ 127.00 | $ 8,128.00 | $ 80.00 | $ 5,120.00 | $ - 0 | |
| 0007AF | Mulch Sod | 445 | SY | $ 2.50 | $ 1,112.50 | $ - 0 | $ - 0 | $ - 0 | $ 6.75 | $ 3,003.75 | $ 2.00 | $ 890.00 | $ - 0 | $ 3.50 | $ 1,557.50 | $ 2.70 | $ 1,201.50 | $ 8.00 | $ 3,560.00 | $ 4.50 | $ 2,002.50 | $ - 0 | |
| 0007AG | Hay Mulch | 2.9 | AC | $ 500.00 | $ 1,450.00 | $ - 0 | $ - 0 | $ - 0 | $ 690.00 | $ 2,001.00 | $ 600.00 | $ 1,740.00 | $ - 0 | $ 725.00 | $ 2,102.50 | $ 258.62 | $ 750.00 | $ 900.00 | $ 2,610.00 | $ 1,000.00 | $ 2,900.00 | $ - 0 | |
| 0007AH | Planting Temporary Cover Crop | 2.9 | AC | $ 200.00 | $ 580.00 | $ - 0 | $ - 0 | $ - 0 | $ 345.00 | $ 1,000.50 | $ 600.00 | $ 1,740.00 | $ - 0 | $ 500.00 | $ 1,450.00 | $ 150.00 | $ 435.00 | $ 550.00 | $ 1,595.00 | $ 850.00 | $ 2,465.00 | $ - 0 | |
| total | $ 60,106.88 | $ - 0 | $ 43,996.96 | $ 54,755.60 | $ 42,650.50 | $ 29,465.37 | $ 90,108.00 | $ 118,690.00 |
Roberts
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | |||||
| BID BOND | X | UNIT PRICE | EXTENDED AMOUNT | X | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | ||||||||||
| 6 ACKNOWLEDGED AMENDMENTS | X | X | ||||||||||||||||||
| 0006 | roberts | $ 21,140.00 | X | X X | X X | |||||||||||||||
| 0006AA | Mobilization/ Demobilization | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ - | $ - | $ - | $ 2,600.00 | $ 2,600.00 | $ - 0 | $ - 0 | $ - 0 | $ 1,725.00 | $ 1,725.00 | $ 3,000.00 | $ 3,000.00 | $ 10,000.00 | $ 10,000.00 | $ - 0 |
| 0006AB | Clearing | 3.7 | AC | $ 500.00 | $ 1,850.00 | $ - | $ - | $ - | $ 1,000.00 | $ 3,700.00 | $ - 0 | $ - 0 | $ - 0 | $ 800.00 | $ 2,960.00 | $ 2,000.00 | $ 7,400.00 | $ 3,500.00 | $ 12,950.00 | $ - 0 |
| 0006AC | Earthfill | 3810 | CY | $ 3.50 | $ 13,335.00 | $ - | $ - | $ - | $ 4.00 | $ 15,240.00 | $ - 0 | $ - 0 | $ - 0 | $ 2.00 | $ 7,620.00 | $ 8.75 | $ 33,337.50 | $ 9.25 | $ 35,242.50 | $ - 0 |
| 0006AD | Installation of Water Control Structure | 81 | LF | $ 25.00 | $ 2,025.00 | $ - | $ - | $ - | $ 35.00 | $ 2,835.00 | $ - 0 | $ - 0 | $ - 0 | $ 53.27 | $ 4,314.87 | $ 229.50 | $ 18,589.50 | $ 65.00 | $ 5,265.00 | $ - 0 |
| 0006AE | Fertilizing | 2 | AC | $ 165.00 | $ 330.00 | $ - | $ - | $ - | $ 250.00 | $ 500.00 | $ - 0 | $ - 0 | $ - 0 | $ 400.00 | $ 800.00 | $ 700.00 | $ 1,400.00 | $ 800.00 | $ 1,600.00 | $ - 0 |
| 0006AF | Seeding | 2 | AC | $ 300.00 | $ 600.00 | $ - | $ - | $ - | $ 250.00 | $ 500.00 | $ - 0 | $ - 0 | $ - 0 | $ 400.00 | $ 800.00 | $ 500.00 | $ 1,000.00 | $ 900.00 | $ 1,800.00 | $ - 0 |
| 0006AG | Hay Mulch | 2 | AC | $ 500.00 | $ 1,000.00 | $ - | $ - | $ - | $ 690.00 | $ 1,380.00 | $ - 0 | $ - 0 | $ - 0 | $ 375.00 | $ 750.00 | $ 1,000.00 | $ 2,000.00 | $ 900.00 | $ 1,800.00 | $ - 0 |
| total | $ 21,140.00 | $ 26,755.00 | $ 18,969.87 | $ 66,727.00 | $ 68,657.50 |
Roten
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||||
| BID BOND | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | |||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | |||||||||||
| 0005 | roten | $ 47,750.00 | X X | X bond 10% | X X | ||||||||||||||
| 0005AA | Mobilization/ Demobilization | 1 | LS | $ 2,750.00 | $ 2,750.00 | $ - | $ 8,400 | $ 8,400 | $ - | $ 8,000 | $ 8,000 | $ - | $ - | $ - | $ - | $ - | $ 19,300 | $ 19,300 | $ - |
| 0005AB | Excavation | 1 | LS | $ 45,000.00 | $ 45,000.00 | $ - | $ 41,100 | $ 41,100 | $ - | $ 42,000 | $ 42,000 | $ - | $ - | $ - | $ - | $ - | $ 101,500 | $ 101,500 | $ - |
| total | $ 47,750.00 | $ 49,500 | $ 50,000 | $ 120,800 |
Brixey-Hicks
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||
| BID BOND | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | |||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | |||||||
| 0003/0004 | Brixey/Hicks | $ 75,196.50 | X X | ||||||||||||||
| 0003/4AA | Rock Rip-Rap 15 inch | 915 | TN | $ 35.00 | $ 32,025.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 43.00 | $ 39,345.00 | $ - 0 | $ - 0 |
| 0003/4AB | Bedding | 296 | TN | $ 30.00 | $ 8,880.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 34.00 | $ 10,064.00 | $ - 0 | $ - 0 |
| 0003/4AC | Mobilization | 1 | LS | $ 10,000.00 | $ 10,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 7,000.00 | $ 7,000.00 | $ - 0 | $ - 0 |
| 0003/4AD | Clearing | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 6,500.00 | $ 6,500.00 | $ - 0 | $ - 0 |
| 0003/4AE | Excavation, Unit 1 | 1 | LS | $ 500.00 | $ 500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 7,500.00 | $ 7,500.00 | $ - 0 | $ - 0 |
| 0003/4AF | Excavation, Unit 2 | 1 | LS | $ 500.00 | $ 500.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 9,400.00 | $ 9,400.00 | $ - 0 | $ - 0 |
| 0003/4AG | Excavation, Outlet Channel | 1 | LS | $ 1,000.00 | $ 1,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 9,400.00 | $ 9,400.00 | $ - 0 | $ - 0 |
| 0003/4AH | Corrugated Metal Pipe | 88 | LF | $ 70.00 | $ 6,160.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 145.45 | $ 12,799.60 | $ - 0 | $ - 0 |
| 0003/4AJ | Vegitative Treatment | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 8,000.00 | $ 8,000.00 | $ - 0 | $ - 0 |
| 0003/4AK | Wetland Embankment Extension - Unit #1 | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 12,500.00 | $ 12,500.00 | $ - 0 | $ - 0 |
| 0003/4AL | Wetland Embankment Extension - Unit #2 | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 23,600.00 | $ 23,600.00 | $ - 0 | $ - 0 |
| 0003/4AM | Wetland Embankment - Unit 5 | 609 | CY | $ 3.50 | $ 2,131.50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 14.00 | $ 8,526.00 | $ - 0 | $ - 0 |
| total | $ 75,196.50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 154,634.60 | $ - 0 | $ - 0 |
Fritz-Bothun
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | ||
| BID BOND | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | |||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | |||||||
| 0002 | Fritz-Bothun | $ 109,597.00 | X X | ||||||||||||||
| 0002AA | Mobilization | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 15,000.00 | $ 15,000.00 | $ - 0 | $ - 0 |
| 0002AB | Water Control Structure | 1 | LS | $ 3,000.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 13,950.00 | $ 13,950.00 | $ - 0 | $ - 0 |
| 0002AC | Geosynthetic Turf | 12 | SY | $ 7.50 | $ 90.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 680.00 | $ 8,160.00 | $ - 0 | $ - 0 |
| 0002AD | Metal Pipe | 60 | FT | $ 600.00 | $ 36,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 298.00 | $ 17,880.00 | $ - 0 | $ - 0 |
| 0002AE | WCS#2 pipe repair | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 9,500.00 | $ 9,500.00 | $ - 0 | $ - 0 |
| 0002AF | Bermudagrass Mulch Sod | 38720 | SY | $ 1.50 | $ 58,080.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 5.95 | $ 230,384.00 | $ - 0 | $ - 0 |
| 0002AG | Hay Mulch | 8 | AC | $ 600.00 | $ 4,800.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 1,150.00 | $ 9,200.00 | $ - 0 | $ - 0 |
| 0002AH | Wetland Embankment Extension | 209 | CY | $ 3.00 | $ 627.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 56.00 | $ 11,704.00 | $ - 0 | $ - 0 |
| 0002AJ | Wetland Embankment Repair | 1 | LS | $ 1,000.00 | $ 1,000.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 28,700.00 | $ 28,700.00 | $ - 0 | $ - 0 |
| total | $ 109,597.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 344,478.00 |
Stout
| item | location | QTY | unit of issue | IGCE | Empire Ranch Construction | Koehn Dozer Work | Steve Minton Equipment | Montgomery and Stone LLC | Ken Bean Dozer Svc, Inc | DM Dozers Inc | Dunham Construction & Excavating | Team's Excavating | T McDonald Construction | C-Gawf Construction | MK Excavation | |||||
| BID BOND | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | No Bid | UNIT PRICE | EXTENDED AMOUNT | No Bid | |||||
| 6 ACKNOWLEDGED AMENDMENTS | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | No Bid | |||||||||||||
| 0001 | Stout | $ 102,463.00 | X bond 10% | |||||||||||||||||
| 0001AA | Field Fence | 2940 | FT | $ 3.00 | $ 8,820.00 | $ - 0 | $ - 0 | $ 3.65 | $ 10,731.00 | $ 3.10 | $ 9,114.00 | $ - 0 | $ - 0 | $ 2.85 | $ 8,379.00 | $ - 0 | $ - 0 | $ 4.00 | $ 11,760.00 | $ - 0 |
| 0001AB | Mobilization | 1 | LS | $ 3,000.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ 22,500.00 | $ 22,500.00 | $ 5,600.00 | $ 5,600.00 | $ - 0 | $ - 0 | $ 12,750.00 | $ 12,750.00 | $ - 0 | $ - 0 | $ 16,000.00 | $ 16,000.00 | $ - 0 |
| 0001AC | Dike Removal #1 | 601 | CY | $ 2.00 | $ 1,202.00 | $ - 0 | $ - 0 | $ 3.75 | $ 2,253.75 | $ 2.25 | $ 1,352.25 | $ - 0 | $ - 0 | $ 1.75 | $ 1,051.75 | $ - 0 | $ - 0 | $ 5.00 | $ 3,005.00 | $ - 0 |
| 0001AD | Dike Removal #2 | 350 | CY | $ 2.00 | $ 700.00 | $ - 0 | $ - 0 | $ 3.75 | $ 1,312.50 | $ 2.25 | $ 787.50 | $ - 0 | $ - 0 | $ 1.75 | $ 612.50 | $ - 0 | $ - 0 | $ 5.00 | $ 1,750.00 | $ - 0 |
| 0001AE | Stream Crossing | 25 | CY | $ 100.00 | $ 2,500.00 | $ - 0 | $ - 0 | $ 75.00 | $ 1,875.00 | $ 172.00 | $ 4,300.00 | $ - 0 | $ - 0 | $ 100.00 | $ 2,500.00 | $ - 0 | $ - 0 | $ 110.00 | $ 2,750.00 | $ - 0 |
| 0001AF | Turnarounds | 2 | EA | $ 400.00 | $ 800.00 | $ - 0 | $ - 0 | $ 400.00 | $ 800.00 | $ 225.00 | $ 450.00 | $ - 0 | $ - 0 | $ 250.00 | $ 500.00 | $ - 0 | $ - 0 | $ 275.00 | $ 550.00 | $ - 0 |
| 0001AG | Diversion | 260 | CY | $ 3.00 | $ 780.00 | $ - 0 | $ - 0 | $ 3.75 | $ 975.00 | $ 2.25 | $ 585.00 | $ - 0 | $ - 0 | $ 1.75 | $ 455.00 | $ - 0 | $ - 0 | $ 5.00 | $ 1,300.00 | $ - 0 |
| 0001AH | Tubing #1 | 75 | FT | $ 45.00 | $ 3,375.00 | $ - 0 | $ - 0 | $ 110.00 | $ 8,250.00 | $ 94.00 | $ 7,050.00 | $ - 0 | $ - 0 | $ 83.00 | $ 6,225.00 | $ - 0 | $ - 0 | $ 110.00 | $ 8,250.00 | $ - 0 |
| 0001AJ | Tubing #2 | 73 | FT | $ 45.00 | $ 3,285.00 | $ - 0 | $ - 0 | $ 110.00 | $ 8,030.00 | $ 94.00 | $ 6,862.00 | $ - 0 | $ - 0 | $ 83.00 | $ 6,059.00 | $ - 0 | $ - 0 | $ 110.00 | $ 8,030.00 | $ - 0 |
| 0001AK | Tubing #2a | 73 | FT | $ 45.00 | $ 3,285.00 | $ - 0 | $ - 0 | $ 110.00 | $ 8,030.00 | $ 94.00 | $ 6,862.00 | $ - 0 | $ - 0 | $ 83.00 | $ 6,059.00 | $ - 0 | $ - 0 | $ 110.00 | $ 8,030.00 | $ - 0 |
| 0001AL | Vegitative Treatment | 1 | LS | $ 19,500.00 | $ 19,500.00 | $ - 0 | $ - 0 | $ 6,120.00 | $ 6,120.00 | $ 6,156.00 | $ 6,156.00 | $ - 0 | $ - 0 | $ 12,000.00 | $ 12,000.00 | $ - 0 | $ - 0 | $ 17,500.00 | $ 17,500.00 | $ - 0 |
| 0001AM | Wetland Embankment #1 | 6356 | CY | $ 3.00 | $ 19,068.00 | $ - 0 | $ - 0 | $ 4.75 | $ 30,191.00 | $ 2.25 | $ 14,301.00 | $ - 0 | $ - 0 | $ 1.50 | $ 9,534.00 | $ - 0 | $ - 0 | $ 6.00 | $ 38,136.00 | $ - 0 |
| 0001AN | Wetland Embankment #2 | 10716 | CY | $ 3.00 | $ 32,148.00 | $ - 0 | $ - 0 | $ 4.75 | $ 50,901.00 | $ 2.25 | $ 24,111.00 | $ - 0 | $ - 0 | $ 1.50 | $ 16,074.00 | $ - 0 | $ - 0 | $ 6.00 | $ 64,296.00 | $ - 0 |
| 0001AP | Swales | 4 | EA | $ 1,000.00 | $ 4,000.00 | $ - 0 | $ - 0 | $ 950.00 | $ 3,800.00 | $ 1,125.00 | $ 4,500.00 | $ - 0 | $ - 0 | $ 750.00 | $ 3,000.00 | $ - 0 | $ - 0 | $ 3,000.00 | $ 12,000.00 | $ - 0 |
| total | $ 102,463.00 | $ 155,769.25 | $ 92,030.75 | $ 85,199.25 | $ 193,357.00 |