Attachment_4_Stout.pdf

PDF 1 MB Posted

Attached to
Wetland Restoration Projects Federal contract opportunity
Solicitation number
AG-7335-S-10-0014
Issued by
Department of Agriculture National Resources Conservation Service

About this file

Attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to Wetland Restoration Projects, newest first.
File Type Posted
AG-7335-10-S-0014 bid abstract.xlsx XLSX spreadsheet
Attachment_39_Q A.docx DOCX document
SF_30_continuation_page.docx DOCX document
S_30.pdf PDF
Attachment_37_supplement_to_Attachment_12.docx DOCX document
SF30.pdf PDF
Attachment_35_Change_page_59_for_Attachment_12.docx DOCX document
Attachment_38_Tom_Way_Site_Visit_Sign-in.pdf PDF
Attachment_34_Q A.docx DOCX document
Attachment_36_supplemental_pages_for_Attachment_10.pdf PDF
SF_30_continuation_page.docx DOCX document
Attachment_32_Page_1_Fritz_Bothun.pdf PDF
Attachment_31_Roten_Site_Visit_Sign-in.pdf PDF
Attachment_33_Baker_Site_Visit_Sign-in.pdf PDF
SF30_Block_14_Continuation.docx DOCX document
SF1442 - conformed copy of sol.pdf PDF
Attachment_30_Page_68of68_Attachment_12.pdf PDF
Attachment_28_April_29_Sign-in.pdf PDF
Attachment_27_Fritz-Bothun_Sign-in.pdf PDF
SF30.pdf PDF
Attachment_25_Amend_0002_Fritz Bothun.pdf PDF
Attachment_18_Newsom_Sign-in.pdf PDF
Attachment_26_Stout_Sign-in.pdf PDF
Attachment_21_Replace_P58of_Attachment_0012.pdf PDF
Attachment_23_Replace_P723-4_Attach_11.pdf PDF
Attachment_20_Replace P1of_Attachment_0012.pdf PDF
Attachment_22_Page_045-8of_Attachment_0011.pdf PDF
SF30_Amendment_0002.pdf PDF
Attachment_24_Tom_Way_Sign-in.pdf PDF
Attachment_19_West_Sign-in.pdf PDF
Attachment_17_Roberts_Sign-in.pdf PDF
SF30_Continuation.rtf RTF text file
Attachment_14_April_19_Pre-Bid_Sign-in.pdf PDF
Attachment_15_April_20_Pre-Bid_Sign-in.pdf PDF
Attachment_16_April_22_Brixey-Hicks_Sign-in.pdf PDF
Attachment_13_Tom_Way.pdf PDF
AG-7335-S-10-0014-0001.pdf PDF
Attachment_5_Fritz Bothun.pdf PDF
Attachment_8_Roberts.pdf PDF
Attachment_9_Newsome.pdf PDF
Attachment_7_Roten.pdf PDF
AG-7335-S-10-0014.rtf RTF text file
Attachment_1_Local Instructions.docx DOCX document
SF1442.pdf PDF
Attachment_11_Baker West.pdf PDF
Attachment_10_Hoogendoorn.pdf PDF
Attachment_3_WD_Creek_Rogers_Counties.docx DOCX document
Attachment_2_Wage Determination.docx DOCX document
Attachment_6_Brixey Hicks.pdf PDF
Attachment_12_Vigeant Hayes.pdf PDF
Show all 50

Wetland Restoration Projects has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM SCHEDULE OF ITEMS SPEC.

NO. SUPPLIES/SERVICES NO. QUANTITY UNIT

1 92 2,940 FT

2 Mobilization 200 1 LS

3 211 601 CY

4 Dike Removal #2 211 350 CY

5 Stream Crossing 211 25 CY

6 Turnarounds 212 2 EA

7 Diversion 212 260 CY

8 244 75 FT

High Density Polyethylene Tubing with Inline Water Control Structure #2 244 73 FT $ $

High Density Polyethylene Tubing with Inline Water Control Structure #2a 244 73 FT $ $

11 Vegetative Treatment 275 1 LS $ XXXXX $

12 Wetland Embankment #1 723 6,356 CY $ $

13 Wetland Embankment #2 723 10,716 CY $ $

14 Swales 729 4 EA $ $

Total $

UNIT

PRICE AMOUNT

• Offeror________________Date________

• TAX ID#_______

• DUN#_________

Stout – WRP Bid Schedule

SCHEDULE OF ITEMS

XXXXX

High Density Polyethylene Tubing with Inline Water Control Structure #1

Field Fence

Dike Removal #1

STOUT WRP – NOBLE COUNTY

December, 2009

SPECIFICATIONS INDEX

Construction Specifications

32 - Structural Concrete 34 - Steel Reinforcement

92 - Field Fence

95 - Geotextile

200 - Mobilization / Demobilization

211 - Excavation

212 - Earthfill

244 - Corrugated Polyethylene Tubing

270 - Bermudagrass Sprigging

273 - Fertilizer

275 - Seeding

276 - Hay Mulch

280 - Planting Temporary Cover Crop

578 - Stream Crossing

723 - Embankment (Wetland)

729 - Excavated Swale

Material Specifications

522 - Aggregates for Portland Cement Concrete

523 - Rock for Riprap

531 - Portland Cement

532 - Mineral Admixtures for Concrete

533 - Chemical Admixtures for Concrete

534 - Concrete Curing Compound

591 - Field Fencing Materials

592 - Geotextile

32–1(210–VI–NEH, January 2009)

1. Scope The work shall consist of furnishing, forming, placing, finishing, and curing portland cement concrete as required to build the structures described in section 24 of this specification.

2. Material Aggregates shall conform to the requirements of Material Specification 522, Aggregates for Portland Cement Con-crete, unless otherwise specified. The grading of coarse aggregates shall be as specified in section 24.

Portland cement shall conform to the requirements of Material Specification 531, Portland Cement, for the speci-fied type.

Fly ash shall conform to the requirements of Material Specification 532, Supplementary Cementitious Materials.

Air-entraining admixtures shall conform to the requirements of Material Specification 533, Chemical Admixtures for Concrete. If air-entraining cement is used, any additional air-entraining admixture shall be of the same type as that in the cement.

Water reducing and/or retarding admixtures shall conform to the requirements of Material Specification 533, Chemical Admixtures for Concrete.

Curing compound shall conform to the requirements of Material Specification 534, Concrete Curing Compound.

Preformed expansion joint filler shall conform to the requirements of Material Specification 535, Preformed Expansion Joint Filler.

Waterstops shall conform to the requirements of Material Specifications 537, Nonmetallic Waterstops, and 538, Metal Waterstops, for the specified kinds.

Water used in mixing and curing concrete shall be clean and free from injurious amounts of oil, salt, acid, alkali, organic matter, or other deleterious substances.

3. Class of concrete Concrete for structure concrete shall be classified as follows:

Class of concrete

Maximum net water content (gal/bag)

Minimum cement content (bags/yd3)

3000M 6 5.5

4000M 6 6

Construction Specification 32—Structure Concrete

32–2 (210–VI–NEH, January 2009)

4. Air content and consistency Unless otherwise specified, the slump shall be 3 to 5 inches. If air entrainment is specified, the air content, by vol-ume, shall be 4 to 7 percent of the volume of the concrete. When specified, directed, or approved by the engineer, a water-reducing, set-retarding, or other admixture shall be used. High range, water reducing agents (superplasticiz-ers) may be used to increase workability, reduce water content, and control concrete temperature in hot weather.

The maximum slump after adding high range water reducing agents shall be 7.5 inches.

5. Design of the concrete mix The proportions of the aggregates shall be such as to produce a concrete mixture that works readily into the cor-ners and angles of the forms and around reinforcement when consolidated, but does not segregate or exude free water during consolidation.

Fly ash may be used as a partial substitution for portland cement in an amount of no more than 25 percent (by weight) of the cement in the concrete mix, unless otherwise specified.

The maximum water to cement ratio shall be 0.5 unless otherwise specified. When more than one cementitious material is used, the maximum water to cementitious materials ratio shall be 0.5 unless otherwise specified.

Before the concrete is placed, the contractor shall furnish the contracting officer, for approval, a statement of the materials and mix proportions (including admixtures, if any) intended for use. The statement shall include evi-dence satisfactory to the contracting officer that the materials and proportions will produce concrete conforming to this specification. The materials and proportions so stated shall constitute the "job mix." After a job mix has been approved, neither the source, character, or grading of the aggregates nor the type or brand of cement or admixture shall be changed without prior notice to the contracting officer. If such changes are necessary, no concrete contain-ing such new or altered material shall be placed until the contracting officer has approved a revised job mix.

6. Inspection and testing The engineer shall have free entry to the plant and equipment furnishing concrete under the contract. Proper facili-ties shall be provided for the engineer to inspect materials, equipment, and processes and to obtain samples of the concrete. All tests and inspections will be conducted so as not to interfere unnecessarily with manufacture and delivery of the concrete.

7. Handling and measurement of material Materials shall be stockpiled and batched by methods that prevent segregation or contamination of aggregates and ensure accurate proportioning of the ingredients of the mix. Except as otherwise provided in section 8, cement and aggregates shall be measured as follows:

Cement shall be measured by weight or in bags of 94 pounds each. When cement is measured in bags, no fraction of a bag shall be used unless weighed.

Aggregates shall be measured by weight. Mix proportions shall be based on saturated, surface-dry weight. The batch weight of each aggregate shall be the required saturated, surface-dry weight plus the weight of surface mois-ture it contains.

Water shall be measured, by volume or by weight, to an accuracy within 1 percent of the total quantity of water required for the batch.

Admixtures shall be measured within a limit of accuracy of 3 percent.

8. Mixers and mixing Concrete shall be uniform and thoroughly mixed when delivered to the work site. Variations in slump of more than 1 inch within a batch are considered evidence of inadequate mixing and shall be corrected by increasing mixing time or other acceptable alternative.

32–3(210–VI–NEH, January 2009)

For stationary mixers, the mixing time after all cement and aggregates are in the mixer drum shall be not less than

1.5 minutes. When concrete is mixed in a truck mixer, the number of revolutions of the drum or blades at mixing speed shall be not less than 70 nor more than l00.

Unless otherwise specified, volumetric batching and continuous mixing at the construction site are permitted. To produce concrete meeting the specified proportioning and uniformity requirements, the batching and mixing equip-ment shall conform to the requirements of ASTM Specification C 685 and shall be demonstrated by tests with the job mix before the concrete is placed. Concrete made by this method shall be produced, inspected, and certified in conformance with sections 6, 7, 8, 13, and 14 of ASTM Specification C 685.

No mixing water in excess of the amount called for by the job mix shall be added to the concrete during mixing or hauling or after arrival at the delivery point.

9. Forms Forms shall be of wood, plywood, steel, or other approved material and shall be mortar tight. The forms and as-sociated falsework shall be substantial and unyielding and shall be constructed so that the finished concrete will conform to the specified dimensions and contours. Form surfaces shall be smooth and free from holes, dents, sags, or other irregularities. Forms shall be coated with a nonstaining form release agent before being set into place.

Metal ties or anchorages within the forms shall be equipped with cones, she-bolts or other devices that permit their removal to a depth of at least 1 inch without injury to the concrete. Ties designed to break off below the surface of the concrete shall not be used without cones.

All edges that will be exposed to view when the structure is completed shall be chamfered, unless finished with molding tools as specified in Section l8.

10. Preparation of forms and subgrade Prior to placement of concrete, the forms and subgrade shall be free of chips, sawdust, debris, water, ice, snow, extraneous oil, mortar, or other harmful substances or coatings and the temperature of all surfaces to be in contact with the new concrete shall be not be less than 40 degrees Fahrenheit. Any oil on the reinforcing steel or other surfaces required to be bonded to the concrete shall be removed. Rock surfaces shall be cleaned by air-water cut-ting, wet sandblasting, or wire brush scrubbing, as necessary, and shall be wetted immediately before placement of concrete. The earth surface shall be firm and damp. Placement of concrete on mud, dried earth, or uncompacted fill or frozen subgrade is not permitted.

Items to be embedded in the concrete shall be positioned accurately and anchored firmly.

Weepholes in walls or slabs shall be formed with nonferrous material.

11. Conveying Concrete shall be delivered to the site and discharged into the forms within l-1/2 hours after the introduction of the cement to the aggregates. In hot weather or under conditions contributing to quick stiffening of the concrete, the time between the introduction of the cement to the aggregates and discharge shall not exceed 45 minutes.

The engineer may allow a longer time, provided the setting time of the concrete is increased a corresponding amount by the addition of an approved set-retarding admixture. In any case, concrete shall be conveyed from the mixer to the forms as rapidly as practicable by methods that prevent segregation of the aggregates and assure no loss of mortar occurs.

32–4 (210-VI-NEH, January 2009)

12. Placing Concrete shall not be placed until the subgrade, forms, steel reinforcement, and embedded items have been in-spected and approved. No concrete shall be placed except in the presence of the engineer. The contractor shall give reasonable notice to the engineer each time concrete is to be placed. Such notice shall provide sufficient time for the engineer to inspect the subgrade, forms, steel reinforcement, and other preparations for compliance with the specifications. Other preparations include, but are not limited to, the concrete mixing plant; delivery equipment system; placing, finishing, and curing equipment and system; schedule of work; workforce; and heating or cooling facilities, if applicable. Deficiencies are to be corrected before concrete is delivered for placing.

The concrete shall be deposited as closely as possible to its final position in the forms. It shall be worked into the corners and angles of the forms and around all reinforcement and embedded items in a manner to prevent segre-gation of aggregates or excessive laitance. Formed concrete shall be placed in horizontal layers not more than 20 inches thick. Concrete shall not be dropped more than 5 feet vertically unless suitable equipment is used to prevent segregation. When high range water reducing agents are used, the concrete shall not be allowed to drop more than 10 feet. Hoppers and chutes, pipes, or "elephant trunks" shall be used as necessary to prevent segregation and the splashing of mortar on the forms and reinforcing steel above the layer being placed.

Immediately after the concrete is placed in the forms, it shall be consolidated by spading, hand tamping, or vibra-tion as necessary to ensure a smooth surface and dense concrete. Each layer shall be consolidated to ensure mono-lithic bond with the preceding layer. If the surface of a layer of concrete in place sets to the degree that it will not flow and merge with the succeeding layer when spaded or vibrated, the contractor shall discontinue placing con-crete and shall make a construction joint according to the procedure specified in section 13.

If placing is discontinued when an incomplete horizontal layer is in place, the unfinished end of the layer shall be formed by a vertical bulkhead.

13. Construction joints Construction joints shall be made at the locations shown on the drawings. If construction joints are needed that are not shown on the drawings, they shall be placed in locations approved by the engineer.

Where a feather edge would be produced at a construction joint, as in the top surface of a sloping wall, an insert form shall be used so that the resulting edge thickness on either side of the joint is not less than 6 inches.

In walls and columns, as each lift is completed, the top surface shall be immediately and carefully protected from any condition that might adversely affect the hardening of the concrete.

Steel tying and form construction adjacent to concrete in place shall not be started until the concrete has cured at least 12 hours. Before new concrete is deposited on or against concrete that has hardened, the forms shall be retightened. New concrete shall not be placed until the hardened concrete has cured at least 12 hours.

The surface of construction joints shall be cleaned of all unsatisfactory concrete, laitance, coatings, or debris by washing and scrubbing with a wire brush or wire broom or by other means approved by the engineer. The surface shall be kept moist for at least 1 hour before the new concrete is placed.

32–5(210-VI-NEH, January 2009)

14. Expansion and contraction joints Expansion and contraction joints shall be made only at locations shown on the drawings.

Exposed concrete edges at expansion and contraction joints shall be carefully tooled or chamfered, and the joints shall be free of mortar and concrete. Joint filler shall be left exposed for its full length with clean and true edges.

Preformed expansion joint filler shall be held firmly in the correct position as the concrete is placed.

When open joints are specified, they shall be constructed by the insertion and subsequent removal of a wooden strip, metal plate, or other suitable template in such a manner that the corners of the concrete are not chipped or broken. The edges of open joints shall be finished with an edging tool before the joint strips are removed.

15. Waterstops Waterstops shall be held firmly in the correct position as the concrete is placed. Joints in metal waterstops shall be soldered, brazed, or welded. Joints in rubber or plastic waterstops shall be cemented, welded, or vulcanized as recommended by the manufacturer.

16. Removal of forms Forms shall not be removed without the approval of the engineer. Forms shall be removed in such a way as to pre-vent damage to the concrete. Supports shall be removed in a manner that permits the concrete to take the stresses of its own weight uniformly and gradually.

17. Finishing formed surfaces Immediately after the forms are removed:

a. All fins and irregular projections shall be removed from exposed surfaces.

b. The holes produced on all surfaces by the removal of form ties, cone-bolts, and she-bolts shall be cleaned, wetted, and filled with a dry-pack mortar. The mortar will consist of one part portland cement, three parts sand that will pass a No. 16 sieve, and just sufficient water to produce a consistency such that the filling is at the point of becoming rubbery when the material is solidly packed.

18. Finishing unformed surfaces All exposed surfaces of the concrete shall be accurately screeded to grade and then float finished, unless specified otherwise.

Excessive floating or troweling of surfaces while the concrete is soft is not permitted.

Adding dry cement or water to the surface of the screeded concrete to expedite finishing is not allowed.

Joints and edges on unformed surfaces that will be exposed to view shall be chamfered or finished with molding tools.

19. Curing Concrete shall be prevented from drying for a curing period of at least 7 days after it is placed. Exposed surfaces shall be kept continuously moist for the entire period, or until curing compound is applied as specified below.

Moisture shall be maintained by sprinkling, flooding, or fog spraying, or by covering with continuously moistened canvas, cloth mats, straw, sand, or other approved material. Wood forms left in place during the curing period shall be kept continuously wet. A formed surface shall be thoroughly wetted immediately after forms are removed and

32–6 (210-VI-NEH, January 2009) shall be kept wet until patching and repairs are completed. Water or covering shall be applied in such a way that the concrete surface is not eroded or otherwise damaged.

Concrete, except at construction joints, may be coated with the approved curing compound instead of continued application of moisture, except as otherwise specified in section 24. The compound shall be sprayed on the moist concrete surface as soon as free water has disappeared, but shall not be applied to any surface until patching, re-pairs, and finishing of that surface are completed. The compound shall be applied at a uniform rate of not less than 1 gallon per 175 square feet of surface and shall form a continuous adherent membrane over the entire surface.

Curing compound shall be thoroughly mixed before applying and continuously agitated during application. Curing compound shall not be applied to a surface requiring bond to subsequently placed concrete, such as construction joints, shear plates, reinforcing steel, and other embedded items. If the membrane is damaged during the curing period, the damaged area shall be resprayed at the rate of application specified above. Any surface covered by the membrane shall not be trafficked unless protected from wear.

20. Removal and replacement or repair When concrete is honeycombed, damaged, or otherwise defective, the contractor shall remove and replace the structure or structural member containing the defective concrete or, where feasible, correct or repair the defective parts. The contracting officer determines the required extent of removal, replacement, or repair. Before starting re-pair work, the contractor shall obtain the contracting officer's approval of the plan for repairs. The contractor shall perform all repair work in the presence of the engineer.

21. Concreting in cold weather Concrete shall not be mixed nor placed when the daily minimum atmospheric temperature is less than 40 degrees Fahrenheit unless facilities are provided to prevent the concrete from freezing. The use of accelerators or anti-freeze compounds is not allowed.

22. Concreting in hot weather The contractor shall apply effective means to maintain the temperature of the concrete below 90 degrees Fahren-heit during mixing, conveying, and placing.

23. Measurement and payment For items of work for which specific unit prices are established in the contract, concrete is measured to the neat lines shown on the drawings and the volume of concrete is computed to the nearest 0.l cubic yard. Measurement of concrete placed against the sides of an excavation without using intervening forms is made only to the neatness or pay limits shown on the drawings. No deduction in volume is made for chamfers, rounded or beveled edges, or for any void or embedded item that is less than 5 cubic feet in volume.

Payment for each item of structure concrete is made at the contract unit price or the contract lump sum; whichever is applicable for that item. Such payment constitutes full compensation for all labor, material, equipment, transpor-tation, tools, forms, falsework, bracing, and all other items necessary and incidental to the completion of the work except items listed for payment elsewhere in the contract. Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made sub-sidiary. Such items and the items to which they are made subsidiary are identified in section 24 of this specification.

24. Items of work and construction details

NRCS – OKLA 32-7 Stout WRP Noble County 12/09

24. ITEMS OF WORK AND CONSTRUCTION DETAILS

Cement for all concrete work shall be Type I. Coarse aggregate shall be Size No. 57, Table 2, ASTM C-33, unless otherwise approved by the Engineer. Joint Filler materials shall be as specified on the drawings.

Items of work to be performed in conformance with this specification and the construction details are:

a. Subsidiary Item, Concrete

(1) This item consists of furnishing and installing the concrete fence post footings required for the field fences and for the concrete required for the footings and pad for the trash guards for the Water Control Structures.

(2) The concrete shall be Class 4000M.

(3) No separate payment will be made for Concrete. Compensation for this item will be included in the payment for Bid Item 1, Field Fence and Bid Items 8, 9, and 10, High Density Polyethylene Tubing with Inline Water Control Structures.

34–1(210–VI–NEH, January 2009)

The work shall consist of furnishing and placing steel reinforcement for reinforced concrete or pneumatically ap-plied mortar.

2. Material Steel reinforcement shall conform to the requirements of Material Specification 539, Steel Reinforcement (for con-crete). Before reinforcement is placed, the surface of the bars and fabric and any metal supports shall be cleaned to remove any loose, flaky rust, mill scale, oil, grease, or other undesirable coatings or foreign substances. Epoxy-coated steel reinforcement shall be free of surface damage. After placement, the reinforcement shall be maintained in a clean and serviceable condition until it is completely embedded within the concrete.

3. Bar schedule, lists and diagrams Any supplemental bar schedules, bar lists or bar-bending diagrams required in section 10 of this specification to accomplish the fabrication and placement of steel reinforcement shall be provided by the contractor. Before rein-forcement is placed, the contractor shall furnish four copies of any such lists or diagrams to the contracting officer for approval. Acceptance of the reinforcement is not based on approval of these lists or diagrams, but on inspec-tion of the steel reinforcement after it has been placed, tied, and supported and is ready to receive concrete.

4. Bending Reinforcement shall be cut and bent in compliance with the requirements of the American Concrete Institute Standard 315. Bars shall not be bent or straightened in a manner that will injure or weaken the material. Bars with kinks, cracks, or improper bends will be rejected.

5. Splicing bar reinforcement Method 1—Splices of reinforcement shall be made only at locations shown on the drawings and provided by the steel schedule. Placement of bars at the lap splice locations shown, when not in contact, shall not be farther apart than one-fifth the shown lap length and in any case no greater than 6 inches.

Method 2—Splices of reinforcement shall be limited to those locations shown on the drawings. Splice lengths shall be determined before fabrication and meet the requirements of ACI Standard 318, Building Code Require-ments for Reinforced Concrete, based upon design information in section 10 of this specification. Bar placement drawings and schedules shall be provided for approval before fabrication. The drawings shall show all splice loca-tions, layouts, and lap dimensions.

6. Splicing welded wire reinforcement Unless otherwise specified, welded wire reinforcement shall be spliced in the following manner:

End-to-end—Adjacent sections shall be spliced end-to-end (longitudinal lap) by overlapping a minimum of one full mesh plus 2 inches plus the length of the two end overhangs. The splice length is measured from the end of the longitudinal wires in one piece of fabric to the end of the longitudinal wire in the lapped piece of fabric.

Side-to-side—Adjacent sections shall be spliced side to side (transverse lap) a minimum of one full mesh plus 2 inches. The splice length shall be measured from the centerline of the first longitudinal wire in one piece of fabric to the centerline of the first longitudinal wire in the lapped piece of fabric.

Construction Specification 34—Steel Reinforcement

34–2 (210–VI–NEH, January 2009)

7. Placing Reinforcement shall be accurately placed and secured in position to prevent its displacement during the placement of concrete. Tack welding of bars is not permitted. Metal chairs, metal hangers, metal spacers, and concrete chairs may be used to support the reinforcement. Metal hangers, spacers, and ties shall be placed in such a manner that they are not exposed in the finished concrete surface. The legs of metal chairs or side form spacers that may be exposed on any face of slabs, walls, beams, or other concrete surfaces shall have a protective coating or finish. The coating or finish can be hot dip galvanizing, epoxy coating, plastic coating, or stainless steel. Metal chairs and spac-ers not fully covered by a protective coating or finish shall have a minimum cover of 0.75 inch of concrete over the unprotected metal part. The exception is that those with plastic coatings may have a minimum cover of 0.5 inch of concrete over the unprotected metal part. Precast concrete chairs shall be manufactured of the same class of con-crete as specified for the structure and shall have the tie wires securely anchored in the chair or a V-shaped groove at least 0.75 inch in depth molded into the upper surface to receive the steel bar at the point of support. Precast concrete chairs shall be clean and moist at the time concrete is placed.

High density or structural plastic rebar accessories designed to ensure maximum concrete bond may be substi-tuted for metal or concrete accessories in spacer applications as approved by the contracting officer. Exposure of plastic rebar accessories at the finished concrete surface shall be kept to a minimum. Plastic rebar accessories, when used, shall be staggered along adjacent parallel bars and shall be placed at intervals no closer than 12 inches.

Plastic rebar accessories shall not be used in concrete sections 6 inches or less in thickness.

Reinforcement shall not be placed until the prepared site has been inspected and approved. After placement of the reinforcement, concrete shall not be placed until the reinforcement has been inspected and approved by the con-tracting officer's technical representative (COTR).

8. Storage Steel reinforcement stored at the work site shall be placed on platforms, skids, or other supports. This is done so that contact with the ground is avoided and the material is protected from mechanical damage and/or corrosion.

9. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the weight of steel re-inforcement placed in the concrete in accordance with the drawings is determined to the nearest pound by compu-tation from the placing drawings. Measurement of hooks and bends is based on the requirements of ACI Standard

315. Computation of weights of reinforcement is based on the unit weights established in tables 34–1 and 34–2 of this specification. Computation of weights for welded wire reinforcement not shown in table 34–2 shall be based on ACI Standard 315. The area of welded wire reinforcement placed in the concrete in accordance with the drawings is determined to the nearest square foot by computation from the placing drawings with no allowance for required laps. The weight of steel reinforcing in extra splices or extra-length splices approved for the convenience of the contractor or the weight of supports and ties is not included in the measurement for payment.

Payment for furnishing and placing reinforcing steel is made at the contract unit price. Such payment constitutes full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work including preparing and furnishing bar schedules, lists, or diagrams; furnishing and attaching ties and supports; and furnishing, transporting, storing, cutting, bending, cleaning, and securing all reinforcements.

34–3(210–VI–NEH, January 2009)

Method 2—For items of work for which specific unit prices are established in the contract, the weight of bar rein-forcement placed in the concrete in accordance with the drawings is determined to the nearest pound by computa-tion from the placing drawings. Measurement of hooks and bends is based on the requirements of ACI Standard

315. Computation of weights of bar reinforcement is based on the unit weights established in table 34–1 of this specification. The weight of steel reinforcing in extra splices or extra length splices approved for the convenience of the contractor or the weight of supports and ties is not included in the measurement for payment.

The area of welded wire reinforcement placed in the concrete in accordance with the drawings is determined to the nearest square foot by computation from the placing drawings with no allowance for required laps.

Payment for furnishing and placing bar reinforcing steel is made at the contract unit price for bar reinforcement.

Payment for furnishing and placing welded wire reinforcing steel is made at the contract unit price for welded wire reinforcement. Such payment constitutes full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work including preparing and furnishing bar schedules, lists, or diagrams; furnishing and attaching ties and supports; and furnishing, transporting, cutting, bending, cleaning, and securing all reinforcement.

All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items to which they are made subsidiary are identified in section 10 of this specification.

Table 34–1 Standard reinforcing bars

- - Bar size designations - - Weight (lb/ft)

English Metric

3 10 0.376

4 13 0.668

5 16 1.043

6 19 1.502

7 22 2.044

8 25 2.670

9 29 3.400

10 32 4.303

11 36 5.313

14 43 7.650

18 57 13.600

1/ The bar diameter (inches) equals the bar size number divided by eight. For example, the diameter of a #4 bar is 4÷8 = 0.5 inch.

2/ The metric bar size has been rounded to a whole number that represents the approximate diameter of the bar in millime-ters.

Table 34–2 Rectangular welded wire reinforcement

- - - - - - - - - - Style designation 1/ - - - - - - - - - - Weight by W-number by steel wire gauge (former designation)

(lb/100 ft2)

6 × 6 – W1.4 × W1.4 6 × 6 – 10 × 10 21

6 × 6 – W2.1 × W2.1 6 × 6 – 8 × 8 30

6 × 6 – W2.9 × W2.9 6 × 6 – 6 × 6 42

6 × 6 – W4.0 × W4.0 6 × 6 – 4 × 4 58

4 × 4 – W1.4 × W1.4 4 × 4 – 10 × 10 31

4 × 4 – W2.1 × W2.1 4 × 4 – 8 × 8 44

4 × 4 – W2.9 × W2.9 4 × 4 – 6 × 6 62

4 × 4 – W4.0 × W4.0 4 × 4 – 4 × 4 85

4 × 12 – W2.1 × W0.9 2/ 4 × 12 – 8 × 12 25

4 × 12 – W2.5 × W1.1 2/ 4 × 12 – 7 × 11 31

1/ Style designation is defined in ACI Standard 315 of the American Concrete Institute.

2/ Welded smooth wire reinforcement with wires smaller than size W1.4 is manufactured from galvanized wire.

NRCS – OKLA 34-4 Stout WRP

12/09

10. ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the

a. Subsidiary Item, Steel Reinforcement

(1) This item consists of furnishing and installing the 8” x 8” - 10 gauge welded wire fabric in the concrete for the pad under the trash guard for the Water Control Structures.

(2) No separate payment will be made for Steel Reinforcement.

Compensation for this item will be included in the payment for Bid Items 8, 9, and 10, High Density Polyethylene Tubing with Inline Water Control Structures.

92–1(210–VI–NEH, January 2009)

The work shall consist of furnishing and installing field fence, including gates and fittings.

2. Material Material for field fence shall conform to the requirements of Material Specification 591. All wooden posts shall be of the same species, when available.

Unless otherwise specified, surfacing, cutting, and boring of preservative treated wooden posts and braces shall be completed before treatment. If field cutting or field repair of treated material is approved, all cuts and abrasions shall be carefully trimmed and coated with copper naphthenate preservative containing a minimum of 2.0 percent copper metal. The treatment preservative shall be applied according to the product label. Any excess preservative not absorbed by the wood member shall be cleaned from the surface prior to the use of the member. Bored holes for connectors or bolts may be treated by pumping coal-tar roofing cement meeting ASTM D5643 into the holes using a caulk gun or similar device. After assembly, any unfilled holes shall be plugged with tightly fitting wooden plugs that have been treated with preservative as specified.

3. Setting posts Concrete or wood posts shall be set in holes and backfilled with earth except where otherwise specified. Wood posts may be driven when approved by the engineer. Steel posts shall be driven unless otherwise specified.

Holes for installing fence posts shall be at least 6 inches larger than the diameter or side dimension of the posts.

Earth backfill around posts shall be thoroughly tamped in layers not thicker than 4 inches and shall completely fill the posthole up to the ground surface. Concrete backfill around posts shall be rodded into place in layers not thicker than 12 inches and shall completely fill the posthole to the surface of the ground. Backfill, either earth or concrete, shall be crowned-up around posts at the ground surface.

No stress shall be applied to posts set in concrete for a period of not less than 24 hours following the development of a firm set of the concrete.

4. Corner assembly Unless otherwise specified in section 11, corner assemblies shall be installed at all points where the fence align-ment changes 15 degrees or more.

5. End panels End panels shall be built at gates and fence ends.

6. Pull post assembly Pull post assembly (bracing within a section of straight fence) shall be installed at the following locations:

a. In straight fence sections, at intervals not to exceed 660 feet.

b. At any point where the vertical angle described by two adjacent reaches of wire is upward and exceeds 10 degrees (except as provided in section 11 of this specification).

c. At the beginning and end of each curved fence section.

Construction Specification 92—Field Fence

92–2 (210–VI–NEH, January 2009)

7. Attaching fencing to posts The fencing shall be stretched and attached to posts as follows:

a. The fencing wire or netting shall be placed on the side of the post opposite the area being protected except for installation along curved sections.

b. The fencing wire or netting shall be placed on the outside for installation along curved sections.

c. The fencing wire or netting shall be fastened to each end post, corner post, and pull post by wrapping each horizontal strand around the post and tying it back on itself with not less than three tightly wound wraps.

d. The fencing wire or netting shall be fastened to wooden line posts by means of steel staples. Woven-wire fencing shall be attached at alternate horizontal strands. Each strand of barbed wire shall be attached to each post. Steel staples shall be driven diagonally with the grain of wood and at a slight downward angle and shall not be driven so tightly as to bind the wire against the post.

e. The fencing wire or netting shall be fastened to steel or concrete line posts with either two turns of 14 gauge galvanized steel or iron wire or in accordance with recommendations provided by the post's manufacturer.

f. Wire shall be spliced by means of a Western Union splice or by suitable splice sleeves applied with a tool designed for that purpose. The Western Union splice shall have no less than eight wraps of each end about the other. All wraps shall be tightly wound and closely spaced. Splices made with splice sleeves shall have a tensile strength no less than 80 percent of the strength of the wire being spliced.

8. Stays Stays shall be attached to the fencing at the spacing outlined in section 11 or as shown on the drawings to ensure maintenance of the proper spacing of the fence wire strands.

9. Crossings at depressions and watercourses Where fencing is installed parallel to the ground surface, the line posts subject to upward pull shall be anchored.

a. If the fence wire or netting is installed parallel to the ground surface, the line posts subject to uplift shall be anchored by means of extra embedment or by special anchors as detailed on the drawings.

b. If the fence wire is installed with the top wire straight and parallel to the ground surface on either side of the depression, extra length posts shall be used to allow normal post embedment. Unless otherwise speci-fied, excess space between the bottom of the fence and the ground shall be closed with extra strands of barbed wire or with netting.

10. Measurement and payment Method 1—The length of each type and kind of fence is measured to the nearest foot along the profile of the fence, including gate openings. Payment for each type and kind of fence is made at the contract unit price for that type and kind of fence. Such payment constitutes full compensation for completion of the work, including fabricating and installing gates.

Method 2—The length of each type and kind of fence is measured to the nearest foot along the profile of the fence, excluding gate openings. Payment is made at the contract unit price for the specified height of fence. The number of each size and type of gate installed is determined. Payment is made at the contract unit price for that type and size of gate. Such payment constitutes full compensation for all labor, material, equipment, and all other items nec-essary and incidental to the completion of the work.

All methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 11 of this specification.

11. Items of work and construction details

NRCS – OKLA 92-3 Stout – WRP Noble County, OK 12/2009

11. ITEMS OF WORK AND CONSTRUCTION DETAILS

Post caps, rail ends, and brace bands, as identified by ASTM F-552, shall meet or exceed requirements of ASTM F-626.

Barbed wire shall be 12 ½ gauge, galvanized, double strand with 14 gauge, and 2-point or 4-point barbs on 5-inch centers. Galvanized coating shall be at least 0.30 ounce per square foot of wire surface.

Wire stays shall be 10 gauge (minimum), galvanized, two-strand spiral, and twist-on type. One stay shall be equally spaced between each post location. Stays shall be twisted firmly against the top strand. The minimum length of stays shall be 36 inches.

Wire gap panels shall be of the same type and wire spacing as the regular fence. Wire shall be double-wrapped around end stays and secured in place by drilling ¼ inch holes at each wire location and tying each wire with 14 gauge galvanized wire through the holes. Anchor hoops shall be two strands of 9 gauge galvanized wire securely fastened to the gate post.

Each horizontal fence wire shall be attached to brace, corner, or end posts with a double wrap of 9 gauge galvanized wire tied back with a minimum of 4 wraps. At pull panel locations, the horizontal fence shall be extended to the opposite end post and tied as previously described. At junctions of fence wire and posts where ties are not specified, the wire shall be secured to the post with standard wire clips on fasteners.

At changes in vertical fence alignment, line posts or pull-panel posts that restrain upward pull of the fence strands shall be anchored by setting such posts in concrete. The engineer will designate the locations where this anchorage is required.

Tie wire shall be used at post locations where there is a change in vertical alignment of the fence wire that produces upward or downward pull. A tie wire of 9 gauge galvanized wire shall be secured to the post with two wraps and tied 3 inches above the top fence wire (where the pull is downward) or 6 inches below the bottom fence wire (where the pull is upward) and shall be extended to each successive fence wire, securing each in position by two close-drawn wraps. The engineer will designate the locations where this tie wire is required.

NRCS – OKLA 92-4 Stout – WRP Noble County, OK

a. Bid Item 1, Field Fence

(1) This item consists of constructing the permanent fence along the south boundary of the easement area as shown on the drawings.

(2) This item also includes the length of fence needed for the construction of a gate in the location of the ingress-egress road to be established on the north property line.

(3) This item also includes the length of fence needed to remove and replace existing fence on the north property line for the construction of the exit channel from Water Control Structure #2.

(4) Measure and Payment shall be by Method 1.

(210-VI-NEH, May 2001) 95–1

Construction Specification 95—Geotextile

1. Scope This work consists of furnishing all material, equipment, and labor necessary for the installation of geotextiles.

2. Quality Geotextiles shall conform to the requirements of Material Specification 592 and this specification.

3. Storage Before use, the geotextile shall be stored in a clean, dry location out of direct sunlight, not subject to extremes of either hot or cold temperatures, and with the manufacturer's protective cover undisturbed.

Receiving, storage, and handling at the job site shall be in accordance with the requirements listed in

ASTM D 4873.

4. Surface preparation The surface on which the geotextile is to be placed shall be graded to the neat lines and grades as shown on the drawings. It shall be reasonably smooth and free of loose rock and clods, holes, depressions, projections, muddy conditions, and standing or flowing water (unless otherwise specified in section 7 of this specification).

5. Placement Before the geotextile is placed, the soil surface will be reviewed for quality assurance of the design and construction. The geotextile shall be placed on the approved prepared surface at the locations and in accordance with the details shown on the drawings and specified in section 7 of this specification. It shall be unrolled along the placement area and loosely laid, without stretching, in such a manner that it conforms to the surface irregularities when material or gabions are placed on or against it. The geotextile may be folded and overlapped to permit proper placement in designated area(s).

Method 1—The geotextile shall be joined by machine sewing using thread material meeting the chemi-cal requirements for the geotextile fibers or yarn. The sewn overlap shall be 6 inches, and the sewing shall consist of two parallel stitched rows at a spacing of about 1 inch and shall not cross (except for any required re-stitching). The stitching shall be a lock-type stitch. Each row of stitching shall be located a minimum of 2 inches from the geotextile edge. The seam type and sewing machine to be used shall pro-duce a seam strength, in the specified geotextile, that provides a minimum of 90 percent of the tensile strength in the weakest principal direction of the geotextile being used, when tested in accordance with ASTM D 4884. The seams may be factory or field sewn.

The geotextile shall be temporarily secured during placement of overlying material to prevent slippage, folding, wrinkling, or other displacement of the geotextile. Unless otherwise specified, methods of secur-ing shall not cause punctures, tears, or other openings to be formed in the geotextile.

Method 2—The geotextile shall be joined by overlapping a minimum of 18 inches (unless otherwise specified) and secured against the underlying foundation material. Securing pins, approved and provided by the geotextile manufacturer, shall be placed along the edge of the panel or roll material to adequately hold it in place during installation. Pins shall be steel or fiberglass formed as a U, L, or T shape or con-tain "ears" to prevent total penetration through the geotextile. Steel washers shall be provided on all but the U-shaped pins. The upstream or upslope geotextile shall overlap the abutting downslope geotextile.

At vertical laps, securing pins shall be inserted through the bottom layers along a line through approxi-mately the mid-point of the overlap. At horizontal laps and across slope labs, securing shall be inserted

(210-VI-NEH, May 2001) through the bottom layer only. Securing pins shall be placed along a line about 2 inches in from the edge of the placed geotextile at intervals not to exceed 12 feet unless otherwise specified. Additional pins shall be installed as necessary and where appropriate to prevent any undue slippage or movement of the geotextile. The use of securing pins will be held to the minimum necessary. Pins are to remain in place unless otherwise specified.

Should the geotextile be torn or punctured, or the overlaps or sewn joint disturbed, as evidenced by visible geotextile damage, subgrade pumping, intrusion, or grade distortion, the backfill around the damaged or displaced area shall be removed and restored to the original approved condition. The repair shall consist of a patch of the same type of geotextile being used and overlaying the existing geotextile.

When the geotextile seams are required to be sewn, the overlay patch shall extend a minimum of 1 foot beyond the edge of any damaged area and joined by sewing as required for the original geotextile except that the sewing shall be a minimum of 6 inches from the edge of the damaged geotextile. Geotextile panels joined by overlap shall have the patch extend a minimum of 2 feet from the edge of any damaged area.

Geotextile shall be placed in accordance with the following applicable specification according to the use indicated in section 7:

Slope protection—The geotextile shall not be placed until it can be anchored and protected with the specified covering within 48 hours or protected from exposure to ultraviolet light. In no case shall material be dropped on uncovered geotextile from a height of more than 3 feet.

Subsurface drains—The geotextile shall not be placed until drainfill or other material can be used to provide cover within the same working day. Drainfill material shall be placed in a manner that prevents damage to the geotextile. In no case shall material be dropped on uncov-ered geotextile from a height of more than 5 feet.

Road stabilization—The geotextile shall be unrolled in a direction parallel to the roadway centerline in a loose manner permitting conformation to the surface irregularities when the roadway fill material is placed on its surface. In no case shall material be dropped on uncov-ered geotextile from a height of more than 5 feet. Unless otherwise specified, the minimum overlap of geotextile panels joined without sewing shall be 24 inches. The geotextile may be temporarily secured with pins recommended or provided by the manufacturer, but they shall be removed before the permanent covering material is placed.

6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the quantity of geotextile for each type placed within the specified limits is determined to the nearest specified unit by measurements of the covered surfaces only, disregarding that required for anchorage, seams, and overlaps. Payment is made at the contract unit price. Such payment constitutes full compensation for the completion of the work.

Method 2—For items of work for which specific unit prices are established in the contract, the quantity of geotextile for each type placed with the specified limits is determined to the nearest specified unit by computing the area of the actual roll size or partial roll size installed. The computed area will include the amount required for overlap, seams, and anchorage as specified. Payment is made at the contract unit price. Such payment constitutes full compensation for the completion of the work.

Method 3—For items of work for which specific lump sum prices are established in the contract, the quantity of geotextile is not measured for payment. Payment for geotextiles is made at the contract lump sum price and constitutes full compensation for the completion of the work.

95–2

(210-VI-NEH, May 2001)

All methods—The following provisions apply to all methods of measurement and payment. Compensa-tion for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 7 of this specification.

7. Items of work and construction details

95–3

NRCS-12/2009 95-4

OK-Stout WRP – Noble County

7. Items of work and construction details

a. Subsidiary Item, Geotextile

(1) This item consists of furnishing and installing the geotextile for the stream crossing as shown on the drawings.

(2) No separate payment will be made for Geotextile.