HOT WORK PERMIT
NEEDED WHEN ANY SPARK OR HEAT PRODUCING EQUIPMENT IS TO BE USED
Project Name:
Name of Contractor’s Firm:
Contractor Contact Name:
Contractor Contact Telephone Number
Date:
Building/Location:
Work To Be Done:
Any Special Precautions:
Fire Watch Required: Yes No The location where the work is to be performed has been examined, necessary precautions have been taken, and permission is granted for this work.
A. Signed
(Contractor Individual Responsible for Authorizing Hot Work)
Permit Expires: (Date)
Time Hot Work Started: Time Hot Work Completed:
1. FINAL CHECK-UP
Work area and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite sides of walls) were inspected 30 minutes after the work was completed and were found fire safe.
Signed___________________ Date __________________ Contractor’s Fire Watch)
(Page 1 of 2)
i. ATTENTION
Before approving any cutting and welding permit, the contractor’s authorized representative or their appointee shall inspect the work area and confirm that pre-cautions have been taken to prevent fire in accordance with NFPA Standard No. 51B.
a) PRECAUTIONS
• Sprinklers are in service where installed
• Cutting and welding equipment in good repair
• Within 35 feet; floors swept clean of combustible, no combustible material or flammable liquids, all wall and floor openings covered, and covers suspended beneath work to collect sparks
• When working on enclosed equipment and in confined space, equipment and area is free of flammable vapors
• Fire watch provided during and 30 minutes after operation (60 minutes for torch applied roofing operations)
• Portable fire extinguisher with adequate rating available in the immediate vicinity
• Standpipe system in service where installed
• Protection of any sprinkler heads when hot work is in close proximity
• Smoking prohibited in immediate vicinity
• Non-combustible shields provided when hot work is done near combustible walls, partitions, floors, roofs
• Prohibition of hot work on pipes contacting combustible walls
• Personnel trained in use of equipment including portable fire extinguishers and sounding a fire alarm
• Final check-up conducted after 30 minute