Hot_Work_Permit.pdf

PDF 16 KB Posted

Attached to
Network Cabling Upgrade Federal contract opportunity
Solicitation number
AG-32SC-S-17-0027
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

Hot Work Permit

View the file

Other files for this federal contract opportunity

Other files attached to Network Cabling Upgrade, newest first.
File Type Posted
PFOIL_342_Material_Submittal.docx DOCX document
Amendment_2.pdf PDF
Questions&Answers2.pdf PDF
Asbestos_Report.pdf PDF
SOW_Revised_27MAR2017.pdf PDF
Attachment_A_-_2017-04-05_DFRC_floor_plans_for_network_cabling_upgrade_-....pdf PDF
Attachment_D_-_2017-03-23_DFRC_network_cabling_numbers.pdf PDF
Attachment_H_-_CPI_wall_mounted_racks.pdf PDF
Attachment_G_-_Rack_Layout_USDA_DFRC.PDF PDF
Questions&Answers.pdf PDF
Amendment_1.pdf PDF
Building_Telecommunications_Cabling_System_Specifications.pdf PDF
Attachment_B_-_0096_Dairy_Forage_Research_Center_-_Fiber_Riser_Diagram.pdf PDF
General_Specifications.pdf PDF
Attachment_J_-_Scaled_DFRC_Floorplans.pdf PDF
Attachment_E_-_UW_Installation_Guidelines_for_Wireless_Access_Point_Moun....pdf PDF
Attachment_F_-_Wireless_Installation_Example.pdf PDF
Attachment_I_-_DFRC_Ceiling_tile_removal_and_replacement.pdf PDF
Attachment_C_-_DFRC_wireless.pdf PDF
SOW_DFRC_Network_Cabling_Upgrade.pdf PDF
Wage_Determination.pdf PDF
AD-1197.pdf PDF
PII_Sheet.pdf PDF
Daily_Inspection_Form.pdf PDF
ARS372.pdf PDF
Attachment_A_-_DFRC_Floorplans_Updated_March.pdf PDF
General_Specifications.pdf PDF
Attachment_B_-_0096_Dairy_Forage_Research_Center_-_Fiber_Riser_Diagram.pdf PDF
Past_Performance.pdf PDF
AG-32SC-S-17-0027.pdf PDF
of0306.pdf PDF
ARS371.pdf PDF
Building_Telecommunications_Cabling_System_Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOT WORK PERMIT

NEEDED WHEN ANY SPARK OR HEAT PRODUCING EQUIPMENT IS TO BE USED

Project Name:

Name of Contractor’s Firm:

Contractor Contact Name:

Contractor Contact Telephone Number

Date:

Building/Location:

Work To Be Done:

Any Special Precautions:

Fire Watch Required: Yes No The location where the work is to be performed has been examined, necessary precautions have been taken, and permission is granted for this work.

A. Signed

(Contractor Individual Responsible for Authorizing Hot Work)

Permit Expires: (Date)

Time Hot Work Started: Time Hot Work Completed:

1. FINAL CHECK-UP

Work area and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite sides of walls) were inspected 30 minutes after the work was completed and were found fire safe.

Signed___________________ Date __________________ Contractor’s Fire Watch)

(Page 1 of 2)

i. ATTENTION

Before approving any cutting and welding permit, the contractor’s authorized representative or their appointee shall inspect the work area and confirm that pre-cautions have been taken to prevent fire in accordance with NFPA Standard No. 51B.

a) PRECAUTIONS

• Sprinklers are in service where installed

• Cutting and welding equipment in good repair

• Within 35 feet; floors swept clean of combustible, no combustible material or flammable liquids, all wall and floor openings covered, and covers suspended beneath work to collect sparks

• When working on enclosed equipment and in confined space, equipment and area is free of flammable vapors

• Fire watch provided during and 30 minutes after operation (60 minutes for torch applied roofing operations)

• Portable fire extinguisher with adequate rating available in the immediate vicinity

• Standpipe system in service where installed

• Protection of any sprinkler heads when hot work is in close proximity

• Smoking prohibited in immediate vicinity

• Non-combustible shields provided when hot work is done near combustible walls, partitions, floors, roofs

• Prohibition of hot work on pipes contacting combustible walls

• Personnel trained in use of equipment including portable fire extinguishers and sounding a fire alarm

• Final check-up conducted after 30 minute

(Page 2 of 2)

A. Signed
1. FINAL CHECK-UP
i. ATTENTION
a) PRECAUTIONS